Loading...
Item C02C ounty of M onroe {f `° " rel BOARD OF COUNTY COMMISSIONERS n Mayor David Rice, District 4 The FlOnda Key y m 1 �� Mayor Pro Tem Sylvia J. Murphy, District 5 Danny L. Kolhage, District 1 George Neugent, District 2 Heather Carruthers, District 3 County Commission Meeting July 18, 2018 Agenda Item Number: C.2 Agenda Item Summary #4354 BULK ITEM: Yes DEPARTMENT: Engineering / Roads TIME APPROXIMATE: STAFF CONTACT: Debra London (305) 453 -8754 N/A AGENDA ITEM WORDING: Approval to negotiate a contract with WSP USA Inc., the highest ranked respondent for Construction Engineering and Inspection Services (CEI) for the Pigeon Key Ramp Rehabilitation Project. If successful negotiations cannot be reached, approval is requested to negotiate a contract with the next highest ranked respondent until successful negotiations are reached. ITEM BACKGROUND: The County advertised an RFQ for Construction Engineering and Inspection Services (CEI) for the Pigeon Key Ramp Rehabilitation Project on April 19, 2018 and received 5 responses on May 23, 2018. The selection committee met in an advertised meeting on June 11, 2018 to rank the responses. WSP USA, Inc., was the highest ranked respondent. The ranking score sheet is attached. FDOT provided approval to negotiate with WSP USA, Inc. as the highest ranked respondent for CEI services on June 12, 2018. The Pigeon Key Ramp Rehabilitation construction project plans and specifications are complete and awaiting FDOT Notice to Proceed for construction bids. The Pigeon Key Ramp project will be advertised for construction bids in early summer 2018 with project completion estimated to be July 2019. The ramp replacement construction plans maintain the overall appearance and basic design of the original. The Pigeon Key Ramp (FDOT bridge 4 904480) was built in 1938 and is a contributing resource to the National Register of Historic Places (NRHP) listed Pigeon Key Historic District. The ramp connects the Old Seven Mile Bridge to Pigeon Key, providing the primary access to and from the island. Due to deterioration of the ramp, it has been closed and out of service for both vehicles and pedestrians. In the ramp's present condition, more than 70 percent of the timber components are not suitable for reuse or rehabilitation, and the remaining 30 percent are in decaying condition and require replacement. Currently, access to the island has been maintained by the Pigeon Key Ferry service. The Federal Highway Administration (FHWA) funding of the design portion of the project required that the ramp be capable of supporting a minimum vehicular live load equivalent to an SU2 (17 -ton) vehicle per American Association of State and Highway Transportation Officials (AASHTO) standards. Re- establishing the historic travel corridor that connected Pigeon Key to the Old Seven Mile Bridge fulfills NRHP requirements such as: remedying the safety risks and aesthetic impacts due to the existing deteriorated condition of the ramp; providing improved and public accessibility; and providing for access by emergency services to protect visitors and Pigeon Key Foundation staff. On February 17, 2017, the Monroe County Planning Department provided Historic Preservation Resolution HP5 -17, approving a special certificate of appropriateness to rehabilitate and substantially replace the Pigeon Key Ramp based on recommended Alternative 1 below. On March 13, 2017, the Florida Director and State Historic Preservation Officer provided a no adverse effect concurrence for the rehabilitation of the Pigeon Key Ramp based on recommended Alternative 1 below. In December of 2015, Metric Engineering provided a Bridge Evaluation Report with 3 Alternatives: Alternative l : Rehabilitate Span 1 & Replace Spans 2 through 23 with Timber Construction to Closely Resemble Original Aesthetics and Geometry. (2015 Estimate $1,648,214). Alternative 2 : Rehabilitate Span 1 & Replace Spans 2 through 23 with a (2) -120ft long, Prefabricated Steel Truss Spans. (2015 Estimate $2,078,622). Alternative 3 : Rehabilitate Span 1 & Replace Spans 2 through 23 with Mechanically Stabilized Earth (MSE) Walls. (2015 Estimate $1,450,565). In March of 2014, the BOCC entered into an agreement with the FDOT for repairs to the Old Seven Mile Bridge 2.2 mile segment that connects Knights Key to Pigeon Key. These repairs are in progress. PREVIOUS RELEVANT BOCC ACTION: January 17, 2018 — the BOCC approved a LAP agreement with the FDOT in the amount of $2,075,000.00 to include construction and construction engineering and inspection services for the Pigeon Key Ramp Rehabilitation Project. July 20, 2016 — the BOCC approved Amendment 1 for a lead survey to the contract with Metric Engineering, Inc. for Engineering Design and Permitting Services for the Pigeon Key Ramp Rehabilitation Project and the transfer of funds between tasks resulting in no increase to the contract. April 15, 2015 — the BOCC approved a contract with Metric Engineering, Inc. for Engineering Design and Permitting Services for the Pigeon Key Ramp Rehabilitation Project in the amount of $205,959.71. April 15, 2015 — the BOCC approved a Supplemental LAP agreement with FDOT in the amount of $86,447.71 to increase the grant funds allocated to the project due to enhanced design requirements by FHWA /FDOT. February 18, 2015 — the BOCC approved negotiations for a contract with Metric Engineering, Inc. for Engineering Design and Permitting Services for the Pigeon Key Ramp Rehabilitation Project. October 17, 2014 — the BOCC approved a Local Agency Program (LAP) agreement with the Florida Department of Transportation (FDOT) for grant funds in the amount of $100,000 for engineering design and permitting services for the ramp from Old Seven Mile Bridge to Pigeon Key Island. CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: Approve negotiations for CEI contract with WSP USA Inc. DOCUMENTATION: 6.11.18 SC meeting final ranking sheet view from water pigeon key ramp FINANCIAL IMPACT: Effective Date: July 18, 2018 Expiration Date: 30 days after final completion and approval of FDOT LAP agreement closeout. Total Dollar Value of Contract: to be determined Total Cost to County: Current Year Portion: Budgeted: Source of Funds: 125 - 22551 - 530490 CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: $225,000 CEI portion of LAP Agreement County Match: Insurance Required: Additional Details: FDOT LAP Agreement N/A REVIEWED BY: Judith Clarke Completed 06/22/2018 10:49 AM Christine Limbert Completed 06/22/2018 2:47 PM Budget and Finance Completed 06/25/2018 8:52 AM Maria Slavik Completed 06/25/2018 9:34 AM Kathy Peters Completed 06/25/2018 1:49 PM Board of County Commissioners Pending 07/18/2018 9:00 AM F- 178 -0- 201 /LA CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES FOR THE PIGEON KEY RAMP PROJECT FINAL RANKING SHEET r -. .. 1 � 91 @m 1 i Total _ 0 0 0 .. - / J l 1 _m e gr-lmmmm 1 illl!llll —; v; c1 ; v o s = ; a l w m o ; LA U, ---------------- t---------- i----------- I----------- F------- 5 c, ' :--- t---------- i----- - - - - -; , ----------- - - - - -' Total Score ' ---------------------- *---------- y----- - - - - -Y Rank ' ' ' ' ----------- - - - - -' ; ; ; ; Total Score 1 5 ' I I ; ----------- - - - - - ' - - - -' - - - - -' --- - - - - -- ' --- - - - - -- - - -- ' ' Rank a I ; ; ; I Total _ 0 0 0 .. - / J l 1 _m e gr-lmmmm 1 illl!llll