Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
02/26/2019 Agreement
Monroe County Purchasing Policy and Procedures COUNTY ADMINISTRATOR CONTRACT SUMMARY FORM FOR CONTRACTS LESS THAN$50,000 Contract with: , MUSCO.Li"-,iii .. Contract# Effective Date: a ko h , _ - Expiration Date: Contract Purpose/Description: Lighting.and Electrical Repairs at Watson Field in Big Pine Key caused by damages_from ; , urricane'- a- Contract Manager: Keith Bring - • 4523 Project Management (Name) . (Ext.) (Department/Stop #) CONTRACT COSTS Total Dollar Value of Contract: $ _ , - d 2;$92.Q0 Current Year Portion: $ Budgeted? Yes[ I No ❑ Account Codes: /,)S-L t5 O_53O (p�„�l' „meg I Grant: $ N/A -. - - - County Match: $ - - - - t.ld ADDITIONAL COSTS Estimated Ongoing Costs: $ /yr For: - (Not included in dollar value above) (e.g.maintenance,utilities,janitorial,salaries,etc.) .. I CONTRACT REVIEW Changes Date Out. In Needed R- iewer Department Head r�ram 7o t q YesEl No ,-, Risk Management � �� Yes❑No� l— . . O ;�ol9 O.M.B./Purchasing 226ttC) Yes❑No r pig 41 County Attorney WO Yes No _.,,/ jf,,k4�/b p� ..l 1 41 : Comments: . OMB Form Revised 2/27/01 MCP#2 ',E- .rc-tl, ,� Monroe County Engineering tl1100 Simonton Street.2-216 ` Key West,FL 33040 \ ! Project Management Date: January 7,2019 To: Cary Knight \\\j Director of Monroe County Project Manage e From: Keith Bring Project Manager Monroe County 1100 Simonton 2-216 Key West FL 33040 RE: Sole Source Musco Lighting Watson Field The lighting system at Watson Field in Big Pine Key was damaged due to high winds and flooding caused by Hurricane Irma.The system was a distinctive manufacturer Musco lighting system unique to parks. It has been determined that in order to obtain conformity and equipment capability in replacement and proper installation of the Musco lighting system it can only be solely acquired through Musco as the manufacturer and installer for S42,892.00. It has been determined that this quote is competitive in this specialized marketplace and there is no other source that offers these particular systems and installation. CFR§200.320(f)(1)provides that procurement by noncompetitive proposals through solicitation of a proposal from only one source and may be used when the item is available only from a single source as the Musco system and installation is. Monroe County Purchasing Policy Ch.7.A. permits sole source acquisition due to the unique nature of the Musco lighting system and installation as there is no other source readily available for conformity,equipment capability and proper installation Thank you Keith Bring Project Manager Monroe County Engineering 1100 Simonton Street,2-216 Key West, FL 33040 PLEASE NOTE:FLORIDA HAS A VERY BROAD RECORDS LAW. MOST WRITTEN COMMUNICATIONS TO OR FROM THE COUNTY REGARDING COUNTY BUSINESS ARE PUBUC RECORDS AVAILABLE TO THE PUBUC AND MEDIA UPON REQUEST.YOUR EMAIL COMMUNICATION MAY BE SUBJECT TO PUBLIC DISCLOSURE. AGREEMENT BETWEEN MONROE COUNTY AND MUSCO SPORTS LIGHTING, LLC. FOR WATSON PARK BASEBALL FIELD LIGHTING REPAIR BOARD OF COUNTY COMMISSIONERS Mayor Sylvia Murphy, District 5 Mayor Pro Tern Danny Kolhage, District 1 ¢offE„ 0 of rl f Michelle Coldiron, District 2 Heather Carruthers, District 3 David Rice, District 4 COUNTY ADMINISTRATOR Roman Gastesi Clerk of the Circuit Court Dir. of Project Management Kevin Madok Cary Knight February 12, 2019 PREPARED BY: Monroe County Project Management Department Scope of Work Re-lamp all of the light fixtures, replace damaged reflectors, lens, knuckle cones, and straighten the racks on 2 poles. Also replace all of the overhead electrical for the Sports Lighting. Contractor shall supply all of the needed materials and hardware to complete the project and properly dispose of debris. Job Name: Watson Field Musco Lighting Repair Job Location: Watson Field 30150 South Street Big Pine Key FL, 33043 Contact: Project Management Keith Bring bring-keithamonroecounty-fl.gov (305) 292-4523 Facilities Management Willie DeSantis desantis-williamamonroecounty-fl.gov PROJECT OVERVIEW, PROJECT INTENT AND SCOPE, GENERAL REQUIREMENTS 1. Project Overview a. The lighting system at Watson Field was damaged due to high winds and flooding caused by Hurricane Irma. The damaged system was a distinctive proprietary manufacturer Musco lighting system unique to parks, such as Harry Harris. It has been determined that in order to obtain conformity and equipment capability in replacement and proper installation of the Musco lighting system it can only be solely acquired and installed through Musco as the manufacturer and installer. 2. Project Intent and Scope Re-lamp all of the light fixtures, replace damaged reflectors, lens, knuckle cones, and straighten the racks on 2 poles.Also replace all of the overhead electrical for the Sports Lighting. Contractor shall supply all of the needed materials and hardware to complete the project and properly dispose of debris. 3. Summary of General Requirements a. Contractor is required to provide protection for all existing surfaces.To include, but not limited to: i. Existing fixtures. ii. Personal Items. iii. Windows and Doors. iv. Pavement/Athletic Turf. v. Vehicles and Personal Property. vi. Landscaping. 2 b. The Contractor shall ensure that all non-exempt employees for this effort are compensated in accordance with all State and Local Laws. c. Provide a dumpster, containment bin, or similar device for the collection and containment of construction generated debris. d. Load, haul, and properly dispose of all construction debris. e. Provide and maintain appropriate (OSHA required) construction warning signs and barriers. f. Furnish all required work site safety equipment. g. Furnish and maintain on-site material safety data sheets ("MSDS") for all materials used in the construction. h. Construction work times shall be limited to: 8:00 A.M. to 5:00 P.M. Monday-Friday. i. All materials shall be approved by submittal prior to commencement of work. j. Contractor needs to be aware of weather and location and plan accordingly. k. Contractor needs to be aware of the facility, its residents, and staff with unusual schedules and plan accordingly. I. Contractor shall provide a safety lift plan for all crane/hoist work. m. Contractor to provide schedule for all phases of the project. n. Contractor to provide one 3-ring Binder with all original device specifications, warranties, maintenance schedules, shop drawings, permits, repair and maintenance contacts, and any other information necessary for the proper function and maintenance of the equipment and one (1) digital copy in PDF format on CD/DVD. o. Contractor to coordinate all activities with concurrent site work being performed. p. By signing this Agreement, the Undersigned has read and accepts the terms and conditions set forth by the Monroe County General Requirements for Construction below: 3 GENERAL REQUIREMENTS Where Project Management is Not a Constructor Section 00750 General Conditions Section 00970 Project Safety and Health Plan Section 00980 Contractor Quality Control Plan Section 01015 Contractor's Use of the Premises Section 01027 Application for Payment Section 01070 Access Roads and Parking Areas Section 01395 Request for Information —(RFI) Section 01595 Construction Cleaning Section 01640 Product Handling Section 01700 Contract Closeout Section 01710 Final Cleaning Section 01720 Project Record Documents Section 01730 Operation and Maintenance Data Section 01740 Warranties 4 Section 00750 General Conditions of the Contract for Construction Where Project Management is Not a Constructor Table of Articles 1. General Provisions 2. Owner 3. Contractor 4. Administration of the Contract 5. Subcontractors 6. Construction by Owner or by Other Contractors 7. Changes in the Work 8. Time 9. Payments and Completion 10. Protection of Persons and Property 11. Insurance and Bonds 12. Uncovering and Correction of Work 13. Miscellaneous Provisions 14. Termination or Suspension of the Contract 5 SECTION 00750 1.0 GENERAL PROVISIONS. 1.1 Basic Definitions 1.1.1 The Contract Documents: The Contract Documents consist of the Agreement between Owner and Contractor, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Contract, Owners proposal documents, other documents listed in the Agreement and Modifications issued after execution of the Contract, and the Contractor's proposal and supporting documentation. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or(4) a written order for a minor change in the Work issued by Project Management. 1.1.2 The Contract: The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Architect and Contractor, (2) between Project Management and Contractor, (3) between the Architect and Project Management, (4) between the Owner and a Subcontractor or (5) between any persons or entities other than the Owner and Contractor. The Owner shall, however, be entitled to enforce the obligations under the Contract intended to facilitate performance of the duties of Project Management and Architect. 1.1.3 The Work:The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. 1.1.4 The Project: The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by other Contractors and by the Owner's own forces including persons or entities under separate contracts not administered by Project Management. 1.1.5 The Drawings: The Drawings are the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams. 1.1.6 The Specifications: The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of relatedservices. 1.1.7 The Project Manual: The Project Manual is the volume usually assembled for the Work which may include the proposal requirements, sample forms, Conditions of the Contract and Specifications 1.2 Execution, Correlation and Intent. 1.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has 6 visited the site, become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. 1.2.2 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results. 1.2.3 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 1.2.4 Unless otherwise stated in the Contract Documents, words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 1.2.5 Where on any of the drawings a portion of the Work is drawn out and the remainder is indicated in outline, the parts drawn out shall also apply to all other like portions of the Work. 1.3 Ownership and Use of Architect's Drawings, Specifications and Other Documents 1.3.1 The Drawing, Specifications and other documents prepared by the Architect are instruments of the Architect's service through which the Work to be executed by the Contractor is described. The Contractor may retain one contract record set. Neither the Contractor nor any Subcontractor, Sub-subcontractor or material or equipment supplier shall own or claim a copyright in the Drawings, Specifications and other documents prepared by the Architect. All copies of them, except the Contractor's record set, shall be returned or suitably accounted for to Project Management, on request, upon completion of the Work.The Drawings, Specifications and other documents prepared by the Architect, and copies thereof furnished to the Contractor, are for use solely with respect to the Project. They are not to be used by the Contractor or any Subcontractor, Sub- subcontractor or material or equipment suppliers unless they are granted a limited license to use and reproduce applicable portions of the Drawings, Specifications and other documents prepared by the Architect appropriate to and for use in the execution of their Work under the Contract Documents. All copies made under this license shall bear the statutory copyright notice, if any, shown on the Drawings, Specifications and other documents prepared by the Architect. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as publication in derogation of copyright or other reserved rights. 1.3.2 Unless otherwise provided in the Contract Documents, the Contractor will be furnished, two (2) original sealed copies and one (1) electronic copy of Drawings, Specifications and the Project Manual free of charge for the execution of the Work. Additional copies may be obtained from Project Management at a fee of$5.00 per page for full size drawings (.25 per page for written specifications or 11"x 17" drawings). 7 2.0 OWNER 2.1 Definition 2.1.1 The Owner is Monroe County. The term "Owner" means the Owner or the Owner's authorized representative. 2.2 Information and Services Required of the Owner 2.2.2 The Owner shall furnish initial site surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. 2.2.3 For existing facilities, the Owner shall secure and pay for necessary approvals, easements, assessments and charges, required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities, except for permits and fees which are the responsibility of the Contractor under the Contract Documents. It is the Contractor's responsibility to secure and pay for the building permit(s)for the project. 2.2.4 Information or services under the Owner's control shall be furnished by the Owner with reasonable promptness to avoid delay in orderly progress of theWork. 2.2.5 Unless otherwise provided in the Contract Documents, the Contractor will be furnished two (2) original sealed copies and one (1) electronic copy of Drawings, Specifications and the Project Manual free of charge for the execution of the Work as provided in Subparagraph 1.3.2. 2.2.6 The Owner shall forward all communications to the Contractor through Project Management and may contemporaneously provide the same communications to the Architect. 2.2.7 The foregoing is in addition to other duties and responsibilities of the Owner enumerated herein and especially those in respect to Article 6 (Construction by Owner or by Other Contractors), Article 9 (Payments and Completion) and Article 11 (Insurance and Bonds). 2.3 Owner's Right to Stop the Work 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the contract Documents as required or persistently fails to carry out Work in accordance with the Contract Documents,the Owner, by written order signed personally or by an agent specifically so empowered by the Owner, may order the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. 2.4 Owner's Right to Carry Out the Work 2.4.1 If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a three-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such three-day period give the Contractor a second written notice to correct such deficiencies within a three-day period. If the Contractor within such second three-day period after receipt of such second notice fails to commence and continue to correct any deficiencies, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change 8 Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such deficiencies, including compensation for another contractor or subcontractor or Project Management's and Architect's and their respective consultants' additional services and expenses made necessary by such default, neglect or failure. If payments then, or thereafter, due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. In the event of clean-up issues, Owner has right to provide a minimum of twenty-four (24) hours' notice. In the event of safety issues determined to be of a serious nature,as determined by Project Management, notice will be given, and Contractor is required to rectify any deficiency immediately. 3.0 CONTRACTOR 3.1 Definition 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout this Agreement as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative. 3.1.2 The plural term "Contractors" refers to persons or entities who perform construction under Conditions of the Contract that are administered by Project Management, and that are identical or substantially similar to these Conditions. 3.2 Review of Contract Documents and Field Conditions by Contractor 3.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner pursuant to Subparagraph 2.2.2 and shall at once report to Project Management and Architect errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner, Project Management or Architect for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to Project Management and Architect. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to Project Management and Architect,the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction. 3.2.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to Project Management and Architect at once. 3.2.3 The Contractor shall perform the Work in accordance with the Contract Documents and submittals approved pursuant to Paragraph 3.12. 3.3 Supervision and Construction Procedures 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention.The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under this Contract, subject to overall coordination of Project Management as provided in Subparagraphs 4.6.3 and 4.6.5. 9 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor. 3.3.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of Project Management in its administration of the Contract, or by test, inspections or approvals required or performed by persons other than the Contractor. 3.3.4 The Contractor shall inspect portions of the Project related to the Contractor's Work in order to determine that such portions are in proper condition to receive subsequent work. 3.3.5 The Contractor shall verify that the Construction Documents being worked with are the most recent and updated available, including all Addenda information. Also the Contractor will perform the work strictly in accordance with this contract. 3.4 Labor and Materials 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 3.4.2 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. 3.4.3 The Contractor is responsible for the conduct of his employees at all times. Misconduct, destruction of property, unsafe practices, or violation of any Federal or State regulations including abuse of alcohol or drugs,will be cause for permanent dismissal from the project. If any Contractor's employee is determined to be detrimental to the Project, as deemed by Project Management, the Contractor will remove and/or replace the employee at the request of Project Management. Employees dismissed from the project will be transported from the job site at the Contractor's expense. 3.4.4 The Contractor shall be totally responsible for the security of his work, materials, equipment, supplies, tools, machinery, and construction equipment. 3.4.5 The Contractor shall be responsible for complete,timely and accurate field measurements as necessary for proper coordination, fabrication and installation of his materials and equipment. The Contractor agrees to cooperate with Project Management, if required, to accommodate any discovered variations or deviations from the Drawings and Specifications so that the progress of the Work is not adversely affected. 3.5 Warranty 3.5.1 The Contractor warrants to the Owner, Project Management and Architect that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform 10 with the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. If required by Project Management, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 3.6 Taxes 3.6.1 The Contractor shall pay sales, consumer, use and similar taxes for the Work or portions thereof provided by the Contractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. 3.7 Permits, Fees and Notices 3.7.1 The Contractor shall secure and pay for all permits, impact fees, governmental fees, licenses, inspections,testing, surveys and utility fees required by Federal, State, Municipal or Utility entities having jurisdiction over the project for the proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required at the time bids are received. The Contractor will be responsible for all building permit costs or impact fees required for this project. The Contractor shall secure and pay for all building and specialty permits including plumbing, electrical, etc. 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of theWork. 3.7.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify Project Management, Architect and Owner in writing, and necessary changes shall be accomplished by appropriate Modification. 3.7.4 If the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to Project Management, Architect and Owner, the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. 3.9 Project Lead Person The Contractor shall employ a competent Lead Person and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case. The superintendent shall be satisfactory to Project Management and shall not be changed except with the consent of Project Management, unless the superintendent proves to be unsatisfactory to the Contractor or ceases to be in his employ. 3.10 Contractor's Construction Schedule The Contractor, promptly after being awarded the Contract, shall prepare and submit for 11 the Owner's and Architect's information and Project Management's approval a Contractor's Construction Schedule for the Work. Such schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project construction schedule to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work. This schedule, to be submitted within fourteen (14) days after Contract Award, shall indicate the dates for the starting and completion of the various stages of construction, shall be revised as required by the conditions of the Work, and shall be subject to Project Management's approval. 1. The Contractor shall cooperate with Project Management in scheduling and performing the Contractor's Work to avoid conflict, delay in or interference with the Work of other Contractors or the construction or operations of the Owner's own forces. 2. The Contractor shall conform to the most recent schedules. 3. Project Management will schedule and conduct a progress meeting at a minimum of one (1) meeting per duration of the project month which the Contractor shall attend. At this meeting, the parties can discuss jointly such matters as progress, scheduling, and problems. 3.11 Documents and Samples at the Site 1. The Contractor shall maintain at the site for the Owner one (1) record copy of the Drawings, Specifications, addenda, Change Orders and other Modifications, in good order and marked currently to record changes and selections made during construction, and in addition approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to Project Management and Architect and shall be delivered to Project Management for submittal to the Owner upon completion of the Work. 3.12 Shop Drawings, Product Data and Samples 1. Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 2. Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work. 3. Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4. Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents.The purpose of their submittal is to demonstrate for those portions of the Work for which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. Review by Project Management is subject to the limitations of Subparagraph 4.6.12. 5. The Contractor shall review, approve and submit to Project Management, in accordance with the schedule and sequence approved by Project Management, Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents. The 12 Contractor shall cooperate with Project Management in the coordination of the Contractor's Shop Drawings, Product Data, Samples and similar submittals with related documents submitted by other Contractors. Submittals made by the Contractor which are not required by the Contract Documents may be returned without action. 6. The Contractor shall perform no portion of the Work requiring submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by Project Management. Such Work shall be in accordance with approved submittals. 7. By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 8. The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by Project Management approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed Project Management and Architect in writing of such deviation at the time of submittal and Project Management have given written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by Project Management's approval thereof. 9. The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by Project Management and Architect on previous submittals. 10. Informational submittals upon which Project Management are not expected to take responsive action may be so identified in the Contract Documents. 11. When professional certification of performance criteria of materials, systems or equipment is required by the Contract Documents, Project Management and Architect shall be entitled to rely upon the accuracy and completeness of such calculations and certifications. 12. if materials specified in the Contract Documents are not available on the present market, the Contractor may submit data on substitute materials to Project Management for approval by the Owner. 3.13 Use of Site 1. The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with materials or equipment. 2. The Contractor shall coordinate the Contractor's operations with, and secure the approval of, Project Management before using any portion of the site. 3.14 Cutting and Patching 13 1. The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly. He shall also provide protection of existing work as required. 2. The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner's own forces or of other Contractors by cutting, patching, excavating or otherwise altering such construction. The Contractor shall not cut or otherwise alter such construction by other Contractors or by the Owner's own forces except with written consent of Project Management, Owner and such other contractors: such consent shall not be unreasonably withheld. The Contractor shall not unreasonably withhold from the other Contractors or the Owner the Contractor's consent to cutting or otherwise altering the Work. When structural members are involved, the written consent of Project Management shall also be required. The Contractor shall not unreasonably withhold from Project Management or any separate contractor his/her consent to cutting or otherwise altering the Work. 3. The Contractor shall arrange for any block outs, cutouts, or openings required for the installation of his/her materials and equipment and the execution of his/her work, whether or not shown or indicated on the Drawings. The Contractor shall be further responsible for sealing and/or finishing, in an acceptable fashion and meeting any applicable code requirements, and such block-out, cutout opening, or other hole in any fire-related floor, ceiling, wall, security wall, or any other finished surface. 3.15 Cleaning Up 1. The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work,the Contractor shall remove from and about the project waste materials rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. Clean up shall be performed to the satisfaction of the Owner or Project Management. 2. If the Contractor fails to clean up as provided in the Contract Documents, Project Management may do so with the Owner's approval and the cost thereof shall be charged to the Contractor. 3.16 Access to Work 1. The Contractor shall provide the Owner, Project Management and Architect access to the Work in preparation and progress wherever located. 3.17 Not used. 3.18 Indemnification and Hold Harmless 1. Notwithstanding any minimum insurance requirements prescribed elsewhere in this agreement, Contractor shall defend, indemnify and hold the COUNTY and the COUNTY's elected and appointed officers and employees harmless from and against (i) any claims, actions or causes of action, (ii) any litigation, administrative proceedings, appellate proceedings, or other proceedings relating to any type of injury (including death), loss, damage,fine, penalty or business interruption, and (iii) any costs or expenses that may be asserted against, initiated with respect to, or sustained by, any indemnified party by reason of, or in connection with, (A) any activity of Contractor or any of its employees, agents, 14 contractors or other invitees during the term of this Agreement, (B) the negligence or recklessness, intentional wrongful misconduct, errors or other wrongful act or omission of Contractor or any of its employees, agents, sub- contractors or other invitees, or (C) Contractor's default in respect of any of the obligations that it undertakes under the terms of this Agreement, except to the extent the claims, actions, causes of action, litigation, proceedings, costs or expenses arise from the intentional or sole negligent acts or omissions of the COUNTY or any of its employees, agents, contractors or invitees (other than Contractor). The monetary limitation of liability under this contract shall be not less than $1 million per occurrence pursuant to F. S. 725.06. Insofar as the claims, actions, causes of action, litigation, proceedings, costs or expenses relate to events or circumstances that occur during the term of this Agreement, this section will survive the expiration of the term of this Agreement or any earlier termination of this Agreement. In the event that the completion of the project (to include the work of others) is delayed or suspended as a result of the Contractor's failure to purchase or maintain the required insurance, the Consultant shall indemnify the County from any and all increased expenses resulting from such delay. Should any claims be asserted against the County by virtue of any deficiency or ambiguity in the plans and specifications provided by the Contractor, the Contractor agrees and warrants that the Contractor shall hold the County harmless and shall indemnify it from all losses occurring thereby and shall further defend any claim or action on the County's behalf. The first ten dollars ($10.00) of remuneration paid to the Contractor is for the indemnification provided for the above. 