Loading...
Item C15C ounty of M onroe {f `° " rel BOARD OF COUNTY COMMISSIONERS n Mayor David Rice, District 4 The FlOnda Key y m 1 �� Mayor Pro Tern Sylvia J. Murphy, District 5 Danny L. Kolhage, District 1 George Neugent, District 2 Heather Carruthers, District 3 County Commission Meeting July 18, 2018 Agenda Item Number: C.15 Agenda Item Summary #4418 BULK ITEM: Yes DEPARTMENT: Engineering / Roads TIME APPROXIMATE: STAFF CONTACT: Debra London (305) 453 -8754 N/A AGENDA ITEM WORDING: Approval to negotiate a contract with WSP, USA Inc., the highest ranked respondent for Engineering Design and Permitting Services for the Sea Level Rise Pilot Project. If successful negotiations cannot be reached, approval is requested to negotiate a contract with the next highest respondent until successful negotiations are reached. ITEM BACKGROUND: The County advertised an RFQ for Engineering Design and Permitting Services for the Sea Level Rise Pilot Project on April 17, 2018 and received 8 responses on May 22, 2018. The selection committee met in an advertised meeting on June 28, 2018 to rank the responses. WSP, USA Inc. was the highest ranked respondent. The ranking score sheet is attached. The County requires engineering design and permitting services for stormwater management systems for the Sea Level Rise Pilot Project with specified roads in the Twin Lakes subdivision in Key Largo and the Sands Subdivision in Big Pine Key. This pilot project needs to be designed to lessen the frequency or severity of flooding, and decrease predicted flood damage. The project design will include roadway elevation, reconstruction of base and asphalt, striping, signage and other items as required by FDOT design standards. The County adopted an interim standard methodology for adapting transportation infrastructure for sea level rise in January, 2017, based on the Sea Level Rise Pilot Project Report. The recommended drainage solution is a pretreated pressurized closed system. The Twin Lakes specified roads will be designed to 5 inches of elevation NAVD88 and the Sands Community specified roads will be designed to 11 inches of elevation NAVD88. There will be a need to meet with environmental regulatory agencies such as South Florida Water Management District, Florida Department of Environmental Protection and the Florida Keys National Marine Sanctuary in the pre design phase and there may be a need for public information /impact meetings during the design phase. Property surveys may need to be conducted in order for construction easements to be executed and driveway connectivity will need to be addressed. The project may be eligible for a Federal Emergency Management Agency Hazard Mitigation Grant (FEMA HGMP) and therefore the contract includes federal contract requirements. PREVIOUS RELEVANT BOCC ACTION: November 20, 2013 — The BOCC approved a contract with Erin L. Deady P.A. to develop a Sustainability Action Plan /Climate Change and Energy Savings Initiatives. November 22, 2016 — The BOCC approved Amendment No. 9 to the Sustainability Action Plan /Climate Change and Energy Savings Initiatives contract to finalize tasks for the Pilot Roads /Tidal Flooding Roads Demonstration Project for specified roads in the Twin Lakes subdivision in Key Largo and the Sands Subdivision in Big Pine Key. January 18, 2017 — The BOCC approved by resolution the final report of the Tidal Flooding Roads Demonstration Project, which recommends road improvements in two communities (Twin Lakes subdivision in Key Largo and the Sands Subdivision in Big Pine Key) and to move forward with the design phase to implement the recommendations. CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: Approval to negotiate a contract with WSP, USA Inc. for Engineering Design and Permitting Services for the Sea Level Rise Pilot Project. DOCUMENTATION: SLR RFP final scoresheets FINANCIAL IMPACT: Effective Date: to be determined Expiration Date: : to be determined Total Dollar Value of Contract:: to be determined Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: County Match: Insurance Required: Additional Details: N/A REVIEWED BY: Judith Clarke Completed 06/29/2018 3:42 PM Christine Limbert Completed 06/29/2018 6:33 PM Budget and Finance Completed 06/30/2018 10:28 AM Maria Slavik Completed 07/02/2018 7:19 AM Kathy Peters Completed 07/02/2018 8:40 AM Board of County Commissioners Pending 07/18/2018 9:00 AM RFQ- 177- 0- 2018/la ENGINEERING DESIGN AND PERMITTING SERVICES FOR THE SEA LEVEL RISE PILOT PROJECT FINAL RANKING SHEET 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 V I 1 1 1 I 1 1 1 O 1 1 QQ I 1 1 1 1 1 I 1 1 1 1 1 1 ! 1 1 1 I 1 1 1 1 1 1 1 1 L I 1 1 1 1 1 1 1 f O U ; E ; ; O . i V . O-; 1 Ln 1 . 1 1 1 1 Ln 1 7 1 T I 1 1 1 ! 1 RESPONDENT _Engineering Design and Permitting cu v. C. SLR Projec. Y . Y 1 cc l _ ; ; I ; - - - -- 1 1 1 1 1 1 1 1 1 ------ -- - - - - -- _ L------- L ----------- J----- '' -''_L L J J_ - - - -- -- L ---------- ------------------ --- ----------------- - - - - -- Total -- - - -- - i Rhonda Haag ---------- - - - - -- ------------------ --------------- - -- - - °- - Total 1 L I J --- ---- -- -L- _ - - - -- -- - - - -_- -- ---- ____- _•�---- -' - -_- ► - - - - -_ __ _ "- - - - -__ ____ " - - -- _-- ' -' - -- - __- - - - - -- ®_-- - - Ra nk - - -- - _- - - - - -- ----------------------------------------------------------- - - - - -- -- -------------------------------------------------------------------------}------- I --- }---------- i---- - - - - -- ;----------- F----- - - - - - ---------- i------ - - -- -----------F----------}----------i--------- Mike Roberts ------------------------------------------------------------ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 4 1 1 1 ® i° Total Score . F ; ; t 1 1 1 1 1 1 1 # '------ -- -_ -- J----- ----- i ----- L---- - - - - -- ---- - - - - -- i----------- E---------- }---- ------ i----- - - - - - 1 - - -- -- h---------- }---------- i--- - - - - -° 1 1 1 Rank --------------- - - - - -- - 1 1 I 1 1 1 I 1 1 1 1 1 1 1 1 ! 1 1 1 1 1 1 -----_-"-----------------------------------------'-------------_-'------ L-'-------- 1----- '--- _J----------- F_-- - - - - -- F--_------_ 1-_-------- •1_--------- J---- - - - - -- ---------- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Debra London Total Score ------------------ - - - - -- 1 1 1 I I 1 1 1---- ------ 1 1 ! 1 � --- - - - - -- f 1 1 1 1 1 1 I 1 1 1 � 1 1 1 ' --_-®®-----®®.«--------- 1 1 1 1 I 1 1 1 Rank 1 1 1 1 1 1 1 ® 1 1 1 1 1 ------------ -- '-------- -' - - -° -------------- - - - - -- - - -- L_---- L ---- 1 - - - -- - ___J - - - - -- J -' - ------- L---------- i ------ ---- J---_------• L-'-------- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 L---- '----- I 1 ---------- f 1 I 1 1 1 TOTAL POINTS p 1 1 1 1 f . ' . - - - -- ----------------- - - - - -- --------------------------------------- - -1 - -- ----- } - - - -- --- -i - - -- - - -- - - -- - - - -- - -- - -- i- -- — - -- -- } - - -- i----- - - - - -i -}----------}----------i--------- I gg 1 1 1 1 1 1 1 1 RANKING; 1 1 gnature of election Comitte.e M ember Date 1# a Signature of Selection Committee Member Date .ter ., Signature of Se ectio Com tttee Member Date ' e