10th Change Order 10/18/2018 • - -
Jacobs Key West International Airport 10/18
Monroe County
Strengthen /Rehabilitate Commercial Apron
Project No. GAKAP148
CHANGE ORDER
PROJECT: CHANGE ORDER NO.: 10
Strengthen /Rehabilitate
Commercial Apron INITIATED ON: October 2, 2018
CONTRACT: GAKAP148
TO (Contractor): ABC Construction, Inc.
7215 NW 7t Street
Miami, Florida 33126
CONTRACT DATE: November 22, 2016
You are hereby authorized and directed to make the following change(s) in this Contract:
Due to the existing base material and high -water table adjacent to the signature lease area, the transition ramp will be
constructed with P -501 Portland Cement Concrete instead of asphalt. This change order is for the re- mobilization of
Homestead Concrete to complete the work.
The original Contract Sum $ 9.250,000.00
Net change by previously approved Change Orders $ 129,023.25
The Contract Sum will be unchanged
by this Change Order $ 3,850.00
The new Contract Sum including this Change Order
will be $ 9.382.873.25
The Contract Time will be increased by NA
Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the
Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time
for delays, disruption, inefficiency, acceleration and all other claims.
RECOMMENDED: AGREED TO:
Jacobs Engineering ABC onstruction, Inc.
IAAA 41/ L 3 [ 20I : 6' 1 0
y 1 to By D. to
AUTHORIZED.
Key West International Airport Monroe County
3491 South Roosevelt Blvd. 1100 Simonton Street
Key West, FL 33040 Key West, FL 33040
to I ArsaralkiiiiranZMI.Ti s i r tor 10 8 IS
By Date By P ate
ptgC- 14s 2(„ks f Ntoti'1(6vta1 '�1''�e C di
• NROE 4 4' ORN
imp tillsAI - D'A ;'12- `A-t- �- fC \c 'p `4'S 4 4 ch4'T • / PP E `� , • • •RM
1 J - ED:3
J • T COUNTY ATTORNEY ,)/
CG
Change Order Attachment per Ordinance No. 004 -1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
Due to the existing base material and high -water table adjacent to the signature lease area,
the transition ramp will be constructed with P -501 Portland Cement Concrete instead of
asphalt. This change order is for the re- mobilization of Homestead Concrete to complete the
work.
• Change Order was included in the original specifications. Yes ❑ No El
If Yes, explanation of increase in price:
• Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No14
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes No
Should a claim under the applicable professional liability policy be made? Yes ❑ No El
Explain:
ABC Construction, Inc. PROPOSED
CHANGE ORDER
7215 NW 7 Street Phone: 305- 663 -0322 No. 11
MIAMI, FL. 33126 Fax: 305 -267 -2403
TITLE: Phase 11 Transition Ramp Mobilization DATE: 09/25/2018
PROJECT: Keys Strengthen Rehabilitate Commercial Apron
JOB: GAKAP145
TO: Attn: Lasa (Adams) Ennis, P.E. CONTRACT/PO: GAKAP145
Jacobs
200 West Forsyth Street Suite 1520 SUBMITTED: 09/25/2018
Jacksonville, Florida 32202 COMPLETED:
Phone:904.636.5432 Fax:561.799.6579
REQUIRED:
Num Item Description Ref Qty Unit Unit Price Amount
1 Homestead Concrete 1.000 Lump 3,500.00 3,500.00
Mobilzation
2 ABC O/H Profit 1.000 Lump 350.00 350.00
Total: $3,850.00
APPROVAL II
By: By:
• se Las Sales'
Date: 1/25/2018 Date:
. J
-
M Homestead Concrete and Drainage, Inc.
-- - Change Order # 7
CC C '
No: 016 -7.35
To: ABC Construction, Inc Date: 9/21/2018
7280 Nw 8th St
Miami, FL 33126
Attn: Kaila Melo
Phone (305) 663 -0322 •
E -mail: kmelo@abcconstruction.cc
Project Name: Key West International Airport - Strengthen /Rehab Commercial Apron
Location: Key West International Airport FL
Project by: JACOBS
This Change Order contains an itemized quotation for changes in the Contract Price and /or Time in response to
proposed modifications to the Contract Documents or other conditions which require herein.
Causes of Change Orders:
Correction of design discrepancies with errors or omissions in the contract documents
ADDITONAL WORK NEEDED AT TRANSITION AREA PHASE 11
Description of Proposed Change:
ADDITONAL PER DIEM, HOUSING, MOBILIZATION SMALL WORK
+ SY PRICE PER CONTRACT (83.33SY)
LINE ITEM 501 -1
Item Description: Qty: UOM: Price Total
4 Men, 3 Rooms, 1 Day /1 Night, Hand Roller Equipment, Truck W/ Trailer 1 $0.00 $0.00
MOBILIZATION, PER DIEM, HOUSING, TRAVEL, FUEL (GENERAL COND) 1 LS $3,500.00 $3,500.00
Change in Contract Price: $3,500.00
Change in Contract Time (days): 2
Acceptance of Change Order -
The above prices, specifications and conditions are satisfactory and are hereby By.
accepted. You are authorized to do the work as specified. Payment will be made as
outlined as above. Date:
221 SW 4th Aavenue, Homeate, FL 33030 P: 305.248 -9649 F: 305 -248 -9650