4.0 ADMINISTRATION OF THE CONTACT 4.1 Architect/Engineer 4.1.1 The Architect and/or Engineer is the person lawfully licensed to practice architecture/engineering or any entity lawfully practicing architecture/engineering identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Architect" means the Architect or the Architect's authorized representative. 4.2 Project Management 4.2.1 Project Management is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Project Management" means Monroe County Project Management Department or Project Management's authorized representative. 4.3 Duties, responsibilities and limitations of authority of Project Management and Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Project Management, Architect and Contractor. Consent shall not be unreasonably withheld. 4.4 In case of termination of employment of Architect, the Owner shall appoint an Architect whose status under the Contract Documents shall be that of the formerArchitect. 4.5 Not Used 4.6 Administration of the Contract 15 4.6.1 Project Management and Engineer will provide administration of the Contract as described in the Contract Documents, and will be the Owner's representatives (1) during construction, (2) until final payment is due and (3)with the Owner's concurrence,from time to time during the correction period described in Paragraph 12.2. Project Management and Engineer will advise and consult with the Owner and will have authority to act on behalf of the Owner only to the extent provided in the Contract Document, unless otherwise modified by written instrument in accordance with other provision of the Contract. 4.6.2 Project Management and Engineer will determine in general that the Work is being performed in accordance with the requirements of the Contract Documents, will keep the Owner informed of the progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work. 4.6.3 Project Management will provide for coordination of the activities of other Contractors and of the Owner's own forces with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other Contractors and Project Management and Owner in reviewing their construction schedules when directed to do so. The Contractor shall make any revisions to the Construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall constitute the schedules to be used by the Contractor, other Contractors, Project Management and the Owner until subsequently revised. 4.6.4 Not used. 4.6.5 Project Management will visit the site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general if the Work is being performed in a manner indicating that the Work, when completed, will be in accordance with the Contract Documents. However, Project Management will not be required to make exhaustive or continuous onsite inspections to check quality or quantity of the Work. On the basis of on-site observations as an architect, Project Management will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the work. 4.6.6 Project Management will not have control over or charge of and will not be responsible for construction means, method, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's responsibility as provided in Paragraph 3.3, and neither will be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. Neither Project Management nor the Architect will have control over, or charge of, or be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or employees, or of any other persons performing portions of the Work. 4.6.7 Communications Facilitating Contract Administration. Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall communicate through Project Management, and shall contemporaneously provide the same communications to the Architect. Communications by and with the Architect's consultants shall be through the Architect. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with other Contractors shall be through Project Management and 16 shall be contemporaneously provided to the Architect. 4.6.8 Project Management will review and certify all Applications for Payment by the Contractor, including final payment. Project Management will assemble each of the Contractor's Applications for Payment with similar Applications from other Contractors into a Project Application for Payment. After reviewing and certifying the amounts due the Contractors, the Project Application for Payment, along with the applicable Contractors' Applications for Payment, will be processed by Project Management. 4.6.9 Based on Project Management's observations and evaluations of Contractors' Applications for Payment, Project Management will certify the amounts due the Contractors and will issue a Project Approval for Payment. 4.6.10 Project Management will have authority to reject Work which does not conform to the Contract Documents, and to require additional inspection or testing, in accordance with Subparagraphs 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed, but will take such action only after notifying Project Management. Subject to review, Project Management will have the authority to reject Work which does not conform to the Contract Documents. Whenever Project Management considers it necessary or advisable for implementation of the intent of the Contract Documents, Project Management will have authority to require additional inspection or testing of the work in accordance with Subparagraphs 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. The foregoing authority of Project Management will be subject to the provisions of Subparagraphs 4.6.17 through 4.6.19 inclusive, with respect to interpretations and decisions of the Architect. However, neither the Architect's nor Project Management's authority to act under this Subparagraph 4.6.10 nor a decision made by either of them in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect or Project Management to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees, or other persons performing any of the Work. 4.6.11 Project Management will receive from the Contractor and review and approve all Shop Drawings, Product Data and Samples, coordinate them with information received from other Contractors, and review those recommended for approval. Project Management actions will be taken with such reasonable promptness as to cause no delay in the Work of the Contractor or in the activities of other Contractors or the Owner. 4.6.12 Project Management will review and approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. Project Management action will be taken with such promptness consistent with the constraints of the project schedule so as to cause no delay in the Work of the Contractor or in the activities of the other Contractors, the Owner, or Project Management, while allowing sufficient time to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as Contractor as required by the Contract Documents. Project Management review of the Contractor's submittals shall not relieve 17 the Contractor of the obligations under Paragraphs 3.3, 3.5 and 3.12. Project Management's review shall not constitute approval of safety precautions or, unless otherwise specifically stated by Project Management, of any construction means, methods, techniques, sequences or procedures. Project Management's approval of a specific item shall not indicate approval of an assembly of which the item is a component. 4.6.13 Project Management will prepare Change Orders and Construction Change Directives. 4.6.14 Following consultation with the Owner, Project Management will take appropriate action on Change Orders or Construction Change Directives in accordance with Article 7 and will have authority to order minor changes in the Work as provided in Paragraph 7.3. 4.6.15 The Contractor will assist Project Management in conducting inspections to determine the dates of Substantial completion and final completion, and will receive and forward to Project Management written warranties and related documents required by the Contract and assembled by the Contractor. Project Management will review and approve a final Project Application for Payment upon compliance with the requirements of the Contract Documents. 4.6.16 Project Management will provide one (1) or more project representatives to assist in carrying out his/her responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives shall be as set forth in an exhibit to be incorporated in the Contract Documents. 4.6.17 Project Management will interpret and decide matters concerning performance under and requirements of the Contract Documents on written request of the Owner or Contractor. Project Management's response to such requests will be made with reasonable promptness and within any time limits agreed upon. If no agreement is made concerning the time within which interpretations required of Project Management shall be furnished in compliance with this Paragraph 4.6, then delay shall not be recognized on account of failure by Project Management to furnish such interpretations until fifteen (15) days after written request is made for them. 4.6.18 Interpretations and decisions of Project Management will be consistent with the intent of and reasonably inferable from the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and decisions, Project Management will endeavor to secure faithful performance by both Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions so rendered in good faith. 4.6.19 Project Management's decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Documents. 4.7 Claims and Disputes 4.7.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between the Owner and Contractor arising out of or relating to the Contract. Claims must be made by written notice. The responsibility to 18 substantiate Claims shall rest with the party making the claim. 4.7.2 Meet and Confer. The Contractor and Project Management shall try to resolve the claim, or dispute with meet and confer sessions to be commenced within fifteen (15) days of the dispute or claim. Any claim or dispute that the parties cannot resolve shall be decided by the Circuit Court, 16th Judicial Circuit, Monroe County, Florida. 4.7.3 Time Limits on Claims. Claims by either party must be made within twenty-one(21) days after occurrence of the event giving rise to such Claim or within twenty-one (21) days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be made by written notice submitted to the designated representative. An additional Claim made after the initial Claim has been implemented by Change Order will not be considered unless submitted in writing to the Owner's representative in a timely manner. 4.7.3.1 Any claim not filed with the Owner within such time and in compliance with the preceding provisions shall be deemed conclusively to have been waived and shall be dismissed at the option of the Owner. The claim shall set forth in detail all known facts and circumstances supporting the claim; final costs associated with any claim upon which notice has been filed must be submitted in writing to the Owner with thirty (30) calendar days after notice has been received. In the event the Contractor seeks to make a claim for an increase in the contract price, as a condition precedent to any liability of the Owner therefore, unless emergency conditions exist, the Contractor shall strictly comply with the requirements of this Section and such claim shall be made by the Contractor before proceeding to execute any work for which a claim is made. Failure to comply with this condition precedent shall constitute a waiver by the Contractor of any claim for additional compensation. 4.7.4 Continuing Contract Performance. Pending final resolution of a Claim unless otherwise agreed in writing, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents. 4.7.5 Waiver of Claims: Final Payment. The making of final payment shall constitute a waiver of Claim by the Owner except those arising from: 1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. 4.7.6 Claims for Concealed or Unknown Conditions. If conditions are encountered at the site which are(1)subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party 19 promptly before conditions are disturbed and in no event later than ten (10) days after first observance of the conditions. Project Management will promptly investigate such conditions, and the parties will follow the procedure in paragraph 4.7.2. 4.7.6.1 As a condition precedent to the Owner having any liability to the Contractor due to concealed and unknown conditions, the Contractor must give the Owner and Owner Engineer written notice of, and an opportunity to observe, such condition prior to disturbing it. The failure by the Contractor to give the written notice and make the claim as provided by the provisions herein shall constitute a waiver by the Contractor of any rights arising out of or relating to such concealed and unknown condition. 4.7.7 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Paragraph 10.3 If the Contractor believes additional cost is involved for reasons including but not limited to(1) a written interpretation from Project Management, (2) a written order for a minor change in the Work issued by Project Management, (3) failure of payment by the Owner, (4) termination of the Contract by the Owner, (5) Owner's suspension or (6) other reasonable grounds, a Claim shall be filed in accordance with the procedure established herein. In a claim by the Contractor against the Owner for compensation in excess of the Contract Sum, any liability of the Owner to the Contractor shall be strictly limited and computed in accordance with the contract documents and shall in no event include indirect costs or consequential damages of the Contractor or any estimated costs or damages. 4.7.8 Claims for Additional Time. 4.7.8.1 If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shall be given. 4.7.8.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. 4.7.9 Injury or Damage to Person or Property. If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party, of any of the other party's employees or agents, or of others for whose acts such party is legally liable, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding twenty-one (21) days after first observance. The notice shall provide sufficient detail to enable the other party to investigate the matter. If a Claim for additional cost or time related to this Claim is to be asserted, it shall be filed as provided in Subparagraphs 4.7.7 or 4.7.8. 5.0 SUBCONTRACTORS AND SUB-SUBCONTRACTORS 5.1 Definitions 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site.The term"Subcontractor"is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor.The term"Subcontractor"does not include 20 other Contractors or subcontractors of other Contractors. 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-subcontractor. 5.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to Project Management for review by the Owner and Project Management the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Work. Project Management will promptly reply to the Contractor in writing stating whether or not the Owner or Project Management, after due investigation, has reasonable objection to any such proposed person or entity. Failure of Project Management to reply promptly shall constitute notice of no reasonable objection. 5.2.2 The Contractor shall not contract with a proposed person or entity to which the Owner or Project Management has made reasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the Owner or Project Management has made reasonable objection. 5.2.3 If the Owner or Project Management refuses to accept any person or entity on a list submitted by the Contractor in response to the requirements of the Contract Documents, the Contractor shall submit an acceptable substitute. However, no increase in the Contract Sum shall be allowed for any such substitution. 5.2.4 The Contractor shall not change a Subcontractor, person or entity previously selected if the Owner or Project Management makes reasonable objection to such change. 5.3 Subcontractual Relations 5.3.1 By appropriate written agreement, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities which the Contractor, by these Documents, assumes toward the Owner or Project Management. Each subcontract agreement shall preserve and protect the rights of the Owner or Project Management under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights. When appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub- subcontractors. The Contractor shall make available to each proposed Subcontractor, copies of the Contract Documents which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors shall similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors. 6.0 CONSTRUCTION BY OWNER OR BY OTHER CONTRACTORS 6.1 Owner's Right to Perform Construction with Own Forces and to Award Other 21 Contracts 6.1.1 The Owner reserves the right to perform construction or operations released to the Project with the Owner's own forces, which include persons or entities under separate contracts not administered by Project Management. The Owner further reserves the right to award other contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver or subrogation. 6.1.2 When the Owner performs construction or operations with the Owner's own forces including persons or entities under separate contracts not administered by Project Management, the Owner shall provide for coordination of such forces with the Work of the Contractor who shall cooperate with them. 6.1.3 It shall be the responsibility of the Contractor to coordinate his/her work with the work of other contractors on the site. The Owner and Project Management shall be held harmless for any and all costs and time increases associated with improper coordination. 6.2 Mutual Responsibility 6.2.1 The Contractor shall afford the Owner's own forces, Project Management and other contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Contract Documents. 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Owner's own forces or other contractors, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to Project Management any apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's own forces or other contractors' completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. 6.2.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the Contractor. The Contractor's sole remedy as against the Owner for costs caused by delays or improperly timed activities or defective construction shall be an extension of time. 6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially completed construction or to property of the Owner or other contractors as provided in Subparagraph 10.2.5. 6.2.5 Claims and other disputes and matters in question between the Contractor and other contractors shall be subject to the provisions of Paragraph 4.7 provided the other contractors have reciprocal obligations. 6.2.6 The Owner and other contractors shall have the same responsibilities for cutting and patching as are described for the Contractor in Paragraph 3.14. 22 6.2.7 Should the Contractor contend that he/she is entitled to an extension of time for completion of any portion or portions of the work, he/she shall, within seventy-two (72) hours of the occurrence of the cause of the delay, notify Project Management in writing, of his/her contention: setting forth (A) the cause for the delay, (B) a description of the portion or portions of work affected thereby, and (C) all details pertinent thereto. A subsequent written application for the specific number of days of extension of time requested shall be made by the Contractor to Project Management within seventy-two (72) hours after the delay has ceased to exist. .1 It is a condition precedent to the consideration or prosecution of any claim for an extension of time that the foregoing provisions be strictly adhered to in each instance and, if the Contractor fails to comply, he/she shall be deemed to have waived the claim. .2 The Contractor agrees that whether or not any delay, regardless of cause, shall be the basis for an extension of time he/she shall have no claim against the Owner or Project Management for an increase in the Contract price, nor a claim against the Owner or Project Management for a payment or allowance of any kind for damage, loss or expense resulting from delays; nor shall the Contractor have any claim for damage, loss or expense resulting from interruptions to, or suspension of, his/her work to enable other contractors to perform their work. The only remedy available to the Contractor shall be an extension of time. 6.3 Owner's Right to Clean Up 6.3.1 If a dispute arises among the Contractor, other contractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish as described in Paragraph 3.15, the Owner may clean up and allocate the cost among those responsible as Project Management determines to be just. 7.0 CHANGES IN THE WORK 7.1 Changes 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. 7.1.2 A Change Order shall be based upon agreement among the Owner, Project Management and Contractor.A Construction Change Directive require agreement by the Owner, Project Management and may or may not be agreed to by the Contractor. An order for a minor change in the Work may be issued by Project Management alone. 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive or order for a minor change in theWork. 7.1.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are so changed in a proposed Change Order or Construction Change Directive that application of such unit prices to quantities of Work 23 proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted. 7.2 Change Orders 7.2.1 A Change Order is a written instrument prepared by Project Management and signed by the Owner, Project Management and Contractor stating their agreement upon all of the following: .1 a change in the Work; .2 the amount of the adjustment in the Contract Sum, if any; and .3 the extent of the adjustment in the Contract Time, if any. 7.2.2 The cost or credit to the Owner resulting from a change in the Work shall be determined in one or more of the following methods: .1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation and payment, and approved by the appropriate authority in writing; .2 unit prices stated in the Contract Documents or subsequently agreed upon, and approved by the appropriate authority in writing; .3 cost to be determined in a manner agreed upon by the parties and amutually acceptable fixed or percentage fee; .4 or by method provided in subparagraph 7.2.3. 7.2.3 If none of the methods set forth in Clauses 7.2.1 or 7.2.2 is agreed upon, the Contractor, provided a written order signed by the Owner or Project Management is received, shall promptly proceed with the Work involved. The cost of such Work shall then be determined by daily force accounts in a form acceptable to the Owner and Project Management. The daily force account forms shall identify Contractor and/or Subcontractor personnel by name, total hours for each man, each piece of equipment and total hours for equipment and all material(s) by type for each extra Work activity claim. Each daily force account form shall be signed by the designated Project Management representative no later than the close of business on the day the Work is performed to verify the items and hours listed. Extended pricing of these forms shall be submitted to Project Management with all supporting documentation required by Project Management for inclusion into a change order. Unless otherwise provided in the Contract Documents, cost shall be limited to the following: cost of materials, including sales tax and cost of delivery; cost of labor, including social security, old age and unemployment insurance, and fringe benefits required by agreement or custom; works' or workmen's compensation insurance; and the rental value of equipment and machinery. Markups for overhead and profit will be in accordance with subparagraph 7.2.4. Pending final determination of cost, payments on account shall be made as determined by Project Management. The amount of credit to be allowed by the Contractor for any deletion or change, which results in a net decrease in the Contract Sum, will be 24 the amount of the actual net cost to the Owner as confirmed by Project Management. When both additions and credits covering related Work or substitutions are involved in any one change, the allowance for overhead and profit shall be figured on the basis of the net increase, if any with respect to that change. 7.2.4 The actual cost of Changes in the Work may include all items of labor or material, power tools, and equipment actually used, utilities, pro rata charges for foreman, and all payroll charges such as Public Liability and Workmen's Compensation Insurance. No percentage for overhead and profit shall be allowed on items of Social Security and Sales Tax. If deductions are ordered the amount of credit shall be a net cost to Owner as defined in section 5.6.1 of the Contract. Items considered as overhead shall include insurance other than that mentioned above, bond or bonds, superintendent, timekeeper, clerks, watchmen, use of small tools, miscellaneous supplies, incidental job costs, warranties, and all general home/field office expenses. The actual cost of Changes in the Work(other than those covered by unit prices set forth in the Contract Documents) shall be computed as follows: .1 If the Contractor performs the actual Work, the maximum percentage mark- up for overhead shall be five percent (5%) and the maximum percentage for profit shall be five percent(5%); .2 If the Subcontractor performs the actual Work, the subcontractor's percentage mark-up for overhead and profit shall be a maximum addition of ten percent (10%). If the Contractor does not perform the Work, the maximum mark-up for managing the Work will be five percent(5%); .3 If the Subcontractor performs part of the actual Work, his/her percentage mark- up for overhead and profit shall be a maximum addition of ten percent (10%) on his/her direct Work only. If the Contractor performs part of the actual Work, his/her percentage mark-up for overhead and profit shall be a maximum addition of ten percent (10%) on his direct Work only. 7.2.5 The Contractor shall furnish to the Owner through Project Management, an itemized breakdown of the quantities and prices used in computing the value of any change that might be ordered. Any additional supporting documentation requested by Project Management such as certified quotations or invoices shall be provided by the Contractor to Project Management at no additional cost to the Owner. 7.2.6 If the Contractor claims that any instructions given to him/her by Project Management, by drawings or otherwise, involve extra Work not covered by the Contract, he/she shall give Project Management written notice thereof within five (5) days after the receipt of such instructions and before proceeding to execute the work, except in emergencies endangering life or property, in which case the Contractor shall proceed in accordance with Paragraph 10.3. .1 The written notice to Project Management for the Extra Work shall include a complete description of the extra Work, the total cost and a detailed cost breakdown by labor, material and equipment for each additional activity required to be performed. Mark-ups shall be limited as specified elsewhere in 25 this Article. .2 Except as otherwise specifically provided, no claim for additional cost shall be allowed unless the complete notice specified by this subparagraph is given by the Contractor. 7.2.7 Unless otherwise agreed in writing, the Contractor shall carry on the Work and maintain its progress during any dispute or claim proceeding, and Owner shall continue to make payments to the Contractor in accordance with the Contract Documents. Disputes unresolved shall be settled in accordance with subparagraph 4.7. The Contractor shall maintain completed daily force account forms in accordance with subparagraph 7.2.3 for any dispute or claim item. 7.2.8 One or more changes to the Work within the general scope of this Contract, may be ordered by Change Order. The Owner may also issue written directions for changes in the Work and may issue Construction Change Directives, as set forth below. The Contractor shall proceed with any such changes or Construction Change Directives without delay and in a diligent manner, and same shall be accomplished in strict accordance with the terms and conditions otherwise provided for in the Contract. 