12/15-41 Lighting Assessment MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date ()pan E:P2-cAkk On Task Order No. 12/15-41 . 03- 6351 D i—53006 Client Project No. G'Fr 111Da9-530% Engineer Project No. E9Y37941 . This. Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—MTH Lighting Assessment Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 2 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price:of$ 15,625.00 N/A Other(Describe): Schedule Services may commence on Execution Services will cease by 365 da s 1>ir2.c4or e� Acia.PoiLTS F 4F 424 OE COT N ry �r O ID 2/ZZ701Q 4ounmiaot Bynis Ma3ar461 - ;r. o{ 'rr CONSULTANT: JACOBS PROJECT MANAGEMENT CO WI ess By Title Sr.Vice President N E C ORNEY File: MSTR APS—Monroe County W E Page 1 of 1 COUN�X l�T olj Y /Izt l_�t:. • Exhibit A(12/15 -41) Scope of Services Monroe County Airports The Florida Keys Marathon International Airport MTH Lighting Assessment SCOPE OF WORK Jacobs will perform an electrical assessment to the existing lighting systems located at the Florida Keys Marathon International Airport in Marathon.These lighting systems include: • Aircraft ramp high mast lighting • Rental car parking lot lighting • Terminal parking lot lighting • Floodlighting and canopy lighting at the Terminal DESCRIPTION OF WORK The data collection, assessment, and report will provide the following: Article A—Site Visit Field Verification:Visit and inspect the site(1 visit)to assess the existing lighting conditions.Take photographs and make written documentation,sketches,notes or reports to confirm and record the general conditions and illumination levels of the existing lighting systems. Initial Meeting: Conduct a meeting with representatives from Monroe County Airports and the design electrical engineer.The purpose of the meeting will be to brief the Jacobs team on the report intent, discuss project features, and review existing conditions and known deficiencies with the design team,and answer questions developed by the Jacobs team. • Review available record drawings • Perform a daytime site investigation • Perform a nighttime site visit to measure photometric levels Services for Article A will be provided under a lump sum basis. Article B—Report Phase The specific tasks Jacobs will perform are as follows: A meeting with Monroe County will be held to review the draft report and generate comments towards the final report. The report will include the following: • Introduction • Executive Summary • Electrical Assessment • Assessment Exhibits • Assessment Images • Electrical Repair Recommendations • Order of Magnitude Cost Estimate for Repairs Page 1 of 2 Any cost estimates provided by Consultant will be on a basis of experience and judgement. Since Consultant has no control over market conditions or bidding procedures, Consultant does not warrant that bids or ultimate construction costs will not vary from these cost estimates. Services for Article B will be provided under a lump sum basis. QUALIFICATIONS AND ASSUMPTIONS For the purpose of providing a stipulated fee amount,this proposal has been based on the following qualifications and assumptions: • As-built documents will be provided by owner, if available. • Construction Documents will not be provided. • Other services not described in the scope of work are excluded. Items identified as not included or limited in the scope of services can be provided or expanded upon as additional services under a separate agreement or supplemental to this agreement. REFERENCES The client will need to provide the following documentation to Jacobs before commencing with our scope of work. • As-built documentation of the existing facility, if available. COMPENSATION See attached spreadsheet. SCHEDULE We anticipate completion of the deliverables in accordance with the following schedule: The overall duration of this effort will be as noted below: A. Site Visit: 10 business days from agreement authorization B. Report Phase: 20 business days from initial meeting and site condition assessment. Page 2 of 2 JACOBS ENGINEERING GROUP 11.15.18 Monroe County Airport: Marathon Project: Lighting Assessment FEE SUMMARY BASIC SERVICES Hours Fee Article A: Site Visit 39 $ 7,471 Article B: Report Phase 70 $ 8,154 Total Basic Services Lump Sum Fee 109 $ 15,625 SPECIAL SERVICES Hours 'Total Special Services Lump Sum Fee 0 $ - TOTAL LUMP SUM PROJECT FEE 109 $ 15,625 1 J:UUrports\_MONROE COUNTY\PSO's\_2018 PSO's\PSO 41-MTH Lighting Assessment\MTH Lighting Assessment-Fee(111518 JM-RF rvsd).xlsx JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Marathon Project: Lighting Assessment Article A:Site Visit Sr.Project Project Structural Mechanical Electrical CADD WORK ITEM .,. . - Manager- Architect Engineer Engineer; Engineer Engineer Tech -'Clerical TOTAL Coordinate with Client/Marathon 1 2 2 Airport/Monroe County 2 Project Management 6 6 3 Client Meeting 1 1 2 4 Perform daytime site visit 8 11 19 5 Perform nighttime site visit 0 10 10 TOTAL HOURS 17 0 0 0 0 22 0 0 39 RATE $ 174.00 $ 112.00 $ 135.00 $ 135.00 $ 93.00 $ 147.00_$ 68.00 $ 54.00 --- PAYROLL ESTIMATE 1$ 2,958 $ - $ - $ - $ - $ 3,234 $ - $ - $ 6,192 Task Subconsultants TOTAL PAYROLL $ 6,192 Total Subconsultants Subconsultants $ - Expenses $ 1,279 Lump Sum Fee Total $ 7,471 Task Expenses: Mileage(380 miles round trip @ 4 $0.555/mi)x 1 $ 209.00 Mileage(214 miles round trip @ 4,5 $0.555/mi)x 1 $ 120.00 4,5 Airfare($500 round trip)x 1 $ 500.00 TOTAL FEE S 7,471 4,5 Meals and Incidental Expenses $ 150.00 4,5 Car Rental($100/trip) $ 100.00 4,5 Lodging($200/night)x I $ 200.00 Reproduction/Misc. $ - Total Expenses $ 1,279.00 J:Wry,dsLMONROE COUNT'MSO'e1J018 PSO',W5O91-MTH Lighting AssournenfMTH Lightlng Assessment-Fee(111510 JM-RF Ned).xt,e 2 • • .1 " • JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport Marathon Project: Lighting Assessment Article B:Report Phase Sr.Project Project Sr Structural Sr.Mechanical Sr Electrical . WORK ITEM-"- <- Manager ''Architect,. . -Engineer. '. 'Engineer. Engineer,' Engineer • CADD Tech Clerical r.''TOTAL • I Draft Report a.Introduction 2 2 b.Executive Summary 2 2 C.Electrical Assessment 8 4 12 d.Assessment Exhibits 4 2 6 c.Assessment Images 4 2 6 f.Electrical Repair Recommendations 8 4 12 g.Order of Magnitude Cost Estimate 8 2 10 2 Prepare for and attend meeting to discuss 2 2 Draft Report(via conference call) 4 3 Final Report 8 2 10 4 QAJQC 2 4 6 TOTAL HOURS 4 0 0 0 44 22 0 0 • 711 RATE $ 174.00 $ 112.00 $ 135.00 $ 135.00 $ 93.00 $ 147.00 $ 68.00 $ 54.00 --- PAYROLL ESTIMATE $ 696.00 $ - $ - $ - $ 4,092.00 $ 3.234.00 $ - $ - S 8,022.00 Tack Esnenses: TOTAL PAYROLL S 8,1122 Subconsultants S - 1,3 Printing&Misc. $ 132.00 Expenses $ 132 Total Expenses $ 132.00 Lump Sum Fee Total $ 8,154 Task Suhconsultants $ - TOTAL FEE $ 8,154 3