Item C1 3.14 Capital Improvements Monroe County Comprehensive Plan Update 1 3.14 CAPITAL IMPROVEMENTS GOAL 1401 Monroe County shall provide and maintain, in a timely and efficient manner, adequate public facilities for both existing and future populations, consistent with available financial resources and the other elements of the Comprehensive Plan. {9J 5.016f .$163.3177(3)(01), F.S.1 Objective 1401.1 Monroe County shall provide the capital improvements necessary to correct existing deficiencies, to accommodate projected future growth, and to replace obsolete and worn- out facilities, in accordance with an adopted Capital Improvements Program. f9J- 5 f & 163.3177(3)(ba)11., F.S.1 Policy 1401.1.1 , 1997, Monroe County shall feiseupdate annually the existing County Capital Improvements Program to incorporate the improvements identified in the Five -Year Schedule of Capital Improvements included - n Table 4.1 . _.. • . .. _ _ .. •. .J &163.3177(3)(a)5.(b), F.S.1 Policy 1401.1.2 Monroe County shall annually update the Comprehensive Plan Five -Year Schedule of Capital Improvements. Proposed revisions to the Schedule, including those addressing the replacement and renewal of capital facilities, shall be evaluated,— and updated, and rankod in accordance with the following considerations (not listed in order of priority): 1. consistency with the relevant elements of the Comprehensive Plan; 2. the elimination of public hazards; 3. consider sea level rise projections as they relate to transportation and bridging projects in particular; 4. the County's need for financial expenditures for infrastructure improvements within or proximate to vulnerable areas, 3-5. the elimination of existing deficiencies; 4 6. financial feasibility including the impact on the annual operating and capital budgets; 6 7. the location in relation to the Future Land Use Map; 6-8. accommodation of the demands from redevelopment and new development; Capital Improvements 1 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update 779. the consistency of the improvement relative to the plans of state agencies and the South Florida Water Management District; and 8710. the availability of other revenue sources including, but not limited to, FDOT Project funding and FDOT Traffic Operations funds from District Dedicated Revenue (DDR) sources. Revisions to the schedule shall be incorporated into the Capital Improvements Program on an annual basis. {9J 5.016f 163.3177(3)(c)1 and 3]a)5.(b), F.S.{ Policy 1401.1.3 Capital improvement projects required to correct existing facility deficiencies shall receive priority over those projects required to serve future development. {9J 5.0104163.3177(3)(41 -., F.S.] Policy .4 • • 1 1 1 -- --• - - ■. • - !! Poliiey140444 improvements to mile markors 80 to 90 section of US 1 by the Florida ■ ■ • <The Remainder of This Puke Intentionally Left Blank> Capital Improvements 2 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update I Five -Year Schedule of Capital Improvements Table (Adopted by BOCC January 16, 2014 - Ordinance -2014) MONROE COUNTY, FLORIDA Schedule of Capital Improvements Fiscal Year 2014 - 2018 I TRASNPORTATION (Policy 301.1.1) Road & Bridge Projects project Appropriated Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Florida 0eparti ent of Transportation eR 96II Soo th RI" 6 PA fist of SR 7 Briaee 9904120 Neaair Briage-Repair,fRehm. 12,261 502,215 - - - 514,476 Garrison B�rR Bridge Repair Bna6e- Repai..fBet.o. - 260,000 - - - Garrison Garrison 260,000 Manx caurty Rtnie areaRaroon - DO 6 Caaarxtion Ono_ Prelim Engineering 200,000 350,000 200,000 200,000 - 950,000 liforrne Co ureyTrancSignalMaiati"Dperstions Traffic Sigma 59,977 83,285 64,220 66,220 68,570 342,272 Monty 00 Contingency 9 Resurface Reaa Rung 10.000 - - - Worm tbwd10,000 Ma faRywiOe DON Mx Construction 50,353 - - Macrae ur 800,000 - 850,353 Macrae C6.at wine Drainage Drainage anoroee 222,418 39,140 254,469 - 286,012 802,039 Monte CRy.Rae Ong *Ainterence 37,991 39,131 40,305 41,514 42,759 201,700 Macrae Cau%tysaae Rcurha n9 rar-et filarial ^e:afrcn6 - - 48,740 30,583 1,000,000 1,079,323 Manx Countywide Traffic Operations Traffic Opp imwwe - 372,860 - 327,300 - 700,160 oa SR 949 1..q A amuse Reps ar rBr irr RepaRenoo. 9,796 - - - • 9,796 Reserve far Me Growth Wit Sm Ca Outreach (tor Future Rroj Renarsang - 966,453 1,469,844 1,490,270 1,570,270 5,496,837 SR 5 MM 99.5 to MM 1015 Lighting 30,000 - 345,348 - - 375,348 SR 5 MM 241 to M ia M 25 Drainage nnaamrt e: 1,438,183 - - - - 1,438,183 SR 5 MM 59.9 to MM 6825 Renat o^g 35,378 - - - - 35,378 3R 5 O/M uto M .3M ass Resurfaang 317,277 - - - - 317,277 SR] I 6&.27 to MM :r 71292 RtareeRg 6,120,240 - - M. - - 6,120,240 SR 7 MM 90.6 to MM ar6 97 Lcaoil t 936,072 217,577 - - - 1,153,649 1959.969330 R ung 623,621 - - - - 623,621 SR 7 M 97t0 MM 996 ng 488,020 112,198 - - - M 600,218 395 MM 94.6 t0 MM 1032 Resurfacing $4,710 - - - - 84,710 SR PAM 42 to NAM 93 Resurfacing 85,912 - - - - 85,912 SR 5 MM 99.6 to MM 1063 t.awtocmg 952,963 206,000 - - - 1,158,963 SR 7 S. or Wag Beach Spa to M. doing Beath 8ha Reaarenng 684,064 - - - - 684,064 SR ] MM S to MM 911 ReaahrDng 7,849,717 1,133,000 - - - 8,982,717 ;a] MM 2177 to MM 3296 ta'a'PR6 - 110,000 - 372,501 - 482,501 SR7 1 AM 92 Reaate°ng 135,901 - - - - 135,901 sR 5 MM 27.4to MM 29.3 Renewing 202,441 - - - - 202,441 SR 7 Over title Duck fey Cannel eiEge Repair Sri gN4epe r,OW ao. 2,059,833 - - - - 2,059,833 SR 5 over ORio-0/1aa..1 Channel Snap R296r SriagNre:peiri Rerreo. 277,597 - - - - 277,597 SR 5 7 Mre ariege over Miner Owner Br;age Repair anage-R.epair ?Rehm. 1,047,132 7,346,731 1,475,032 9,868,895 1 Capital Improvements 3 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total 5115 nn 1,1 U :c.116 rtla ba •rh4uk ended MM ii at. r aA f Arell 1,900,575 - - - - 1,900,575 5115 xrn rril MM 15 MUM 163 NM. Nall Troll 504,000 - _ - - 504,006 5R 5dndrnMMVSSeu PAIR xS dw ran /lydl 145,535 - - - - 145,535 5115 Mom 5. wru..rY lend w 5. uru.. banal Sidewalk 1,040,365 118,450 - - - 1,158,815 5R Same rrRe Than aim .! er Clunnol o &A Mere Byrd R ',..tIaeht. 302,750 - - - - 302,750 11 Owe r Wu Mee Chanel & RIde aSO WDd s "MOM ro „wA.h R Bade. 889,861 173,040 - - - 1,062,901 5115 n .v ! a.d 1-I R. ,t nca 6 a..lake NW adman HadenRe,.k/llrht6. 