7.2.9 The execution of a Change Order by the Contractor shall constitute conclusive evidence of the Contractor's agreement to the ordered changes in the work, this Contract as thus amended, the Contract Price and the time for performance by the Contractor. The Contractor, by executing the Change Order,waives and forever releases any claim against the Owner for additional time or compensation for matters relating to, arising out of or resulting from the Work included within or affected by the executed Change Order of which the Contractor knew or should have known. 7.3 Authority 7.3.1 Project Management will have authority to order minor changes in the Work not involving adjustment in the Contract sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes shall be effected by written order issued through Project Management and shall be binding on the Owner and Contractor. The Contractor shall carry out such written order promptly. 8.0 TIME 8.1 Definitions 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. 8.1.2 The date of commencement of the Work is the date established in the Notice to Proceed per this Agreement. The date shall not be postponed by the failure to act of the Contractor or of persons or entities for which the Contractor is responsible. 8.1.3 The date of Substantial Completion is the date certified by Project Management in accordance with Paragraph 9.8. 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. 26 8.1.5 The Owner/Project Management shall be the final judge as to whether Substantial Completion has been achieved and certifies the date to the Contractor. 8.2 Progress and Completion 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement, the Contractor confirms that the Contract Time is a reasonable period for performing the Work. 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely commence operations on the site or elsewhere prior to the effective date of insurance required by Article 11 to be furnished by the Contractor. The date of commencement of the Work shall not be changed by the effective date of such insurance. 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the Contract Time. 8.3 Delays and Extensions of Time 8.3.1 If the Contractor is delayed, at any time, in the progress of the Work by any act or neglect of the Owner, Project Management, or the Architect/Engineer, or by any employee of either, or by any separate contractor employed by the Owner, or by changes ordered in the Work, or by fire, unusual delay in transportation, adverse weather conditions not reasonably anticipatable, unavoidable casualties or any causes beyond the Contractor's control, or by delay authorized by the Owner, Project Management, or by any other cause which Project Management determines may justify the delay, then the Contract Time shall be extended by no cost Change Order for such reasonable time as Project Management may determine, in accordance with subparagraph 6.2.7. 8.3.2 Any claim for extension of time shall be made in writing to Project Management not more than Seventy-two (72) hours after the commencement of the delay in accordance with paragraph 6.2.7; otherwise it shall be waived. Any claim for extension of time shall state the cause of the delay and the number of days of extension requested. If the cause of the delay is continuing, only one claim is necessary, but the Contractor shall report the termination of the cause for the delay within seventy-two (72) hours after such termination in accordance with paragraph 6.2.7; otherwise, any claim for extension of time based upon that cause shall be waived. 8.3.3 No claim for an increase in the Contract Sum for either acceleration or delay will be allowed for extensions of time pursuant to this Paragraph 8.3 or for other changes in the Construction Schedules. 8.3.4 If the Project is delayed as a result of the Contractor's refusal or failure to begin the Work on the date of commencement as defined in Paragraph 8.1.2, or his/her refusal or failure to carry the Work forward expeditiously with adequate forces, the Contractor causing the delay shall be liable for, but not limited to, delay claims from other Contractors which are affected. 9.0 PAYMENTS AND COMPLETION 9.1 Contract Sum 27 9.1.1 The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. 9.2 Schedule of Values 9.2.1 Before submittal of the first Application for Payment, the Contractor shall submit to Project Management, a schedule of values allocated to various portions of the Work, prepared in such form and supported by such data to substantiate its accuracy as Project Management may require. This schedule, unless objected to by Project Management, shall be used as a basis for reviewing the Contractor's Applications for Payment. 9.3 Applications for Payment 9.3.1 At least fifteen (15) days before the date established for each progress payment, the Contractor shall submit to Project Management an itemized Application for Payment for Work completed in accordance with the schedule of values. Such application shall be notarized and supported by such data substantiating the Contractor's right to payment as the Owner or Project Management may require, such as copies of requisitions from Subcontractors and material suppliers, and reflecting retainage if provided for elsewhere in the Contract Documents. .1 Such applications may include request for payment on account of changes in the Work which have been properly authorized by Construction Change Directives but not yet included in Change Orders. .2 Such applications may not include requests for payment of amounts the Contractor does not intend to pay to a Subcontractor or material supplier because of a dispute or other reason. 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner's title to such materials and equipment or otherwise protect the Owner's interest, and shall include applicable insurance, storage and transportation to the site for such materials and equipment stored off the site. Each application for payment of materials stored onsite shall not exceed the amount of the certified vendor invoice(s) for said materials, less retainage per Sec. 00500, 5.6.1-5.8 and F.S. 218.735 (8)(a). 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which approval for payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. All Subcontractors and Sub-subcontractors shall execute an agreement stating that title will so pass, upon their receipt of payment from the 28 Contractor. The warranties are for the administrative convenience of the Owner only and do not create an obligation on the part of the Owner to pay directly any unpaid subcontractor, laborer or materialmen. Such persons must seek payment from the Contractor or his public construction bond surety, if any, only. 9.4 Approval for Payment 9.4.1 Project Management will assemble a Project Application for Payment by combining the Contractor's applications with similar applications for progress payments from other Contractors and certify the amounts due on such applications. 9.4.2 After the Project Management's receipt of the Project Application for Payment, Project Management will either approve the Application for Payment, with a copy to the Contractor, for such amount as Project Management determine is properly due, or notify the Contractor in writing of Project Management's reasons for withholding approval in whole or in part as provided in Subparagraph 9.5.1. 9.4.3 The issuance of a separate Approval for Payment will constitute representations made by Project Management to the Owner, based on their individual observations at the site and the data comprising the Application for Payment submitted by the Contractor, that the Work has progressed to the point indicated and that, to the best of Project Management's knowledge, information and belief, quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to minor deviations from the Contract Documents correctable prior to completion and to specific qualifications expressed by Project Management. The issuance of a separate Approval for Payment will further constitute a representation that the Contractor is entitled to payment in the amount approved. However, the issuance of a separate Approval for Payment will not be a representation that Project Management has (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed the Contractor's construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor's right to payment or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. 9.5 Decisions to Withhold Approval 9.5.1 Project Management may decline to approve an Application for Payment if, in his opinion, the application is not adequately supported. If the Contractor and Project Management cannot agree on a revised amount, Project Management shall process the Application for the amount it deems appropriate. Project Management may also decline to approve any Application for Payment because of subsequently discovered evidence or subsequent inspections. It may nullify, in whole or part, any approval previously made to such extent as may be necessary in its opinion because of: (1) defective Work not remedied; (2) third party claims filed or reasonable evidence indicating probable filing of such claims; (3) failure of the Contractor to make payments properly to Subcontractors or for labor, materials, or equipment; (4) reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; (5) damage to Project Management, the Owner, or another contractor working at the project; (6) reasonable evidence that the Work will not be completed within the contract time; (7) persistent failure to carry out the Work in 29 accordance with the Contract Documents. No payment shall be made to the Contractor until certificates of insurance or other evidence of compliance by the Contractor, with all the requirements of Article 11, have been filed with the Owner and Project Management. 9.5.2 When the above reasons for withholding approval are removed, approval will be made for amounts previously withheld. 9.6 Progress Payments 9.6.1 After Project Management has issued an Approval for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents, and shall so notify Project Management. From the total of the amount determined to be payable on a progress payment, a retainage in accordance with the Florida Local Government Prompt Payment Act, Chapter 218, Florida Statutes will be deducted and retained by the Owner until the final payment is made. The balance of the amount payable, less all previous payments, shall be approved for payment. .1 It is understood and agreed that the Contractor shall not be entitled to demand or receive progress payment based on quantities of Work in excess of those provided in the proposal or covered by approved change orders, except when such excess quantities have been determined by Project Management to be a part of the final quantity for the item of Work in question. .2 No progress payment shall bind the Owner to the acceptance of any materials or Work in place, as to quality or quantity. All progress payments are subject to correction at the time of final payments. 9.6.2 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the Owner, out of the amount paid to the Contractor on account of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub- subcontractors in similar manner. 9.6.3 Project Management will, on request,furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and action taken thereon by the Owner and Project Management on account of portions of the Work done by such Subcontractor. 9.6.4 Neither the Owner nor Project Management shall have an obligation to pay, or to see to, the payment of money to a Subcontractor except as may otherwise be required bylaw. 9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in Subparagraphs 9.6.2, 9.6.3 and 9.6.4. 9.6.6 A progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract Documents. 9.6.7 All material and work covered by partial payments made shall thereupon become the sole • 30 property of the Owner, and by this provision shall not be construed as relieving the Contractor from the sole responsibility for the materials and Work upon which payments have been made or the restoration for any damaged material, or as a waiver of the right of the Owner or Project Management to require the fulfillment of all the terms of the Contract. 9.6.8 Except in case of bona fide disputes, or where the Contractor has some other justifiable reason for delay, the Contractor shall pay for all transportation and utility services not later than the end of the calendar month following that in which services are rendered and for all materials, tools, and other expendable equipment which are delivered at the site of the Project. The Contractor shall pay to each of his Subcontractors, not later than the end of the calendar month in which each payment is made to the Contractor, the representative amount allowed the Contractor on account of the Work performed by the Subcontractor. The Contractor shall, by an appropriate agreement with each Subcontractor, also require each Subcontractor to make payments to his/her suppliers and Sub-subcontractors in a similar manner. 9.8 Substantial Completion 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor and. Project Management shall jointly prepare a comprehensive list of items to be completed or corrected. The Contractor shall proceed promptly to complete and correct items on the list. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Upon receipt of the list, Project Management will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the inspection discloses any item, whether or not included on the list, which is not in accordance with the requirements of the Contract Documents, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by Project Management. The Contractor shall then submit a request for another inspection by Project Management, to determine Substantial Completion. When the Work or designated portion thereof is substantially complete, Project Management will prepare a Certificate of Substantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate. 9.8.3 Upon Substantial Completion of the Work or designated portion thereof and upon application by the Contractor and certification by Project Management, the Owner shall make payment, reflecting adjustment in retainage, if any, for such Work or portion thereof 31 as provided in the Contract Documents. 9.9 Partial Occupancy or Use 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented to by the insurer as required under Subparagraph 11.3.1 and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor and Project Management shall jointly prepare a list as provided under Subparagraph 9.8.2. Consent of the Contractor to partial occupancy or use shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement between the Owner and Contractor or, if no agreement is reached, by decision of Project Management. 9.9.2 Immediately prior to such partial occupancy or use, the Owner, Project Management and Contractor shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute acceptance of Work not complying with the requirements of the Contract Documents. 9.10 Final Completion and Final Payment 9.10.1 Upon completion of the Work, the Contractor shall forward to Project Management a written Notice that the Work is ready for final inspection and acceptance and shall also forward to Project Management a final Contractor's Application for Payment. Upon receipt, Project Management will promptly make such inspection. When Project Management, finds the Work acceptable under the Contract Documents and the Contract fully performed, Project Management will promptly issue a final Approval for Payment stating that to the best of their knowledge, information and belief, and on the basis of their observations and inspections, the Work has been completed in accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor and noted in said final Approval is due and payable. Project Management's final Approval for Payment will constitute a further representation that conditions listed in Subparagraph 9.10.2 as precedent to the Contractor's being entitled to final payment have been fulfilled. 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to Project Management(1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is made, is currently in effect and will not be canceled or allowed to expire until at least thirty ( 30) days' prior written notice has been given to the Owner, (3) a written statement that the 32 Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract. The following documents (samples included in Section 01027, Application for Payment) are required for Final Payment: (1) Application and Certificate for Payment. (2) Continuation Sheet. (3) Certificate of Substantial Completion. (4) Contractor's Affidavit of Debts and Claims. (5) Contractor's Affidavit of Release of Liens. (6) Final Release of Lien. (7) Contractor shall provide two (2) hard copies in tabulated divided binders and one (1) saved electronically tabbed and indexed in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD of all the following but not limited to: A. Project Record Documents (As Built Documents). B. Operating and maintenance data, instructions to the Owner's personnel. C. Warranties, bond and guarantees. D. Keys and keying schedule. E. Spare parts and maintenance materials. F. Electronic copies of approved submittals. G. Evidence of payment and final release of liens and consent of suretyto final release (includes final release from all utilities and utility companies). 9.10.3 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment. Such waivers shall be in addition to the waiver described Subparagraph 4.7.5. 9.11 Payment of Subcontractors 9.11.1 Any requirement of this Article 9 that the Contractor furnish proof to the Owner or Project Management that the subcontractors and materialmen have been paid is for the protection and convenience of the Owner only. Unpaid subcontractors and materialmen may only seek payment from the Contractor and the surety that provided the Contractor's Public Construction Bond, if any. The Contractor must insert this paragraph 9.11 in all its contracts with subcontractors and materialmen. 10.0 PROTECTION OF PERSONS AND PROPERTY 10.1 Safety Precautions and Programs 10.1.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. The Contractor shall submit the Contractor's safety program to Project Management for review, approval and coordination with the safety programs of other Contractors. 33 10.1.2 In the event the Contractor encounters on the site material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Project Management in writing. The Work in the affected area shall not thereafter be resumed except by written agreement of the Owner and Contractor if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The Work in the affected area shall be resumed in the absence of asbestos or polychlorinated biphenyl (PCB), or when it has been rendered harmless, by written agreement of the Owner and Contractor. 10.1.3 The Contractor shall not be required pursuant to Article 7 to perform without consent any Work relating to asbestos or polychlorinated biphenyl (PCB). 10.1.5 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to Project Management in writing.The Owner, Contractor and Project Management shall then proceed in the same manner described in Subparagraph 10.1.2. 10.1.6 The Owner shall be responsible for obtaining the services of a licensed laboratory to verify a presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to verify that it has been rendered harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor and Project Management the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor and Project Management will promptly reply to the Owner in writing stating whether or not any of them has reasonable objection to the persons or entities proposed by the Owner. If the Contractor or Project Management has an objection to a person or entity proposed by the Owner,the Owner shall propose another to whom the Contractor and Project Management have no reasonable objection. 10.2 Safety of Persons and Property 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: .1 employees on the Work and other persons who may be affectedthereby; .2 the Work and materials and equipment to be incorporated therein, whetherin storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub-subcontractors; .3 other property at the site or adjacent thereto, such as trees, shrubs,lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction;and .4 construction or operations by the Owner or other Contractors. 34 10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. 10.2.5 The Contractor shall promptly remedy damage and loss to property referred to in Clauses 10.2.1.2, 10.2.1.3, and 10.2.1.4 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Clauses 10.2.1.2, 10.2.1.3 and 10.2.1.4, except damage or loss attributable to acts or omissions of the Owner, Project Management or Architect or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's obligations under Paragraph 3.18. 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owner or Project Management. 10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety. 10.3 Emergencies 10.3.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Paragraph 4.7 and Article 7. 10.4 Site Specific Safety Plan See Section 00970, Project Safety and Health Plan, for minimum requirements of job site safety plan. 11.0 INSURANCE AND BONDS 11.1.1 Prior to commencement of Work governed by this contract (including the pre-staging of personnel and material), the Contractor shall obtain, at its own expense, insurance as specified in the schedule set forth in Section 00130, Insurance Requirements and Forms which are made part of this Agreement. The Contractor will ensure that the insurance obtained will extend protection to all subcontractors engaged by the Contractor. As an alternative, the Contractor may require all subcontractors to obtain insurance consistent with the attached schedules. 35 11.1.2 The Contractor will not be permitted to commence Work governed by the Agreement (including pre-staging of personnel and material) until satisfactory evidence of the required insurance has been furnished to the County as specified below. Delays in the commencement of Work resulting from the failure of the Contractor to provide satisfactory evidence of the required insurance shall not extend deadlines specified in this Agreement and any penalties and failure to perform assessments shall be imposed as if the Work commenced on the specified date and time, except for the Contractor's failure to provide satisfactory evidence of insurance. 11.1.3 The Contractor shall maintain the required insurance throughout the entire term of this contract and any extensions specified in any attached schedules. Failure to comply with this provision may result in the immediate suspension of all Work until the required insurance has been reinstated or replaced. Delays in the completion of Work resulting from the failure of the Contractor to maintain the required insurance shall not extend deadlines specified in this Agreement and any penalties and failure to perform assessments shall be imposed as if the Work commenced on the specified date and time, except for the Contractor's failure to provide satisfactory evidence of insurance. 11.1.4 The Contractor shall provide, to the County in care of Project Management as satisfactory evidence of the required insurance, either: Certificate of Insurance or a certified copy of the actual insurance policy. 11.1.5 The County, at its sole option, has the right to request a certified copy of any or all insurance policies required by this Contract. 36 11.1.6 All insurance policies must specify that they are not subject to cancellation, nonrenewal, material change, or reduction in coverage unless a minimum of thirty (30) days prior notification is given to the County by the insurer. 11.1.7 The acceptance and/or approval of the Contractor's insurance shall not be construed as relieving the Contractor from any liability or obligation assumed under this contract or imposed by law. 11.1.8 The Monroe County Board of County Commissioners, its employees and officials will be included as "Additional Insured" on all policies, except for Worker's Compensation. 11.1.9 In addition, the County will be named as an additional insured and loss payee on all policies covering County-owned property. 11.1.10Any deviations from these General Insurance Requirements must be requested in writing on the County prepared form entitled "Request for Waiver of Insurance Requirements" and approved by the Monroe County's Risk Manager. 12.0 UNCOVERING AND CORRECTION OF WORK 12.1 Uncovering of Work 12.1.1 If a portion of the Work is covered contrary to Project Management's request or to requirements specifically expressed in the Contract Documents, it must, if required in writing by Project Management, be uncovered for their observation and be replaced at the Contractor's expense without change in the Contract Time. 12.1.2 If a portion of the Work has been covered which Project Management has not specifically requested to observe prior to its being covered, Project Management may request to see such Work and it shall be uncovered by the Contractor, if such Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate Change Order, be charged to the Owner, if such Work is not in accordance with the Contract Documents,the Contractor shall pay such costs unless the condition was caused by the Owner or one of the other Contractors in which event the Owner shall be responsible for payment of such costs. 12.2 Correction of Work 12.2.1 The Contractor shall promptly correct Work rejected by Project Management or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear costs of correcting such rejected Work, including additional testing and inspections and compensation for Project Management's services and expenses made necessary thereby. 12.2.2 If, within one (1) year after the date of Substantial Completion of the Work or designated portion thereof, or after the date for commencement of warranties established under Subparagraph 9.9, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written 37 acceptance of such condition. This period of one (1) year shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual performance of the Work. This obligation under this Subparagraph 12.2.2 shall survive acceptance of the Work under the Contract and termination of the Contract. The Owner shall give such notice promptly after discovery of the condition. 12.2.3 The Contractor shall remove from the site portions of the Work which are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner. 12.2.4 If the Contractor fails to correct nonconforming Work within a reasonable time, the Owner may correct it in accordance with Paragraph 2.4. If the Contractor does not proceed with correction of such nonconforming Work within a reasonable time fixed by written notice from Project Management, the Owner may remove it and store the salvageable materials or equipment at the Contractor's expense. If the Contractor does not pay costs of such removal and storage within ten (10) days after written notice, the Owner may upon ten (10) additional days' written notice sell such materials and equipment at auction or at private sale and shall account for the proceeds thereof, after deducting costs and damages that should have been borne by the Contractor, including compensation for Project Management's services and expenses made necessary thereby. If such proceeds of sale do not cover costs which the Contractor should have borne, the Contract Sum shall be reduced by the deficiency. If payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the Owner. 12.2.5 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or other Contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements of the Contract Documents. 12.2.6 Nothing contained in this Paragraph 12.2 shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Documents. Establishment of the time period of one (1) year as described in Subparagraph 12.2.2, relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct theWork. 12.3 Acceptance of Nonconforming Work 12.3.1 If the Owner prefers to accept Work which is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. 13.0 MISCELLANEOUS PROVISIONS 13.1 Governing Law 13.1.1 The contract shall be governed by the laws of the State of Florida. Venue for any claims or disputes arising under this contract shall be in the Circuit Court of the 16th Judicial 38 Circuit of the State of Florida. 