12/14-64 Commercial Apron 1st Supplement • • MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution Task Order No. 12/14-64 . Liu,- (v3ye I5G- S60 Client Project No. GA KAP LI - 53a31,1) Engineer Project No. E9Y16764 (S1) . This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized — Supplemental No. 1 — Strengthen/Rehabilitate Commercial Apron Construction Support and RPR Services Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 3 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 840,355.00 . N/A Other (Describe): Schedule (THIS IS A TIME EXTENSION REQUEST) ►:,„;, -s may commence on Execution (Date approMed by Monroe County, 10/19'16) . k' A, ill cease by 1 460 days ''' AC h • BOARD OF COUNTY COMMISSIONERS = b " - ` a �A y.�* VIN MADOK, CLERK OF MO •E C TY, FLkIDA �. . By / c-):, `t/ rn t7 t4 - • Mayor/Chairman c cm q: CONSULTANT: z-^'-, JACOBS PROJECT MANAGIENT COI!' ` 4611,.........00 By Witn s Title V.P. Geographical Operations Manager / • -• cOU IV/, J•R.ROVE .. i File: MSTR APS—Monroe County i PED':• -t''-' ADO Page 1 of 1 - - • T U• ' TYATTORNEY3 7 A Exhibit A—Scope of Work(12/14-64) Monroe County Key West International Airport Strengthen/Rehabilitate Commercial Apron Construction Support and RPR Services SCOPE OF WORK Jacobs will provide construction support and resident project representative (RPR) services for the "Strengthen/Rehabilitate Commercial Apron" project at Key West International Airport(EYW). These construction services will provide the following: ASSUMPTIONS • Construction phase services are based on an anticipated duration of 370 calendar days of construction in field. In the event the construction duration exceeds the calendar days listed above, Jacobs reserves the right to revise our proposal. • Jacobs Project Management Company will invoice on a percent complete, including expenses, to compensate the level of effort required for each assignment. • All as-built drawings to be provided to Jacobs in electronic(AutoCad)format and hard copy (printed)format. • Construction Support services are based upon the following: 30 shop drawings/product submittals. Our assumption is 80%of submittals will be approved on the first review and 20%will require re-submittal for further review; respond to 20 Contractor RFI's. • The Contract Documents requires the Contractor to perform all of Phase 1 work(80 calendar days)between the hours of 10pm-6am. The remaining phases(270 calendar days)allows the Contractor to work during normal daylight hours, but does require that concrete paving be performed during the hours of 10pm-6am.Therefore, the Contractor may be working multiple shifts during the later phases of the project. It is assumed that 1 RPR will be required for the duration of the project. A second part time(50%) RPR will be required for the later phases to cover the multiple phases during the 270 calendar days. ARTICLE D—CONSTRUCTION ADMINISTRATION SERVICES 1. Prepare and issue conformed drawings for construction. 2. Prepare and issue construction contract to the awarded low bidder. 3. Issue a "Notice to Proceed," on behalf of the Airport, to the Contractor. 4. Review the Contractor's construction schedule. 5. Prepare for and attend the Pre-Construction conference. Page 1 of 3 6. Review all shop drawing submittals for conformance to the plans and specifications and respond to the CONTRACTOR and Airport with detailed summary of the applicability and acceptability of the shop drawing. 7. Respond to Contractor's RFI's. 8. Attend site visits and bi-weekly progress meetings. Observe work in progress and provide reports to Owner. Assume eighteen (18) site visits throughout the course of the construction project. 9. Prepare construction management plan. 10. Prepare Field Sketches, as necessary. 11. Provide general supervision and administrative support for resident project representative (RPR). 