#9th Change Order 09/28/2018Jacobs Key West International Airport 09 Monroe County Strengthen - 'Rehabilitate Commercial Apron Project No. GAKAP148 CHANGE ORDER PROJECT: CHANGE ORDER NO.: 9 Strengthen `Rehabi 1 itate Commercial Apron INITIATED ON: September 18, 2018 TO (Contractor): ABC Construction. Inc. 7215 NW 7 Street Miami, Florida 33126 CONTRACT: GAKAP148 CONTRACT DATE: November 22, 2016 You are hereby authorized and directed to make the following change(s) in this Contract: Due to Signature Airlines not revising their lease with the airport, the scone of the Droiect had to be modified to not include the Signature Lease area. In order to tie into the Signature Lease area, the Contractor is required to mill and resurface the existing asphalt. The original contract did not include a milling line item. This charge order is the cost associated with milling the existing asphalt. The original Contract Sum ............................... Net change by previously approved Change Orders......... The Contract Sum will be unchanged by this Change Order ...................... The new Contract Sum including this Change Order will ................ ............................... The Contract Time will be increased by ......... ............................... $ 9.250.000.00 $ 41.583.30 $ 14.355.00 $ 9,305,938.30 NA Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the Contract Sum and or the Contract Time. Adjusted cost and time include all direct. indirect apJ impact costs and time for delays. disruption, inefficiency, acceleration and all other claims. . /`` NRI)E COU F RECOMMENDED: Jacobs Engineering Date Y� OA AGREED TO: � ° °" °' - _ �--�_ PEDRO MERI ADO ABC Construction, Inc. Datgr k k By I Date AUTHORIZED: ? ` G Change Order Attachment per Ordinance No. 004 -1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Due to Signature Airlines not revising their lease with the airport, the scope of the project had to be modified to not include the Signature Lease area. In order to tie into the Signature Lease area, the Contractor is required to mill and resurface the existing asphalt. The original contract did not include a milling line item. This charge order is the cost associated with milling the existing asphalt. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No Fa If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes []No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: ABC Construction, •.O ti, TITLE: Transition Ramp at Phase 11 DATE: 09/17/2018 PROJECT: Keys Strengthen Rehabilitate Commercial Apron JOB: GAKAP145 TO: Attn: Lasa (Adams) Ennis, P.E. CONTRACT /PO: GAKAP145 Jacobs 200 West Forsyth Street Suite 1520 SUBMITTED: 09117/2018 Jacksonville, Florida 32202 Phone: 904.636.5432 Fax:561.799.6579 COMPLETED: REQUIRED: Num Item Description Ref Qty Unit Unit Price Amount 1 Milling Machine Mobilzation 1.000 Lump 8,500.00 8,500.00 2 Work Done During the Evening 1.000 Lump 3,000.00 3,000,00 3 Trucking (Minimum Fee) 2.000 Each 600.00 1,200.00 4 Water Truck Rental 1.000 Night 350.00 350.00 5 ABC OM Profit 1.000 Lump 1,305.00 1,305.00 Total: $14,355.00 APPROVA By: y: *.Andy PDeLas Date: 09/17/2018 Date: Faustino Paz Ortiz (FPO Trucking Inc. Transportation Services) 305- 509 -9604 6717 Shrimp Road Apt 217 Key West, Florida 33040 United States Billed To Date of Issue Jorge Gonzalez 09/12/2018 ABC CONSTRUCTION Invoice Number 0000229 Amount Due (USD) ZU 7215 NW 7th Street Due Date Miami, Florida 09/12/2018 33126 United States Description Rate Qty Line Total Hauling Milling from the Airport to Toppino's. Trucks# 0820 and #3119 $75.00 16 $1,200.00 Subtotal 1,200.00 Tax 0.00 Total 1,200.00 Amount Paid 0.00 Amount Due (USD) $1,200.00 A. LUIS MILLING & SERVICES, INC. 24250 SW 142 AVENUE HOMESTEAD, FL 33032 Phone# 305 -216 -7331 aluismilling @bellsouth.net Fax # 305 -257 -2399