13.2 Successors and Assigns 13.2.1 The Owner or Project Management (as the case may be) and the Contractor each binds himself/herself, his/her partners, successors, assigns, and legal representatives of such other party in respect to all covenants, agreements, and obligations contained in the Contract Documents. Neither party to the Contract shall assign the Contract or sublet it as a whole without the written consent of the other. 13.2.2 The Contractor shall not assign any monies due or to become due under this Contract without prior written consent of the Owner or Project Management. 13.3 Not used. 13.4 Rights and Remedies 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. 13.4.2 No action or failure to act by the Owner, Project Management, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except as may be specifically agreed in writing. 13.5 Tests and Inspections 13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give Project Management timely notice of when and where tests and inspections are to be made so Project Management may observe such procedures. The Owner shall bear costs of test, inspections or approvals which do not become requirements until after bids are received or negotiations concluded. 13.5.2 If Project Management, Owner or public authorities having jurisdiction determine that portions of the Work require additional testing, inspection or approval not included under Subparagraph 13.5.1, Project Management will, upon written authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to Project Management of when and where tests and inspections are to be made so Project Management may observe such procedures. The Owner shall bear such costs except as provided in Subparagraph 13.5.3. 13.5.3 If such procedures for testing, inspection or approval under Subparagraphs 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, the Contractor shall bear all costs made necessary by such failure including those of repeated procedures and compensation for Project Management's services and expenses. 39 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to Project Management. 13.5.5 If Project Management is to observe tests, inspections or approvals required by the Contract Documents, Project Management will do so promptly and, where practicable, at the normal place of testing. 13.5.6 Test or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid unreasonable delay in the Work. 13.7 Commencement of Statutory Limitation Period 13.7.1 The statute of limitations applicable to this contact are as provided in Section 95.11 (3) (C), Florida Statutes. 14.0 TERMINATION OR SUSPENSION OF THE CONTRACT 14.1 Termination by the Owner for Cause The Owner may terminate the Contract if the Contractor: 1. Persistently or repeatedly refuses or fails to supply enough properlyskilled workers or proper materials. 2. Fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors. 3. persistently disregards laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction. OR 4. Otherwise is guilty of substantial breach of a provision of the Contract Documents. II. When any of the above reasons exist, the Owner, after consultation with Project Management, and upon certification by Project Management that sufficient cause exists to justify such action, may without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's surety, if any, seventy-two (72) hours written notice,terminate employment of the Contractor and may, subject to any prior rights of the surety: 1. take possession of the site and of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor; 1. accept assignment of subcontracts pursuant to Paragraph 5.4; and 2. finish the Work by whatever reasonable method the Owner may deem 40 expedient. III. When the Owner terminates the Contract for one of the reasons stated in Subparagraph 14.1.1. the Contractor shall not be entitled to receive further payment until the Work is finished. 14.2 Suspension or Termination by the Owner for Convenience The Owner may, without cause, order the Contractor in writing to terminate, suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. II. In the event of Termination,the Owner shall pay for work completed to date of Termination. 14.3 Insurance Requirements: Workers' Comp Employers' Liability $100,000/$500,000/$100,000 Bodily Injury by Accident/Bodily Injury by Disease, policy limits/Bodily Injury by Disease each employee General Liability $300,000 Combined Single Limit Vehicle $200,000 per Person $300,000 per Occurrence $200,000 Property Damage or $300,000 Combined Single Limit 14.4 The Contractor shall be required to secure and pay for all permits required to perform the work. 14.5 The Contractor is required to have all current licenses necessary to perform the work. 14.6 Indemnification, Hold Harmless and Defense. Notwithstanding any minimum insurance requirements prescribed elsewhere in this agreement, Contractor shall defend, indemnify and hold the County and the County's elected and appointed officers and employees harmless from and against (i) any claims, actions or causes of action, (ii) any litigation, administrative proceedings, appellate proceedings, or other proceedings relating to any type of injury (including death), loss, damage, fine, penalty or business interruption, and (iii) any costs or expenses that may be asserted against, initiated with respect to, or sustained by, any indemnified party by reason of, or in connection with, (A) any activity of Contractor or any of its employees, agents, contractors or other invitees during the term of this Agreement, (B) the negligence or recklessness, intentional wrongful misconduct, errors or other wrongful act or omission of Contractor or any of its employees, agents, sub-contractors or other invitees, or (C) Contractor's default in respect of any of the obligations that it undertakes under the terms of this Agreement, except to the extent the claims, actions, causes of action, litigation, proceedings, costs or expenses arise from the intentional or sole negligent acts or omissions of the County or any of its employees, agents, contractors or invitees(other than Contractor). 41 The monetary limitation of liability under this contract shall be not less than $1 million per occurrence pursuant to Section 725.06, Florida Statutes. Insofar as the claims, actions, causes of action, litigation, proceedings, costs or expenses relate to events or circumstances that occur during the term of this Agreement, this section will survive the expiration of the term of this Agreement or any earlier termination of this Agreement. In the event that the completion of the project (to include the work of others) is delayed or suspended as a result of the Contractor's failure to purchase or maintain the required insurance, the Contractor shall indemnify the County from any and all increased expenses resulting from such delay. Should any claims be asserted against the County by virtue of any deficiency or ambiguity in the plans and specifications provided by the Contractor, the Contractor agrees and warrants that the Contractor shall hold the County harmless and shall indemnify it from,all losses occurring thereby and shall further defend any claim or action on the County's behalf. The first ten dollars ($10.00) of remuneration paid to the Contractor is for the indemnification provided for the above. The extent of liability is in no way limited to, reduced, or lessened by the insurance requirements contained elsewhere within this Agreement. FDEM Indemnification To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Agency, the State of Florida, Department of Emergency Management, and its officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of the Contractor and persons employed or utilized by the Contractor in the performance of this Contract. This indemnification shall survive the termination of this Contract. Nothing contained in this paragraph is intended to nor shall it constitute a waiver of the State of Florida and the (County) Agency's sovereign immunity. 14.7 NON-COLLUSION. By signing this proposal, the undersigned swears, according to law on his/her oath, and under penalty of perjury, that their firm executes this proposal with prices arrived at independently without collusion, consultation, communication, or agreement for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor. Unless otherwise required by law, the prices which have been quoted in this proposal have not been knowingly disclosed by the proposer and will not knowingly be disclosed by the proposer prior to proposal opening, directly or indirectly, to any other proposer or to any competitor. No attempt has been made or will be made by the proposer to induce any other person, partnership or corporation to submit, or not to submit a proposal for the purpose of restricting competition. The statements contained in this paragraph are true and correct, and made with the full knowledge that Monroe County relies upon the truth of the statements contained in this paragraph in awarding contracts for this project. 14.8 ETHICS CLAUSE. By signing this proposal, the undersigned warrants that he/she/it has not employed, retained or otherwise had act on his/her/its behalf any former County officer or employee in violation of Section 2 of Ordinance No. 010-1990 or any County officer or employee in violation of Section 3 of Ordinance No. 010-1990. For breach or violation of this 42 provision the County may, in its discretion,terminate this Agreement without liability and may also, in its discretion, deduct from the Agreement or purchase price, or otherwise recover, the full amount of any fee, commission, percentage, gift, or consideration paid to the former County officer or employee. 14.9 DRUG-FREE WORKPLACE. By signing this proposal, the undersigned certifies that the Contractor complies fully with, and in accordance with Florida Statute, Section 287.087, the requirements as follows: I. They will publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specify the actions that will be taken against employees for violations of such prohibition. II. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. Ill. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (i). IV. In the statement specified in subsection (i), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893 (Florida Statutes) or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. V. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, for any employee who is so convicted. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. End of Section 00750 43 SECTION 00970 PROJECT SAFETY AND HEALTH PLAN A. REGULATIONS AND POLICIES Every Contractor and Subcontractor employed on the Project shall comply with all applicable local, State, and Federal safety and health regulations and with Monroe County safety and health policies as described herein. The Contractor shall comply with OSHA (Occupational Safety and Health Administration) Parts 1910 and 1926, Construction Industry Standards and Interpretations, and with this supplement. Requests for variances or waiver from this supplement are to be made to the Contracting Officer in writing supported by evidence that every reasonable effort has been made to comply with the contractual requirements. A written request for a waiver or a variance shall include-- (1) Specific reference to the provision or standard in question; (2) An explanation as to why the waiver is considered justified; and (3) The Contractor's proposed alternative, including technical drawings, materials, or equipment specifications needed to enable the Contracting Officer to render a decision. No waiver or variance will be approved if it endangers any person. The Contractor shall not proceed under any requested revision of provision until the Contracting Officer has given written approval.The Contractor is to hold and save harmless Monroe county Florida free from any claims or causes of action whatsoever resulting from the Contractor or subcontractors proceeding under a waiver or approved variance. Copies of OSHA Parts 1910 and 1926, Construction Industry Standards and Interpretations, may be obtained from: U.S. Government Printing Office Bookstore 710 North Capitol Street N.W. Washington, DC 20401 B. GENERAL CONTRACTOR REQUIREMENTS 1.0 SAFETY PROGRAM Each Contractor and sub-contractor is to demonstrate that he or she has facilities for conducting a safety program commensurate with the work under contract. The Contractor is to submit in writing a proposed comprehensive site specific safety program for approval to the Contracting Officer for Monroe County before the start of construction operations. The program is to specifically state what provisions the Contractor proposes to take for the health and safety of all employees, including subcontractors and rental equipment operators. The program shall be site specific and provide details relevant to the work to be done, the hazards associated with the work, and the actions that will be necessary to minimize the identified hazards. 43 The Safety Program will also be required to provide emergency contact person, emergency planning and a personnel evacuation plan for any hurricane evacuation event. 1.1 PRECONSTRUCTION SAFETY MEETING Representatives for the Contractor are to meet with the Contracting Officer (CO) or the CO's representative before the start of construction to discuss the safety program and the implementation of all health and safety standards pertinent to the work under this contract. 1.2 JOINT SAFETY POLICY COMMITTEE The Contractor or designated on-site representative is to participate in monthly meetings of a joint Safety Policy Committee with Monroe County Project Management and Contractor supervisory personnel. At these meetings the Contractor's project manager and the Contracting Officer will review the effectiveness of the Contractor's safety effort, resolve current health and safety problems, and coordinate safety activities for upcoming work. 1.3 SAFETY PERSONNEL Each Contractor is to designate a competent supervisory employee satisfactory to the Contracting Officer to administer the safety program. The Mandatory Safety and Health Rules shall be posted in a conspicuous location along with the OSHA and Emergency Phone Number posters. 1.4 SAFETY MEETINGS A minimum of one (1) "on-the-job" or "toolbox" safety meeting is to be conducted each week by all field supervisors or foremen and attended by mechanics and all construction personnel at the jobsite. The Contractor is to also conduct regularly scheduled supervisory safety meetings at least monthly for all levels of job supervision. Each Contractor and Subcontractor shall be expected to indoctrinate his/her employees as to the safety and health requirements of this project and to enforce adherence to safe work procedures. Each Contractor and Subcontractor shall cooperate fully with all other contractors in their respective safety and health programs. 1.5 SAFETY INSPECTION The Contractor shall perform frequent and regular safety inspections of the jobsite, materials, and equipment, and shall correct deficiencies. Good housekeeping shall be observed at all times. Waste, debris, and garbage shall be removed daily or placed in appropriate waste containers. All materials, tools, and equipment shall be stored in a safe and orderly fashion. Each contractor shall donate (10%) ten percent of their staff to a crew that will convene every Friday at 1:00 pm for a joint site clean-up effort not to exceed duration of three (3) hours. In summary, there will be a three-part clean-up plan. 44 1. The first part consists of the Contractor cleaning up on a daily basis, his workstations, and his/her trade work. 2. The second part consists of the general clean-up, the concerted effort by all trade contractors working on the project. A minimum of one (1) crew is to be utilized by each contractor, or ten (10%) percent, whichever is more. 3. The third part consists of the Owner cleaning up for a particular trade contractor should adequate notice not compel him to clean up his/her work. In this case, the appropriate contractors will be back charged. Shortly after the award of the contract and prior to the beginning of work, an Activity Hazard Analysis (phase plan)shall be prepared by the contractor and submitted to Monroe County for approval. The analysis will address the hazards for each activity to be performed in that phase and will present the procedures and safeguards necessary to eliminate the hazards or reduce the risk to an acceptable level. A phase is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform work. The analysis will be discussed by the Contractor and Monroe County on-site representatives at the Preparatory Inspection Meeting. Work will not proceed on that phase until the Activity Hazard Analysis (phase plan) has been accepted by Monroe County. If Monroe County notifies any Contractor of any noncompliance with the provisions of this program, the Contractor shall make all reasonable efforts to immediately correct the unsafe conditions or acts. Satisfactory corrective action shall be taken within the specified time. If the Contractor or Subcontractor refuses to correct unsafe or unhealthy conditions or acts, Monroe County shall take one or more of the following steps: a. Cease the operation or a portion thereof. b. Stop payment for the work being performed. c. Correct the situation using other forces and back charge the Contractor expenses incurred. d. Increase withholding in proportional increments for that given pay period. 1.6 FIRST AID TRAINING Every Contractor foreman's work crew must include an employee who has a current first aid certificate from the, American Red Cross, or other Monroe County approved organization. 1.7 REPORTS Each Contractor is to maintain an accurate record of all job-related deaths, diseases, or disabling injuries. The records shall be maintained in a manner approved by the Contracting Officer. A copy of all reports is to be provided to the Contracting Officer. All fatal or serious injuries are to be reported immediately to the Contracting Officer, and every assistance is to be given in the investigation of the incident, including submission of a comprehensive narrative report to the Contracting Officer. Other occurrences with serious accident potential, such as equipment failures, slides, and cave-ins, must also be 45 reported immediately. The Contractor is to assist and cooperate fully with the Contracting Officer in conducting accident investigations. The Contracting Officer is to be furnished all information and data pertinent to investigation of an accident. 1.8 CERTIFICATION OF INSURANCE Contractors are to provide the Contracting Officer or his or her authorized representative with certificates of insurance before the start of operations indicating full compliance with State Worker's Compensation statutes, as well as other certificates of insurance required under the contract. 2.0 FIRST AID AND MEDICAL FACILITIES 2.1 FIRST AID KITS A 16-unit first aid kit approved by the American Red Cross is to be provided at accessible, well-identified, locations at the ratio of at least one (1) kit for each twenty-five (25) employees. The first aid kits are to be moisture proof and dust tight, and the contents of the kits are to be replenished as used or as they become ineffective or outdated. 2.2 EMERGENCY FIRST AID At least one (1) employee certified to administer emergency first aid must be available on each shift and duly designated by the Contractor to care for injured employees.The names of the certified employees shall be posted at the jobsite. 2.3 COMMUNICATION AND TRANSPORTATION Prior to the start of work, the Contractor is to make necessary arrangements for prompt and dependable communications, transportation, and medical care for injured employees. 2.4 FIRST AID AND MEDICAL REPORTS The Contractor is to maintain a record system for first aid and medical treatment on the jobsite. Such records are to be readily available to the Contracting Officer and are to include: (a) A daily treatment log listing chronologically all persons treated for occupational injuries and illnesses; (b) Cumulative record of injury for each individual; (c) Monthly statistical records of occupational injuries, classified by type and nature of injury; and (d) Required records for worker's compensation. 2.5 SIGNS AND DIRECTIONAL MARKINGS Adequate identification and directional markers are to be provided to readily denote the location of all first aid stations. 2.6 EMERGENCY LISTING A listing of telephone numbers and addresses of doctor, rescue squad, hospital, police, and fire departments is to be provided at all first aid locations. 46 • 3.0 PHYSICAL QUALIFICATIONS OF EMPLOYEES 3.1 GENERAL REQUIREMENTS Persons employed throughout the contract are to be physically qualified to perform their assigned duties. Employees must not knowingly be permitted or required to work while their ability or alertness is impaired by fatigue, illness, or any other reason that may jeopardize themselves or others. No personal radios or stereos will be allowed on the job-site. 3.2 HOIST OPERATORS Operators of cranes, cableways, and other hoisting equipment shall be examined annually by a physician and provided with a certification stating that they are physically qualified to safely operate hoisting equipment. The Contractor is to submit a copy of each certification to the Contracting Officer. 3.3 HEAVY EQUIPMENT OPERATORS It is recommended that operators of trucks and heavy construction equipment be given physical examinations to determine if they are physically qualified to perform their assigned work without endangering themselves or others. 3.4 MOTOR VEHICLE OPERATORS Operators of motor vehicles engaged primarily in the transportation of personnel are to be (18) eighteen years of age or older and have a valid state operator's permit or license for the equipment being operated. The operators must have passed a physical examination administered by a licensed physician within the past year showing that they are physically qualified to operate vehicles safely. 4.0 PERSONAL PROTECTIVE EQUIPMENT 4.1 HARDHAT AREAS The entire jobsite, with the exception of offices, shall be considered a hardhat area. All persons entering the area are, without exception, required to wear hardhats. The Contractor shall provide hardhats for visitors entering hardhat areas. 4.1.1 LABELS Hardhats shall bear a manufacturer's label indicating design compliance with the appropriate ANSI (American National Standards Institute) standard. 4.2 POSTING Signs at least 3 by 4 feet worded as follows with red letters (minimum 6 inches high) and white background shall be erected at access points to designated hardhat areas: CONSTRUCTION AREA - HARDHATS REQUIRED BEYOND THIS POINT These signs are to be furnished and installed by the Contractor at entries to shops, construction yards, and job access points. 4.3 SAFETY GOGGLES (DRILLERS) 47 4.3.1 DRILLERS AND HELPERS Drillers and helpers operating pneumatic rock drills/concrete saws must wear protective safety goggles. 5.0 MACHINERY AND MECHANIZED EQUIPMENT 5.1 SAFE CONDITION Before any machinery or mechanized equipment is initially used on the job, it must be inspected and tested by qualified personnel and determined to be in safe operating condition and appropriate for the intended use. Operators shall inspect their equipment prior to the beginning of each shift. Any deficiencies or defects shall be corrected prior to using the equipment. Safety equipment, such as seatbelts, installed on machinery is to be used by equipment operators. 5.2 TAGGING AND LOCKING The controls of power-driven equipment under repair are to be locked. An effective lockout and tagging procedure is to be established, prescribing specific responsibilities and safety procedures to be followed by the person or persons performing repair work. Mixer barrels are to be securely locked out before permitting employees to enter them for cleaning or repair. 5.3 HAUL ROADS FOR EQUIPMENT 5.3.1 ROAD MAINTENANCE The Contractor shall maintain all roadways, including haul roads and access roads, in a safe condition so as to eliminate or control dust and ice hazards. Wherever dust is a hazard, adequate dust-laying equipment shall be available at the jobsite and utilized to control the dust. 5.3.2 SINGLE-LANE HAUL ROADS Single-lane haul roads with two-way traffic shall have adequate turnouts. Where turnouts are not practical, a traffic control system shall be provided to prevent accidents. 5.3.3 TWO-WAY HAUL ROADS On two-way haul roads, arrangements are to be such that vehicles travel on the right side wherever possible. Signs and traffic control devices are to be employed to indicate clearly any variations from a right-hand traffic pattern. The road shall be wide enough to permit safe passage of opposing traffic, considering the type of hauling equipment used. 5.3.4 DESIGN AND CONSTRUCTION OF HAUL ROADS Haul road design criteria and drawings, if requested by the Contracting Officer, are to be submitted for approval prior to road construction. Sustained grades shall not exceed twelve percent (12%) and all curves shall have open-sight line with as great a radius as practical. All roads shall be posted with curve signs and maximum speed limits that will permit the equipment to be stopped within one-half the minimum sight distance. 5.3.5 OPERATORS Machinery and mechanized equipment shall be operated only by authorized qualified persons. 48 5.3.6 RIDING ON EQUIPMENT Riding on equipment by unauthorized personnel is prohibited. Seating and safety belts shall be provided for the operator and all passengers. 5.3.7 GETTING ON OR OFF EQUIPMENT Getting on or off equipment while the equipment is in motion is prohibited. 5.3.8 HOURS OF OPERATION Except in emergencies, an equipment operator shall not operate any mobile or hoisting equipment for more than (12) twelve hours without an 8-hour rest interval away from the job. 5.4 POWER CRANES AND HOISTS (TRUCK CRANES, CRAWLER CRANES, TOWER CRANES, GANTRY CRANES, HAMMERHEAD CRANES, DERRICKS, CABLEWAYS, AND HOISTS) 5.4.1 PERFORMANCE TEST Before initial onsite operation, at 12-month intervals, and after major repairs or modification, power cranes, derricks, cableways, and hoists must satisfactorily complete a performance test to demonstrate the equipment's ability to safely handle and maneuver the rated loads. The tests shall be conducted in the presence of a representative of the Contracting Officer. Test data shall be recorded and a copy furnished to the Contracting Officer. 5.4.2 PERFORMANCE TEST—POWER CRANES (Crawler mounted, truck mounted and wheel mounted) The performance test is to be carried out as per ANSI requirements. The test is to consist of raising, lowering, and braking the load and rotating the test load through 360° degrees at the specified boom angle or radius. Cranes equipped with jibs or boom-tip extensions are to be tested using both the main boom and the jib, with an appropriate test load in each case. 5.4.3 PERFORMANCE TEST—DERRICKS, GANTRY CRANES, TOWER CRANES, CABLEWAYS, AND HOISTS, INCLUDING OVERHEAD CRANES This equipment is to be performance tested as per ANSI requirements. 5.4.4 BOOM ANGLE INDICATOR Power cranes(includes draglines)with booms capable of moving in the vertical plane shall be provided with a boom angle indicator in good working order. 5.4.5 CRANE TEST CERTIFICATION The performance test required by 5.4.2 and 5.4.3 is fulfilled if the Contractor provides the Contracting Officer a copy of a certificate of inspection made within the past (12) twelve months by a qualified person or by a government or private agency satisfactory to the Contracting Officer. 5.4.6 POSTING FOR HIGH VOLTAGE LINES A notice of the 10-foot (or greater) clearance required by OSHA 1926.550, Subpart N, 49 shall be posted in the operator's cab of cranes, shovels, boom-type concrete pumps, backhoes, and related equipment. 5.4.7 BOOM STOPS Cranes or derricks with cable-supported booms, except draglines, shall have a device attached between the gantry of the A-frame and the boom chords to limit the elevation of the boom. The device shall control the vertical motions of the boom with increasing resistance from 83° or less, until completely stopping the boom at not over 87° above horizontal. 5.4.8 SAFETY HOOKS Hooks used in hoisting personnel or hoisting loads over construction personnel or in the immediate vicinity of construction personnel shall be forged steel equipped with safety keepers.When shackles are used under these conditions,they shall be of the locking type or have the pin secured to prohibit turning. 5.5.1 ROLLOVER PROTECTIVE STRUCTURES OSHA 1926, Subpart W, Overhead Protection, Sections 1001 and 1002 are applicable regardless of the year in which the equipment was manufactured and regardless of the struck capacity of the equipment. 