12. Review and approve estimates submitted by the Contractor for progress/final payments. 13. Prepare and negotiate change orders, as necessary. Assume two change orders. 14. Attend final inspection meeting. 15. Review Closeout Documentation. 16. Review quality assurance testing results. 17. Prepare record drawings and provide hardcopies and electronic files to the Airport. 18. Prepare and submit FAA closeout documentation and prepare and process final change order. Services for Article D will be provided under a lump sum basis. AMENDMENT TO ARTICLE E -RESIDENT PROJECT REPRESENTATIVE (RPR) 1. Attend pre-construction conference. 2. Coordinate and attend progress meetings with the contractor, Airport, and any other interested parties, as required prior to construction (e.g. Staging area coordination, setting up Contractor's trailer.). 3. Provide full-time RPR services for the work associated with the project. The RPR's for the project shall have field experience in the type of work to be performed, be fully qualified to make interpretations, decisions,field computations, and have knowledge of testing requirements and procedures. The RPR's shall be responsible for the following: • Checking of construction activities to ensure compliance with the plans and specifications. Inform the contractor and County of any work,which is in non-compliance. • Coordinate quality assurance tests and verify they have been performed at the frequency stated in the specifications. Page 2 of 3 • Review certifications for conformance with the specifications. • Document quantities of materials used on the project by actual measurements and computations in a field notebook or computer printout retained in a folder. • Maintain a set of working drawings on the job site,which can be used to prepare"As-Built" drawings. • Review the test reports and certifications for conformance with the specifications and maintain a file for all reports and certifications. • Inform the County of deficiencies so corrections can be made and retesting performed. • Jacobs does not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures of construction or for safety precautions and programs in connection with the work, since these are solely the CONTRACTOR'S responsibility under the contract for construction. • Jacobs shall make every reasonable effort to ensure that the CONTRACTOR completes the work in accordance with the current approved schedule and carries out the work in accordance with the contract documents. • Review close out documentation. • Review payment requests and certified payrolls from the contractor. • Maintain a diary, which will contain entries made and signed by the resident engineer. Each entry should include the following, plus any additional pertinent data: a. Date and weather conditions. b. Names of important visitors. c. Construction work in progress and location. d. Size of contractor's workforce and equipment in use. e. Number of hours worked per day for contractor and subcontractors. 4. Quality Assurance Testing of Construction Materials will be provided by our subconsultant,Tierra South Florida. 5. Avirom and Associates will provide survey services to provide survey checks to confirm Contractor's grade controls and elevations prior to concrete paving. 6. Attend final inspection and create punch list. 7. Attend follow up site visit to confirm completion of punch list items. Services for Article E will be provided under a lump sum basis. Page 3 of 3 • JACOBS ENGINEERING GROUF JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Strengthen/Rehabilitate Commercial Apron(12/14-64) FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article A:Data Collection 0 $ - S - Article B:Design,Specifications and Meetings 0 $ - S - Article C:Bidding Phase Services 0 $ - S - Article D:Construction Phase Services 724 $ 115,555 S - Article E:RPR Services 3,724 $ 598,870 S Total Basic Services Lump Sum Fee 4,448 $ 714,425 $ - SPECIAL SERVICES Hours Fee DBE AMOUNT Article E:RPR Services Avirom and Associates-Survey $ 45,900 $ - Tierra-Geotechnical $ 80,030 $ 80,030 Total Special Services Lump Sum Fee 0 $ 125,930 $ 80,030 TOTAL LUMP SUM PROJECT FEE 4,448 $ 840,355 $ 80,030 $840,355 Page 4 of 6 • e JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Strengthen/Rehabilitate Commercial Apron(12/14-64) Article D:Construction Administration Sr.Proj. Sr. Project Sr.CADD WORK rum Proj.Director Manager Engineer Engineer Engineer Designer Ter! Clerical TOTAL Prepare.Stamp.Sign,and Issue Conformed Drawings(54 Sheets)and Specifications 2 20 22 2 Prepare and Issue Construction Contract 2 2 3 Issue Notice to Proceed 2 2 4 Review Contractor's Schedule 8 8 5 Prepare for and attend Pre-Construction Conf 8 12 20 6 Review shop drawings and submittals 8 8 56 40 112 7 Respond to RF1's 12 24 40 16 92 8 Attend Site Visits and Bi-Weekly Progress 180 180 Meetings(Say 18 Visits) 9 Prepare Construction Management Plan 2 16 18 10 Prepare Field Sketches 12 16 40 68 11 General Supervision and Support to RPR 16 40 56 12 Review and Approve Contractor Pay Req(Say 1�) 1 12 12 13 Prepare and Negotiate Change Orders(Assume 4 8 16 28 2) 14 Attend Final Inspection 8 8 15 Review Closeout Documentation 8 8 16 Review QA test results 8 8 17 Prepare and Submit Record Drawings 8 40 48 18 Prepare and Submit FAA Closeout 8 8 16 32 Documentation and Final Change Order TOTAL HOURS 0 244 74 8 186 96 116 0 724 RATE ---- S 220.00 S 195.00 $ 140.00 S 123.00 $ 90.00 $ 85.00 S 90.00 $ 58.00 PAYROLL ESTIMATE S - $ 47,580 S 10360 S 984 $ 16.740 $ 8,160 $ 10,440 $ - S 94,264 TOTAL PAYROLL S 94,264 Subconsultants $0 Task Expenses: Expenses S 21.291 5 Airfare(I(r$600)x 2 S 1,200.00 Lump Sum Fee Total $ 115,555 Lodging'Meals Per Dian(I(r$304)x 2 $ 608.00 a Airfare(18 trips(a$600) S 10.800.00 TOTAL FEE S 115,555 Lodging/Meals Per Diem(18(a$304) S 5A72.00 14 Airfare(I;a,S600)x 2 $ 1,200.00 Lodging,Meals Per Diem(14$304)x 2 $ 608.00 MiscParking.Printing 5 1,403.00 Total Expenses $ 21.291.00 Subconsultants Total Subs $ - Page 5 of 6 I V . • JACOBS ENGINEERING GROUP JOB HOUR AND F Monroe County Airport Key West International Airport Project: SVengthenlRehabilitate Commercial Apron(12/14-64) Article F:RPR Proj. Sr.Proj. Sr. Project Sr.CADD WORK ITEM Director Manager Engineer Engineer Ent/Weer Designer Tech Clerical TOTAL I Attend Pre-Construction Meeting tt 8 2 Coordinate and Attend Progress Meetings Included in Item No.3 3a Perform fuli.time resident inspection services(53 weeks 2650 2650 5 5days pa week(e 10hnday) 3b Perform part-time resident inspection services(21 weeks 1050 1050 (d,5 days per week tee.10 he day) 4 Provide QA Testing Seer Mere/Seim 5 Provide Survey Checks SeeAairn&kw 6 Attend Punch List Inspection 6 8 7 Attend Follow Up Inspection 8 8 TOTAL HOURS 0 0 0 2674 1050 0 3724 RATE -_- S 220.00 S 195.00 S 140.00 S 123.00 S 90.00 S 85.00 $ 90.00 S 58.00 --- PAYROLL ESTIMATE S - S - S - S 328,902 S 94500 $ - S 423,402 Subconsultants: TOTAL PAYROLL S 423,402 Avirom(52,550 Shift x 18) S 45,900 Subconsultants S 125,930 Tien S 80.030 Expenses S 175,468 Total Subs S 125,930 Lump Sum Fee Total S 724,800 Task Enoensos: TOTAL FEE S 724,800 I Airfare(1(dS600) S 60.00 Lodging/Mals Per Diem(101304) S 304.00 Airfare(Assume 2 trips home/Month for 12 months) 3a (2403600) S 14.400 LodgingMals Pa Diem(323 night(d,$304) $ 98,192 Airfare(Assume 2 trips home/Month for 5 months) 3b (100600) S 6,000 Lodging/Meals Pa Diem(127 night(t4$304) S 38,608 a Airfarc(1(eiS600) S 600.00 Lodging/Meals Per Diem(10304) S 304.00 7 Airfare(I(dS600) S 600.00 Lodging/Meals Per Diem(105304) S 304.00 Field Vehicle(Full Time RPR) No Charge Rental Vehicle(Part Time RPR,5 Months(d S1,200/Month) S 6,000.00 Misc.,Gas.Parking S 10.096.00 Total Expenses S 175.468 Page 6 of 6