12/15-36 Baggage Area Doors-ARFF Canopy j J.5pM7°4-f..- Kevin Madok, CPA
i► ••.-`= Clerk of the Circuit Court&Comptroller—Monroe County, Florida
DATE: December 4, 2018 •
TO: Beth Leto,Airports
Business Manager
FROM: Pamela G. Hanc•./ 1�t.C.
SUBJECT: November 20'BOCC Meeting
Enclosed is a duplicate original of Item G18,Jacobs Project Management Co.'s Task Order
No. 12/15-36 in the amount of$78,491.00 for design and bidding of Baggage Area Doors and an
Aircraft Rescue Fire Fighters truck canopy at the Key West International Airport, to be funded
50% FDOT Grant G0E77; and 50%Airport Operating Fund 404, for your handling.
Should you have any questions,please feel free to contact me at(305) 292-3550. Thank
you.
cc: County Attorney
Finance
File
KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING
500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road
Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Florida 33070
305-294-4641 305-289-6027 305-852-7145 305-852-7145
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
teen Effective Date l pan ReclaimTask Order. No. 12/15-36
d (0301$ -53OO�
Client.Project No. A 135-5,503.l U Engineer Project No. E9Y37936
This Task Order is entered into on the effective date noted above pursuant to the "Master
Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS
PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The
Agreement is incorporated herein and forms an integral part of this Task Order.
Services Authorized—Baggage Area Doors and ARFF Canopy—Contract Documents
Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and
incorporated herein, which Exhibit A is marked with the above noted Task Order No. and
consists of 6 page(s).
Pricing .
N/A Time and Expense per Agreement and Appendix B to the Agreement
-r
j.
•
X Firm Fixed Price of$ 78,491.00 .
N/A Other(Describe): o ROE •1� r • ' OR Z rn.
j 'PR• �� 9'o OR cry
Schedule ,• E ADO =
J.M RC p..;.. . .
Services may commence on Execution ASSIST•. •, : - •-
Date — .
�yds" tiServLe , ill cease by 365 da s
BOARD OF COUNTY COMMISSIONERS
tyATTSST9 4, VIN MADOK, CLERK OF MONRO COUNTY, FLORIDA
BU�i N L 4
L4 r3"w
:737A )9Aelt÷..,
By
Mayor/Chairman •
CONSULTANT:
JACOBS PROJECT MANAGEMENT CO
By I
Witn Title Operations Leader
• ROE CO, •
, PROs%� ' 03 .
File: MSTR APS—Monroe County
Page 1 of 1 •- r ' •UNTY A17ORNEYjo S 18
Date
Exhibit A—Scope of Work (12/15-36)
Monroe County
Key West International Airport(EYW)
Baggage Area Doors and ARFF Canopy— Contract Documents
SCOPE OF WORK
Jacobs will provide architectural, structural and electrical engineering documents for the addition
of three new overhead roll-up doors at the existing terminal baggage handling area(airside). The
overhead doors and support structure shall be designed to meet current code requirements. The
doors will have electric operators with manual override capabilities. Also included is the addition
of a new free-standing pre-engineered aluminum canopy, approximately 600 square foot+/-,for
the ARFF truck.The columns will have a four-foot high concrete base. The ARFF canopy,
including foundations will be included in the bid documents as being provided by a delegated
engineer. These improvements will be located at the Key West International Airport in Key West,
Florida. All design work shall be designed in accordance with the current Key West Airport
Design Guidelines and shall comply with the Florida Building Code 2017.
Jacobs understands that as-built documentation of the existing facility and site are available. A
topographic survey will be required to be performed for the areas of work.
EXISTING CONDITIONS
The current baggage handling area at the airport is open to the elements and the opening is
divided in three sections by structural steel columns and covered by a steel framed roof structure.
The ARFF truck canopy will be located on the existing concrete apron and modifications to the
concrete apron will be minimized. The contractor shall provide a delegated engineer for the pre-
engineered canopy and foundation design.