5.5.2 EQUIPMENT REQUIRING ROPS The requirement for ROPS meeting 5.5.1 above applies to crawler and rubber-tired tractors such as dozers, push-and-pull tractors, winch tractors, tractors with backhoes, and mowers; off-highway, self-propelled, pneumatic-tired earthmovers, including scrapers, motor graders and loaders; and rollers, compactors, water tankers (excluding trucks with cabs).These requirements shall also apply to agricultural and industrial tractors and similar equipment. 5.5.3 EQUIPMENT REQUIRING SEATBELTS The requirements for seatbelts as specified in OSHA Subpart 0, Motor Vehicles, Mechanized Equipment, and Marine Operations, Section 1926.602 shall also apply to self- propelled compactors and rollers, and rubber-tired skid-steer equipment. 5.6 LIFT PLAN A Crane Lift or Concrete Boom Truck Plan is required for any crane lift on a Monroe County project. Lifts exceeding (75%) seventy-five percent of the cranes stability / structural capacity chart, requiring movement of a crane carriage with the load, personnel platforms, sensitive loads (long lead time, cost), loads requiring two (or more) hooks, work over occupied facilities, or work involving encroachment on public rights of way are considered critical. These lifts must be authorized in advance. Critical crane lift plans, if authorized, may have to be reviewed by a professional engineer (PE) (the contractor shall budget the PE review within project budget). Additionally, a critical lift JHA shall be submitted with the Crane Lift Plan. Crane Lift Plans must be submitted at least 48 hours(2 business days) prior to mobilization 50 —five (5) days for critical and helicopter lifts. Crane Lift Plans must be based on "worst case" combination of load weight with chart deductions and lift radius for a specific crane configuration in a specific location.The Crane Lift Plan may be valid for more than one (1) day, as long as the configuration, location, maximum expected load, and maximum expected radius does not change. Use multiple lift plans for multiple locations. The Crane Lift Plan must be COMPLETE along with attachments—see Section 5 for the required Attachments. All rigging devices MUST bear the name of the manufacturer and be certified as to their capacity. Custom-fabricated devices (lifting beams, spreader bars, etc.), may be acceptable with proper PE stamp or proof testing as required by applicable standards. Capacities shall be marked and legible on all such devices. Work that is not anticipated in the Crane Lift Plan, but may arise due to site conditions (moving equipment, loading materials onto floors, etc.) must be reviewed with Monroe County prior to hoisting. Changes affecting crane configuration and / or location may require the Crane Lift Plan to be amended. The Contractor is responsible to visit the site prior to the lift date to review documentary information pertaining to the site, which is maintained by Monroe County. The Contractor is responsible (determining adequacy, supplying and installing) for all supporting material (as defined within 29 CFR 1926.1402) necessary for the crane lift. The Contractor is responsible to obtain all information that is necessary to develop a power line safety plan. The Contractor is responsible to train all personnel involved in the Assembly/ Disassembly and or Crane Lift. The Contractor must provide the following information along with the Crane Lift Plan: • Competent/Qualified Person Designation Forms for ND Director, Operator, Rigger, and Signal Person • Load Chart (complete with notes) • Range Chart • Dimension Illustration and Specifications for Crane • Lightning and Wind Restrictions (from operator's manual) • Area (Quadrant) of Operation Diagram • Operator's License, Operators Training Information, USDOT Medical Certification, OSHA 10/30 Hour Course Completion Cards, as may be required by the project • Jurisdictional Registration, if required • JHA for Assembly/ Disassembly of Crane, Severe Weather, Truck Load / Unload, Etc. • JHA for Power Line Encroachment • Third Party Inspection Certification and Report—see Crane Lift Plan for 51 requirements (Note: The inspector shall be certified with the CCAA) • Weights of Materials • Rigging Plan • Logistics Plan The Contractor shall comply with the Site Specific Safety Plan. The Contractor / Crane Company / Rigging Company is responsible for the accuracy of plan and inspections. This planning process has been established to help ensure proper coordination between Contractor, subcontractors, and Monroe County. No warranty or certification of the suitability of this plan is accepted by Monroe County. It is the responsibility of the Contractor/Subcontractor and the Crane Operator to ensure that they and their employees are qualified, competent, properly equipped and properly trained to perform the activities outlined in this plan. 6.0 LADDERS AND SCAFFOLDING 6.1 LADDERS OSHA 1926, Subpart L- Section 450. Ladders shall be used as work platforms only when use of small hand tools or handling of light material is involved. No work requiring lifting of heavy materials or substantial exertion shall be done from ladders. 6.2 SCAFFOLDING. OSHA 1926, Subpart L- Section 451 Scaffolds, platforms, or temporary floors shall be provided for all work except that which can be done safely from the ground or similar footing. 6.3 SAFETY BELTS, LIFELINE, AND LANYARDS. OSHA 1926, Subpart E, Section 104 Lifelines, safety belts and lanyards independently attached or attended, shall be used when performing such work as the following when the requirements of 6.1 or 6.2 above cannot be met. (a) Work on stored material in hoppers, bins, silos, tanks, or other confined spaces. (b) Work on hazardous slopes, structural steel, or poles; erection or dismantling of safety nets, tying reinforcing bars; and work from Boatswain's chairs, swinging scaffolds, or other unguarded locations at elevations greater than (6) six feet. (c) Work on skips and platforms used in shafts by crews when the skip orcage 1. does not block the opening to within one (1)foot of the sides of the shaft, unless cages are provided. 7.0 FIRE PROTECTION 7.1 Every Contractor and Subcontractor employed on the Project shall exercise good construction practices to prevent fire. It shall be the responsibility of the Contractor to insure that general fire protection facilities are adequate for his work and to provide additional fire protection facilities and devices, including fire extinguishers as required by their scope of work. 8.0 WORK NEAR ENERGIZED ELECTRICAL LINES OR OTHER UTILITIES 8.1 It shall be the Contractor's sole and exclusive responsibility: 52 (a) To provide personnel capable of working adjacent to energized electrical lines or other utilities. (b) To provide adequate, safe, and properly maintained equipment. (c) To conduct all of his work in accordance with the safety rules and regulations prescribed by the National Electric Code, National Electric Safety Code, H30, and Safety Rules for Installation and Maintenance of Electrical Supply and Communication Lines Hand Book 81, Occupational Safety and Health Act of 1970, as well as other safety codes in effect at the site of construction and as specified elsewhere herein, or as are generally applicable to the type of work being performed. (d) To continuously supervise and inspect the work being performed, to assure that the requirements of(a), (b), and (c) above are complied with, and nothing in these Contract Documents shall be held to mean that any such responsibility is the obligation of the Owner or the Architect or Project Management. 9.0 BARRICADES, WARNING DEVICES AND LIGHTING 9.1 The Contractor shall be solely responsible for providing temporary ladders, guard rails, warning signs, barricades, night guard lights, and deck or floor closures required in connection with his/her work to comply with Federal, State, and local safety requirements. The Contractor shall be solely and exclusively responsible for the design, construction, inspection, and maintenance of such facilities at all times. 9.2 It shall be the responsibility of the Contractor to provide additional temporary lighting, if needed to maintain safe conditions. 9.3 It shall be the sole and exclusive responsibility of the Contractor to provide a safe place to work for all laborers and mechanics and other persons employed on or in connection with the project, and nothing in these Contract Documents shall be construed to give any of such responsibility to the Owner, the Architect, or Project Management. 9.4 The Contractor shall provide a security fence around the area of the Work so as to prevent entry into the Work area by unauthorized personnel and the general public. The fence shall have fence post bases that eliminate the need to penetrate the ground for support. 10.0 HAZARDOUS MATERIALS 10.1 In the event the Contractor encounters on the site material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Project Management in writing. The Work in the affected area shall not thereafter be resumed, except by written agreement of the Owner and Contractor, if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The Work in the affected area shall be resumed in the absence of asbestos or polychlorinated biphenyl (PCB), or when it has been rendered harmless, by written agreement of the Owner and Contractor. 53 10.2 The Contractor shall not be required pursuant to Article 7 to perform without consent any Work relating to asbestos or polychlorinated biphenyl (PCB). 10.3 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to Project Management in writing. The Owner, Contractor, and Project Management shall then proceed in the same manner described in Subparagraph 10.1 10.4 The Owner shall be responsible for obtaining the services of a licensed laboratory to verify a presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to verify that it has been rendered harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor and Project Management the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor and Project Management will promptly reply to the Owner in writing stating whether or not any of them has reasonable objection to the persons or entities proposed by the Owner. If the Contractor or Project Management has an objection to a person or entity proposed by the Owner,the Owner shall propose another to whom the Contractor and Project Management have no reasonable objection. 11.0 SAFETY OF PERSONS AND PROPERTY 11.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: .1 Employees on the Work and other persons who may be affectedthereby; .2 The Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody, or control of the Contractor or the Contractor's Subcontractors or Sub-subcontractors; .3 Other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation, or replacement in the course of construction;and .4 Construction or operations by the Owner or other Contractors. 11.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury, or loss. 11.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. 11.4 When use or storage of explosives or other hazardous materials or equipment or unusual 54 methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. 11.5 The Contractor shall promptly remedy damage and loss to property referred to in Clauses11.1.1-11.1.4 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Clauses 11.1.1-11.1.4, except damage or loss attributable to acts or omissions of the Owner, Project Management, or Architect or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, and not attributable to the fault or negligence of the Contractor. 11.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owner or Project Management. 11.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety. 12.0 EMERGENCIES 12.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury, or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Paragraph 4.7 and Article 7. End of Section 00970 55 SECTION 00980 CONTRACTOR QUALITY CONTROL PLAN 1.0 RELATED DOCUMENTS A. Drawings and General Requirements of the Contract, including General and Supplementary Conditions, and other Division 1 Specification Sections, apply to this Section. 1.1 SUMMARY A. This Section includes administrative and procedural requirements for quality control services. B. Quality control services include inspections, tests, and related actions, including reports performed by Contractor, by independent agencies, and by governing authorities. They do not include contract enforcement activities performed by Architect. C. Inspection and testing services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with Contract Document requirements. D. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products. 1. Specific quality control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products. 2. Specified inspections, tests, and related actions do not limit Contractor's quality control procedures that facilitate compliance with Contract Document requirements. 3. Requirements for Contractor to provide quality control services required by Owner, or authorities having jurisdiction are not limited by provisions of this Section. E. Related Sections: The following Sections contain requirements that are related to this Section: 1. Division 1 Section "Cutting and Patching" specifies requirements for repair and restoration of construction disturbed by inspection and testing activities. 2. Division 1 Section "Submittals: specifies requirements for development of a schedule of required tests and inspections. F. The intention of this plan is to create a system of checks and balances that will minimize delays caused by rework and a lack of planning and maximize production and insure that the finished product is one that the entire construction team can pride themselves in. These goals can be achieved by giving the Owner exactly 56 what he has bought. The Owner will expect no more and through Quality Assurance, the construction team will provide no less. 1.2 PROJECT MANAGEMENT'S DUTIES AND RESPONSIBILITIES A. The Project Management Representative will monitor all work performed by the Contractor and assist the Contractor with his/her conformance of the work to the Contract Drawings and Specifications. 1.3 CONTRACTOR'S DUTIES AND RESPONSIBILITIES A. The Contractor is responsible for the quality of the work performed by his/her work force on this project as well as the quality of the material, equipment, and supplies furnished by him/her to be incorporated into the work. B. The Contractor will provide a Quality Control Plan for approval and designate a Quality Control Representative who will be on site at all times while the respective Contractor's work is in progress and will have the authority and responsibility to accept or reject items of work. The Contractor's Quality Control Representative may delegate his/her duties but the primary responsibility and authority will rest on him/her. C. The Contractor's Quality Control Representative will coordinate the submittal of all shop drawings, product data and samples to Project Management. Any submittal that is at variance to the contract requirements must be identified as such and transmitted to Project Management for submittal and approval by the Owner. No work requiring submittal of a shop drawing, product data or sample shall commence until the submittal has been reviewed and approved by Project Management. D. The Contractor will bear the responsibility of scheduling all required testing and inspections by the designated material-testing laboratory, in a timely fashion, to prevent needless cancellations and delays of work activities. Any costs caused by untimely notification shall be borne by the Contractor. E. The Contractor's Quality Control Representative will review his/her drawings, procurement documents and contracts to insure that the technical information provided and all work performed is in accordance with the latest revisions of the Contract Drawings and Specifications. F. The Contractor's Quality Control Representative will perform an inspection upon receipt at the site of the work of all materials, equipment and supplies including those furnished to him/her by the Owner. Notes from this inspection will be filled out on the appropriate form and included with the Contractor Daily Quality Control Report. Items which are damaged or not in conformance with the respective submittals, quality standards, contract drawings, and specifications shall be brought to the attention of Monroe County representative on site and then will be identified and segregated from accepted items. Items thus identified will not be incorporated into the work until corrective action acceptable to Project 57 Management is completed. Items determined unsalvageable will be removed from the job site. These items shall be noted as deficient in the applicable section of the Contractor Daily Quality Control Report. G. The Contractor's Quality Control Representative shall be required to attend periodic scheduled Quality Control meetings at the discretion of Monroe County Project Management 1.4 INSPECTION AND TESTING A. The Contractor shall be responsible to secure, provide, and pay for all inspections, test, and other quality-control services specified and required by the contract or governing authorities. Costs for these services are included in the Contract Sum. Any reference in the Contract Documents, Drawings, Front End Documents or Technical Specifications indicating the Owner is responsible to secure and pay for testing shall be disregarded and rendered null and void. 1. Where individual Sections specifically indicate that certain inspections, tests, and other quality-control services are the Contractor's responsibility, the Contractor shall employ and pay a qualified independent testing agency to perform quality-control services. Costs for these services are included in the Contract Sum. a. Where the Owner has engaged a testing agency for testing and inspecting part of the Work, and the Contractor is also required to engage an entity for the same or related element, the Contractor shall not employ the entity engaged by the Owner, unless agreed to in writing by the Owner. B. Re-testing: The Contractor is responsible for re-testing where results of inspections, tests, or other quality-control services prove unsatisfactory and indicate noncompliance with Contract Document requirements, regardless of whether the original test was Contractor's responsibility. 1. The cost of re-testing construction, revised or replaced by the Contractor, is the Contractor's responsibility where required tests performed on original construction indicated noncompliance with Contract Document requirements. C. Associated Services: Cooperate with agencies performing required inspections, tests, and similar services, and provide reasonable auxiliary services as requested. Notify the agency sufficiently in advance of operations to permit assignment of personnel. Auxiliary services required include, but are not limited to, the following: 1. Provide access to the Work. 2. Furnish incidental labor and facilities necessary to facilitate inspections and tests. 3. Take adequate quantities of representative samples of materials that require testing or assist the agency in taking samples. 4. Provide facilities for storage and curing of test samples. 58 5. Deliver samples to testing laboratories. 6. Provide the agency with a preliminary design mix proposed for use for materials mixes that require control by the testing agency. 7. Provide security and protection of samples and test equipment at the Project Site. D. Duties of the Testing Agency: The independent agency engaged to perform inspections, sampling, and testing of materials and construction specified in individual Sections shall cooperate with the Architect and the Contractor in performance of the agency's duties. The testing agency shall provide qualified personnel to perform required inspections and tests. 1. The agency shall notify the Project Management and the Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services. 2. The agency is not authorized to release, revoke, alter, or enlarge requirements of the Contract Documents or approve or accept any portion of the Work. 3. The agency shall not perform any duties of the Contractor. E. The Contractor will provide personnel and equipment to perform the operational tests and check-out of the equipment, facilities or equipment constructed, fabricated or installed under this Contract. The Project Management Superintendent will coordinate and witness all such tests. Notification should be given at least ten (10) days in advance of the scheduled tests. F. Project Management will coordinate and attend all final inspections of the work. Prior to requesting a final inspection, all tests for the equipment and systems must be completed. See Section 01700 (Contract Closeout) for contract closeout. G. Unless the Contractor is responsible for this service, the independent testing agency shall submit a certified written report, in duplicate, of each inspection, test, or similar service to Project Management. If the Contractor is responsible for the service, submit a certified written report, in duplicate, of each inspection, test, or similar service through the Contractor 1. Submit additional copies of each written report directly to the governing authority, when the authority so directs. 2. Report Data: Written reports of each inspection, test, or similar service include, but are not limited to, the following: a. Date of issue. b. Project title and number. c. Name, address, and telephone number of testing agency. d. Dates and locations of samples and tests or inspections. e. Names of individuals making the inspection or test. f. Designation of the Work and test method. g. Identification of product and Specification Section. 59 h. Complete inspection or test data. I. Test results and an interpretation of test results. j. Ambient conditions at the time of sample taking and testing. k. Comments or professional opinion on whether inspected or tested Work complies with Contract Document requirements. Name and signature of laboratory inspector. m. Recommendation on re-testing. F. Qualifications for Service Agencies: Engage inspection and testing service agencies, including independent testing laboratories, that are pre-qualified as complying with the American Council of Independent Laboratories" Recommended Requirements for Independent Laboratory Qualification" and that specialize in the types of inspections and tests to be performed. 1. Each independent inspection and testing agency engaged on the Project shall be authorized by authorities having jurisdiction to operate in the state where the Project is located. G. General: Upon completion of inspection, testing, sample taking and similar services, the Contractor is to: 1. Repair damaged construction and restore substrates and finishes. Comply with Contract Document requirements for Division 1 Section "Cutting and Patching". 2. Protect construction exposed by or for quality-control service activities, and protect repaired construction. 3. Repair and protection is Contractor's responsibility, regardless of the assignment of responsibility for inspection, testing, or similarservices. 1.5 INSPECTION PLAN The contractor will utilize a multi-point inspection plan for each separate feature of work to be performed under this Contract, i.e., work described by each division of the technical provision section of the contract specifications. This plan will consist of, but not be limited to the following: 1. Preparatory Inspection—Prior to commencing the work, the Contractor's Quality Control Representative will meet with Project Management's representative and check the following items at a minimum for conformance: (a) Approval of shop drawings and submittals. (b) Approval of inspection and test reports of materials and equipment to be utilized. (c) Completion of previous operations of preliminary work. (d) Availability of materials and equipment required. (e) Potential utility outages. (f) Any other preparatory steps dependent upon the particular 60 operation. (g) Quality standards. (h) Safety or environmental precautions to be observed. (Phase Hazard) Note: Project Management will record the minutes to this inspection meeting and distribute accordingly. 2. Initial Inspection—Upon completion of a representative sample of a given feature of the work, the Contractor's Quality Control Representative will meet with Project Management's representative and check the following items at a minimum for conformance: (a) Workmanship to established quality standards. (b) Conformance to contract drawings and specifications. (c) Construction methods, equipment, and tools utilized. (d) Materials and articles utilized. (e) Adequacy of testing methods. (f) Adequacy of shop drawings. (g) Adequacy of safety or environmental precautions. Note: Project Management will record the minutes to this inspection meeting and distribute accordingly. 3. Follow-up Inspections—The Contractor's Quality Control Representative will inspect the work daily to assure the continuing conformance of the work to the workmanship standards established during the preparatory and initial inspections. Additionally, as a part of the follow-up inspection, sign-off sheets will be utilized as often as possible. The intent of these sheets is to achieve concurrence from other trade contractors and responsible parties that ensuing work can indeed commence over underlying work. This will prevent oversights and omissions which could elevate costs. Sign-off sheets shall be used for, but not be limited to, concrete, drywall, ceilings, painting, roofing substrates, and flooring. These reports are to be generated by the Contractor and submitted to Project Management Superintendent for approval prior to the start-up of work. Failure to generate a sign-off sheet or to attain proper signatures prior to covering up underlying work may affect payment for that piece of work if ensuing problems are detected or not. This disciplinary action shall be carried out via the Nonconformance Report. (See Section 1.6.B of this plan.) Note: The Contractor shall be responsible to record these inspections and all other project related activities encountered throughout the day on the Contractor Daily Quality Control Report. 4. Completion Inspections—Upon completion of a given feature of the work, the Contractor's Quality Control Representative will meet with the Project 61 Management Superintendent, if he/she so desires to attend, to perform an inspection of the completed work. Nonconforming items will be identified and corrected prior to commencement of the next operation. Note: The Contractor shall conduct and report corrections of this inspection which shall be a required submittal. 5. Follow-On Inspections—Upon execution of the Contractor's completion inspection in elements of the work which result in concealment; such as, ceiling and drywall installations, the Contractor shall schedule and conduct multi-trade or singular inspections prior to covering installation. Note: Project Management will record the minutes to this inspection meeting. 6. Pre-Final Inspection—Upon substantial completion of the project work Project Management shall coordinate and conduct a universal inspection of all areas and elements of the work. The Architect/Engineer may be represented if he/she so desires. This inspection shall be completed at least (15) fifteen days prior to the final substantial completion inspection which shall be conducted by Project Management. All deficiencies and incomplete work should be completed prior to the final substantial completion inspection. 1.6 REPORTING Maintaining accurate and retrievable records is extremely important in the Quality Assurance Program. These records will act as a main source of information in the present and in the future for the entire Project Management team. The main report that will be utilized to provide this information is the Daily Quality Control Report. Nonconformance Reports may also be issued. A. DAILY QUALITY CONTROL REPORT The Daily Quality Control Report shall be used to document the summary of daily inspection activities performed by the Contractor's designated Quality Control Representative. It shall include any of the steps of inspection that are performed that day, all test monitoring, and any rework of nonconforming items. The daily Quality Control Report section of the Daily Superintendent's Report will be routinely used for daily reporting requirements. When the magnitude or complexity necessitates such, a more separate and comprehensive form will be used. Reference Contractor's Daily Report, and as needed Contractor Daily Quality Control Report, Section 01385. B. NONCONFORMANCE REPORT Nonconformance Reports will be issued for work that is found to be in nonconformance with the contract documents or the referenced quality standards. The report will be issued by Project Management. It is not the intent to routinely and repeatedly issue nonconformance reports, but 62 to issue them only after normal enforcement standards have been exhausted, or if the work performed is a detriment to the project. A copy of the Nonconformance Report will be forwarded to the Site Project Manager for his/her information and/or action. It should also be included in the Contractor's Daily Quality Report package for general review. Nonconformance Reports will be signed off once the deficient item or items have adequately been corrected. This will be done by the issuing Superintendent and Project Manager. These sign-offs will be included with a corresponding corrective action taken. Significant nonconformance needs to be addressed to prevent recurrence. The signed-off report will also be submitted for review. Work activities affected by a Nonconformance Report will proportionally counter- affect payments. Whether that be partial or full retainage will be left up to the discretion of Project Management. 