Loading...
Item G1 Revised 3/99 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 01/19/2000 Division: Public Works Bulk Item: Yes 0 No ~ Department: Enaineerina AGENDA ITEM WORDING: Report on Palm Avenue Bike Path, Key West. ITEM BACKGROUND: After the December 1, 1999 Board Meeting, a group of individuals met at Old City hall to discuss Palm Avenue Bike/Pedestrian Path. Included at the meeting were City Commissioner Merili McCoy, Joan Langley of the Key West Pedestrian Action Commission, Jim Malcom of the City's Planning Commission and bicycle advocate, City Engineer Roland Flowers, and County Engineer David Koppel. After much discussion, an agreeable plan was reached. The plan called for a six-foot wide bike/pedestrian path to be placed on both sides of the roadway. The path would be separated from the roadway with a two-foot strip of sod and connections between the path and the roadway will be made as needed. This alignment will eliminate the need to relocate the underground utilities, and will not interfere with the electric poles. The stormwater management system will be redone and brought up to code during this project. . PREVIOUS RELEVANT BOCC ACTION: At the December 1,1999 Town Hall Meeting in Key West, several individuals addressed the Board regarding the need for a bike path and pedestrian walkway on Palm Avenue. STAFF RECOMMENDATION: N/A TOTAL COST: N/A COST TO COUNTY: N/A REVENUE PRqDUCING: Yes 0 No D BUDGETED: Yes 0 No 0 AMOUNT PER MONTH YEAR APPROVED BY: COUNTY A TTY 0 ~/:URCH;'I~ 0 RISK MANAGEMENT 0 ITEM PREPARED BY: ~~ County Engineer, Engineerin epartment DIVISION DIRECTOR APPROVAL: ~ /2-/21#7' DIVISION DIRECTOR NAME: Dent Pierce . DOCUMENTATION: INCLUDED:. 0 TO FOLLOW: 0 NOT REQUrED:~ DISPOSITION: AGENDA ITEM #: ,(; . I.