1st Change Order 10/25/2018MONROE COUNTYANGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Key Largo II Roadway and Drainage Project CHANGE ORDER NO: 1 INITIATION DATE: 1011/18 TO CONTRACTOR: Weekley Asphalt Paving, Inc. CONTRACT DATE: 6/20/18 The Contract is changed as follows: The original Contract Sum......................................................................................$1,622,981.58 Net change by previously authorized Change Order ...................................................... $0 The Contract Sum prior to this Change order was.........................................................$1,622,981.58 The Contract Sum is (decreased) by this Change Order #1 ($37,200.00) The Revised 1 Contract Sum including this Change Order ............................................ $1,585,781.58 Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the Work shall be determined in one or more of the following: 7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation 7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon 7.2.2.3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee Due to utility conflicts Weekley Asphalt (refer to contract change request) recommended eliminating solid pipe crossing the roads and instead installing additional french drain/slotted pipe in the right of way. This change was approved by the FOR and the CEI (RS&H, Inc.) concurs with the change to the contract as follows: Bid Item No. Description Decrease/Increase Quantity UO M Unit cost $ Amount 430-175-115 15 inch solid pipe -224 LF $180.00 ($40,320.00) 430-175-118 18 inch solid pipe -26 LF $180.00 ($4,680.00) 443-70-4 French Drain 24 inch 26 LF $300.00 $7800.00 Total Deduction to Contract Change Order 1 $37,200.0,0 The project commencement was August 22, 2018. Contractor agrees to accept the decrease in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order is (.023 %) of the original contract price. Not valid until signed by FDOT�kQwner. Architect (if applicable), and Contractor CONTRACTOR II 111 115 Date ENGINEER OF RECORD (CDM) Io02 /♦f 6 UT pw ate ENGINEERING SERVICES DIRECTOR `�/i�L ` "� J ��✓� uaie ASSISTANT COUNTY ADMINISTRA R Date FLORIDA DEPARTMENT OF TRANSPO TATI N (SCOP FUNDED) IoArIt P Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Due to utility conflicts, contractor recommended revision to the drainage layout and it has been approved by the Engineer of Record (CDM Smith) • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Weekley Asphalt Paving, Inc. 20701 Stirling Road • Pembroke -Pines, Florida 33332 Oct.1, 2018 Jackson Taylor RS&H 3100 Overseas Highway Marathon, FL 33050 Re: Key Largo II Roadway & Drainage Improvements Dear Jackson, Please consider this letter Weekley Asphalt Paving, Inc: s request to eliminate some of the pipe crossings between drainage structures on the above mentioned project. Due to the close proximity of the vacuum sewer lines and the water service lines to the.structure locations throughout the project, we are at risk of numerous conflicts and potential damage to the existing facilities. We certainly do not want to risk the possibility of damaging the facilities and placing the sewer and water out of service for the residents. Also there will be a substantial cost savings to Monroe County as the pipe items to be eliminated would deduct $37,200.00 from the contract (-224 LF 15" pipe @ $180.00/LF, -26 LF 18" pipe @ $180.00/1-F and + 26 LF 24" French drain @ 300.00/1-F). See attached Table of the proposed pipe to be eliminated and French Drain added. Please review this request and get back to me with any questions or comments you may have. Respectfully, Rob nkman Weekley asphalt Paving, Inc. CC; 18077 file PHONE: (954) 680-8005 ENGINEERING FAX (954) 680-8671 • ACCOUNTING FAX (954) 680-8692 Structure 15" 18" 24" FD S-1 . -28 S-4 -26 S-7 -19 S-8A -23 S-10 -31 S-11 -27 S-12 -22 S-13A -28 S-13B -221 26 S-15 -24 TOTAL -224 -26 26 Key Largo II Drainage Revisions Had to extend this drainage pipe in order to avoid placing the structure into the driveway CHANGE ORDER 1 Pay Item Item Description Units Quantity Unit Price Item Total 430-175-115 PIPE CULVERT, OPTIONAL MATERIAL, 15" S/CD LF -224 $ 180.00 $ (40,320.00) 430-175-118 PIPE CULVERT, OPTIONAL MATERIAL, 18" S/CD LF -26 $ 180.00 $ (4,680.00) 443-70-4 FRENCH DRAIN, 24" LF 26 $ 300.00 $ 7,800.00 Total 1 $ (37,200.00) French Drain Eliminate Cross Drain? Comment FDA y install approx equal lengths of FD on each side of S. Bay Harbor Dr FD-2 N majority of basin drains to north side of S. Bay Harbor Dr FD-3 N majority of basin drains to south and east sides of N. Bay Harbor Dr FD-4 y install approx equal lengths of FD on each side of N. Bay Harbor Dr FD-5 y install approx equal lengths of FD on each side of Sunset Rd FD-6 N majority of basin drains to south side of Sunset Rd FD-7 y install approx equal lengths of FD on each side of Bonito Ln FD-8 y install approx equal lengths of FD on each side of Lobster Ln FD-9 N cross drain needed for drainage FD-10 y install approx equal lengths of FD on each side of Dove Rd FD-11 y install approx equal lengths of FD on each side of Heron Rd FD-12 y install approx equal lengths of FD on each side of Mockingbird Rd FD-13 y install approx equal lengths of FD on each side of Heron Rd FD-14 NA no cross drain FD-15 y install approx equal lengths of FD on each side of Snapper Ln FD-16 NA no cross drain FD-17 NA no cross drain '.7Y'd '600'EZSt9l9 37NN N3ONN UMS ONV 03N9IS 37Id 31NCWJ7373 MI 51 J33HS SIH1 90 OL073N 7YI3iddO 3H1 - c 00'OS+LS! S 3NnHJ1vn x b u � t t W 44 lsO ;L O W d yy Q uj/ cc kn cc tl*l IAr h ` coro S I " LDW ' W Ir O I W' cw 'WpOyW 61 I 5n to Z Lu 3 I j o _ I yr.a - 'uj XCIA gg W VAX .F50'00 E (( Ip 2 ao i p 1;9 W N 514E �_`I �I Lu I wi 91.4 �_ W c\ o Lu I A as 11 c, . eW hZl �o I u f1. f'li W w ea I w m W z�yy uSH o oti .I 00'09+L£I T45 3NIIH01VN bs N N "` r„ J m I a Y � W A m oby_ i Boa u �o aw qq } Lu w ^ a q Ci w `n � a 2 m � z o w � m _ w cc -a eau a ma aaumi uanaa uw OaN915 3?li 3INOa13373 3H1 S! 133NS SIH1 dO ON033N lVDIdd0 3H1 }R}�� SAW s�:q70 i +�;yA�,• Tr y �4 4' Q5 .] N43 - CCii !Y • I � � II i CO 'ate '�7I LL W `ice u lid p v W C-1 Y¢ m CI 1,{, t ;� W C l7 a W atSc O e C _ W Lu 1� CC CLU � a Ix CA J r � '+ r g W �� •. o '. Y s7 0� W •1 W� 1 W CUO .. O I, Z _ W ® /1 .,.. �CC N� S �•o gq N''m 2� oo .�. F•I a.�¢ a� U i' dcaQ W e ec o F ICE Vi W V CCG �acr / eal.fY=n CC�C p0cw CC7� ta` - .OLa ;O UQ C LU m q .... -. •a :4r:.as .or u.. m U.W + ac - w Q co -- LU k AIAH SV3SN3AO / L 'S'!1 J co 4b V_ c: 8 v k m u m