130,347 _ _ - 130,347 Subtotal - FOOT 27,838,158 5,730,481 9,769,657 4,803,420 2,967,611 51,109,327 Revenues - FOOT , 27,838,158 5,730,481 9,769,657 4,803,420 2,967,611 51,109,327 Monroe Carney dwd Wield. femme S 22000 -000 S - 55, 000,000 55,000,000 53,500,000 51,000,000 4,500,000 22,000,000 wd mherrw..5.re 15.000 -000 5500,000 52 _500000 53.500.000 4,500,000 18,000,000 Ld.! Mel T.. S0 SO 10 1500.000 - 500,000 11M - iMd.1 *Mee Fund elan., SO 12 500000 11000000 SO - 3,500,000 Tuts nn.,ue 55,000,000_ 55,000,000 53, 500,000 54,000,000 54300,000 22,000,000 d.uwM adds.arda..rr. �Fda r 5 950 S 20,480 8 25 ,000 104,520 - - - 929,520 Mamma 1wu.u. e Fund tame 825,000 104,520 - - _ Le./ �r . lemma di 929,520 US 1 aarold.11ieralerd Um PWel, S 254011 S 423.895 1,087 1,001,286 - - - 2,089,186 Rna urs u5 voc..r,..,n 1,053,021 - - - 1,053,021 1iu dssr lineal ..,n „N.a Fr Fuml dW..v 34,879 1,001,286 - - - 1,036,165 Tumr Anomie 1,087,900 1,001,286 - - - 2089186 a vas_ ea. Lams S 1001404 1 2829,8 1,850,003 871,443 - - - 2,721,446 1r.e num LSO dwd».n Impact mw w 174 d,.l.M:. 1,850,003 871,443 - - - 2,721,446 urwaynetir5✓enel. 5 1.178.166 5 80,000 1,098,166 - - - - 1,0988166 , R„en.. 145 F edema i,,.,,u 1,098166 - - - - 1,098,166 Old 5117MH.soe A Sri* S 860160 5 315.250 545,510 - - - - 545,510 1 Capital Improvements 4 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total US fi.d.ral,imd, 545,510 - - - - 545,510 Tom's NNW n de. .n,.i 7d S 3,001636 S 1831,662 176,974 - - - - 176,974 Nnoormes US slam TANNIN 175,974 - - - - 176,974 No *... key &Saga S 6; S 171435 6,335,948 - - - - 5,335,948 Ammar, 1 VIAL. "° 5,270,013 - - 5,270,013 VW Two T., 1.065,935 - - - - 1,065,935 TufO1 4111° 56,335,940 - - - - 6,335,948 Card S.und /NW Nwir- rNin..dn[ S 580.000 S 66,814 513,186 - - - - 513,106 Nwinew usr.r,rw.,n 513,186 - - - - 513,186 NW 11 wW4y n,,. ANL S.enic i i.d1. S 1.230,000 S - 150,000 1,080,000 - - - 1,230,000 l/.wnun US ALIN G,..f, 150,000 1,080,000 - - - 1,230,000 AWN. e.. P.d.rtd.n r•i#e. S 480.000 S - - - 480,000 - - 480,000 N...n.. US T.d.,r Comet - - 480,000 - - 480,000 Subtotal - Monroe County 42,315,440 4,195,504 17,582,687 8,057,249 3,980,000 4,000,000 4,500,000 38,119,936 (Total Road & Bridge Projects 1 1 1 I 45,420,845 I 13,787,730 I 13,749,657 I 8,803,420 I 7,467,611 I 89,229,263 I Mass Transit Project FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total N 1301 Mon,.. Um*. pu IV vl. 1 Capital Improvements 5 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Ports Project FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total MOT Morava County IN. l*ujw6 Aviation Project Approp.ined Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Marathon Airport uxrt Aq.tie tamer Uganda Avrrkn Prwr.mnn 1,000,000 $ 116,710 230,707 652,583 - - - 883,290 n...nrn 4W- Dam sane Ha..nr., 162,782 652,583 - - - 815,365 +rai - fedora "taro" 64,350 - - - - 64,350 aai -sue lame, 3,575 - - - - 3,575 7aol *memos 230,707 652,583 - - - 863290 MOT MIL% rlr.ira>'wd. A.t.tkar Pia.n..oran 147 - 147,940 - - - - 147,940 N..anan 401- Lima atom N.M,n.. 73,970 - - - - 73,970 alu i wr.•�...m _ 73,970 - - - - 73,970 rota M...ue 147,940 - - - - 147,940 CUT Miltla /7l. fAr..a..nkrr CM K..+.rrs•7 Ad.ti n 111.4 +a. 1,560,000 59,400 440,600 601,930 - - - 1,042,530 DOT /401HIS Ta.n6alt.a.rrerft.+.na9 AMllkaN.wtu, 325,000 - - - - 325,000 kaara..Taniallkid,c awn la,.ea..y AviationN.'lp. 133,070 - - - - 233,070 Total imam! EwrdA.e 1,560,000 59,400 898,670 601,930 - - - 1,500,600 Nnanara MO ° 349,035 300,965 - - - 650,000 4Y9 - federal wants 200,600 - - - - 200,600 nw.11 xa.wam 349,035 300,965 - - - 650,000 rotot Roma•. 898,670 601,930 - - 1,500,600 sour AAOrS Masud s..,.ip .u.a A.lr, ;.MV 100,000 - 100,000 - - - - - 100,000 Nn.nur. •aai . urr.annr Nwamrw, 20 - - - - 20.000 Capital Improvements 6 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Prarct Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Mai x.t+ rm 80,000 - - - - 80,000 Fufd rt..eruo 100,000 - - - - 100,000 wler. Maned wrnse mrnt Plan 044-1 Aw.tior f..mr.arian 36,000 - 36,000 - - - - 36,000 A.amn.. 481:1- upn.wnR N...mrrra 1 - - - - 1,800 ..deevi 32,400 - - - - 32,400 4)I wu+w.nu .-- 1,800 - - - - 1,800 t.r.l flan.,,,. 36,000 - - - - 36,000 oa.um:ke Removal ONNU 0/25 "Madam Sarni 457,121 - 457,121 - - - - 457,121 MN - ul,...drw e..+rar.a 22,856 - - - - 22,856 wi Federal Wont, 411,409 - - - - 411,409 4+m- Yaw nwrn 22,856 - - - - 22,856 Total flue 457,121 - - - - 457,121 T 4wrigar u...dlown..t tner n Aw.Ik,, q..fup. 3,250,000 - - 3,250,000 - - - 3,250,000 . A.aerrrr. 401 - Up.. dam x...n.r. - 650,000 - - - 650,000 - 2,600,000 - - - 2,600,000 tarn, fl...rrue - 3 - - - 3,250,000 l..n roadie r -.f 11111.pler-m Mar. Itl.rr.a AM.tk.r h.r4KW s 1,509,000 - - 1,500,000 - - - 1,500,000 liamenues 40W 1../p...11n0 naw-.rr.a. - 300,000 - - - 300,000 Mai - sea. a;, - 1 - - - 1,200 000 . ,rural flu. rrrue - 1 - - - 1,500000 M+mrmwr Ir1...ee.JC.n.sr.rwr I\,mm l A.t.w,n Sale. 20,000,000 - - - 20,000,000 - - 20,000,000 Amain.. 41►a - Up..Wng n...ru.a - - 1,000,000 - - 1,000,000 Mai f.d.n. Cowls - - 18,000,00 - - 18,000,000 4°° ' - - 1,000,000 - - 1,000,000 rutpr tfannue - - 20,000,000 - - 20,000,000 *real Mammy 1/25 Ad tkon sd.M 2,000,000 - - - 2,000,000 - - 2,000,000 Anarun 41/d - up..dn0 rt...nm.. - - 100,000 - - 100,000 May - Federal Weida - 1,800,000 - - 1,800,000 w1 - stw+:r.ro - - 100,000 - - 100,000 Total Revenue - - 2,000,000 , - - 2,000,000 1 Capital Improvements 7 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total N..e..r *.em.MfGar.u.d1.. /1... wr kim..n 1.11r4 2,000,000 - - - 2,000.000 - - 2,000,000 401 - up.atlnt p...ran - - 100,000 - 100,000 om F.dwal c:r.ma - - 1,800,000 - - 1,800,000 tot WO* im...rn - - 100,000 - - 100,000 !awl K...aro - - 2,000,000 - - 2,000,000 Armii.{cn Appro.& Nth Y.Ji.ear Rdmelme. A.I.o.wr LMe 75,000 - - 5 . - - 75,000 - 75,000 Ikmenian ama upa Ong flw..un - - - 7,500 - 7,500 sus f.d.dtir.rrra - - - 67,500 - 67,500 Tufai rt.r.r..o - - - 75,000 - 75,000 . avow* *wrr.r ..eR W .A.M .trrbn Ar�k. h...rvrk.n 1,200,000 - - - - - 1,200,000 1,200,000 N..mun as, - Upending R...nn.. - - 60,000 60,000 Lu - r.d.rd ur.sa - - - - 1,080,000 1,080,000 W! - %4444.r.n6 - - - - 60,000 60,000 rrK.a re.r.a.e - - - - 1,200,000 1,200,000 N. Tosite tnuCimn Aw.w.r R.vrrlp. 400,000 - - - - - 400,000 400,000 N..m■a 4W upwaont aw.mr..a _ - - - 40 40 4W r.dmalLamas - - - - 320,000 320,000 VHS Mato Ur - - - - 40,000 40,000 Tow t.rmun - - - - 400,000 400,000 *..4.4141 Amen p r " o1e A"rnur^ 01444042 250,000 - - • - - 250,000 250,000 w..un 4W up..Ming Nn..nun - - - - 125,000 125,000 4W 7et. rw.rn - - - - 125,000 125.000 r,Km T '^+ n n s o - - - • 250,000 250,000 *unmask D...lepur.ee N.. Av.drn.lo.rr.wn 2 - _ - - - 2,000,000 2,000,000 am Up..nn,xw.r.r.a - - - - 1,000,000 1,000,000 oss Yam Iowa., - - - - 1,000,000 1,000,000 r.K.drre..nne - - - - 2,000,000 2,000,000 WRA*I x...d Mari +ran /l..dr.l Avt.U.n h.r.rr.nan 500,000 - - - - - 500,000 500,000 Knarun 1 Capital improvements 8 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total sup ur.