Loading...
Item C24C ounty of M onroe {f `° " rel BOARD OF COUNTY COMMISSIONERS n Mayor David Rice, District 4 The FlOnda Key y m �� 1 Mayor Pro Tem Sylvia J. Murphy, District 5 Danny L. Kolhage, District 1 George Neugent, District 2 Heather Carruthers, District 3 County Commission Meeting September 19, 2018 Agenda Item Number: C24 Agenda Item Summary #4675 BULK ITEM: Yes DEPARTMENT: Project Management TIME APPROXIMATE: STAFF CONTACT: Ann Mytnik (305) 292 -4439 N/A AGENDA ITEM WORDING: Report of monthly change orders for the month of August, reviewed by the County Administrator /Assistant Administrator. ITEM BACKGROUND: There was one (1) change order considered and approved by the County Administrator /Assistant Administrator for the period beginning 08/01/18 and ending 08/31/18 for $45,585.00. There were no change order requests denied. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No 027 -1998 was adopted in order to provide that the County Administrator may approve separate, non - cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,000 (as amended per Ordinance No. 024 - 2015), or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: N/A DOCUMENTATION: August 2018 change order report (revised) FINANCIAL IMPACT: Effective Date: N/A Expiration Date: Total Dollar Value of Contract: N/A Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: Grant: County Match: Insurance Required: Additional Details: No If yes, amount: N/A REVIEWED BY: Cary Knight Patricia Eables Kathy Peters Board of County Commissioners Completed Completed Completed Pending 08/31/2018 1:16 PM 09/04/2018 10:11 AM 09/04/2018 11:31 AM 09/19/2018 9:00 AM CHANGE ORDERS CONSIDERED BY THE COUNTY ADMINISTRATOR'S OFFICE FOR THE PERIOD 08/01/18 — 08/31/18 PROJECT CO# AMOUNT DESCRIPTION DATE CONSIDERED CAUSE HVAC System 14 $45,585.00 Labor and material to install two control valves in *08/10/18 Omission from the drawings and Improvements — Stock the Condensate l ines, and one equalizing line specin cations. Island ]ail Complex between the towers. An additional 60 days to substantial completion is n eeded. I Total $45,585.00 * Approved ** THE FOLLOWING CHANGE ORDERS HAVE CUMULATIVE TIME EXTENSIONS OF OVER 6 MONTHS (180 DAYS): HVAC System Improvements — Stock Island ]ail Complex. Original date of substantial completion was 02/20/17: CO #1— Extend substantial completion 31 days due to delays in procuring the Air Handlers. CO #2 — Extend 60 days due to delays in procuring the Air Handlers. CO #5 — Extend 90 days due to delays in the installation of Chiller #1. CO #6 — Extend 120 days. 28 day delay to repair the concrete spalling on the roof for the cooling tower and 92 day due to delays caused by Hurricane Irma. CO #7 — Extend 30 days due to delays in coordinating with the sub - contractor. CO #8 — Extend 30 days due to delays in coordinating with the sub - contractor. CO #9 — Extend 30 days due to delays in coordinating with the sub- contractor. CO #11 — Extend 35 days due to the deteriorated security bars found that had to be removed and replaced. CO #12 — Extend 30 days due to the fabrication and lead time needed for the security bars in CO #11. CO #13 -- Extend 60 days due to an error and omission in the original specifications. Contractor has to recommission two Daiken Chillers and set up the condenser water pumps to be controlled by the chillers. CO #14 — Extend substantial completion by 60 days to install two control valves in the condensate lines at the towers, and one equalizing line between the towers. These were omitted from the drawings and specifications. Total number of days from beginning substantial completion to September 17, 2018 is 576 days. /_[i 1 .T: �:rm; - .. r MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 14 HVAC System Improvements Stock Island Jail Complex INITIATION DATE: June 27, 2018 TO CONTRACTOR: CONTRACT DATE: June 15, 2016 Sea Tech of the Florida Keys, Inc 131 Palomino Horse Trail Contractors Change Order Request: 14 Big Pine Key, Florida 33043 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price).,......., ..... ..................$1,538,612.00 Net change by previously authorized Change Orders ....... ............................... $ 47,288.14 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was..$1,585,900.14 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (Unchanged) by this Change Order.. $ 45,585.00 The new (Contract Sum l (Guaranteed Maximum Price) Including this Change Order $1,631,485.14 The Contract Time will be (increased} (decreased) (unchanged) by .....................60 Days The date of Substantial Completion as of the date of this Change Order is......... WW, 2018 It Detailed description of change order and justification: Contractor needs a 60- day time extension to have subcontractor install one control valves In the condensate lines at the towers and one equalizing line between the towers. None of this was outlined on the drawings or in the specifications. Once this is completed, the contractor will be able to complete the Test and Balance, Substantial completion increase of 60 days from July 19, 2018 to September 17, 2018 This change Order Is2.96% of the orioinglontract Price. blo vallo unfJI sinned by Owner, Arch itect (KjM1IrgbIeI. and Qontract or ARCHITECT: CONTRACTOR: PROJECT MANAGEMENT: COUNTY /ASSISTANT ADMI r k+y Change Order Attachment per Ordinance No. 004 -1999 • Change Order was not included in the original contract specifications. Yes 2 No ❑ If Yes, explanation: The two control valves in the condensate lines at the towers and one equalizing line between the towers were omitted from the original drawings and specifications. An additional 36L days is needed. 