DESCRIPTION OF WORK
The data collection, design, bidding, and special services will include:
Article A—Data Collection
Field Verification: Visit and inspect the site (1 visit) to determine if existing conditions match
those provided by Monroe County. Take photographs and make written documentation, sketches,
notes or reports to confirm and record the general conditions of the existing facility and site.
Within this initial phase we will review all applicable requirements.
Initial Meeting: Conduct a meeting with representatives from Monroe County and the design A/E
team to include architect, electrical engineer and structural engineer. The purpose of the meeting
will be to brief the Jacobs team on the design intent, discuss project features, and review
submittal requirements with the design team, and answer questions developed by the Jacobs team.
Page 1 of 6
Data Collection phase will also include:
• Coordinate with the topographic survey sub-consultant, as necessary.
• Review available record drawings
• Perform a site investigation
Services for Article A will be provided under a lump sum basis.
Article B—30% Design
The specific tasks Jacobs will perform are as follows:
A meeting with Monroe County will be held to review the 30% Design documents and
generate comments towards the next design phase. The 30% design will include the
following drawings:
• Set up drawing set.
• Title Sheet.
• General Notes,abbreviation and code information.
• Site Plan.
• Life-Safety Plan.
• Floor plans(s)drawn at an architectural scale that will allow the entire facility to be
shown on one sheet,without break-lines and with notes and dimensions.
• Roof plan.
• Architectural exterior elevations.
• Baggage Make-up Area roof framing plans(schematic).
• Electrical power plans(schematic).
• 30% construction order of magnitude cost estimate.
Services for Article B will be provided under a lump sum basis.
Article C—90% Design
The specific tasks Jacobs will perform are as follows:
After written authorization to proceed and based on the approved 30% Design Phase documents
or in the Fixed Limit of Construction Cost authorized by Client, Jacobs shall prepare the Final
Construction Documents setting forth in detail the requirements for the construction of the
project. During this work phase, we will prepare all required construction documents for permit
and construction. We will provide detailing for the completion of the improvements. This work
effort will include architectural, structural and electrical plans.
Documents shall include the following:
• Title sheet including index of drawings, abbreviations, schedule of material indications,
and schedule of notations and symbols.
• An area location map and legal description of property.
• Life-safety plans to show exit strategy, rated doors, emergency wall openings and ramps.
Fire extinguishers, emergency lighting, exit signs, smoke and fire dampers, and other life
safety-equipment relevant to the facility shall be indicated by symbol.
Page 2 of 6
• Floor plans including: All dimensions and any target notes explaining the extent of work,
wall types, or other component, assembly or direction regarding the construction.
• Reflected ceiling plans.
• Exterior elevations showing location of the rain water leaders, openings and light
fixtures.
• Building and wall sections to establish vertical controls and construction types for the
Project.
• Details of the following: Door jamb,head and sill conditions.Door head, sill and jamb
conditions.
• Structural Engineering framing plans, structural schedules and details.
• Structural analysis and calculations.
• Electrical Engineering: Drawings for convenience outlets and circuiting. Power systems
and equipment. Panel schedules,applicable installation details, general legend and
abbreviations.
• 90% construction order of magnitude cost estimate.
Services for Article C will be provided under a lump sum basis.
Article D—100%Design
The specific tasks Jacobs will perform are as follows:
After written authorization to proceed and based on the approved 90% Design Phase we will
prepare the bid and construction documents for permit and construction of the improvements.
We will finalize the construction documents and incorporate final owner comments from the 90%
review. The construction documents will include signed and sealed architectural, structural and
electrical plans.
Documents shall include the final drawings for following:
• Title sheet including index of drawings, abbreviations, schedule of material indications,
and schedule of notations and symbols.
• An area location map and legal description of property.
• Life-safety plans to show exit strategy,rated doors, emergency wall openings and ramps.
Fire extinguishers, emergency lighting, exit signs, smoke and fire dampers, and other life
safety-equipment relevant to the facility shall be indicated by symbol.