+n *R..wu., - - - 250,000 250,000 4W a.[. w wn - - - - 250,000 250,000 Tuna tr..Gn,e - - - - 500,000 500,000 n..rd Nana r.,r.k A.. . ►.p-cGrnr.ra.l Aau� ., R.r,+u,,, 6,000.00 - 0 - - - - . 5,000,000 5,000,000 Rrwnw, .cud - Up.. ran. R.wnun - - - 2.500,006 2.500,000 4 SAa. �.rwn - - - - 2 ,500,000 2,500,000 rat., l+o.uo - - - - ar 5,000,000 5,000,000 *Gina tar wwh facility Aw.av■ a...Na, 1,500,000 - - - - - 1,500,000 1,5410,000 Nauman aw - uR..On. Rwvnun - - - - 750,000 750,000 - 750,000 750,000 Tumti ir..a.n+o - - - - 1,500,000 1,500,000 i.r.nrtf.,ara /WW1.. 500,000 .. _ - - - w.n 500,000 500,000 J0 - lip..ann{ RwGrun - - - _ 250,000 250,000 au- %Wetomb - - - - 250,000 230,000 Total dyvy� , - - - - 500,000 500,000 Total Marathon Airport 43,476,061 176,110 1,870,439 6,004,513 24,000,000 75,000 11,350,000 43 ,299,951 Key West International Airport 0110T MN SBCWktrr s wrrIa Aa.ann S.hrtr 1.320.185 1,242 ,260 77,925 - - - - 77,925 Newman *NA - Saga aroats 77,925 - - - - 77,925 r u *( Atir Ak rivre 37-41 Adrtkn R.hrrAV 224.336 45.326 176,990 - - - - 178,990 AE�%AG MELT I1- Aw*tk., R., Op, 775.316 515.544 259,772 - - - - EatY'A 259,772 ,4 riEVATt1* 3.1.46 &viatica Rearti 300,000 297.636 2,364 - - - - W 2,364 . al w r,p.neEk... 1,299,631 858,506 441,126 - - - WWI - 441,126 Rnmu.a MA Upon aline k.wn.. 110281 - - - 110,281 w. r.d.rautan. 220,564 - - - - 220,564 iii. S6r.4rwn 110,281 - - - - 110,281 Toni Moorman 441,126 - - - - 441,126 r,.f l56 NdarSNrdf 414 Ad.uw Et.rfrq , 441,260 382,799 64,461 _ - _ 64,461 1 Ca pital Improvements 9 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Pf°leat • Budget As of 9130113 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total nevenura 404 uw.o"K ow.w..... 3,223 - - - - 3,223 406 • Foam. al Lawns 61,238 - - - - 61,238 Torni*T..e,00 64,461 - - - - 64,461 "DOT MOM KM' !1.'.'6M MAW. 0.w.mw K..,rUu. 262,687 - 262,687 - - - - 262,687 44.6 V i"" d "K p "'""" 131,343 - - - - 131,343 44)11 fMaD.:rwra 131,344 - - - - 131,344 rww w..w...e 262,687 - - - - 262,687 Wew Ew menak Yad i146 Audio' P.e noun 102,550 81,973 20,577 - - - - 20,577 Items,.... Our upw.enK „..+n".. 1 - - - - 1,029 *Al - F.dw.lWentz 18,519 - - - - 18,519 406 Marne ww.n 1 - - - - 1,029 hotel Itavenue 20,577 - - - - 20,577 MG OM/GI 01746 A..11.1 ".e...tiun 265,000 151,960 113,040 - - - - 113,040 44.6 uw..nnK ti...n.... 5,652 - - - - 5,652 _ 44)11 r.d.r..lwants 101,736 - - - - 101,736 4w - ue..w.wo. 5,652 - - - - 5,652 Tomr lr.wn..e 113,040 - - - - 113,040 ICOOTiA0106 KIN UJSTiMi ed.LL.e rw.,rc V 90,934 - 90,934 - - - - 90,934 Ne.em.. 406 ui,.rfinK o...nn.. 2,273 - - - - 2 ,273 406 • Fodor. Went% 86,388 - - - - 86,388 ION Mary w.nta 2,273 - - - - 2,273 Y.r.l.Y,..nue 90,934 - - - - 90,934 #E*1*U EMT *001)41 A.rrkn "....ns6nn 657,300 - 657,300 - - - - 657,300 'I..en.r. 40* - Owe ding N.w..o.. 32,865 - - - - 32,865 wr r.dwr.l e...nu 591,570 - - - - 591,570 Our Marva.w.ta 32,865 - - - - 32,865 14,4 r..e.ue 657,300 - - - - 657,300 w6iMn *iuu Gil 44 A 4.lkw ".,."soon 552,000 - 552,000 - - - - 552,000 444 Up., M..w.n.. 27,600 - - - - 27,600 1 Capital Improvements 10 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9 /30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total o o F.d.r1 ur.ni. 496,800 - - - - 496,800 4+rl xt.,.J 27000 - - - - 27,600 twin rummer uo 552,000 - - - - 552,000 212100. 100W l i DEP 01141,2 Ad.O.n ].My 436,400 - 436,400 - - - - 436,400 lira, r. 401 00000041o.o .. 21,820 - - - - 21,820 u.o. F.d.,Utir.nn 392,760 - - - - 392,760 404 2442 4,14.004 21,820 - - - - 21,820 Frrr.r*'•*•rne 436,400 - - - - 436,400 oMw KOMI 041a1 *,n.u.., 1043.rv4O.rn 567,200 - 567,200 - - - - 567,200 404 Um/dinrw...n.r. 28,360 - - - - 28,360 430 . F.drrd tir.m. 510,480 - - - - 510,480 aH Mae 4.4'"" 28,360 - - - - 28,360 Fr.rn1 *avenue 567 - - - - 567,200 ItGMSNN'IW 221.0ecru.tie 400nm 1w/40 5,500,000 - 5,500,000 - - - - 5,500,000 annerrues Our - 00' N"'^ 275,000 - - - - 275,000 • 404 F.d.rd 0.002 4,950,000 - - - - 4,950.000 404 Sed.■.m 275,000 - - - - 275,000 F.rd h..ene 5,500,000 - - - - 5,500,000 (anr0.r .20 Apra. 100.01 0140100 P .1 Avian., Pr...n.nnn 3,000,000 - 3,000,000 - - - - 3,000,000 404 UP.tiin. N...n.r. 150000 - - - - 150,000 uw - hood woo 2,700,000 - - - - 2,700,000 4°0- 1"48.41. n° 150,000 - - - - 150,000 Frr.f 1,4■4040 3,000,000 - - - - 3,000,000 .21000 inf1°al This • wrr` 004412r0 Nrv/uP, 150,000 - 150,000 - - - - 150,000 A..anr. 404 - UP.r ring w4.rnrr. 7,500 - - - - 7,500 4011. Fodor. Want, 135,000 - - - - 135,000 404 Maw .:r4m 7,500 - - - - 7,500 hos eY.varno 150,000 - - - - 150,000 t4n.sn.e wm.r Ohms 2 Awik.r 20.,12)r, 400,000 - 400,000 - - - - 400,000 ii.,ar.,n 41}1 1.104r4242 Nw.nrrrr. 200,000 - - - - 200,000 Capital Improvements 11 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total 404 PAP Urph 200,000 - - - - 200.000 T„ 4.4 e•■•.uo 400,000 - - - - 400,000 /nm inniPApo. s.cnnw. clion l... t PUMP. P..an,.nun 3,000,000 - - 3,000,000 - - - 3,000,000 Moneenues 919 1.1 "r N '"'n"" - 150,000 - - - 150,000 404 - F.d.pd r,..m. - 2,700,000 - - - 2,700,000 41° fa.n.a'A.n - 150,000 - - - 150,000 Tnrd N...,.o - 3,000,000 - - - 3,000,000 •rte' su s.nrslr.lun /PP. pap gmptliqd ApPuro Ppervatlun 400,000 - 400,000 - - - 400,000 404 - Is.4dns 5...,o., - 20,000 - - - 20,0 404 - F.da.l ti..m. 360,000 - - - 360,000 PP - SUP. twants _ 20,000 - - - 20,000 Turstr..ane - 400,000 - - - 400,000 PP. in.usPFm. tS..n UP A* skin Pmenualut. 743,500 - - 743,500 - - - 743,500 4w - uN.,.mnr Nww.ue - 18,588 - - - 18,588 Our - Fed„ 0114.13 - 706,324 - - - 706,324 4r1 . 0.1i40i0° - 18,388 - - - 18,588 ,r,N.FR.,a.ue - 743,500 - - - 743,500 111114E1014.41 4~04 Purr .. a n 4,000,000 - - 4,000,000 - - - 4,000,000 Neronura 414 - u".tl... N1....... - 100,000 - - - . 100,000 404 F.d., l c .. n. 3,800,000 - 3,800,000 - - 414,311 - '""'•"""" 100,000 - - - 100,000 rw.r .mnuo - 4,000,000 - - - 4,000,000 • AIM Equte....r A,4 .,, PM, 500,000 - - 500,000 - - - 500,000 N..eu.. Our - Up. Pint 04.0.. - 250,000 - - - 250,000 *Ng - Mate tar rift - 250,000 - - - 250,000 .rut.. N..a,ue - 500,000 - - - 500,000 PPP. Pfau Upd.l. A.i.u„ N.....v.nun 600,000 - - 600 - - 600,000 PP - 30,000 - - ur uv. m ". 30,000 Our 1.d.0.4.40t. - - 540,000 - - 540,000 419 Statqi,rsuE - - 30,000 - - 30,000 1 Capital Improvements 12 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update • Project Budget As of 9130/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total isonto.o..s. - - 600,000 - - 600,000 m.r.,nrd.eir„rr.r..ar up AvilAkin Aneonmtlan 1 ,381, - - - 1,361,500 - - 1,381,500 40* upr .nn.M...nun - - 34,538 - - 35,533 0-114 r.dwao,.na - - 1,312,424 - - 1,312,424 y'0'9 ' - - 34,53II - - 34.535 aootsr ..e - - 1,381,500 - - 1,381,500 UIRwr.. *.rov, a.,.nr.o.n 4;JO0,0+0J - - - 4,000,000 - - 4,000,000 !!.ours 400 - Up., 4410 n.vn.. -. - - 100,000 - - 100,000 40*-1.dma ,n.n, - - 3,600,000 - - 3,800,000 404 - S4404., r,r, - - 100,000 - - 100,000 .