1.6 AUDITS A. Project Management may choose at its option to perform Contractor audits of their Contractor Quality Control Plan at any time. Reports of these audit results will be forwarded to the Project Manager for his/her action. Any action items noted during an audit for the Contractor will be followed up and documented to insure compliance and avoid recurrence. End of Section 00980 63 SECTION 01015 CONTRACTOR'S USE OF PREMISES PART 1 —GENERAL 1.1 DESCRIPTION A. Work included: This Section applies to situations in which the Contractor or his representatives including, but not necessarily limited to, suppliers, subcontractors, employees, and field engineers, enter upon Owner's property. Related work: Documents affecting work of this Section include, but are not limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 1.2 QUALITY ASSURANCE A. Promptly upon award of the Contract, notify all pertinent personnel regarding requirements of this Section. Require all personnel who will enter upon the Owner's property certify their awareness of and familiarity with requirements of this Section. 1.3 SUBMITTALS Maintain an accurate record of names and identification of all persons entering upon Owner's property in connection with Work of this Contract, including times of entering and times of leaving, and submit a copy of the record to Owner daily. 1.4 TRANSPORTATION FACILITIES A. Provide adequate protection for curbs and sidewalks over which trucks and equipment pass to reach job site. Contractor's vehicles: 1. Require Contractor's vehicles, vehicles belonging to employees of Contractor, and all other vehicles entering upon Owner's property in performance of Work of Contract, to use only the Access Route approved in advance by Owner. Do not permit such vehicles to park on any street or other area of Owner's property except in the area approved by Owner as "Contractor's Parking Area." 1.5 SECURITY A. Restrict access of all persons entering upon the Owner's property in connection with work to the Access Route and to actual site of the work. End of Section 01015 64 SECTION 01027 APPLICATION FOR PAYMENT 1. SUMMARY This section provides procedures for preparation and submittal of Applications for Payment. 2. FORMAT The Application for Payment including the Continuation Sheet is the required format for submitting invoices. A copy of these forms is included in this section. The Owner reserves the right to modify the format to better suit his internal accounting system. 3. SUBMITTAL PROCEDURES A. The initial Application for Payment will not be processed until the Contractor's Construction Schedule, Schedule of Values, and the initial Submittal Schedule have been received, reviewed, and approved by Project Management. B. Submit an updated Construction Schedule and Submittal Schedule and a Partial Release of Lien with each Application for Payment. C. Payment shall be made according to the Local Government Prompt Payment Act, Sec. 218.70 et seq., Florida Statutes. D. Monroe County makes every effort to meet the payment schedule. It is requested that the contractor not make any calls to any County office inquiring about payment until the twentieth (20th) day after submission of the pay request. 4. MONTHLY PAY REQUEST PROCEDURE A. Project Management to review as-builts as to current additions, corrections, etc., prior to monthly approval to ensure as-builts are current. 5. FINAL PAY PROCEDURE A. To help expedite the final payment, it is necessary for Project Management to have a correct and complete package of documents twenty (20) days in advance of requested pay date. B. A minimum of ten (10) working days is required from receipt of correct documents for Project Management to obtain necessary signatures and submit project for Final Payment. Contractor shall submit all required forms and releases to Project Management. The following documents (samples attached) are required for Final Payment: (1) Application and Certificate for Payment (2) Continuation Sheet (3) Certificate of Substantial Completion (4) Contractor's Affidavit of Debts and Claims (5) Contractor's Affidavit of Release of Liens (6) Final Release of Lien 65 Also, all warranties and guarantees required by Contract, "As-Built" drawings, including red-lined site plan, submittal documents, certification that all utility bills (i.e., electric, local water) have been paid, and a complete list of subcontractors with addresses and phone numbers must be submitted prior to final payment in both bound paper and electronic PDF form on CD/DVD. C. It is the Contractor's responsibility to ensure the completeness of the Final Pay Package. Incompleteness will result in delay of Final Pay. Final Pay Requests will not be processed until all the required documents are received by Monroe County Project Management. Final Pay Request must be submitted no later than thirty(30) days after final project completion and acceptance. 6. SUBSTANTIATING DATA A. When the Owner's Representative requires substantiating information, submit data justifying dollar amounts in question. B. Provide one (1) copy of data with cover letter for each copy of submittal. Indicate Application number, date, line item by number and description. 66 APPLICATION FOR PAYMENT ARCHITECT'S CERTIFICATE FOR PAYMENT SUMMARY In accordance with the Contract Documents,based on on-site observations and the data comprising the above application,the Architect certifies to the Owner that to the best of the Application No: Ai ut iiteut�kr iuvvledye,ii'fun naliun dud bullet the Wurk t iaa plow ebbed as indicated,tl ie quality of the Work is in accordance with the Contract Documents,and the Contractor is To: Monroe County,Florida entitled to payment of the Amount Certified. From: Contractor This Certificate is not negotiable.The Amount Certified is payable only to the Contractor named herein.Issuance,payment and acceptance of payment are without any prejudice Project: to any rights of the Owner or Contractor under this Contract. Contract For: Amount Certified: (Attach an explanation if the amount certified differs from the amount applied for) Period: From: To: ARCHITECT: Contract Date: By: — Original Contract Sum: $ Date: Net Change By Approved Change Order: The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief,the Work covered by this Application for Payment has been Contract Sum To Date: completed in accordance with the Contract Documents,that all amounts have been paid by the Contractor for Work for which previous Applications for Payment were issued and Total Completed&Stored To Date: _ payments received from the Owner,and that current payment shown herein is nowdue. Retainage %of Completed Work: By: _ Date: Total Earned Less Retainage: State of: County of: Less Previous Payments: Subscribed and sworn to before me this day of ,200 Current Payment Due: Notary Public: Balance to Finish: My Commission Expires: Reviewed for Payment Director of Project Management Approved for Payment Approved for Payment. Monroe County, Owner County Administrator/Assistant Administrator Date: Date: Date: APPLICATION FOR PAYMENT 67 CONTINUATION SHEET PAGES APPLICATION AND CERTIFICATEFOR PAYMENT APPLICATION NO.: Containing Contractor's signed Certification is attached. APPLICATION DATE: In tabulations below,amounts are stated to the nearest dollar. PERIOD TO: Use Column I on Contracts where variable retainage for line items may apply. Change Orders added at the end of sheet. A B C D I E F G H I WORK COMPLETED ITE DESCRIPTION OF WORK SCHEDULED FROM THIS MATERIALS TOTAL % BALANC RETAINAG M VALUE PREVIOUS PERIOD PRESENTLY COMPLETED AND (G+ E TO E(IF NO. APPLICATION STORED(NOT STORED TO DATE C) FINIS VARIABLE (D+E) IN D OR E) (D+E+F) H(C- RATE) G) 68 MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: INITIATION DATE: TO CONTRACTOR: CONTRACT DATE: The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) $ Net change by previously authorized Change Orders $ The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was $ The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order $ The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is $ The Contract Time will be (increased) (decreased) (unchanged) by The date of Substantial Completion as of the date of this Change Order is Detailed description of change order and justification: This change Order is % of the original contractprice. Not valid until signed by Owner. Architect(if applicable), and Contractor ARCHITECT: Date CONTRACTOR: Date DIRECTOR PROJECT MANAGEMENT: Date SR. DIRECTOR ENG/PW: Date COUNTY/DEPUTY ADMINISTRATOR Date Change Order Attachment per Ordinance No. 004-1999 69 • Change Order was not included in the original contract specifications. Yes ❑ No❑ If yes, explain: • Change Order was included in the original specifications. Yes ❑ No ❑ If yes, explain: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater) Yes ❑ No❑ If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑ No ❑ Should a claim under the applicable professional liability policy be made?Yes ❑ No ❑ Explain: 70 CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: CONTRACT FOR: (Name and address) CONTRACT DATE: TO OWNER: TO CONTRACTOR: (Name and address) (Name and address) DATE OF ISSUANCE: PROJECT OR DESIGNATED PORTION SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Project Manager's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of • Substantial Completion of the Project or portion thereof designated above is hereby established as: _ which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. INSPECTOR BY DATE (if used) The Contractor will complete or correct the Work on the list of items attached hereto within the above date of Substantial Completion. CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at (time),on (date). OWNER BY DATE The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be asfollows: Note-Owners and Contractors legal and insurance counsel should determine and review insurance requirements and coverage. 71 CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS TO OWNER: CONTRACT FOR: (Name and address) CONTRACT DATE: PROJECT: (Name and address) State of • County of The undersigned, pursuant to Article 9 of the General Conditions of the Contract for Construction, hereby certifies that, except as listed below, he/she has paid in full or has otherwise satisfied all obligations for all materials and equipment furnished,for all work, labor, and services performed,and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or his property might in any way be held responsible. EXCEPTIONS: (If none,write"None". If required by the Owner,the Contractor shall furnish bond satisfactory to the Owner for each exception). SUPPORTING DOCUMENTS ATTACHED CONTRACTOR: HERETO: 1. Consent of Surety to Final Payment. Address Whenever Surety is involved, Consent of Surety is required. AIA DOCUMENT G707, CONSENT OF SURETY, maybe used for this purpose. Indicate (Signature of authorized representative) attachment: yes( ) no( ) The following supporting documents should be (Printed Name and Title) attached hereto: 1. Contractor's Release or Waiver of Liens, conditional upon receipt of final payment. The foregoing instrument was acknowledged before me this day of 20_, 2. Separate Releases or Waivers of Liens by from Subcontractors and material and Who is ( ) personally known to me or() equipment suppliers, to the extent produced a driver's license as identification. required by the Owner, accompanied by a list thereof. NOTARY PUBLIC, STATE OF FLORIDA 3. Contractor's Affidavit or Release of Liens. Print,type of stamp commissioned name of notary My Commission Expires: (SEAL) 72 CONTRACTOR'S AFFIDAVIT OF RELEASE OF LIENS TO OWNER: CONTRACT FOR: (Name and address) CONTRACT DATED: PROJECT: (Name and address) State of County of The undersigned hereby certifies that to the best of the undersigned's knowledge, information and belief, except as listed below, the Releases or Waivers of Lien attached hereto include the Contractor, all Subcontractors, all suppliers of materials and equipment, and all performers of Work, labor or services who have or may have liens or encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the Contract referenced above. EXCEPTIONS: The foregoing instrument was acknowledged SUPPORTING DOCUMENTS ATTACHED before me this day of 20_, by HERETO: Who is ( ) personally known to me or() produced a driver's license as identification. 1. Contractor's Release or Waiver of Liens, conditional upon receipt of final payment. NOTARY PUBLIC, STATE OF FLORIDA 2. Separate Releases or Waivers of Liens from Subcontractors and material and equipment Print,type of stamp commissioned name of notary suppliers, to the extent required by the Owner, accompanied by a list thereof. My Commission Expires: CONTRACTOR: (SEAL) Address (Signature of authorized representative) (Printed name and Title) 73 FINAL RELEASE OF LIEN KNOW ALL MEN BY THESE PRESENTS, that for and consideration of the sum of Dollars ($ ) paid to by Monroe County, Florida receipt of which is hereby acknowledged, do(es) hereby release and quit claim to Monroe County, Florida, the Owner, its successors or assigns, all liens, lien rights, claims or demands of any kind whatsoeverwhich has (have) or might have against the property, building, and/or improvements, on account of labor performed, material furnished, and/or for any incidental expense for the construction of thereon or in otherwise improving said property situated as above described. IN WITNESS WHEREOF THIS day of , 20 The foregoing instrument was acknowledged before me this day of 20_, by (Name of Company) Who is () personally known to me or() produced a driver's license as identification. (Signature of authorized representative) NOTARY PUBLIC, STATE OF FLORIDA (Printed name and Title) Print,type of stamp commissioned name of notary Witness My Commission Expires: Witness (SEAL) • 74 AFFIDAVIT AND PARTIAL RELEASE OF LIEN APPLICATION NO.: PERIOD ENDING DATE: APPLICATION DATE: KNOW ALL MEN BY THESE PRESENTS, that the undersigned, for and in consideration of the payment of the sum $ , to be paid to the undersigned, hereby releases, acquits, satisfies and forever discharges, MONROE COUNTY, OWNER, their successors and assigns from all suits, causes of action, liens, lien rights, claims or demands of any kind whatsoever, to the extent of the payment to date on account of the furnishing of labor, material or services for the improvement of the following described property: As part of this PARTIAL RELEASE, THAT UNDERSIGNED HEREBY CERTIFIES the following: THAT the contract of the undersigned, as adjusted by all increases and decreases, is in the amount of$ , as of the date of the Partial Release and the undersigned has received $ as payment on the adjusted contract amount as of the date of this Partial Release. THAT all supplies of labor, material or services furnished to, or for the benefit of the undersigned for improvement to the subject property have been paid in full. Any and all suppliers of labor, material or services for improvement to the subject property, who have not been paid in full are listed below with the amount owing each, claimed by each and the reason for non-payment: (If none, write "NONE") CLAIMANT AMOUNT DUE AMOUNT CLAIMED REASON FOR NONPAYMENT THAT all taxes imposed by all government agencies have been paid and discharged. THAT all funds have been collected for FICA and withholding taxes have been properly deposited with appropriate agencies or paid to the government as required by law. THAT the undersigned has no other claims for money against the OWNER other than those Subcontractors'/Suppliers' amounts remaining due and owing on the adjusted contract balance as reflected above. THAT the undersigned further certifies that if there is a Guarantee, Warranty or Maintenance Agreement in connection with the labor and material furnished by it, that this payment and PARTIAL RELEASE shall not release the undersigned from any obligations under such Guarantee, Warranty, or Maintenance Agreement. WITNESS MY HAND THIS day of , 20 Witness Name of Company Witness Signature,Title 75 SECTION 1070, ACCESS ROADS AND PARKING AREAS A. The Contractor shall be responsible for installing and maintaining, until the completion of his Work any temporary access roads or parking facilities required by his Work, other than that which has been provided or required by the Owner. The Contractor shall remove temporary access roads and parking facilities and restore the areas to original or required grades. B. Any Contractor excavating across an access road or parking area shall back-fill and compact his excavation and resurface the road or parking area to match the existing surface. The Contractor shall comply with all applicable Specifications when so doing. End of Section 01070 76 SECTION 01395 REQUEST FOR INFORMATION (RFI) PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Notification to Architect and Project Management in the event errors, field conflicts, and omissions are found in the Contract Documents or clarifications are necessary. 2. Utilization of(RFI)form. • B. Related Sections: 1. General Conditions Article 2.3 2. General Conditions Article 6.2 and 8.3.2 3. General Conditions Article 12.3 and 13.3 1.2 FORM AND CONTENT OF REQUEST FOR INFORMATION A. All errors,field conflicts, and omissions in the Contract Documents shall be brought to the attention of Architect/Engineer and Project Management immediately. If _ clarifications are necessary, the request is to be conveyed to Architect/Engineer and Project Management. Architect/Engineer and Project Management will respond to the Contractor. The RFI is a tool established to provide expedient clarifications of contract drawings, specifications or field conflicts. It is not meant to be a substitute for good communication. B. The RFI is not meant for formal notification of extra work. Reference General Conditions paragraph 8.3.2 and 13.3.1, when formal correspondence is required for formal notification of time extensions, and for cost change notifications. C. The responses provided on the RFI form to the Contractor are considered by the Owner to be clarifications and/or minor changes in the Work not involving an adjustment in the Contract Sum or an extension of the Contract time per Paragraphs 6.2, 7.2, and 8.3 of the Contract General Conditions. Should the Contractor consider the RFI response requires extra work, notification in accordance with Agreement written notice provision is required. 1.3 UTILIZATION OF RFI FORM A. The RFI form to be utilized is included at the end of this section, if you wish to use a form of your own; it must contain the same information requested on our form and submitted in PDF format. 77 REQUEST FOR INFORMATION (RFI) DATE RFI# PROJECT FROM CONTRACTOR ADDRESS PHONE_ FAX CELL Email address TO ARCHITECT ADDRESS PHONE FAX CELL Email address DESCRIPTION CONTRACTORS RECOMMENDATION COST IMPACT NAME DATE RESPONSE NAME DATE 78 Section 1595 Construction Cleaning PART 1 - GENERAL 1.1 SUMMARY OF WORK PERFORMED BY THE CONTRACTOR A. Section includes: 1. Cleaning during progress of work. 1.2 DISPOSAL REQUIREMENTS A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws. 1. Do not burn or bury rubbish and waste materials on Project Site. 2. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains. PART 2 - PRODUCTS 2.1 MATERIALS A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces. B. Use only those cleaning materials and methods recommended by manufacturer of the surface material to be cleaned. C. Use cleaning materials only on surfaces recommended by cleaning material manufacturer. D. Sweeping compounds used in cleaning operations shall leave no residue on concrete floor surfaces that may affect installation of finish flooring materials. PART 3 - EXECUTION 3.1 DURING CONSTRUCTION A. Execute cleaning to keep the Work, the Site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris, resulting from construction operations. B. Provide on-site containers for the collection of waste materials, debris, and rubbish. C. Dispose of waste materials, debris, and rubbish off site at a state permitted disposal site. D. Trash containers shall be provided by Contractor and located in trash accumulation areas designated by Project Management. Contractor each day shall collect and deposit in the containers, all rubbish, waste materials, debris, and other trash from his/her operations, including any trash generated by his/her employees during lunch periods or coffee breaks. Shipping dunnage is also to be removed by the Contractor. Paper, boxes and bulk packaging shall be folded or cut into reasonable sizes and shapes as appropriate and confined to prevent loss of trash due to wind relocation. Full trash containers shall be disposed and replaced as necessary to maintain above requirements and/or as directed by Project Management. End of Section 01595 79 Section 1640 Product Handling 1.1 DESCRIPTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR A. Work included. Protect products scheduled for use in the Work by means including, but not necessarily limited to, those described in this Section. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division of these Technical Special Provisions. 2. Additional procedures also may be prescribed in other Sections of these Technical Special Provisions. 1.2 QUALITY ASSURANCE A. Include within the Contractor's quality assurance program such procedures as are required to assure full protection of work and materials. 1.3 MANUFACTURERS' RECOMMENDATIONS A. Except as otherwise approved by Project Management, determine and comply with manufacturers' recommendations on product handling, storage, and protection. 1.4 PACKAGING A. Deliver products to the job site in their manufacturer's original container, with labels intact and legible. 1. Maintain packaged materials with seals unbroken and labels intact until time of use. 2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements, at no additional cost to the Owner. B. Project Management may reject as non-complying such material and products that do not bear identification satisfactory to Project Management as to manufacturer, grade, quality, and other pertinent information. 1.5 PROTECTION A. Protect finished surfaces through which equipment and materials are handled. B. Provide protection for finished floor surfaces in traffic area prior to allowing equipment or materials to be moved over such surfaces. C. Maintain finished surfaces clean, unmarred, and suitably protected until accepted by the Owner. 1.6 REPAIRS AND REPLACEMENTS A. In event of damage, promptly make replacements and repairs to the approval of Project Management and at no additional cost to the Owner. B. Additional time required to secure replacements and to make repairs will not be considered by Project Management to justify an extension in Contract Time of Completion. End of Section 01640 80 Section 1700 Contract Closeout PART 1 —GENERAL 1.1 PROJECT TERMINATION A. The Contract requirements are met when construction activities have successfully produced, in this order, these three (3) terminal activities: 1. Substantial Completion. 2. Final Completion. 3. Final Payment. 1.2 NOTICE OF SUBSTANTIAL COMPLETION A. Contractor shall submit to Project Management when work is substantially complete: 1. A written notice that the Work, or designated portion thereof, is substantially complete. 2. Request Substantial Completion Observation at a mutually agreeable date. 3. Certifications of systems and testing/balancing final reports. 4. Submit evidence of compliance with requirements of governing authorities: a. Certificate of Occupancy (or Completion) b. Certificates of Inspection as applicable: 1) Electrical systems if required by Code B. Within a reasonable time after receipt of such notice, the Owner and the Contractor will make an observation to determine the status of completion. C. Should the Owner determine that the work is not substantially complete,the following will occur: 1. The Owner will promptly notify the Contractor in writing, giving the reasons. 2. The Contractor shall remedy the deficiencies in the Work, and send a second written notice of substantial completion to the Owner. 3. The Owner will re-observe the Work. D. When the Owner concurs that the Work is substantially complete, thefollowing will occur: 1. Project Management will prepare a Certificate of Substantial Completion accompanied by the Punch List of items to be completed or corrected, as verified and amended by Project Management. Contract responsibilities are not altered by inclusion or omission of required Work from the punch list. 81 2. The Owner will submit the certificate to the contractor for written acceptance of the responsibilities assigned to them in the certificate. A. Contractor shall complete or correct items identified on the punch list and required by the Contract requirements within time limit established by the certificate. 1.2 FINAL COMPLETION A. To attain final completion, the Contractor shall complete activities pertaining to substantial completion, complete Work on punch list items and submit written request to the Owner for final inspection within thirty (30) calendar days of date of substantial completion. B. When the Work is complete, the Contractor shall submit written certificationthat: 1. The Contract Documents have been reviewed. 2. Work has been inspected for compliance with the Contract Documents. 3. Work has been completed in accordance with the Contract Documents. 4. Equipment and systems have been tested in the presence of the Owner's representative and are operational. 5. Work is completed and ready for final observation. C. The Owner and the Contractor will make an inspection to verify the status of completion with reasonable promptness after receipt of such certification. D. Should the Owner consider that the Work is incomplete or defective: 1. The Owner will promptly notify the Contractor in writing, listing the incomplete or defective work. 2. The Contractor shall take immediate steps to remedy the stated deficiencies and send a second written certification to the Owner that the Work is complete. 3. The Owner will re-inspect the Work. E. When the Work is acceptable under the Contract Documents as determined by the Owner, the Owner will request the Contractor to make close-out submittals. Warranties & Guarantees for everything will begin at Substantial Completion. 1.3 THE CONTRACTOR'S CLOSEOUT SUBMITTALS TO THE OWNER Contractor shall provide two (2) hard copies in tabulated divided binders and one(1) saved electronically tabbed and indexed in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD of the all the following but not limited to: A. Project Record Documents (As Built Documents). B. Operating and maintenance data, instructions to the Owner's personnel. C. Warranties, bond and guarantees. 82 D. Keys and keying schedule. E. Spare parts and maintenance materials. F. Electronic copies of approved submittals. G. Evidence of payment and final release of liens and consent of surety to final release (includes final release from all utilities and utilitycompanies). 1.4 FINAL ADJUSTMENT OF ACCOUNTS A. Submit a final statement of accounting to the Owner. B. Statement shall reflect adjustments to the Contract Sum: 1. The original Contract Sum 2. Additions and deductions resulting from: a. Previous Change Orders. b. Allowances. c. Deductions for uncorrected Work. d. Deductions for Liquidated Damages. e. Deductions for Re-Inspection Payments. f. Other Adjustments. C. The Owner will prepare a final Change Order, reflecting adjustments to the Contract Sum which were not previously made by Change Orders. 1.5 FINAL APPLICATION FOR PAYMENT A. The Contractor shall submit the final Application for Payment in accordance with procedures and requirements stated in the Conditions of the Contract. B. Contractor shall complete or correct items identified on the punch list and required by the Contract requirements within time limit established by the certificate. 1.6 FINAL COMPLETION A. To attain final completion, the Contractor shall complete activities pertaining to substantial completion, complete Work on punch list items and submit written request to the Owner for final inspection within thirty (30) calendar days of date of substantial completion. B. When the Work is complete, the Contractor shall submit written certificationthat: 1. The Contract Documents have been reviewed. 