08th Amendment 01/25/2019Jacobs Key West International Airport 01/19
Monroe County
Drainage Improvements Phase 2 & 3
Project No. GAKAP 149
CHANGE ORDER
PROJECT: CHANGE ORDER NO.: 8
Draina a Im rovements
Phase 2 & 3 INITIATED ON: January 15, 2019
CONTRACT: GAKAP 149
TO (Contractor): Charley Toppino & Sons
129 Toppino Industrial Drive
Key West, FL 33040
CONTRACT DATE: November 22, 2016
You are hereby authorized and directed to make the following change(s) in this Contract:
The actual field conditions did not reflect the record drawings that the design was based on. In order to connect the
pumped injection well to the existing drainage system an additional 266 LF of pipe is needed This change order
includes the renegotiation of the unit cost for drainage pipe under turf and under pavement. The cost includes the credit
for using ADS pipe.
The original Contract Sum ...............................
Net change by previously approved Change Orders.........
The Contract Sum will be unchanged
by this Change Order ......................
The new Contract Sum including this Change Order
willbe ...............................................
The Contract Time will be increased by ........................................
$ 1,655,480.85
69,928.20
$ 68351.20
$ 1,793,760.25
NA
Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the
Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time
for delays, disruption, inefficiency, acceleration and all other claims.
RECOMMENDED:
Jacobs Engineering
y Date
Key West International Airport
3491 South Roosevelt Blvd.
Key West, FL 33040
B Date
AGREED TO:
Charley Toppino & Sons
AUTHORIZED:
Monroe County
1100 Simonton Street
Key West, FL 33040
M
RO J. ERCA�0
AS313TANT C NTY ATTORNEY
Date
mm
I
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: The actual field conditions did not reflect the record drawings that the
design was based on. In order to connect the pumped injection well to the existing drainage
system, an additional 266 LF of pipe is needed. This change order includes the renegotiation
of the unit cost for drainage pipe under turf and under pavement. The cost includes the credit
for using ADS pipe.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
'Adgmullba,.
qw
E PRICE QUOTATION
Attention: Lasa Ennis DATE 1/1019
Jacobs Engineering Inc.
3750 NW 87th Ave #750
Miami, FL 33178
-ocation: KWIA Apron Project, Key West International Airport
Z-�cope: EYW Drainage irriprovements Phase 2 & 3 - Additional Drainage
I tQ11
Description
Line item Co`stng��
...... ....
- -- - -----
------------------------
24" Storm Pipe (Turf)
24" Storm Fipe (Pvmt)
Periormance/Paymenrgo—nds ($Z0MffhM=
Mobilization/Demobilization
General Conditions (Permits, Management PedestrianSaftey, etc ........
Charley Toppino & Sons, Inc. ---------------