- du *nemo IOW - - 4,000,000 - - 4,000,000 is...soN 4-21 liwIrbill144104 Kra 141.44n,.atl4n11 4.000,000 - - - 4,000,000 - - 4,000,000 4 upr ding nwn,,.n - - 200,000 - - 200,000 4w- 2444ra`",.n° - - 3,600,000 - - 3,600,000 4lN. Maim 1...,[. - - 200000 - - 200,000 X5.0* R..o,.o - - 4,000,000 - - 4,000,000 ✓ r.. N*JOk. DU Lt cap.n■i.s, , ,our, H.r,v.0.4 500,000 - - - 500,000 - - 500,000 11044,04 401 -op., .0 n■n...,,.rs - - 25,000 - - 25,000 404 - 240.1a Usani: - - 450,000 - - 450,000 404 Wt. r1h - - 25,000 - - 25,000 TOW Revolve - - 500,000 - - 500,000 LW Fi.tr,ni A.0*,,n ',At I, 301,000 - - - 301,000 - - 301,000 w..r.p., 404 - opm 114 44 ner.n,.r, - 15,050 - - 15,050 4414 - 2.41.1-41 ,,.n,: - - 270,900 - - 270,900 4- Salo - - 15,050 - - 15,050- . M , 7ot4(0040420 - - 301,000 - - 301,000 SWIM" 942 R.r,.b**.,,nn 14404 2 it. urn Iru,++.nl ..., 4,000,000 - - - - 4,000,000 - 4,000,000 Nnaor. 40U- Op.m.r n...n.n - - - 200,000 - 200,000 4,4 F.d.prc:,.nn - - - 3,600,0180 - 3,600,000 ..a- am.4rr,n - - - 100,000 - 200,000 1 Capital Improvements 13 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As . As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2016 Total ,�... , ^-•. - - - 4,000,000 - 4,000,000 me 41, rh...i AvvuT r4.,,•, eft, n 4,000,000 - - - - 4,000,000 - 4,000.000 0.9 r "..14flo""""' - - - 100,000 - 100,000 4w ..dri.14n.1. - - - 3,800,000 - 3,800,000 404 W40 40040 - - - 100,000 - 100,000 rura4N.v1nm - - - 4,000,000 - 4,000,000 1.0$044 w..n• t4M. 6.m01111111 to wwl ;.$d.n 7.M. 500,000 - - - - - 500,000 500,000 Amnon 4114' up.,o.t4 a.wn..p■ - - - - 25,000 25,000 401 - f440441,40400 - - - - 450,000 450,000 404- Side 4..ants - - - - 250,000 250,000 r,.rdR.....ue - - - - 725,000 725,000 ■+ora.w Shodider w►ce.n+gi Ad.15...,s... 1,500,000 - - - - - 1,500,000 1,500,000 43.1 up..ringx..mun - - - - 75,000 75,000 10* f.A..l.�u.m - - - - 1,350,000 1,350,000 ew- x.e. wr.e. - - - - 75,000 i17Y5�,000 Tuna. k..0 50 ..e - - - - 1, 1, 500 , 000 Illagi4s 1140. f04 AN.th f ^.41s 1,800,000 - - - - - 1,800,000 1,800,000 4a11 Ulm .Gn.H .nun - - - - 90,000 90,000 404 - f min el (Awn, - - - - 1,620,000 1,620,000 4a0 . ]..to- W - - - - 90,000 90,000 ,. 11ohO 44.40,444 - - - - 1,300,000 1,300,000 000 i.m. I'nt N$0.084140 !yawn A0.004 7ahn. 4000,000 - - - - - 1,000,000 1,000,000 404 - 01$41,444.0040004 - - - - 30,000 50,000 404 - i.der4 eC,,.,n. - - - - 900,000 900,000 440 - 5,1101,. *bawds - - - - 30,000 50,000 r "'d f lmalant - - - - 1,000,000 1,000,000 E..rYAYO.nrtadp....w Aw.U:n n..Juy. 250,000 - - - - - 250,000 250,000 404 - up..rfn41140410wa - - - - 125,000 125,000 40* t. 0., ,b - - - - 125,000 125,000 T " tpf er.. ea - - - - 250,000 250,000 Capital Improvements 14 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Project Budget As of 9/'30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total tar Amnia' haiku '""•u°' "'y+"' n. 5,000.000 - - - - - 5,000,000 5,.000,000 Hna..wa 404 - u,.. rink n.wnw, - - - - 2,500,000 2,500,000 401 m.r.,.u...,n - - - 2,500,000 2,.500,000 /utat4 ft 's - - - - 5,000,000 5,000,000 eAreeteneesee Areri.. hey/U{12 500,000 - - - - - 500,000 500,000 Newman *NI- Uwe hies Hwm.us - - - - 2sc000 250,000 MA 1114.4 ants - - - - 250,000 250,000 ,rwi.i ir.......,e - - - - 500,000 500,000 Total Key West International Airport 53,027,150 2,717,500 12,333,650 8,643,500 10,752,500 8,000,000 10,550,000 50,309,650 Total - Aviation 96,503,211 2,893,610 14,206,068 14,618,013 34,782,500 8,075,000 21,900,000 93,609,601 1 Capital Improvements 15 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Potable Water (Policy 701.1.11 Project Tide Project Appropriated Budget As of 9130113 FY 2014 FY 2015 FY 2016 FY 2017 FY 2019 Total Florida Keys Aquaduct Authority aistriautian Replacerent 4,300,000 3,700,000 2,100,000 2,100,000 2,100,000 14,300,000 ni9n Semite Pump Station retrovevrsnc 750 ,000 750,000 rrarorission eepracernent )tr+ooi ersa:;i 500,000 500,000 500,000 500,000 2,000,000 Cabo& Prvte®arn- Tam. & 13 PAle Stretch 200,000 200,000 ai1tribution Pump Station CLcaise 50,000 750,000 750,000 1,550,000 Florida 0 /3 mg Sitaral¢ Tara. 2,600,000 2,600,000 5,200,000 vane Purceeze & ivories City WVP 1,000,000 1,000,000 2,000,000 Total - FKAA 4,500,000 4,200,000 6,250,000 6,950,000 4,100,000 26,000,000 Revenues - FKAA 4,500,000 4,200,000 6,250,000 6,950,000 4,100,000 26,000,000 Monroe County Projects Ocean Reel Roane osmosis Project 2,600,000 - - 2,600,000 - - - 2,600,000 ROWHIuvs ,ion mr*emumse Sate Surma - 2,600,000 - - - 2,600,000 Total 2,600,000 4,500,000 6,900,000 6,250,000 6,950,000 4,100,000 28,6001,000 1 Capital Improvements 16 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Solid Waste (Policy 801.1.1) Project Title Project Appropriated Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Hairnet Shed-Cudjoe Transfer Station 175,000 - 175,000 - - - - 175,000 RavenuP3 414 - MSD Fund Clhargez for Service 175,000 - - - - 175,000 Hasmat Shed -Long Key Transfer Station 175,000 - 175,000 - - - - 175,000 Rawnuvs 414 - MSO Fund Charges for Service 175,000 - - - - 175,000 Renovation of Transf Stn Bldg-Codjoe Transf Stn 125,000 - 125,000 - - - - 125,000 Revenues 414 - M5O Fund Charges for Service 125,000 - - - - 125,000 Renovation of Transf Stn Bldg -Long Key Transf Stn 125,000 - 125,000 - - - - 125,000 Revenues 414 - M50 Fund Charges for Service 125,000 - - - - 125,000 Renovation of Transf Stn Bldg -Key Largo Transf 5tn 125,000 - 125,000 - - - - 125,000 Revenues 414 - MS0 Fund Charges for Service 125,000 - - - - 125,000 Total 725,000 - 725,000 - - - - 725,000 Capital Improvements 17 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update I Sanitary Sewer (Policy 901.1.11 Project Title Project Appropriated Budget As of 9130113 FY 2014 FY 2015 F7 2016 F7 2017 FY 2018 Total Florida KeysAquaduct Authority ;Kai Hymen Collection artemhnproYement 4.150.000 - 650,000 2,500,000 1,000,000 - - 4,150,000 outgo E. wring ite0 WW Colliecban Sr EN:en:ion 250.000 - - - 150,000 100,000 - 250,000 Total - FKAA 4,400,000 - 650,000 2,500,000 1,150,000 100,000 - 4,400,000 Revenues - FKAA 4,400,000 - 650,000 2,500,000 1,150,000 100,000 - 4,400,000 Monroe County Projects Westminster UPgrade to County Owed Fecities 1,020,886 449,858 571,028 - - - - 571,028 Wen= 304 - Mraaitnxatune Sec surtax 571,028 - - - - 571,028 Duck Key Wastewater System-County Portion 14,233,101 14,057 ,210 175,891 - - - - 175,891 Dude Key Wastewater System -FKAA Portion 2,988,767 2,988,767 - - - - - - Total Project Expenditures 17,221,868 17,045,977 175,891 - - - - 175,891 norweres 311 - 11u3 rtrl W.YCmiaa! Fund Capital.t:carp}[: 175,891 - - - - 175,891 Cudjoe Reponai Wastewater System 175,735,643 29,847,581 58,107,390 67,575,400 15,599,048 4,606,224 - 145,888,062 Wrwraas 312 - OWjoe Illegionel WWCepitaI Fund Cap 3 menus 703,390 2,275,400 1,137,700 - - 4,116,490 in- Raft G -twN a 30,000,000 - - - - 30,000,000 in - FeavetCrean - 1,300,000 1,300,000 - - 2,600,000 312 CWSHFInen 27,404,000 61,000,000 10,,161,348 4,606,224 - 103,171,572 1 Capital Improvements 18 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total 304 - Infractoucture Salc5.rmc - 3,000,000 3,000,000 - - 6,000,000 Total Revenuer 58,107..190 67,575,400 15,599.048 1.006.214 - 145,888,062 key largo Wastewater Treatment District 153,160,543 144,738,661 8,421,882 - - - - 8,421,882 ANIMAS" on.'617D 3'mre stare 8,421,882 - - - - 8,421,882 Total 351.538940 192,082,077 67926,191 70,07:,400 16.749.048 4.706114 - 159.456,863 Drainage and Storm Water (Poicy 1001.1.1) Project Title Project Appropriated Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Grouper lane -key largo 421,824 - 421,824 - - - - 843,648 Rawanues 102 - Fuel Tam 421,824 - - - - 421,824 Ninth Avenue -Stock Island 746,874 - 746,874 - - - - 1,493,748 Revenues 102 - Fuel Tam 746,874 - - - - 746,874 Total 1,168,698 - 1,168,698 - - - - 2,337,396 On January 16, 2014, the BOCC approved the table above with a total of 52,337,396; however, the total is actually 51,168,698. ltotal column doubled the value) I Capital Improvements 19 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Parks and Recreation (Policy 1201.1.1) Project Title Project Appropriated Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total dins Beach Fitness Trail 15,500 5,000 10,500 - - - - 10,500 Ra ° vanuos 303 nma2nxture Sales Surtax 10,500 - - - - 10,500 Riggs Beach Master Plan 3,400,000 - 1,000,000 260,000 1,170,000 1,170,000 - 3,600,000 Ravanucs 304 imrur.i- ure Soles Surtax 1..000,000 260,000 1,170,000 1,170,000 - 3,600,000 Rowers Marina Waterfront Park 5,000,000 - 5006000 - - - - 5,000,000 Ra VQnWps 304 IllfrIECILICILLre )43: IX 5,000,000 - - - - 5,000,000 ■erasteitPark 3,232,000 6,599 275,401 1,475,000 1,475,000 - - 3,225,401 Aovonues 131 - Paris & Reatrbe r Irnal Fe= 25,401 - - - - 25,401 304 .arta:tructuie Sale: :urte. 250,000 1,475,000 1,475,000 - - 3,200,000 Total Project Revenues 275,401 1,475,000 1,475,000 - - 3,225,401 Bay Point Park 60,350 5 5,350 15,000 - - - - 15,000 Revenues 131 - Part: &Reaeetor Impact Fec 15,000 - - - - 15,000 1 Capital Improvements 20 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Budget A: of 9;30, 13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Big Coppitt Pork 20,000 20,000 - - - - 20,000 Revenues 131 - Part E. Recruit on Impect Fee; 20,000 - - - - 20,000 Old Seven Mile Bridge 2,700,000 - 1,350,000 1,350,000 - - - 2,700,000 Fr.enues 304 irearstructure SalmSunni 1,350,000 1,350,000 - - 2,700,000 B ig Pine Swimming Pole 2,000,00C. - - - 600,000 1,400,000 2,000,000 Revenues Sus - rrrre2ru¢ure Seim Surtax limit mobto I - - - 500,000 500,000 1,000,000 123 - Stete Grans - - - 100,000 900,000 1,000,000 Total Project Revenues - - 600,000 1,400,000 2,000,000 B oating knprovement Fund Project; Sinop Pow Boat Rame 249 ,831 24,831 235,000 - - - - 225,000 Ba IOno.r.iTttewlsea:Romp 67,000 67,000 - - - - 67,000 Stu Rd u Boat 4srro i� to Tara r; 25,000 25,000 - - - - 25,000 Btterswet Boat =Imp 5,000 5,000 - - - - 5,000 rxrn Pa Boat Ramp 250,000 250,000 - - - - 250,000 $'wry -!errs Pert. Bait Rime 68,000 68,000 - - - - 68,000 Sunset Point Park Melt ( t Rim .se I 25,000 25,000 - - - - 25,000 PupiS-Prr,rxe Pertrenhip Vloonrg .it II 749,416 24,950 200,050 174,416 350,000 - - 724,466 Total Boating improvement Project Revenue: 1,439,247 49,781 865,050 174,416 350,000 - - 1,389,466 Fr ✓en,es 137 = Value Banns impr .emmt Fun= 865,050 174,416 350,000 - - 1,389,466 Total 15 106,730 8,535,951 3,259,416 2,995,000 1,770,000 1,400,000 17,960,367 1 Capital Improvements 21 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Land Development & Lend Acquisition r 101.6 & 102.41 I Project Title Project Appropriated Budget As of 9130/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Monroe County land Authority - Land Acquisition-PI Keys ACSC 3,276,027 - - - - 3,276,027 AOGOReserves 4,274,123 - - - - 4,274,123 Total 7,550,150 - - - - 7,550,150 flavanues Tourt Impact Tax 950,000 950,000 State Park Surcharge 360,000 360,000 (Monroe County Land Authority Fund Sala rce 6,240,150 6,240,150 Total Revenues 7,550,150 - - - - 7,550,150 Total 7,550,150 - - - 7,550,150 Capital Improvements 22 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update General Government Project Title Project Appropriated Budget As of 9/30/13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2016 Total General Government Function Projects Lester Budding Rood Replacement 339,405 289,405 50,000 - - - - 50,000 Ravcnuos 334 - umnzr.r_n:re tae: 7,-.1132A 50,000 - - - - 50,000 Jefferson Browne Building Rehabilitation 6,000,000 - 600,000 5,400,000 - - - 6,000,000 Ravanuos 313- Debt Proceed: 600,000 5,400,000 - - - 6,000,000 Various Public Works Projects 4,440,183 414,,813 3,249,907 775,463 - - - 4,025,370 Ravanuos 304 - hirmst r -store Saes Surtax 3,249,907 775,463 - - - 4,025,370 TotaI-General Government Function 10,779,588 704,218 3,899,907 6,175,,463 - - - 10,075,370 Public Safety Function Projects MCDC Sprinkler Piping Replacement 308,575 37,451 271,124 - - - - 271,124 Pc vanoos 3?1- irmn� 32e Saes Surtax 271,124 - - - - 271,124 Fire /EMS Vehicle Replacement 1,975,000 - 1,000,000 975,000 - - - 1,975,000 Ra'Van UCS 313- Inrrsinamre Se a :_+-rta;.: 1,000,000 975,000 - - - 1,975,000 1 Capital Improvements 23 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Budget As of 9f30,i13 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Tota Key Largo Fire Vehicle & Hydrants 250,000 - 250,000 - - - - 250,000 Fa:an1, 304 - Irtrtsir_i".i.re :at: _i-m, 250,000 - - - - 250,.000 Stock Island Fire Station 4,574,013 4,116,665 457,348 - - - - 457,348 Gvanues 3=e- Lett-r -weed; 457,348 - - - - 457,348 Conch key Fire Station 2,363,446 2,353,446 10,000 - - - - 10..000 ac van - ,us 30E - G^= "rcc^-eas 10,000 - - - - 10..000 5umnnerland Key Fire Station 4,500,000 - - 450,.000 3,000,000 1,050,000 - 4,500,.000 Fc:cnucs 3 ct " y - 450,000 3,000,000 1,050,000 - 4,500,000 Fire Training Academy -Crawl Key 1,200,000 - 1,200,000 - - - - 1,200,000 h'a: cnJ,s 3:3 • Cep- . 1, - - - - 1.200,000. Total- Public Safety Function 15,171,034 5,507,562 3,188,472 1,425,000 3.000,000 1,050,000 - 8,663,472 Physica Eo wl ion ment Function Projects Canal Mastev Plan 5,000,000 47.500 1,.650,000 1,650,000 1,652,500 - - 4,952,.500 Pc van acs - 304•irmssr,_ueae:a.m, 1,.650,000 1,650,.000 1,.652,500 - - 4,952,500 Cuiture & Recreation Function Projects Library Automation Update 175,000 1.28,703 25,000 21,297 - - - 46,297 • 1 Capital Improvements 24 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Budget A: of 9,33'13 FY 2014 F4 2015 F 2016 FY 2017 FY 2018 total ___ J - - _ T_a -=a_ 25,000 21,.297 - - - 46,297 Marathon Library 3,000,000 - 300,000 2,400,000 300,000 - - 3,000,000- ~c vc,awas 313 DS;a-oceen: 300,000 2,400,000 300,000 - - 3,000,000 Tate Culture & Recreation Fumrtion 3,175,000 126,703 325,000 2,421,297 300,000 - - 3,046,297 Court Related Function Projects Marathon Courthouse 1,752,023 1,716,,523 35,500 - - - - 35,500 374 - irttn5rr_s_La ec ;Lrte• 35,500 - - - - 35,500 Freeman Justice Center 20,618,230 20,027,,330 590,900 - - - - 590,900 Rcvanues 304 - Inrraer_ir-_re _a e: _Lm • 590,900 ,900 - - - 590,.900 Freemen Justice Center lobby Eepension 334,346 175,508 158,838 - - - - 158,839 Rc enwez Sat - irmaxn.cave5ses'Arta,. 158,838 - - - - 158,638 PK Courthouse & Jail 10,600,000 - 1,060,000 4,774,000 4,770,000. - - 14,600,000 r' r. an,ecs 313 -De¢?rocees: 1,060,000 4,770,000 4,770,000 - - 10,600,000 Total Court Related Function 33,304,599 21,919,361 1,845,238 4,770,000 4,770,000 - - 11,385,238 Total 67,430,221 29,307,344 10,,908,617 16,441,760 9,722,500 1,050,000 38,122,.677 1 Capital Improvements 25 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update ve 1�i_ With the following exceptions, _public expenditures within the Coastal High Hazard Area (CHHA) shall be limited to the restoration or enhancement of natural resources and parklands, expenditures required to serve existing development such as the maintenance or repair of existing infrastructure, and expenditures necessary for public health and safety: 1. Msublic expenditures within the CHHA may be permitted where required to meet adopted level of service standards or to maintain or reduce hurricane evacuation clearance times and where no feasible alternatives to siting the required facilities within the CHHA exist. 2. public expenditures within the CHHA may be permitted for improvements and expansions to existing public facilities, which improvements or expansions are designed to minimize risk of damage from flooding. {93- 5 016(3)(b)2] P eyl404 . • • t" . . 541-6(3)(-01-and-9-1 No County public expenditures shall be made for new or expanded public facilities in areas designated as units of the Coastal Barrier Resources System, undisturbed saltmarsh and buttonwood wetlands, or offshore islands not currentl accessible by road, with the exception of expenditures for conservation and parklands consistent with natural resource protection, and expenditures necessary for public health and safety. {93- 5.016(3)(c)3 --aftd-91 <The Remainder of This Page Intentionally Left Blank> Capital Improvements 26 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Objective 1401.3 Monroe County shall ensure that future development pays its proportionate share of the costs of improvements necessary to serve new development at the adopted level of service standards. {9J 5.016H163.3177(3)(1934}03., F.S.l Policy 1401.3.1 By January 1, 1997, Monroe County shall adoptrevise and update the Land Development ode to update the County's current expenditure procedures and proportional fair—share assessment of impact fees, in accordance with the adopted levels of service referenced in Policy 1401.4.1. The revised Land Development RegulationsCode shall also include provisions for the collection of impact fees to offset the public costs of public facilities and services. 6 <The Remainder of This Page 1ntentiona111' Left Blank> Capital Improvements 27 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Objective 1401.4 Monroe County shall coordinate land use decisions and fiscal resources with a schedule of capital improvements in order to maintain the adopted level of service (LOS) standards for both -pfes issued development orders and future development. {-9-J- 5,04-6H163.3177(3)(4)3 and 5]., F.S.] Policy 1401.4.1 Monroe County shall adopt and maintain level of service (LOS) standards for the following public facility types: roads, sanitary sewer, solid waste, drainage, potable water, and parks and recreation. The LOS standards are established in the following sections of the Comprehensive Plan: 1. The LOS for roads is established in Traffic Circulation Policiy 301.1.1 and 301.1.2; 2. The LOS for potable water is established in Potable Water Policy 701.1.1; 3. The LOS for solid waste is established in Solid Waste Policy 801.1.1; 4. The LOS for sanitary sewer is established in Sanitary Sewer Policy 901.1.1; 5. The LOS for drainage is established in Drainage Policy 1001.1.1; and 6. The LOS for parks and recreation is established in Recreation and Open Space Policy 1201.1.1. f9-J-541-6(3)(6-)4} Policy 1401.4.2 Monroe County shall adopt a Capital Budget at the same time it adopts its Annual Operating Budget. The Capital Budget shall include those projects necessary to maintain the adopted levels of service referenced in Policy 1401.4.1. f9-3.- 5.016(3)(c)71 Policy 1401.4.3 To the extent allowed by Florida Statutes, Monroe County supports the use of tourist - related charges to offset tourist - related impacts on public facilities. Monroe County supports the use of Tourist Development Council funds to provide public facilities that will serve both tourists and residents. Policy 1401.4.4 Public facilities and services needed to support development shall be available • - • = . - • = ' • :: - : : = .:: = • , in accordance with the adopted levels of service referenced in Policy 1401.4.1 and Chapter 9J 5.0055, F.A.C._ Development approval may be phased to allow the provision of public facilities and services necessary to maintain the adopted levels of service. {-9-J- 5 Capital Improvements 28 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Policy 1401.4.5 Monroe County hereby adopts a Concurrency Management System to ensure that facilities and services needed to support development are available concurrent with the impact of development. The Concurrency Management System shall ensure that the County shall issue no development order or permit which results in a reduction in the level of service (LOS) below the adopted LOS standards referenced in Policy 1401.4.1 for those public facilities that are subject to the system. The guidelines established in Policies 1401.4.6, 1401.4.7, 1401.4.8, 1401.4.9, and 1401.4.10 shall ensure that concurrency is successfully implemented. Policy 1401.4.6 The following guidelines identify the stages in the development review process when the test for concurrency must be met. 1. Preliminary Development Order Stage - A preliminary development order is a development order that precedes the issuance of a building permit, such as a subdivision plat, development plan, certificate of compliance, conditional use permit, or development of regional impact development order. A proposed development must receive a conditional concurrency determination prior to receiving a preliminary development order. 