2. Work has been inspected for compliance with the Contract Documents. 3. Work has been completed in accordance with the Contract Documents. 83 4. Equipment and systems have been tested in the presence of the Owner's representative and are operational. 5. Work is completed and ready for final observation. C. The Owner and the Contractor will make an inspection to verify the status of completion with reasonable promptness after receipt of such certification. D. Should the Owner consider that the Work is incomplete or defective: 1. The Owner will promptly notify the Contractor in writing, listing the incomplete or defective work. 2. The Contractor shall take immediate steps to remedy the stated deficiencies and send a second written certification to the Owner that the Work is complete. 3. The Owner will re-inspect the Work. E. When the Work is acceptable under the Contract Documents as determined by the Owner, the Owner will request the Contractor to make close-out submittals. Warranties & Guarantees for everything will begin at Substantial Completion. 1.7 THE CONTRACTOR'S CLOSEOUT SUBMITTALS TO THE OWNER Contractor shall provide two (2) hard copies in tabulated divided binders and one(1)saved electronically tabbed and indexed in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD of the all the following but not limited to: A. Project Record Documents (As Built Documents). B. Operating and maintenance data, instructions to the Owner's personnel. C. Warranties, bond and guarantees. D. Keys and keying schedule. E. Spare parts and maintenance materials. F. Electronic copies of approved submittals. G. Evidence of payment and final release of liens and consent of surety to final release (includes final release from all utilities and utilitycompanies). 1.8 FINAL ADJUSTMENT OF ACCOUNTS A. Submit a final statement of accounting to the Owner. B. Statement shall reflect adjustments to the Contract Sum: 1. The original Contract Sum 2. Additions and deductions resulting from: a. Previous Change Orders. b. Allowances. c. Deductions for uncorrected Work. d. Deductions for Liquidated Damages. e. Deductions for Re-Inspection Payments. f. Other Adjustments. 84 C. The Owner will prepare a final Change Order, reflecting adjustments to the Contract Sum which were not previously made by Change Orders. 1.9 FINAL APPLICATION FOR PAYMENT A. The Contractor shall submit the final Application for Payment in accordance with procedures and requirements stated in the Conditions of the Contract. B. Contractor shall complete or correct items identified on the punch list and required by the Contract requirements within time limit established by the certificate. 1.10 FINAL COMPLETION A. To attain final completion, the Contractor shall complete activities pertaining to substantial completion, complete Work on punch list items and submit written request to the Owner for final inspection within thirty (30) calendar days of date of substantial completion. B. When the Work is complete, the Contractor shall submit written certificationthat: 1. The Contract Documents have been reviewed. 2. Work has been inspected for compliance with the Contract Documents. 3. Work has been completed in accordance with the Contract Documents. 4. Equipment and systems have been tested in the presence of the Owner's representative and are operational. 5. Work is completed and ready for final observation. C. The Owner and the Contractor will make an inspection to verify the status of completion with reasonable promptness after receipt of such certification. D. Should the Owner consider that the Work is incomplete or defective: 1. The Owner will promptly notify the Contractor in writing, listing the incomplete or defective work. 2. The Contractor shall take immediate steps to remedy the stated deficiencies and send a second written certification to the Owner that the Work is complete. 3. The Owner will re-inspect the Work. E. When the Work is acceptable under the Contract Documents as determined by the Owner, the Owner will request the Contractor to make close-out submittals. Warranties & Guarantees for everything will begin at SubstantialCompletion. 1.11 THE CONTRACTOR'S CLOSEOUT SUBMITTALS TO THE OWNER Contractor shall provide two(2) hard copies in tabulated divided binders and one(1)saved electronically tabbed and indexed in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD of the all the following but not limited to: A. Project Record Documents (As Built Documents). 85 B. Operating and maintenance data, instructions to the Owner's personnel. C. Warranties, bond and guarantees. D. Keys and keying schedule. E. Spare parts and maintenance materials. F. Electronic copies of approved submittals. G. Evidence of payment and final release of liens and consent of surety to final release (includes final release from all utilities and utility companies). 1.12 FINAL ADJUSTMENT OF ACCOUNTS A. Submit a final statement of accounting to the Owner. B. Statement shall reflect adjustments to the Contract Sum: 1. The original Contract Sum 2. Additions and deductions resulting from: a. Previous Change Orders. b. Allowances. c. Deductions for uncorrected Work. d. Deductions for Liquidated Damages. e. Deductions for Re-Inspection Payments. f. Other Adjustments. C. The Owner will prepare a final Change Order, reflecting adjustments to the Contract Sum which were not previously made by Change Orders. 1.13 FINAL APPLICATION FOR PAYMENT A. The Contractor shall submit the final Application for Payment in accordance with procedures and requirements stated in the Conditions of the Contract. End of Section 01700 86 SECTION 01710 FINAL CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Contractor's cleaning at completion of Work 1.2 DISPOSAL REQUIREMENTS A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws. 1. Do not burn or bury rubbish and waste materials on the Project Site. 2. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains. PART 2 - PRODUCTS 2.1 MATERIALS A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces. B. Use only those cleaning materials and methods recommended by manufacturer on the surface material to be cleaned. C. Use cleaning materials only on surfaces recommended by cleaning material manufacturer. PART 3 - EXECUTION 3.1 DUST CONTROL A. Handle materials in a controlled manner with as little handling as possible. 3.2 FINAL CLEANING A. Employ skilled workmen for final cleaning. B. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other foreign materials from sight-exposed interior and exterior surfaces. C. Polish glossy surfaces to a clear shine. D. Broom clean exterior paved surfaces; rake clean other surfaces of thegrounds. E. Prior to final completion, or the Owner occupancy, conduct an inspection of sight- exposed interior surfaces, exterior surfaces and work areas, to verify that the entire Work is clean. F. Clean tunnels and closed off spaces of packing boxes, wood frame members and other waste materials used in the Construction. G. Remove temporary labels and stickers from fixtures and equipment. Do not remove permanent name plates, equipment model numbers and ratings. H. Remove from the Site all items installed or used for temporary purposes during construction. Restore all adjoining areas to their original or specified condition. End of Section 01710 87 SECTION 01720 PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 SUMMARY A. Contractor shall: 1. Maintain at the job site one (1) copy of: a. Record Contract Drawings. b. Record Project Manual. c. Coordination drawings. d. Addenda. e. Reviewed shop drawings. f. Change Orders. g. Other modifications to the Contract. h. Field test records. 1.2 GENERAL A. Store documents in cabinets in temporary field office, apart from documents used for construction. B. Maintain documents in clean, dry, legible condition. C. Do not use Project Record Documents for construction purposes. D. Make documents available for inspection by Project Management. E. Failure to maintain documents up-to-date will be cause for withholding payments. F. Obtain from Project Management (at no charge) two (2) sets of the Contract Documents for Project Record Documents including: 1. Specifications with all addenda. 2. Two (2) complete sets of black-line prints of all Drawings. 1.3 RECORDING A. Label each document"Project Record". B. Keep record documents current. C. Do not permanently conceal any work until required information has been recorded. D. Contract Drawings: 1. Required information may, as an option, be entered on a "working set"and then at completion of Project transfer the information to final submitted "Project Record" set. 2. Legibly mark to record actual construction: a. Depths of various elements of foundation in relation to survey data. b. Horizontal and vertical location of underground utilities and appurtenances referenced to permanent surface improvements. c. Location of internal utilities and appurtenances concealed in construction referenced to visible and accessible features of structure. d. Field changes of dimension and detail. 88 e. Changes made by Change Order or Construction Change Directive. f. Details not on original Contract Drawings. E. Specifications and Addenda: 1. Legibly mark up each Section to record: a. Manufacturer, trade name, catalog number and supplier of each product and item of equipment actually installed. b. Changes made by Change Order or Construction Change Directive. c. Other items not originally specified. F. Conversion of schematic layouts: 1. Arrangement of conduits, circuits, piping, ducts and similar items are in most cases shown schematically on the Drawings. 2. Legibly mark to record actual construction: a. Dimensions accurate to within 1" on the centerline of items shown schematically. b. Identify each item, for example, "cast iron drain""galvanized water". c. Identify location of each item, for example, "under slab", "in ceiling plenum", "exposed". 3. Project Management may waive requirements of schematic layout conversion, when in his opinion, it serves no beneficial purpose. Do not, however, rely on waivers being issued except when specifically issued by Project Management in writing. 1.4 SUBMITTAL A. At completion of Project, deliver Project Record Documents to Project Management and one (1) saved electronically tabbed and indexed copy in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD prior to request for final payment. B. Accompany submittal with transmittal letter, in duplicate, containing: 1. Date. 2. Project title and Project number. 3. The Contractor's name and address. 4. Title and number of each record document. 5. Certification that each document as submitted is complete and accurate. 6. Signature of the Contractor, or his/her authorized representative. End of Section 01720 89 SECTION 01730 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY: THE CONTRACTOR SHALL PROVIDE OPERATION AND MAINTENANCE DATA A. Section includes: 1. Format and content of manuals. 2. Schedule of submittals. B. Related sections: 1. SECTION 01301 - SUBMITTALS 2. SECTION 01700- CONTRACT CLOSEOUT 3. Individual Specifications Sections: specific requirements for operation and maintenance data. 1.2 QUALITY ASSURANCE A. Prepare instructions and data by personnel experienced in maintenance and operation of described products. 1.3 FORMAT A. Prepare data in the form of an instructional manual. B. Binders: commercial quality, 8-1/2" x 11" three-ring binders with hardback, cleanable, plastic covers; 1-1/2" maximum ring size. When multiple binders are used, correlate data into related consistent groupings. C. Cover: identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS; list title of the Project and separate building; identify subject matter of contents. D. Arrange content by systems under Section numbers and sequence of Table of Contents of these Specifications. E. Provide tabbed fly leaf for each separate product and system, with typed description of product and major component parts of equipment. F. Text: manufacturer's printed data, or typewritten data on 20-pound paper. G. Drawings: provide with reinforced punched binder tab. Bind in with text;fold larger drawings to size of text pages. H. Provide one (1) indexed digital electronic copy of all Operation Maintenance Data on CD. 90 1.4 CONTENTS, EACH VOLUME A. Table of Contents: provide title of the Project; names, addresses, and telephone numbers of Project Management, consultants, and the Contractor with name of responsible parties; schedule of products and systems, indexed to content of the volume. B. For each product or system: list names, addresses, and telephone numbers of subcontractors and suppliers, including local source of supplies and replacement parts. C. Product data: mark each sheet to clearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information. D. Drawings: supplement product data to illustrate relations of component parts of equipment and systems, to indicate control and flow diagrams. Do not use the Project Record Documents as maintenance drawings. E. Type text: as required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions. F. Warranties and bonds: bind in copy of each. 1.5 MANUAL FOR MATERIALS AND FINISHES A. Building products, applied materials, and finishes: include product data, with catalog number, size, composition, and color and texture designations. Provide information for re-ordering custom manufactured products. B. Instructions for care and maintenance; include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance. C. Moisture protection and weather exposed products: include product data listing applicable reference standards, chemical composition, and details of installation. Provide recommendations for inspections, maintenance, and repair. D. Additional requirements; as specified in individual product specification Sections. 1.6 MANUAL FOR EQUIPMENT AND SYSTEMS A. Each item of equipment and each system: include description of unit or system, and component parts. Identify function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and complete nomenclature and commercial number of replaceable parts. 91 B. Maintenance requirements: include routine procedures and guide for trouble- shooting; disassembly, repair, and re-assembly instructions; and alignment, adjusting, balancing, and checking instructions. C. Provide servicing and lubrication schedule, and list of lubricants required. D. Include manufacturer's printed operation and maintenance instructions. E. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance. F. Provide the Contractor's coordination drawings. G. Provide list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage. H. Include test reports. I. Additional requirements: as specified in individual product specification Sections. J. Provide a listing in Table of Contents for design data, with tabbed fly sheet and space for insertion of data. 1.7 SUBMITTALS A. Submit two (2) copies of operation and maintenance data for review by Project Management prior to Final Inspection. One (1) copy will be returned with comments. B. Submit the required number of copies per each Specification Section or two (2) copies each if not specified of approved data in final form within ten (10) days after Final Inspection. C. For equipment or component parts of equipment put in service during construction and operated by the Owner, submit operation and maintenance data within ten (10) days after acceptance. D. Submit two (2) copies of approved revised volumes of data in final form within ten (10) days after final inspection. End of Section 01730 92 SECTION 01740 WARRANTIES PART 1 —GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for the Contractor for warranties required by the Contract Documents, including manufacturers standard warranties on products and special warranties. 1. Refer to the General Conditions for terms of the Contractor's period for correction of the Work. B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 1 Section "Submittals" specifies procedures for submitting warranties. 2. Division 1 Section "Contract Closeout" specifies contract closeout procedures. 3. Certifications and other commitments and agreements for continuing services to Owner are specified elsewhere in the Contract Documents. C. Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not relieve the Contractor or the warranty on the Work that incorporates the products. Manufacturer's disclaimers and limitations on product warranties do not relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with the Contractor. D. Separate Prime Contracts: Each prime contractor is responsible for warranties related to its own contract. 1.3 DEFINITIONS A. Standard products warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to the Owner. B. Special warranties are written warranties required by or incorporated in the Contract Documents, either to extend limits provided by standard warranties or to provide greater rights for the Owner. 93 1.4 WARRANTY REQUIREMENTS A. Related Damages and Losses: When correcting failed or damaged warranted construction, remove and replace construction that has been damaged as a result of such failure or must be removed and replaced to provide access for correction of warranted construction. B. Reinstatement of Warranty:When Work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement. The reinstated warranty shall be equal to the original warranty with an equitable adjustment for depreciation. C. Replacement Cost: Upon determination that Work covered by a warranty has failed, replace or rebuild the Work to an acceptable condition complying with requirements of the Contract Documents. The Contractor is responsible for the cost of replacing or rebuilding defective Work regardless of whether the Owner has benefited from use of the Work through a portion of its anticipated useful service life. D. Owner's Recourse: Expressed warranties made to the Owner are in addition to implied warranties and shall not limit the duties, obligations, rights, and remedies otherwise available under the law. Expressed warranty periods shall not be interpreted as limitations on the time in which the Owner can enforce such other duties, obligations, rights or remedies. E. Where the Contract Documents require a special warranty, or similar commitment on the Work or part of the Work, the Owner reserves the right to refuse to accept the Work, until the Contractor presents evidence that entities required to countersign such commitments are willing to do so. 1.5 SUBMITTALS A. Submit written warranties to Project Management prior to the date certified for Substantial Completion. If Project Management's Certificate of Substantial Completion designates a commencement date for warranties other than the date of Substantial Completion for the Work, or a designated portion of the Work, submit written warranties upon request of the Owner. B. When the Contract Documents require the Contractor, or the Contractor and a subcontractor, supplies manufacturer to execute a special warranty, prepare a written document that contains appropriate terms and identification, ready for execution by the required parties. Submit a draft to the Owner, through Project Management, for approval prior to final execution. C. Form of Submittal: At Final Completion compile two (2) copies of each required warranty properly executed by the Contractor, or by the Contractor, subcontractor, supplier, or manufacturer. Organize the warranty documents into an orderly sequence based on the table of contents of the Project Manual. 94 D. Bind warranties and bonds in heavy-duty, commercial-quality, durable 3-ring, vinyl-covered loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8 '/2 x 11" (115-by-280-mm) paper and one (1) saved electronically tabbed and indexed copy in Adobe Acrobat file (.PDF) format delivered on a downloadable CD/DVD. 1. Provide heavy paper dividers with celluloid covered tabs for each separate warranty. Mark the tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product, and the name, address, and telephone number of the Installer. 2. Identify each binder on the front and spine with the typed or printed title"WARRANTIES", Project title or name, and name of the Contractor. 3. When warranted construction requires operation and maintenance manuals, provide additional copies of each required warranty, as necessary, for inclusion in each required manual. END OF SECTION 01740 95 The Base Proposal shall be furnished below in words and numbers. If there is an inconsistency between the two, the Proposal in words shall control. Forty-two thousand eight hundred and ninety-two and no cents Dollars (Total Base Proposal-words) $ 42,892.00 Dollars (Total Base Proposal — numbers) I acknowledge Alternates as follows: Alternate#1 Dollars (Alternate#1-words) $ Dollars (Alternate#1— numbers) I acknowledge receipt of Addenda No.(s) or None No. Dated 96 In addition, Proposer states that he/she has included a certified copy of Contractor's License, Monroe County Occupational License, and Certificate of Liability showing the minimum insurance requirements for this project. Execution by the Contractor must be by a person with authority to bind the entity. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their duly authorized representatives, as follows: Contractor: Musco Sports L`ghting. LLC Mailing Address: 100 1st Avenue West Oskaloosa, Iowa 52577 Phone Number: 641-673-0411 E.I.N.: 42-1511754 Email: Date: 41 I AI i Signed: $92)%. James M. Hansen (Name) Secretary (Title) Contractor's Witness signature: tUlLaCten Olth_t Witness name: Melinda Walter Date: ct2/if1q MONRO TY / Z Date: 21214141 Kevin Wilson, Assistant County Administrator MO OE COU .ATTORNE\' ROVED TO OR,.r CH S A ROSIN—" ASSISTANT COUNTY A t{Q :p,. 97 Date: __ ADDITIONAL CONTRACT PROVISIONS I. Nondiscrimination/Equal Employment Opportunity. CONTRACTOR and COUNTY agree that there will be no discrimination against any person, and it is expressly understood that upon a determination by a court of competent jurisdiction that discrimination has occurred, this Agreement automatically terminates without any further action on the part of any party, effective the date of the court order. CONTRACTOR or COUNTY agrees to comply with all Federal and Florida statutes, and all local ordinances, as applicable, relating to nondiscrimination. These include but are not limited to: 1) Title VII of the Civil Rights Act of 1964 (PL 88-352) which prohibits discrimination on the basis of race, color or national origin; 2)Title IX of the Education Amendment of 1972, as amended (20 USC ss. 1681-1683, and 1685-1686), which prohibits discrimination on the basis of sex; 3) Section 504 of the Rehabilitation Act of 1973, as amended (20 USC s. 794), which prohibits discrimination on the basis of handicaps; 4)The Age Discrimination Act of 1975, as amended (42 USC ss. 6101-6107)which prohibits discrimination on the basis of age;5)The Drug Abuse Office and Treatment Act of 1972 (PL 92-255), as amended, relating to nondiscrimination on the basis of drug abuse; 6) The Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970 (PL 91-616), as amended, relating to nondiscrimination on the basis of alcohol abuse or alcoholism; 7) The Public Health Service Act of 1912, ss. 523 and 527 (42 USC ss. 690dd-3 and 290ee-3), as amended, relating to confidentiality of alcohol and drug abuse patient records; 8) Title VIII of the Civil Rights Act of 1968 (42 USC s. 3601 et seq.), as amended, relating to nondiscrimination in the sale, rental or financing of housing; 9) The Americans with Disabilities Act of 1990 (42 USC s. 12101 Note), as may be amended from time to time, relating to nondiscrimination on the basis of disability; 10) Monroe County Code Chapter 14, Article II, which prohibits discrimination on the basis of race, color, sex, religion, national origin, ancestry, sexual orientation, gender identity or expression,familial status or age; 11)Any other nondiscrimination provisions in any Federal or state statutes which may apply to the parties to, or the subject matter of, this Agreement. During the performance of this Agreement, the CONTRACTOR, in accordance with Equal Employment Opportunity (30 Fed. Reg. 12319, 12935, 3 C.F.R. Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, Amending Executive Order 11246 Relating to Equal Employment Opportunity, and implementing regulations at 41C.F.R. Part 60 (Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor). See 2 C.F.R. Part 200, Appendix II, ¶C, agrees as follows: (1) The CONTRACTOR will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause. (2)The CONTRACTOR will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. 98 (3)The CONTRACTOR will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee, who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions, discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the CONTRACTOR's legal duty to furnish information. (4) The CONTRACTOR will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under section 202 of Executive Order 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The CONTRACTOR will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (6)The CONTRACTOR will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the CONTRACTOR's non-compliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the CONTRACTOR may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. II. Termination. a. In the event that the CONTRACTOR shall be found to be negligent in any aspect of service, the COUNTY shall have the right to terminate this agreement after five.