• Floor plans including: All-dimensions and any target notes explaining the extent of work,
wall types, or other component, assembly or direction regarding the construction.
• Reflected ceiling plans including all discipline coordination.
• Exterior elevations showing location of the rain water leaders, openings and light
fixtures.
• Building and wall sections to establish vertical controls and construction types for the
Project.
• Details of the following: Door jamb, head and sill conditions.Interior signage to include
room identification, emergency exiting and equipment signs, and any other items
pertinent to the identification of the project.
• Structural Engineering framing plans, structural schedules and details.
• Structural analysis and calculations.
• Electrical Engineering: Drawings for convenience outlets and circuiting.Power systems
and equipment. Panel schedules, applicable installation details, general legend and
abbreviations.
Page 3 of 6
• 100%construction order of magnitude cost estimate.
• Address comments from client and permitting agencies.
Services for Article D will be provided under a lump sum basis.
Article E—Bid Phase Services
Upon completion of the construction documents and at the request of the Airport,Jacobs will
prepare the project documents for bidding. Jacobs will perform bidding support services,the
following terms will apply:
• The County appoints Jacobs as its Agent, and Jacobs accepts such appointment to perform
bid/procurement services on Monroe County's behalf in connection with the project.
• Such services shall be performed under County's direction and in accordance to such
forms, terms and conditions, or modifications or revisions to same as County may in its
sole discretion at any time instruct Jacobs to use. All services shall be carried out in
accordance with the procedures mutually agreed upon by County and Jacobs.
• Jacobs shall not have authority to accept or bind the County in any way to changes,
modifications, revisions, alterations, amendments, or supplemental, additional, or
different terms and conditions (hereinafter referred to as "deviations") which may be
submitted or requested by a vendor or contractor. Jacobs shall immediately submit any
deviations from the County's standard terms and conditions to the County for review by
the County's Purchasing Manager or their representative and such deviations shall not be
accepted by Jacobs unless Jacobs receives express written approval thereof from the
County's Project and/or Purchasing Manager or their representative.
• All documents issued by Jacobs hereunder shall be signed by Jacobs for the County if so
directed. The ownership and title of all items purchased hereunder shall pass directly
from the selling party to the County, and Jacobs shall at no time be a party to such
transaction other than as agent of the County. The County shall have the unilateral right
to have the commitment authority of Jacobs, its employee or this limited agency
authorization in its entirety revoked and cancelled at any time, with or without cause.
The County shall be obligated directly to the selling party for all payments for materials,
equipment, supplies and services procured hereunder.
• The County shall hold Jacobs and its employees harmless from any claims, suits or
liabilities arising out of any breach or other failure of performance by any contractor,
vendor or supplier under any contract or purchase order issued by Jacobs hereunder.
The following task will be performed as part of the bid phase services:
• Coordinate with the County Purchasing Department and the Airport to advertise for bids.
• Coordinate with the County to provide electronic copies of the bid documents to
prospective bidders
• Prepare for and attend a project pre-bid conference
• Prepare responses to address requests for information from prospective bidders
• Prepare and coordinate the issuing one(1) addendum with the County purchasing
department.
Page 4 of 6
• Revise bid documents as necessary for the addendum
• Review bids for responsiveness
• Prepare a bid tabulation
• Make a recommendation for award based on review of the bid information submitted.
QUALIFICATIONS AND ASSUMPTIONS
For the purpose of providing a stipulated fee amount, this proposal has been based on the
following qualifications and assumptions:
• As-built documents will be provided by owner, including underground utilities.
• Design shall be based on site walk through and attached exhibits.
• Permit issuance related work such as processing plans through City, County,
and/or State agencies, other than plan revisions requested by such agencies, are
not included.
• Environmental Engineering is not included.
• Geotechnical Engineering is not included.
• Government Agency cost for all building and engineering permit fees are not
included in this proposal.
• Review of change orders is not included.