2. Final Development Order Stage - A final development order is a building permit or any other development permit authorizing the construction or expansion of a structure, an increase in development intensity, or a change of use requiring a new certificate of occupancy. A proposed development must receive a final concurrency determination prior to receiving a final development order. Policy 1401.4.7 The following guidelines identify the effect of a concurrency determination 1. A Conditional Concurrency Determination shall indicate that adequate public facilities are available at the time the determination is issued, but shall not guarantee the adequacy or availability of public facilities at subsequent stages of development review. 2. A Final Concurrency Determination shall indicate that adequate public facilities will be available at all subsequent stages of development stages of development review, subject to certain limitations such as elapsed time and the payment of fees. Capital Improvements 29 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update The following guidelines identify the minimum criteria necessary to meet the concurrency requirements of each public facility type. 1. The concurrency requirements for roads, potable water, solid waste, sanitary sewer, and drainage facilities and services shall be satisfied if one or more of the following conditions are met: a) the necessary facilities and services are in place at the time a development permit is issued; or b) the necessary facilities and services are in place at the time a certificate of occupancy, or its functional equivalent is issued. b) the development permit is issued subject to the condition that thc necessary facilities and services will be in place when thc c) the necessary facilities arc under construction at the time a permit of-the-development occur. An enforceable development agreement may include, but is not limited to, development agreements pursuant to scction 163.3220, F.S., or an agreement or 2. The concurrency requirements for recreational facilities shall be satisfied if one or more of the following conditions are met: a) conditions 1(a) or 1(b), or 1(c) listed above or, in the case of acreage for parks and recreational facilities, which shall be dedicated to or acquired by the County prior to issuance of a building permit, or funds in the amount of the developer's fair share are committed no later than the approval to commence construction; or b) a binding executed contract is in place at the time thc development permit is issued which provides for the commencement of the actual construction of the required facilities or provision of e-)b) an enforceable development agreement guarantees that the necessary facilities and services will be in place with the issuance of the applicable development permit. An enforceable development agreement may include, but is not limited Capital Improvements 30 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update to, development agreements pursuant to section 163.3220, F.S., or an agreement or development order issued pursuant to Chapter 380, F.S. 3. The concurrency requirementst the following cond' a) conditions 1(a) or 1(b) li b) a binding executed contract is APIIIIIPhe time 411.0.1111Ent permit is issued which provides for the commencement of the actual construction of the required facilities or provision of services: or c) an enforceable development agreement guarantees that the necessary facilities and services will be in place with the issuance of the applicable development permit. An enforceable development agreement may include, but is not limited to, development agreements pursuant to section 163.3220, F.S., or an agreement or development order issued pursuant to Chapter 380, F.S. Policy 1401.4.9 The following guidelines identify the minimum components of the County's concurrency monitoring system. 1. The County shall maintain a database of permitting data that includes the amount of development for which final development orders have been issued, development for which final development orders have expired, development which is under construction, and development which has been constructed. 2. The County shall maintain a database of public facility data that includes the capacity of existing public facilities, the additional capacity created by facility improvements, the impacts of existing development, and the impacts anticipated due to committed development. 3. The County shall prepare a : - : - - .: : - _ . - - - - . . _ - - - Public Facilities Capacity Report assessing the capacities of all public facilities subject to the Concurrency Management System. The Concurrency Management Report shall be used to monitor changes in the capacity of public facilities and the levels of service provided by the facilities based upon development activities and capital improvement projects completed Policy 1401.4.10 Capital Improvements 31 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Monroe County shall use the following guidelines for interpreting and applying level of service standards to development order applications. For the purposes of this policy, reserve capacity refers to the capacity of existing public facilities plus the capacity of public facilities which do not exist but which meet the applicable requirements of Policy 1401.4.7, less the existing demand for those facilities and the demand expected to be created for those facilities by approved but unbuilt development as determined by the databases in Policy 1401.4.9. 1. Potable Water- The County shall not render a final concurrency determination unless the quantity of water available under the FKAA Consumptive Use Permit meets or exceeds the estimated water demand of the proposed development together with the estimated water demand of all existing and committed development. 2. Solid Waste - The County shall not render a final concurrency determination unless capacity available at solid waste facilities either awned- by- erunder contract with Monroe County meets or exceeds the estimated daily solid waste generation of the proposed development together with the estimated daily solid waste generation of all existing and committed development for a period of three (3) years from development approval. 3. Sanitary Sewer- The County shall not render a final concurrency determination unless the proposed development will be served by a treatment plant permitted by the PretectionnFDEP with adequate reserve capacity to accommodate the impact of the proposed development or an on -site sewage disposal system permitted by the ! - . • - . - - . - . . ' - .. • • : • • - - • - - DOH. 4. Drainage- The County shall not render a final concurrency determination unless the proposed development will be served by stormwater management facilities approved by the South Florida Water Management District; or has received an individual construction permit or written authorization to proceed pursuant to a general permit from the South Florida Water Management District. If the proposed development requires a permit from the South Florida Water Management District, such permit must be obtained prior to the final concurrency determination or the applicant's drainage plans must be consistent with Monroe County's stormwater management requirements. 5. Parks - The County shall not render a final concurrency determination unless the park facilities either in existence or programmed within the next year will meet or exceed the estimated park demand of the proposed development together with the estimated park demand of all existing and committed development. Within each impact area for park facilities, the County shall determine the population capacity of both resource -based and Capital Improvements 32 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update activity -based facilities by multiplying the level of service standard by the number of acres of existing or programmed parks. 6. Roads - The County will not render a final concurrency determination unless the estimated traffic impacts of the proposed development, together with the estimated traffic impacts of all existing and committed development, will not exceed - - - _ . eapoeythe level of service of U.S. 1, as determined by the U.S. 1 Level of Service Task Force lhedelegymethodology. The trip assignment for proposed developments with an estimated trip generation rate of more than 10 trips per day shall be based on a traffic impact report prepared by the developer based on a professionally accepted methodology. The trip assignment for proposed developments with a trip generation rate of 10 trips or less (such as a single family home) shall be limited to the segment of U.S. 1 most directly impacted by the development. Policy 1401.4.11 Annual debt service on Monroe County's direct debt shall not exceed the following annual median ratios for medium size counties published by Moody's Investment Services: 1. debt to operating revenue; 2. debt to assessed valuation; and 3. debt per capita. Moody's Investment Services, a bond rating agency, publishes annual medians depicting local governments' debt service as a percentage of population, operating revenue, and assessed valuation. [9J 5.016(3)(c)21 • .. . - •. • ! •. • •! • • Policy 1401.4.4 -312 By January 4, 1997, Monroe County shall revise the Comprehensive Plan Five - Year Schedule of Capital Improvements and the County Capital Improvements Program annually to include funding for any improvements required to provide for solid waste disposal after expiration of the current solid waste haul out contract (See Solid Waste Objective 801.3 and related policies). Capital Improvements 33 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Polic - 1401.4 4 •S. „ - - - Master Plan which shall be implemented bcginning in Fiscal Year 1999. Prior to alternative revenue source in order to fund the drainage facility improvements required by thc Stormwatcr Management Mastcr Plan. Notc: Monroe County recognizes its obligations under the stipulated settlement agreement but date premises. e s. .. ..� The County shall coordinate with the FKAA, the Florida Departments of • - - . _ • - . . - - • . - - . ' - ncy (EPA), at a minimum, concerning joint preparation and funding of the Master Plan. Note: Monroe County practicality of timcframc implementations may require modifications of agreement date premises. Policy 1401.4.4-613 By January 4, 1998, Monroe County shall revise the Comprehensive Plan Five - Year Schedule of Capital Improvements and the County Capital Improvements Program annually to include funding for the improvements identified in the Sanitary Wastewater /Stormwater Management Master Plan. By January 4, 1998, Monroe County shall explore thc feasibility and benefits of S 1 between thc Dade County line and CR 905. <The Remainder of This Page Intentionally Left Blank> Capital Improvements 34 Keith and Schnars, P.A. Comprehensive Plan: July 2014 Monroe County Comprehensive Plan Update Objective 1401.5 Monroe County shall provide public facilities sufficient to maintain adopted level of service standards that are within the ability of the County to fund, or within the County's authority to require others to provide. Evaluation of funding alternatives for improvements identified in other plan elements will include consideration of improvements required by existing versus future development in order to ensure a fair - share allocation of costs. {9J 5.0161 F.S.1 Policy 1401.5.1 The estimated capital expenditures for all needed public facilities shall not exceed conservative estimates of revenues from sources that are available to the County pursuant to current law, and which have not been rejected by referendum, if referendum is required to enact a source of revenue. {9J 5.016(3)(b)51 Policy 1401.5.2 Monroe County shall not provide a public facility, nor shall it accept the provision of a public facility by others, if it is unable to pay for the subsequent annual operating and maintenance costs of the facility. {93-5,0-14(3)(b)-51 Policy 1401.5.3 Monroe County's Capital Improvements Program shall be monitored in conjunction with the evelopment review process to ensure that the County is not required to construct improvements beyond its financial capacity. {93- 5.016(3)(b)51 <The Remainder of This Pape Intentionally Left Blank> Capital Improvements 35 Keith and Schnars, P.A. Comprehensive Plan: July 2014