(5) days' written notification to the CONTRACTOR. b. Either of the parties hereto may cancel this Agreement without cause by giving the other party sixty (60) days' written notice of its intention to do so. c. Termination for Cause and Remedies: In the event of breach of any contract terms, the COUNTY retains the right to terminate this Agreement. The COUNTY may also terminate this agreement for cause with CONTRACTOR should CONTRACTOR fail to perform the covenants herein contained at the time and in the manner herein provided. In the event of such termination, prior to termination,the COUNTY shall provide CONTRACTOR with five (5) calendar days' notice and provide the CONTRACTOR with an opportunity to cure the breach that has occurred. If the breach is not cured, the Agreement will be terminated for cause. If the COUNTY terminates this agreement with the CONTRACTOR, COUNTY shall pay CONTRACTOR the sum due the CONTRACTOR under this agreement prior to termination, unless the cost of completion to the COUNTY exceeds the funds remaining in the contract; however, the COUNTY reserves the right to assert and seek an offset for 99 damages caused by the breach. The maximum amount due to CONTRACTOR shall not in any event exceed the spending cap in this Agreement. In addition, the COUNTY reserves all rights available to recoup monies paid under this Agreement, including the right to sue for breach of contract and including the right to pursue a claim for violation of the COUNTY's False Claims Ordinance, located at Art. IX, Section 2-721 et al. of the Monroe County Code. d. Termination for Convenience: The COUNTY may terminate this Agreement for convenience, at any time, upon seven (7) days' notice to CONTRACTOR. If the COUNTY terminates this agreement with the CONTRACTOR, COUNTY shall pay CONTRACTOR the sum due the CONTRACTOR under this agreement prior to termination, unless the cost of completion to the COUNTY exceeds the funds remaining in the contract. The maximum amount due to CONTRACTOR shall not exceed the spending cap in this Agreement. In addition, the COUNTY reserves all rights available to recoup monies paid under this Agreement, including the right to sue for breach of contract and including the right to pursue a claim for violation of the COUNTY's False Claims Ordinance, located at Art. IX, Section 2-721 et al. of the Monroe County Code. e. Scrutinized Companies: For Contracts of any amount, if the County determines that the Contractor/Consultant has submitted a false certification under Section 287.135(5), Florida Statutes or has been placed on the Scrutinized Companies that Boycott Israel List, or is engaged in a boycott of Israel, the County shall have the option of (1) terminating the Agreement after it has given the Contractor/Consultant written notice and an opportunity to demonstrate the agency's determination of false certification was in error pursuant to Section 287.135(5)(a), Florida Statutes, or (2) maintaining the Agreement if the conditions of Section 287.135(4), Florida Statutes, are met. III. MAINTENANCE OF RECORDS. CONTRACTOR shall maintain all books, records, and documents directly pertinent to performance under this Agreement in accordance with generally accepted accounting principles consistently applied. Records shall be retained for a period of ten (10) years from the termination of this agreement. Each party to this Agreement or its authorized representatives shall have reasonable and timely access to such records of each other party to this Agreement for public records and audit purposes during the term of the Agreement and for ten (10) years following the termination of this Agreement. If an auditor employed by the County or Clerk determines that monies paid to CONTRACTOR pursuant to this Agreement were spent for purposes not authorized by this Agreement, or were wrongfully retained by the CONTRACTOR, the CONTRACTOR shall repay the monies together with interest calculated pursuant to Sec. 55.03 of the Florida Statutes, running from the date the monies were paid by the COUNTY. IV. PUBLIC ACCESS. The CONTRACTOR and COUNTY shall allow and permit reasonable access to, and inspection of, all documents, papers, letters or other materials in its possession or under its control subject to the provisions of Chapter 119, Florida Statutes, and made or received by the CONTRACTOR and COUNTY in connection with this Agreement; and the COUNTY shall have the right to unilaterally cancel this Agreement upon violation of this provision by CONTRACTOR. CONTRACTOR shall be referred to herein also as "Contractor" for this provision only: 100 Public Records Compliance. Contractor must comply with Florida public records laws, including but not limited to Chapter 119, Florida Statutes and Section 24 of article I of the Constitution of Florida. The County and Contractor shall allow and permit reasonable access to, and inspection of, all documents, records, papers, letters or other"public record" materials in its possession or under its control subject to the provisions of Chapter 119, Florida Statutes, and made or received by the County and Contractor in conjunction with this contract and related to contract performance. The County shall have the right to unilaterally cancel this contract upon violation of this provision by the Contractor. Failure of the Contractor to abide by the terms of this provision shall be deemed a material breach of this contract and the County may enforce the terms of this provision in the form of a court proceeding and shall, as a prevailing party, be entitled to reimbursement of all attorney's fees and costs associated with that proceeding. This provision shall survive any termination or expiration of the contract. The Contractor is encouraged to consult with its advisors about Florida Public Records Law in order to comply with this provision. Pursuant to F.S. 119.0701 and the terms and conditions of this contract, the Contractor is required to: (1) Keep and maintain public records that would be required by the County to perform the service. (2) Upon receipt from the County's custodian of records, provide the County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. (3) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the County. (4) Upon completion of the contract, transfer, at no cost, to the County all public records in possession of the Contractor or keep and maintain public records that would be required by the County to perform the service. If the Contractor transfers all public records to the County upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the County's custodian of records, in a format that is compatible with the information technology systems of the County. (5) A request to inspect or copy public records relating to a County contract must be made directly to the County, but if the County does not possess the requested records, the County shall immediately notify the Contractor of the request, and the Contractor must provide the records to the County or allow the records to be inspected or copied within a reasonable time. If the Contractor does not comply with the County's request for records, the County shall enforce the public records contract provisions in accordance with the contract, notwithstanding the County's option and right to unilaterally cancel this contract upon violation of this provision by the Contractor. A Contractor who fails to provide the public records to the County or pursuant to a valid public records request within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. The Contractor shall not transfer custody, release, alter, destroy or otherwise dispose of any public records unless or otherwise provided in this provision or as otherwise provided by law. 101 IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS, BRIAN BRADLEY AT PHONE# 305-292-3470 BRADLEY- BRIANci MONROECOUNTY-FL.GOV, MONROE COUNTY ATTORNEY'S OFFICE 1111 12TH Street, SUITE 408, KEY WEST, FL 33040. V. Right to Audit Availability of Records. The records of the parties to this Agreement relating to the Project, which shall include but not be limited to accounting records (hard copy, as well as computer readable data if it can be made available; subcontract files (including proposals of successful and unsuccessful bidders, bid recaps, bidding instructions, bidders list, etc.); original estimates; estimating work sheets; correspondence; change order files (including documentation covering negotiated settlements); back charge logs and supporting documentation; general ledger entries detailing cash and trade discounts earned, insurance rebates and dividends; any other supporting evidence deemed necessary by Owner to substantiate charges related to this agreement, and all other agreements, sources of information and matters that may in Owner's reasonable judgment have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any contract document (all foregoing hereinafter referred to as "Records") shall be open to inspection and subject to audit and/or reproduction by Owner's representative and/or agents of Owner. Owner may also conduct verifications such as, but not limited to, counting employees at the job site,witnessing the distribution of payroll, verifying payroll computations, overhead computations, observing vendor and supplier payments, miscellaneous allocations, special charges, verifying information and amounts through interviews and written confirmations with employees, Subcontractors, suppliers, and contractors representatives. All records shall be kept for ten (10) years after Final Completion. FEDERAL CONTRACT PROVISIONS The CONTRACTOR and its subcontractors must follow the provisions, as applicable, as set forth in 2 C.F.R. §200.326 Contract Provisions and Appendix II to 2 C.F.R. Part 200, as amended, including but not limited to: I. Clean Air Act(42 U.S.C. §§7401-7671q.) and the Federal Water Pollution Control Act(33 U.S.C. §§1251-1387) as amended. Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act(42 U.S.C. §§7401- 7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. §§1251-1387) and will report violations to FEMA and the Regional Office of the Environmental Protection Agency (EPA). The Clean Air Act (42 U.S.C. §§7401-7671q.) and the Federal Water Pollution Control Act(33 U.S.C. §§1251-1387), as amended, applies to Contracts and sub grants of amounts in excess of$150,000. II. Contract Work Hours and Safety Standards Act (40 U.S.C. §§3701-3708). Where applicable, which includes all FEMA grant and cooperative agreement programs, all contracts awarded by the COUNTY in excess of$100,000 that involve the employment of mechanics or laborers must comply with 40 U.S.C. §§3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. §3702 of the Act, each contractor must compute the wages of every mechanic and laborer on the basis of a standard work week of forty (40) hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a 102 half times the basic rate of pay for all hours worked in excess of forty (40) hours in the work week. The requirements of 40 U.S.C. §3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. III. Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of "funding agreement" under 37 CFR §401.2 (a) and the recipient or sub recipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that "funding agreement," the recipient or sub recipient must comply with the requirements of 37 CFR Part 401, "Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements," and any implementing regulations issued by the awarding agency. IV. Debarment and Suspension (Executive Orders 12549 and 12689). A contract award (see 2 CFR 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), "Debarment and Suspension." SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. V. Byrd Anti-Lobbying Amendment (31 U.S.C. §1352). Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. §1352. Each tier must also disclose any lobbying with non- Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award. VI. Compliance with Procurement of recovered materials as set forth in 2 CFR § 200.322. CONTRACTOR must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designed in guidelines of the Environmental Protection Agency (EPA at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition,where the purchase price of the item exceeds$10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. (1) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired; (i) Competitively within a timeframe providing for compliance with the contract performance schedule; (ii) Meeting contract performance requirements; or (iii) At a reasonable price. (2) Information about this requirement, along with the list of 103 EPA-designated items, is available at EPA's Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpq-program. VII. Americans with Disabilities Act of 1990 (ADA), as amended. The CONTRACTOR will comply with all the requirements as imposed by the ADA, the regulations of the Federal government issued thereunder, and the assurance by the CONTRACTOR pursuant thereto. VIII. Disadvantaged Business Enterprise (DBE) Policy and Obligation. It is the policy of the COUNTY that DBE's, as defined in 49 C.F.R. Part 26, as amended, shall have the opportunity to participate in the performance of contracts financed in whole or in part with COUNTY funds under this Agreement. The DBE requirements of applicable federal and state laws and regulations apply to this Agreement. The COUNTY and its CONTRACTOR agree to ensure that DBE's have the opportunity to participate in the performance of this Agreement. In this regard, all recipients and contractors shall take all necessary and reasonable steps in accordance with 2 C.F.R. §200.321 (as set forth below), applicable federal and state laws and regulations to ensure that the DBE's have the opportunity to compete for and perform contracts. The COUNTY and the CONTRACTOR and subcontractors shall not discriminate on the basis of race, color, national origin or sex in the award and performance of contracts, entered pursuant to this Agreement. IX. C.F.R. §200.321 - CONTRACTING WITH SMALL AND MINORITY BUSINESSES, WOMEN'S BUSINESS ENTERPRISES, AND LABOR SURPLUS AREA FIRMS: a. If the CONTRACTOR, with the funds authorized by this Agreement, seeks to subcontract goods or services, then, in accordance with 2 C.F.R. §200.321, the CONTRACTOR shall take the following affirmative steps to assure that minority businesses, women's business enterprises, and labor surplus area firms are used whenever possible. b. Affirmative steps must include: i. Placing qualified small and minority businesses and women's business enterprises on solicitation lists; ii. Assuring that small and minority businesses, and women's business enterprises are solicited whenever they are potential sources; iii. Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority businesses, and women's business enterprises; iv. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women's business enterprises; v. Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce. vi. Requiring the Prime contractor, if subcontractor are to be let, to take the affirmative steps listed in paragraph (i) through VI) of this section. X. The Contractor shall utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the Contractor during the term of the Contract and shall expressly require any subcontractors performing work or providing services pursuant to the Contract to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the Contract term. 104 Xl. The Contractor is bound by the terms and conditions of the Federally-Funded Sub award and Grant Agreement between County and the Florida Division of Emergency Management (Division) found at the following link on the Monroe County web page: http://fl-monroecounty.civicplus.com/Bids.aspx?CatID=18. XII. The Contractor shall hold the Division and County harmless against all claims of whatever nature arising out of the Contractor's performance of work under this Agreement, to the extent allowed and required by law. • 105 Minority Owned Business Declaration Musco Sports Lighting, LLC , a sub-contractor engaged by Monroe County during the completion of work associated with the below indicated project (Check one) is a minority business enterprise, as defined in Section 288.703, Florida Statutes or X is not a minority business enterprise, as defined in Section 288.703, Florida Statutes. F.S. 288.703(3) "Minority business enterprise" means any small business concern as defined in subsection (6)(see below) which is organized to engage in commercial transactions, which is domiciled in Florida, and which is at least 51-percent-owned by minority persons who are members of an insular group that is of a particular racial, ethnic, or gender makeup or national origin, which has been subjected historically to disparate treatment due to identification in and with that group resulting in an underrepresentation of commercial enterprises under the group's control, and whose management and daily operations are controlled by such persons. A minority business enterprise may primarily involve the practice of a profession. Ownership by a minority person does not include ownership which is the result of a transfer from a nonminority person to a minority person within a related immediate family group if the combined total net asset value of all members of such family group exceeds $1 million. For purposes of this subsection, the term "related immediate family group"means one or more children under 16 years of age and a parent of such children or the spouse of such parent residing in the same house or living unit. F.S 288.703(6) "Small business"means an independently owned and operated business concern that employs 200 or fewer permanent full-time employees and that, together with its affiliates, has a net worth of not more than $5 million or any firm based in this state which has a Small Business Administration 8(a) certification. As applicable to sole proprietorships, the $5 million net worth requirement shall include both personal and business investments. Contractor may refer to F.S. 288.703 for more information. Contractor: M Sports Lighting, LLC Sub-Recipient: Monroe County Sign a Signature Print Name: James M. Hansen Printed Name:. 1. "1100%,6,-1 Title: Secretary Title/OMB Department:-Ci4414cc E -) Verified via: sve +-i&.a... https://osd.dms.mvflorida.com/directories Address: 100 1st Avenue West DEM Contract: Z0002 City/State/Zip Oskaloosa, Iowa 52577 Date: 02/io f Ioo FEMA Proiect Number: 106 Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion Contractor Covered Transactions (1) The prospective contractor of the Recipient, Musco Sports Lighting, LLC, certifies, by submission of this document, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. (2) Where the Recipient's contractor is unable to certify to the above statement, the prospective contractor shall attach an explanation to this form. CONTRACTOR: Musco Sports Lighting, LLC By 1-10e4e eoc4*47-C Signs a Recipient's Name James M. Hansen, Secretary 2. Name and Title Division Contract Number 100 1st Avenue West 68393 Street Address FEMA Project Number Oskaloosa, Iowa 52577 City, State, Zip 2h 1q Date 107 LOBBYING AND CONFLICT OF INTEREST CLAUSE SWORN STATEMENT UNDER ORDINANCE NO. 010-1990 MONROE COUNTY, FLORIDA ETHICS CLAUSE Musco Sports Lighting, LLC (Company/indivdual)warrants that he/it has not employed, retained or otherwise had act on his/its behalf any former County officer or employee in violation of Section 2 of Ordinance No. 010-1990 or any County officer or employee in violation of Section 3 of Ordinance No. 010-1990. For breach or violation of this provision the County may, in its discretion,terminate this Agreement without liability and may also, in its discretion, deduct from the Agreement or purchase price, or otherwise recover,the full amount of any fee, commission, percentage, gift, or consideration paid to the former County officer or employee". (Sig Lure) Date: c 2/ 1611 STATE OF: IOWA COUNTY OF: MAHASKA PERSONALLY APPEARED BEFORE ME, the undersigned authority, James M. Hansen who, after first being sworn by me (name of individual signing) affixed his/her signature in the space provided above on this l - day of 'f 20 19 tLW-602031-5 LOVILL NOTARY PUBLIC My Commission Expires: 4/24/2019 (SEAL) MELINDA K. WALTER Notarial Seal - Iowa Commission # 746584 My Commission Expires I — 4, - 4 108 NON-COLLUSION AFFIDAVIT James M. Hansen according to law, on my oath, and under penalty of perjury, depose and say that: 1. I am Secretary of the firm of Musco Sports Lighting, LLC the bidder making the Proposal for the project described in the Request for Competitive Solicitations for: Watson Park Baseball Field Lighting Repair and that I executed the said proposal with full authority to do so. 2. The prices in this proposal have been arrived at independently without collusion, consultation, communication or agreement for the purpose of restricting competition, as to any matter relating to such prices with any other bidder/responder or with any competitor. 3. Unless otherwise required by law, the prices which have been quoted in this proposal have not been knowingly disclosed by the bidder/responder and will not knowingly be disclosed by the bidder prior to the opening of the responses, directly or indirectly, to any other bidder/responder or to any competitor. 4. No attempt has been made or will be made by the bidder/responder to induce any other person, partnership or corporation to submit, or not to submit, a proposal for the purpose of restricting competition. 5. The statements contained in this affidavit are true and correct, and made with full knowledge that Monroe County relies upon the truth of the statements contained in this affid in i g contracts for said project. Ci2110 11 q (S. ature n ent) (Date) STATE OF: IOWA COUNTY OF: MAHASKA PERSONALLY APPEARED BEFORE ME, the undersigned authority, James M. Hansen who, after first being sworn by me, affixed his/her signature in the space provided above on this 1a day of 20!—[)1. kbideta--7L,Cti NOTARY PUBLIC q My Commission Expires: 4/24/2019 (SEAL) MELINDA K. WALTER Notarial Seal - Iowa Commission # 746584 My Commission Expires 109 ir .or �- -me � - - _ 4i DRUG-FREE WORKPLACE FORM The undersigned vendor in accordance with Florida Statute 287.087 hereby certifies that: Musco Sports Lighting, LLC (Name of Business) 1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1). 4. In the statement specified in subsection(1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893 (Florida Statutes) or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, or any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements. Re ondent' ure o2IIe/ 14 Date NOTARY PUBLIC My Commission Expires: 4/24/2019 MELINDA K. WALTER (SEAL) Notarial Seal - Iowa Commission # 746584 My Commission Expires 110 PUBLIC ENTITY CRIME STATEMENT "A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or CONTRACTOR under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida Statutes, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." I have read the above and state that neither Musco Sports Lighting, LLC (Proposer's name) nor any Affiliate has been placed on the convicted vendor list within the last 36 months. (Si ature) Date: STATE OF: IOWA COUNTY OF: MAHASKA PERSONALLY APPEARED BEFORE ME, the undersigned authority, James M. Hansen who, after first being sworn by me, (name of individual signing) affixed his/her signature in the space provided above on this /03, day of 20 . I AL LWamt NOTARY PUBLIC My Commission Expires: 4/24/2019 (SEAL MELINDA K. WALTER Notarial Seal - Iowa Commission # 746584 My Commission Expires 111 VENDOR CERTIFICATION REGARDING SCRUTINIZED COMPANIES LISTS Project Description(s): Watson Park Baseball Field Lighting Repair Respondent Vendor Name: Musco Sports Lighting, LLC Vendor FEIN: 42-1511754 Vendor's Authorized Representative Name and Title: James M. Hansen, Secretary Address: 100 1st Avenue West City: Oskaloosa State: Iowa Zip: Oskaloosa. Iowa 52577 Phone Number 641-673-0411 Email Address: Section 287.135, Florida Statutes prohibits a company from bidding on, submitting a proposal for, or entering into or renewing a contract for goods or services of any amount if, at the time of contracting or renewal,the company is on the Scrutinized Companies that Boycott Israel List,created pursuant to Section 215.4725, Florida Statutes, or is engaged in a Boycott of Israel. As the person authorized to sign on behalf of Respondent, I hereby certify that the company identified above in the Section entitled "Respondent Vendor Name" is not listed on the Scrutinized Companies that Boycott Israel List or engaged in a boycott of Israel and for Projects of$1,000,000 or more is not listed on either the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or engaged in business operations in Cuba or Syria. I understand that pursuant to Section 287.135, Florida Statutes,the submission of a false certification may subject company to civil penalties, attorney's fees, and/or costs. I further understand that any contract with the COUNTY may be terminated, at the option of the COUNTY, if the company is found to have submitted a false certification or has been placed on the Scrutinized Companies that Boycott Israel List or engaged in a boycott of Israel or placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or been engaged in business operations in Cuba or Syria. Certified by: James M. Hansen ,who is authorized to sign on behalf of the above refer-• ed c•, p- Authorized Signature: Ai../ Print Name: James M. Ha en Title: Secretary Note:The List are available at the following Department of Management Services Site: http://www.dms.myflorida.com/business operations/state purchasing/vendor information/convicted susp ended discriminatory complaints vendor lists 112 „111111,11.111111111110111111111111,—II 41111111.111111110111111.11111101111111111111111116.. . i I RICK SCOTT,GOVERNOR JONATHAN ZACHEM,SECRETARY _. . onda 1 : . , t Fl ' . ,, , i , . : 1. ‘ i t - •--...t....41,....: ,, _, Ilp —, 1 i i i I ; -. ... ., . „ . - .. .. I ,i STATE OF FLORIDA 1 i . , DEPARTMENT OF BUSINESS:ANP,-PR0FESSIONAL REGULATION . • ;:;447ili-i .--.)----,,, A t.:, ; .st,c ', No, ,I.r..:It,, q.'"....,,, i •, I ' ,c'e i'L,•.'-''' :::-,'"-,,,..,-:),FY A,-%,„.,c2,.... ELECTRICALX-b-i't_.R7A'''":c7T,OR--SilEt.edEzN, S\ING BOARD ,,,,ifi.$,--.4,:,------ -4-t-,, -c.„ ,•icr,,,:,. THE ELECTRICa Aitz7.- bi,N'697-RA-z--.-'ilO'41i'llt"RE;....,;;;11`)11.,,810.„,t;R-:tl.F.4.1E19,,, pRovislomsycyR,,Q _ .,1 , ,.: 6 fi 4.-,j-' .''''iy,4-,:..... 1::,z,' HAPTER,489- LOR AST, 4UTES -.%-:-.--;- ---/If .., . 1 flasiKes§-1Q'adi-a ,e Addiip.,,n,a - .• . ,, 14 c tl ,R r -,...,4,...:-.-...::-,r.1,•....-,•-.7,,. ,— ',.1 -7/1,'IV.V....7--„,-...-:.k45-..rfAi,--:'---'.t -..-.., `r_l,iLl 0----4. ).,•-..,” -----t,..r., .. •,. ., i i TIP ,• i 1 ..", ,_ F. '704iiiiii`osliii6iria."2-% ': , ' -:. / i' s • , -411-q.i.---`'i UNDER THE i ,1 1 ' I i 1 I 1 , -,,,,,, •,,,,, „..:, ..... A ....c., : .... ''. .'.., ; 7.--z. . ,-. ' ', , --- „---,41 t.,:-..--,1'. (44 ..'lar:'LLSNER'rMARIC)---7 '1 r;X:" t .k 5,-,r)It4,'÷7.7-"::,,,ZJIMIV416.W.K7i..--,-e-7.r=!,.,-• ,:2:::,:;.7-if-` 7---:','I rst,I) 1 .. ':-\ ..r.':'),mOlUSeipSRORT-allIGHTLiNG-;fLIG:51,,,----4 t 1. ; 0 t ,,`,7"..,,,/ ••• ',.).'.",..7.;.4..0.-0. /4 "Vr4f43077--..7, 7 ,j,, ,,, ,:c-1., °71"4/--4::.,.,",4P-",,.44-,.-...r.."..„"Ct5.i,, L,,0 0:,.:::>, 8;.„,,,1.,5, .:,4tP; t,A!.i '`-C'fA.*!1l•Cl4'.5.,,,,••.1•:,,„-47.,,.,,„:..7.•...•,.u.4.,,•PA 2.0.., W , 1 ' \ : ; ; • : V- ( -. „ - .r :::::sEiumtE7 400694 - 1i1i11i,i. . • I:'1 EXPIRATIoNtD. , .ATl- ASIGUST 31, 2020 ; I Always verify licenses online at MyFloridaLicense.com i 1 I ! • ' ' , . i . Do not alter this document in any form. i 1 . , - 1 This is your license. It is unlawful for anyone other than the licensee to use this document. , 1 c , 1 ...._ . _ . . -: . STATE OF FLORIDA DEPART' .ENT OF T US NESS ,'N Ir) PROFESSII I NAL REGU'_;'\TION ELECTRICAL CONTRACTORS LICENSING BOARD • �,41 . (850)487-1395 k - 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 Congratulations!With this license you become one of the nearly one million Floridians licensed by the Department of Business and Professional Regulation.Our professionals and businesses range from architects to yacht brokers,from boxers to barbeque restaurants,and they keep Florida's economy strong. Every day we work to improve the way we do business in order to serve you better. For information about our services,please log onto www.myfloridalicense.com.There you can find more information about our divisions and the regulations that impact you,subscribe to department newsletters and learn more about the Department's initiatives. Our mission at the Department is: License Efficiently,Regulate Fairly.We constantly strive to serve you better so that you can serve your customers.Thank you for doing business in Florida,and congratulations on your new license! br STATE OF FLORID,DEPARTMENT `OF B NES USIS AN PRO FESSIONAL OFESSIONAL REGULATION ECA000891 r ' - c. y ISSUED.07/03/2018 ELECTRICAL CONTRACTOR FLESNER.MARK J` MUSCO SPORTS LIGHTING LLC Signature LICENSED UNDER CHAPTER489 FLORIDASTATUTES EXPIRATION DATE:`AUGUST 31;'020: ..------"I ® DATE(MM/DD/YYYY) A�o CERTIFICATE OF LIABILITY INSURANCE 09/06/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.If d SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this 1►. certificate does not confer rights to the certificate holder in lieu of such endorsement(s). .c PRODUCER CONTACT 17 NAME: Aon Risk Services Central, Inc. PHONE FAX t Omaha NE Office (A/C.No.Ext): C402) 697-1400 (NC.No.): C402) 697-0017 11213 Davenport E-MAIL c Suite 201 ADDRESS: _ Omaha NE 68154 USA INSURER(S)AFFORDING COVERAGE NAIL# INSURED INSURER A: Sentry Insurance A Mutual Company 24988 Musco Sports Lighting, LLC INSURERS: Sentry Casualty Company 28460 • c/o Musco Corporation 100 1st Ave W INSURERC: Travelers Property Cas Co of America 25674 Oskaloosa IA 52577 USA INSURERD: Nautilus Insurance Company 17370 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:570075275596 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested INSR ADDL SUER POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY MM/DD/YYYY1 LIMITS A X COMMERCIAL GENERAL LIABILITY 901687704 07/01/2018 U7/01/2019- EACH OCCURRENCE $1,000,000 fI'�X I C �qp DAMAGE TO RENTED CLAIMS-MADE I 1 OCCUR ' DAM' PREMISES(Ea occurrence) $300,000 AP RO tvr — BY MED EXP(Any one person) $10,000 DALE ' PERSONAL&ADV INJURY $1,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: WAIVER A Y $""' GENERAL AGGREGATE $2,000,000 r POLICY X PE° I X I LOG PRODUCTS-COMP/OPAGG $2,000,000 n 0 OTHER: P- A A AUTOMOBILE LIABILITY 901687703 07/01/2018 07/01/2019 COMBINED SINGLE LIMIT $1,000,000 N (Ea accident) X ANY AUTO BODILY INJURY(Per person) O Z OWNED SCHEDULED BODILY INJURY(Per accident) df AUTOS ONLY AUTOS X HIRED AUTOS x NON-OWNED PROPERTY DAMAGE tE 0 ONLY AUTOS ONLY (Per accident) t C X UMBRELLALIAB X OCCUR ZUP61M9917718NF 07/01/2018 07/01/2019 EACH OCCURRENCE $25,000,000 0 EXCESS LIAR CLAIMS-MADE AGGREGATE $25,000,000 DED X RETENTION$10,000 B WORKERS COMPENSATION AND 901687701 07/01/2018 07/01/2019 X PER STATUTE OTH- EMPLOYERS'LIABILITY Y I N ER ANY PROPRIETORIPARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? N N I A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000- D Archit&Eng Prof PCADN50044250718 07/01/2018 07/01/2019 Archi&Eng Prof $5,000,000 SIR applies per policy terms & conditions SIR/Deductible $250,000 Aggregate $5,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached it more space is required) Re: Musco Project svc-414033 - Harry Harris Park and Svc-414624 - Watson Field. zck Monroe County Board of county Commissioners is included as Additional Insured in accordance with the policy provisions of the ""r�am--� General Liability and Automobile Liability policies. g R-. CERTIFICATE HOLDER CANCELLATION ��-eI.�L SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE : 14 EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE 1 I POLICY PROVISIONS. -SDK Monroe County Board of AUTHORIZED REPRESENTATIVE I�f4 County Commissioners ; 1100 Simonton Street, 2-216 Key West FL 33040 USA �` ©1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD