16th Change Order 07/30/2018MONROE COUNTYIENGINEERING/ PROJECT
14ANA
CONTRACT CHANGE ORDER
PROJECT TITLE- CHANGE ORDER NO- 16
The Redevelopment of Semstein Park INITIATION DATE, as 26f�, 2018
I
t 00
W, &*An, 0, 9011"', 1 1111606"1", 0,9110.1 "
I ne �uontract bum) (GfancunTeu indA11111in e-rlue) plul [0 Inng kf1dn,&,V 'I'mov
The (gontract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order-- $7,693.52
The new (qqintr Surn) (Guaranteed Maximum Price) including this Change Order is
The Contract Time will be (increased) (decreased) (unchanged) by. 00 Days
The date of Substantial Completion as of the date of this Change Order is... July 6, 2018
Detailed description of change order and justification:
Addition of alurninurn fence around Cisterns and reclaimed water based il'r- tion 0
rev ,LlLpq �110 a c s 4 e�pnient. Addition of alurninn M e tO efqptOcal stg-p a q�QsUre
_ggL — a -- _gf� 'Lg -P 4
7 17o tr
ARCHITECT:
C William Ho Date
CONTRACTOR:
rti 6z, y urke ate
DIRECTOR PROJECT MANAGEMENT' L44
C r nick at
COUNTYIASSISTANT ADMINISTRATO
Roman G si, Kevin Wilson, Christine Date
Change Order Attachment per Ordinance No. 004-1999
Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: Fence needed around electrical and pressurized water equipment to
discourage public access.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
Change Order exceeds $50,000 or 5% of contract price (whichever is greater).Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
Change OWNER X
Order
Request ARCHITECT
CONTRACTOR X
FIELD
AIA Document G710 11 bURKE
SUBCONTRACTOR Construcrion Group Inc.
PROJECT: Bernstein Park CHANGE ORDER NUMBER: 041
6751 5th Street DATE: 5/24/2016
Stock Island< Florida 33040 CONTRRACTOR PROJECT#: 1611
CONTRACTOR: Burke Construction Group, Inc.
10145 N.W. 19th Street
Doral, Florida 33172
Prime Contract Change Order #041: Additional Aluminum Fencing Per
owners request
TO: Monroe County Engineering FROM: Burke Construction Group, Inc.
1100 Simonton Street 10145 NW 191h Street
Key West, Florida 33040 Miami Florida 33172
DATE CREATED: 5/ 24 /2016 CREATED BY: Armando Silveira (Burke Construction Group,
Inc.)
CONTRACT STATUS: Pending - In Review REVISION: 0
DESIGNATED REVIEWER: Armando Silvelra (Burke Construction REVIEWED BY:
Group, Inc.)
DUE DATE: REVIEW DATE:
INVOICED DATE: PAID DATE:
SCHEDULE IMPACT: 15 days EXECUTED: No
CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $ 7,593.62
DESCRIPTION:
Provide additional Aluminum fencing around Reclaim Water tanks and by electrical disconnect at Community Building.
ATTACHMENTS:
+! 0041Rri l.A,lttmi.nw_Fgnr ,prop s44-pal_
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO # Title Schedule Impact Amount
041 Additional Aluminum Fencing Per owners request 7,593.62
- TOTAL: $ 7,9.62
CHANGE ORDER LINE ITEMS:
PCO # 041 : Additional Aluminum Fencing Per owners request
# Coal Code Description Type Amount
1 02-832 - SITE PICKET FENCE (M) Aluminum Picket Fence Material Materials $ 2,59310
2 02-833 - SITE PICKET FENCE (L) Install Additional Aluminum Fence and gates Labor S 4,310,00
Subtotal•.
56AU29
Overhead: .00% Apples to all line Item types.
345,18
Pront: 6.00% Applies to all line Item types.
345.18
Grand Total:
$7,693.12
Burke Construction Group, Inc. page 1 of 2 Printed On: 5/24/ 2018 12 :37 AM
Change OWNER X
Order
Request ARCHITECT
CONTRACTOR X
FIELDb U rK--"4 K E
A/A Document G710
SUBCONTRACTOR fii€i�tii'll�'don ,-,,,p Inc.
The original (Contract Sum) $ 7,921,975.00
Net change by previously authorized Change Orders ($71,487.25)
The contract sum prior to this Change Order was $ 7,5 ,487.75
The contract sum would be changed by this Change Order in the amount of $ 7,593.62
The new contract sum including this Change Order will be $ 7,858,081.37
The Contract Time will be (increased) (decreased) (unchanged) by 15 days
The date of Substebtiel Completion as of the date of this Change Order therefore Is
Master Permit Issue Date: Contract Base Days: Added Time Above:
Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount
for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime,
acceleration and or impact costs, unless specifflcally stated. The right Is expressly reseved to amend and make claim for any and all of these related
Items prior to final settlement of this contract.
Bill Horn (Architect) Monroe County Engineering Burke Construction Group, Inc.
915 Eaton Street 1100 Simonton Street 10145 NW 19th Street
Key West Florida 33040 Key West Florida 33040 Miami Florida 33172
SIGNATURE DATE
SIGNATURE DATE SIGNATURE
Burke Construction Group, Inc. page 2 of 2 Printed On: 5/24/ 2018 12 :37 AM
Em
Ultra Aluminum Mfg., Inc.
2124 Grand Commerce Drive
Howell, Michigan 48855
517-548-6755 Fax: 517-548-6756
Prepared By: Dan
Prepared for: BURKE CONSTRUCTION GROUP
10145 NW 19th STREET
DORAL, FL 33172
P.O. Number: BP Add 5/21/18
Quotation
-1,I
Prepared On
5/21/2018
Quantity
Description Quotation Color: Black
Price
Amount
UAF-200 - Flat Top Industrial, 4" Spacing, Fully Weld at Each Cross Member,Standard b
6
48" H x 6' W, 3 Rails
152.60
915.0
4
Line Posts - 3" Square x 5' x .125 Cut to 51" with Welded Flanges
40.51
162.04
2
Blank Posts - 4" Square x 5' x .125 Cut to 51" with Welded Flanges
51.26
102.52
2
Blank Posts - 4" Square x 6' x .125
59.63
119.06
2
UAF-200W - Walk Gate, Ind., 4" Sp., 48" H x 36" W - 3 Rails
192.05
384.10
4
Caps - 3" Square
0.00
0.00
4
Caps - 4" Square
0.00
0.00
4
Caps - 2 1/2" Square
0.00
0.00
164
Screws - #8 x 1" Self Drilling (per Hundred)
0.00
0.00
2
Hinges - 2" Aluminum Hinge (pairs)
0.00
0.00
2
Latches - Lokk Latch
0.00
0.00
2
Gate Latches - Drop Rod with Guides
12.48
24.96
2
Floor Flanges - 5" Welded Flange
15.71
31.42
2
Floor Flanges - 6 " Welded Flange
75.00
150.00
18
Rail Ends - Standard - Industrial
3.31
59,53
18
Rail Ends - Cup - Industrial
3.31
59.53
18
Rail Ends - Plate - Industrial
3.31
5.5
Notes
Sub -Total:
$2,068.29
Premium Ship to Remote Location
Other:
$100„00
8" x 8"
Tax:
$0.00
Flanges
Freight:
$425.00
Total:
$2,593.29
Quotation valid for 30 days from Date prepared.
FENCE MASTERS, INC.
3550 N. W. 54Ta STREET
MIAMI, FLORIDA 33142
DADE: (305) 635-7777 * BROWARD (954) 463-3172 * FAX: (305) 635-7887
Date: May 23, 2018 Name: Armando Silveira
Company: Burke Construction Group Job Name: Bernstein Park
Address: 10145 NW 19th St
City: Doral, FL 33172 Job Address: Stock Island
Phone: (305) 468-6604, Fax:
We propose, subject to acceptance by Fence Masters. Inc., (seller) to perform work in accordance with quantities and sizes listed
below. Before erection is begun, purchaser is to establish property line stakes and grade stakes and to remove all obstructions that
may interfere with erection. Purchaser is responsible for location ofany underground lines. Fence Masters, Inc. is not responsible for
any damage to unmarked lines After the contract is executed and received by Fence Masters, Inc„ notice to proceed is to be provided
by purchaser at least 14 days prior to date of commencement of the work In order to avoid unforeseen conflicts in contract language,
by signing this contract you are waiving any obligation on our part to sign any contract or otherdocument that you subsequently may
offer, provide, or demand. This contract will be the only contract for this job and is binding on both parties.
Install Gwncrs Material
6 — 6'x 4' High aluminum fence panels on top of wall (anchors by others) $2,935.00
2 — Gates 4' High aluminum gates with associated hardware. $1,375.00
Price complete $4,310.00
IMPORTANT PRICING NOTE:
Due to recent conditions beyond our control relating to raw steel material availability, this price is subject to change.
Actual price will be based on receipt date of executed contract and mill price increases if any.
Permit Costs are not included in this price, and if required, will be added as a Change Order to this contract
Subject to credit approval by Pence Masters, Inc. Terms are net on billing Interest of 1 h % per month will be charged on accounts past due, Title to the property as
addressed by this proposal shall remain in the seller, Fence Masters, Inc, until payment in full is received, pursuant to the term hereof. This is a retain title contract.
In the event the money due hereunder, or any portion thereof, has to be collected on demand ofan attorney or by suit, the purchaser agrees to
pay all costs of collection including interest at the highest legal rate and reasonable allorney s fees.
Approved & Accepted: Fence Masters, Inc. (Seller)
fly
Signature
Robert S. Miller, Project Manager
Approved & Accepted by Purchaser:
Burke Construction Group
Signature
Armando Gomez,
Steel & Aluminum Picket Fence ** Chain Link ** Highway Guardrail ** Site Bollards ** Access Control Systems
Since 1947