HomeMy WebLinkAbout1st Change Order 02/12/2019Jacobs Key West International Airport 01/19 Monroe County Faraldo Circle Realignment and Curbside Improvements Project No. GAKAP155 CHANGE ORDER PROJECT: CHANGE ORDER NO.: 1 Faraldo Circle Realignment And Curbside Improvements INITIATED ON: January 22, 2019 CONTRACT: GAKAP155 TO (Contractor): Charley Toppino & Sons, Inc. 129 Toppino Industrial Drive Key West, FL 33040 CONTRACT DATE: September 191, 2018 You are hereby authorized and directed to make the following change(s) in this Contract: As an owner requested change, the raised crosswalks were added to enhance safety on Faraldo Circle. The original Contract Sum ............................... Net change by previously approved Change Orders......... The Contract Sum will be unchanged by this Change Order ...................... The new Contract Sum including this Change Order willbe ............................................... The Contract Time will be increased by ........................................ $ 397,440.00 $ N/A $ 7,750.00 $ 405,190.00 N/A Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time for delays, disruption, inefficiency, acceleration and all other claims. RECOMMENDED: Jacobs Engineering q Date Key West International Airport 3491 South Roosevelt Blvd. Key West, FL 33040 w By Date AGREED TO: Charley Toppino & Sons, Inc. 04 AAAAAe.- d 112- Date AUTHORIZED: Monroe County 1100 Simonton Street Key Wes L 33040 By ate Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: As an owner requested change, the raised crosswalks were added to enhance safety on Faraldo Circle. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: qw PRICE QUOTATION Attention: Lasa Ennis DATE, V22119 Jacobs Engineering Inc. 3750 NW 87th Ave #750 Miami, FL 33178 ITEMIZED QUANTITIES Location: KWIA Apron Project, Key West International Airport 1 Scope: Faraldo Circle (ES1001 REV) Item Description Quantity Units Cost er Unit Line Item Cost Notes 1 Raised Crosswalk (asphalt overbuild 1.0 LS $ 3,85000 $ 3,850,00 2 80 LF 3" PVC 1.0 LS $ 3,400,00 $ 3,40000 3 Concrete Material 2.0 CY $ 25000 $ 500.00 Subtotal $ 7,75000 4 Performance!'Pa ent Bonds $20.00/Thousand 1,0 LS $ $ 5 Mobilization/Demobilization 1.0 LS $ $ 6 General Conditions Permits, Management, Pedestrian Safte , etc) 10 LS $ $ Total: $ 7,750.00 Notes: Inclusions: Exclusions: Prepared by: Estimator Charley Toppino & Sons, Inc. Sheet 1 of 1 Date: 1/22/19