00 p,,r— • Change Order was included in the original specifications. Yes ❑ No CR If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater).Yes ❑ No JZ If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: M Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ® No ❑ M err Explain: Errors and omissions will be resolved with Architect at the end of the project. £«« @., KEYS W 19 M! T iff 0 IT M"M 7 A M Attn: Dan BcnsIcy 1100 Simonton Street, 2-211 IMWILYMMMSY119 SL'Etl revise sequence of operation with the 9.1 condenser water purn 9.2 Superintenden i 1 Is @ 42774.4 $42,774.43 16 hr @ 40 $640.00 I Payment in full upon completion. Any attemtion or deviation from above specifications involving extra costs will be executed only upon written 3irders and will become an extra charge over and above the estimate, All agreements contingent upon strikes, « cidents, or delays beyond our control. Owner to carry fire, tomado and other necessary insurance upon above work. Workers Compensation and General Liability insurance on above work will be taken out by SEA TECH, INC, Note - This proposal may be withdrawn by us if not accepted withi< \f¥!«« ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as outlined above. 2ignature Daft r-0 W I., T.E.M. Environmental Mechanical Services, C R .e: Stock Island Jail HVAC Improvements 6/20/2017 Add equalizing line to Cooling Towers at the Detention Center COR-1505-08 Em"M MM Our price includes the following: Install equalizing line between cooling towers CT-1 & CT-2 and revise isequence of operation with the condenBer water pumps We thank you for the opportunity to provide you this proposal. If you have any questions please do not hesitate to contact us. We look forward to working with you in the future. T nvironmental & Mechanical Services, Corp Tom McKee me [He Vice President Tel: 305-414-8290 www,temenvir(nncch,QQjU temenvironmental@yahoo.com M W I., - Aonme County Detention Center 6/20/2018 Key West Eq*ment & Material $ 3,293.92 TAX -B7+810 $ 197.64 Subcontractors S 36,796.00 Miscellaneous $ - Supervision $ 450.00 Labor $ - u $ 4D,737.56 Bid Amount proft 5% proft 42,774A3 11111EM - �A -14 F-ITMEM 1711MIM-ITT07fr4w4d 1 9'. g"Ej=', Ifiitrit-TI.���- .1 r-O Rough Material Factor 1 00 1.00 Rough Material Total - $ 4S.00 0 Equipment Total 3,293.92 INS Rate 0.09700 Equip & Material Total 3,293,92 ti 100NE 3 RD STREET UNIT (F) HALLANDALE FL. 33009 Mechanical Construction & Structural Welding OFFICE (954) 458-WELD (954) 458-9353 Fax (954) 455-7932 CELL (305) 804-1924 PR0P0MSU Ili. i1TTEUT* TEM ENVIR6NMENTAL &MECHANICAL SERVICES Nam 405 NWE STOCK ISLAND CORRECTION CENTER III 14 We PropO 910 hereby to furnish labor and materials ® complete In accordance with above specifications, for the sum of 50% BEFORE STARTING AND 50% APPON COMPLETION PayMent to be Mada U UbW& oullned above, Data of Accaphince. Aulhorl;zad Signature . . ..... Note: This propo5M may be withd(am by us if not accepted wn days, r.0 W I., SIEMENS Siemens Industry, nc_ Building Technologies 3021 N Commerce Parkway, Miramar, FWda 33025 5501 College Road Key West, Florida 33040 Name Matthew Lammar Departmert Automation Service Project Telephone 954-364-6737 Fax NA Mobile 954-609-3685 E-Mall Matthew Lammer@Sismons.com I 7 F I F I I I i I ITT I I I �illi I 1171717�111:1� ig�II R IFTT 1, conduit, control wiring, and 120V power Wiring from the Siemens control panel to the two now control actuators and specialist labor to implement the revised CW valve and pump sequence, Exclusions. & • Permit fees. • Painting and patching 1111111,MPTVANNTIT! �.- FOM =—. Company Name: Siemens Industry, Inc. By (Signed) By (Signed): Name Matt Lammer Name Title: Project Manager Title: e Date: 6118118 Date: Siemens Industry, Inc. `1000 Deerfield Parkway Building Technologies I):. 4:1 Buffalo Grove, IL 60089 North America Headquarters United States Accepted I have read the attached Terms & Conditions of Sale, understand them fully, and agree to abide by them. I r-O W I., =211ME MEMORANDUM TO: Board of County Commissioners From: Assistant County Administrator Date: August 9, 2018 RE: Change Orders Attached is a proposed Change Order #14 Sea Tech of the Florida Keys, Inc., HVAC System Improvements Stock Island Jail Complex. The Contract Sum will be increased $45,585.00. The date of Substantial Completion as of the date of this Change Order is August 18, 2018. According to Ordinance No. 0041999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. ignature VAsis? County Administrator Kevin G. Wilson Print Name M IM