• Construction administration services required by lending institutions and/or
prospective tenants in this project are not a part of our services in this phase.
• Preparation of close-out/warranty documents coordination is not included.
• Design of the pre-engineered metal canopy and foundations shall be provided by
the contractor per the basis of design prepared by our office.
• Construction Administration Services are not included.
• As-Built drawings are not included.
• Life Cycle Cost Analysis is not included.
• The testing scope of services along with the construction testing is by others.
• Lightning protection will not be provided.
• Water fire flow test is not included.
• Preparation of 3D renderings and/or marketing brochures are not included.
• Proposal is based on the existing electrical systems having adequate capacity to
properly serve the improvements.No major modifications to the existing
electrical systems are included in this proposal.
• Attendance and/or presentation to public hearings and/or other meetings with
municipal agencies are not included.
• Municipal Agency and all associated permit fees are to be paid by the client.
Jacobs is not responsible for obtaining any permits.Permits are to be obtained by
the contractor. Jacobs will monitor the contractor's progress through the permit
process for the client and provide follow up periodically with the permitting
agency to verify the status,but it is ultimately the responsibility of the contractor
to obtain all permits.
• Services do not include"design to cost". Jacobs will assist the owner in
evaluating and offering cost reduction strategies as requested by client. The
"design to cost"is basically noting that if Jacobs receives direction from the
client or one of its sub-consultants on how to design the project and if any
changes are required due to the project being over budget,then the re-design
Page 5 of 6
•
required to bring the project back within budget is not a part of the lump sum fee
and shall be treated as additional services.
• It is assumed that the existing utilities (with required capacity) are available
adjacent to the improvements.
• Services not described in the scope of work are not included.
Items identified as not included or limited in the scope of services can be provided or
expanded upon as additional services under a separate agreement or supplemental to this
agreement.
REFERENCES
The client will need to provide the following documentation to Jacobs before commencing with
our scope of work.
• As-built documentation of the existing facility, site and underground utilities.
• Construction Budget.
• Program requirements.
COMPENSATION
See attached spreadsheet.
Direct project expenses will include printing, presentation material, travel, travel related costs,
delivery, research fees, photography and other costs directly associated with the performance of
our work shall be billed at cost.
SCHEDULE
We anticipate completion of the deliverables in accordance with the following schedule:
The overall duration of this effort will be as noted below:
Item Duration(Business Days)
A.Data Collection 20 business days from agreement authorization
B. 30%Design 20 business days from initial meeting and approval of
Schematic Design layout.
C. 90% Design 20 business days from approval of the 30% Design
Submittal.
D. 100%Design 20 business days from approval of the 90% Design
Submittal.
E. Bid Phase Services 60 business days from completion of 100%Design.
Page 6 of 6
JACOBS ENGINEERING GROUP
09.21.18
Monroe County
Airport:
Key West International
Project:
Baggage Area Doors and ARFF Canopy(12/15-36)
FEE SUMMARY
BASIC SERVICES
Hours Fee
PHASE 1
Article A: Data Collection 36 $ 6,707
Article B: 30% Design 126 $ 15,153
Article C: 90% Design 218 $ 27,510
Article D: 100% Design 147 $ 18,023
Article E: Bidding Phase Services 73 $ 11,097
TOTAL BASIC SERVICES LUMP SUM PROJECT FEE 600 $ 78,491
SPECIAL SERVICES
Hours Fee
TOTAL SPECIAL SERVICES LUMP SUM PROJECT FEE $ -
TOTAL SERVICES LUMP SUM PROJECT FEE $ 78,491
Page 1 of 6
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key West International
Project: /'
Baggage Area Doors and ARFF Canopy(12/15-36)
Article A:Data Collection
{ Sr Project Sr Project .'Project Structural Structural Mechanical Mechanical Electrical Electrical IF/Security
..WORKITEM Manager Architect Arch@ec''t Engineer' Engineer Engineer ,Engineer,--Engineer:-Engineer' Engineer Clerical TOTAL
Coordinate with Client(Initial 1 1
Meeting)
2 Code Research 1 3 4 3 11
4 Perform site visit 12 12 24
TOTAL HOURS 13 13 3 4 0 0 0 3 0 0 0 36
RATE $ 174.00 $ 169.00 $ 112.00 $ 135.00 $ 90.00 $ 135.00 $ 75.00 $ 147.00 $ 93.00 $ 225.00 $ 54.00
ESTIMATE $ 2,262 $ 2,197 $ 336 $ 540 $ - $ - $ - $ 441 $ - $ - $ - $ 5,776
Task Subconsultants TOTAL $ 5,776
Subconsultant-Avirom $ -
Subconsultant-Tierra $ -
Expenses $ 931
Lump Sum Fee Total $ 6,707
Task Expenses:
Mileage(480 miles round trip @
$0.555/mi)x I $ 266.40
Airfare($500 round trip)x 1 $ 500.00 TOTAL FEE $ 6,707
Meals and Per Diem($70)x 2 $ 140.00 /
Lodging($175 pr/nght)x 0 $ -
Airport Parking($25)x 1 $ 25.00
Total Expenses $ 931.40
2 of 6
• •
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key West International
Project:
Baggage Area Doors and ARFF Canopy(12/1538)
Article B:30%fledge
..... .,.. ,,,, , . .. .
_" : •- .. • ','''*:- -s '-Sr.p.iia sr.p;o1.,- t,,,,Ii.d . .s it i s' ' '' '' ' ;SF'Y
' woiicifErki .,-' Manager: ,Arehitect ArchiriCt.: - rinZeCT :SEinn'itt° .M411."LE'r 51"°°flk.l'Engl EI"tri'd 'FF1EI"f'l Sr.irrIS';irlt; 1 iii-sYi :-: .O21C;- neer. ' Engineer 'Engineer Engineer, ' '-i....... r:............
I Sei up GADD drawings/fries 2 2 2 6
2 Title Sheet(I) 4 4
3 General Notes,Abbreviations&Code info 2 I 2 3 3 II
(I)
4 General Plan/Reference Site Plan(1) 1 4 5
5 Life Safety Plan(I) 2 3 5
6 Architectural Floor Plans(1) 1 8 9
7 Architatural Reflected Ceiling Plans(I) 0
8 Architectural Roof Plan(I) 2 2
9 Building Sections(1) 0
10 Architectural Exterior Elevations(I) I 16 17
II Structural Foundation Plan(1) 2 3 5
12 Structural Roof Warning Plus)!) 2 3 5
13 Structural Details(I) 2 3 5
14 Electrical Power Plan(I) 3 6 9
15 IT/Security Plan(1) 0
16 Develop Specifications Table of Contents 1 2 3 6
17 Develop 30%Cost estimate I 1
Propane for and attend meeting to discuss
18 submittals and project progress(Interna))- 2 2
2
20 Coordinate and distribute plans 2 2 2 6
21 QA/QC 2 2 I 1 I 1 1 9
22 Prepare for and attend Review Meeting
4 I 5
with Client(Token) ,
23 Address Clients Comments 4 2 2 2 4 14
TOTAL HOURS 6 8 49 12 ° 00IS18 0 0 —
126
RATE S 174.00 S 169.00 $ 112.00 5 135.00 $ 90.00 S $ 75.00 S 147.00 S 93.00 $ 225.00 $ 54 00
ESTIMATE $ 1,044.00 $ 1,352.00 S 5,488.00 S 1,620.00 5 1,620.00 S 135.00 - s2,0500s1,674.0os
- $ - S 15,003.00
Task 3gr55eE,, TOTAL S 15,003
Mileage(380 miles round trip @
0.555/mi)x 1 S -
Printing 30%submission S 150 00 Sul:consultants S
Plans S - Expenses S 150
Airfare(5500 round trip)xi S - Lump Sum Fee Total S 15,153
Airport Parking S -
Meals and Per Diem(S70)x 1 S -
Total Expenses $ 150.00
TOTAL FEE 5 15,1531
3056
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key West International
Project:
Baggage Area Doom and ARFF Canopy(12/15-36)
Article C:90%Design
Sr. Sri FP/
Sr.Project Sr.Project Project Sr.Stance rut Stars turat 'Modanic:MEogi MecllaofcstE gi, EIeot wl FP/Electn al`Sr-ITfSecurity ,
.. - ..WORK 1fEM =Menuger` Architect, Architect, Engineer Engineer .,nor • .neer _ Engineer_ •/Engineer 'Engineer 1, Clerical- TOTAL':'.1-.
I Title Sheet(1) 1 1
2 General Notes,Abbreviations&Code info 1 I 2 2 2 8
(1)
3 General Plan/Reference Site Plan(1) 4 4
4 Life Safety Plan(I) 1 4 4 9
5 Architectural Floor Plans(I) 1 6 9
6 Architectural Reflected Coding Plans(I) 4 4
7 Architectural Roof Plan(I) 4 4
8 Building Sections(1) 8 8
9 Wall Sections(1) 8 8
10 Architectural Exterior Elevations(I) 8 8
11 Details(2) 12 12
12 Structural Foundation Plan(1) 3 4 7
13 Structural Roof Framing Plan(1) 3 4 7
14 Structural Schedules&Details(4) 5 8 13
15 Electrical Power Plan(1) 2 4 6
15A Canopy Lightning Protection/Grounding 2 4 6
Plan(I)
16A Lightning Protection and Grounding Details 2 4 6
(1)
16 Electrical Schedules,Risers and Details 2 4 6
(2)
17 IT/Security Plan(I) 0
18 IT/Security Details(I) ll
19 Develop 90%Specifications 12 6 10 8 36
20 Develop 90%Cost estimate 4 2 6
21 Analysis and Calculations 4 2 2 8
Prepare for and attend meeting to discuss
22 submittals and project progress(Internal)- 2 2 4
2
Attend(1)Design Coordination meeting
23 with owner(lelcen) 4 1 5
24 Coordinate and distribute plans 2 2 2 6
25 QA/QC 2 2 2 2 2 2 2 14
27 Addms Clients Comments 2 I 2 2 2 2 2 13
TOTAL HOURS 20 16 68 30 24 0 0 30 30 0 0 218
_ RATE $ 174.00 $ 169.00 $ 112.00 $ 135.00 $ 90.00 $ 135.00 $ 75.00 3 147.00 $ 93.00 3 225.00 $ 54.00 —
ESTIMATE $ 3,480.00 $ 2,704.00 S 7,616.00 $ 4,050.00 S 2,160.00 $ - $ - $ 4,410.00 $ 2,790.00 $ - S - S 27,210.011
Tar) Ernense TOTAL S 27,210
Mileage(380 miles round Trip @
3.555/mi)x I $ -
Printing 90%submission $ 150.00 Subcansullanis $ -
Specifications-3 sets @ 350/set) $ 150.00 Expenses $ 300
Airfare(3500 round trip)x 1 $ - Lump Sum Fee Total $ 27,510
Airport Pinking $ -
Mcals and Per Diem($70)x 1 S -
Total Expenses $ 300.00
I TOTAL FEE S 27,5111
4 of
1
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key West International
Project
Baggage Area Doors and ARFF Canopy(12/15-36)
Article D:1.00./.Design
, •Sr d£ ':Sr FP/ ..:
Sr.Project Sr.Proje t Project S.Structural Stractoroi MahenicalE gi Mach la i ngi�Elest cot PP/Ele Rica) Sr.IIISc as0 `�.
..... - WORKHEM' , -.Manager Architect Architect" ',Engineer ` Engineer oarc-deer ,''Engineer ..+C6 gineer .Engineer ' -Clerical 'TOTAL.
1 Title Sheet(I) r I I
2 General Notes,Abbreviations&Code info 1 1 1 1 1 5
(3)
3 General Plan/Reference Site Plan(1) 1 2 3
4 Life Safety Plan(1) 1 1 2 4
5 Architectural Floor Plans(1) 1 4 5
6 Architectural Reflected Ceiling Plans(I) 2 2
7 Architectural Roof Plan(I) 2 2
8 Building Sections(I) - 4 4
9 Wall Sections(1) 4 4
10 Architectural Exterior Elevations(1) 4 4
11 Details(2) 6 6
12 Structural Foundation Plan(I) 2 4 6
13 Strucnual Roof Framing Plan(I) 2 4 6
14 Structural Schedules&Details(4) 4 4 8
15 Electrical Power Plan(1) 2 3 5
I5A Canopy Lightning Protection/Grounding 2 3 5
Plan(1)
16A Lightning Protection and Grounding Details 2 3 5
1)
16 Electrical Schedules,Risers and Details
2) 4 4 8
17 IT/Security Plan(I) 0
18 IT/Security Details(1) 0
19 Develop 100%Specifications 3 6 9
20 Develop 100%Cost estimate 3 3
21 Structural Analysis and Calculations 3 2 5
Prepare for and attend meeting to discuss
22 submittals and project progress(Internal)- 2 2 2 2 2 10
2
24 Coordinate and distribute plans 2 2 2 6
25 QA/QC 2 I 2 2 2 3 3 15
26 Address Clients Comments I 2 1 2 2 2 10
27 Address permitting comments I 2 1 2 6
TOTAL HOURS 2 12 41 18 23 0 0 28 23 '0 0 147
RATE S 174.00 $ 169.00 $ 112.00 S 135.00 S 90.00 S 135.00 $ 75.00 $ 147.00 S 93.00 $ 225.00 $ 54.00 ---
ESTIMATE $ 348.00 $ 2.028.00 $ 4,592.00 S 2,430.00 $ 2,070.00 $ - $ - $ 4,116.00 $ 2,139.00 $ - S - S 17,723.00
Tas$i E<nense TOTAL 5 (7,723
Printing 100%submission
Plans $ 150.00
Specilications-3 sets@$50/set) $ 150.00 Subconsullanis 3 -
Mrsc $ - Expenses S 300
Total Experosrs $ 300.00 Lump Sum Fee Total S 18,023
TOTAL FEE S 18,023 1
Page 5 of 6
4 • •
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key Went International
Project:
Baggage Area Doors and ARFF Canopy(12/16-36)
3
2 '°J.iti": Monroe"ithP—h"ing
for
4
3 Alrrtrd Pro-Bid Conference 12 13
dRespondt0 Bidders I 2 4 4 It
5 Issue
atZstosatidadel,:(tm anedi, 2 1 4 4 4 4 4 23
6 titl'albr:11=daPird7r:ob'd nda ti o n 1 9
FrIrr 'ntra't for successfulsuccessful Iov 2
b
4 I 1 1 1 8
TOTAL HOURS 28 4 II 10 5 0 0 9 6 0 0 73
RATE $ 174.00 $ 169.00 S 112.00 $ 135.00 $ 90.00 $ 135.00 $ 75.00 $ 147.00 $ 93.00 $ 225.00 $ 54.00 --
ESTIMATE $ 4,872 $ 676 3 1,232 $ 1,350 S 450 $ - $ - $ 1,323 $ 558 $ - $ - S 10,461
TOTAL S 10,461
Plans $ 150.00
Spocificatioca S 150.00
Airfare(I visit @$500/visit) S - $ -
Mileage(480 miles round trip(4)
$0.555/mi)x I $ 266.40 0xpecsen S 636
Meals and Per Diem($70)x I $ 70.00 Lump Sum Fee Total $ 11,097
Airport Parking $ -
Total Expenses:$ 636.40
TOTAL FEE S 11,097 I
6 of 6