12/15-51 Departure Hall-Restroom-Pet Station p couRr Kevin Madok, CPA 4 UF ;o~RC••........ F Clerk of the Circuit Court&Comptroller—Monroe County, Florida oUN. DATE: June 6, 2019 TO: Beth Leto, Airports Business Manager FROM: Pamela G. Hanco4 I).C. SUBJECT: May 22"a BOCC Meeting Attached are electronic copies of the following items for your handling: C8Jacobs Project Management Co.'s Task Order No. 12/15-51 (Supplemental#1 to Task Order 12/15-21) in the amount of$119,030.00 for the Departure Hall Renovations, Restroom Renovations and Service Animal Pet Relief Area Project at the Key West International Airport, to be funded with PFC#17; FDOT Grant G0E77; and/or Airport Operating Fund 404. C12 McFarland Johnson Task Order No. 2019-04 in the amount of$214,902.00 for Engineering Design Services for a new Airport Maintenance Storage Facility at the Key West International Airport to be paid 50%from Airport Operating Fund 404; and 50%FDOT Grant G1008. C14 Contract with the most responsive bidder, Republic Parking System, LLC, to provide parking lot management services at the Key West International Airport, including full staffing during normal operating hours, an automated gate system for the short-term parking lot, and fully automated after hours"pay in lane" devices for both the long-term and short-term parking lots. Should you have any questions,please feel free to contact me at(305) 292-3550. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING 500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Florida 33070 305-294-4641 305-289-6027 305-852-7145 305-852-7145 is • , • MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date U b G7�e C�1 `� Task Order No. 12/15-51 tbq. — 3 181- -S'3�49b Client Project No. G'ffKD j35—53O3!0 Engineer Project No. E9Y37951 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—Departure Hall Renovations—Restroom and Pet Relief Station Design (12/15-21)—Supplemental#1 Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 4 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. • X Firm Fixed Price of$ 119,030.00 N/A Other(Describe): ram-• c r'~rz c.}T = Q Schedule c-r 1 ch . _ 33 Services may commence on Execution 7.) "o IT, 3.' c-, Services will cease by 365 da s •<`' �„�... 30 if( ..C�.!r�"� ,r`ter, �. � .. .�:• �� ' BOARD OF COUNTY COMMISSIONERS - " — )10, : KEVIN;1 ' ''',-----. ----ob i (7,,,,..,..„.z. OK, CLERK OF MONROE COUNTY, FLORIDA '',, By ! f�.r M yor/ airman CONSULTANT: JACOBS PROJECT MANAGEMENT CO • cticia.ftim,. By Vice President,Geographic Operations Manager • Title ON OE «Tf%�RNEY File: —Monroe County p P ,•' Gv Page 1 of 1 PEOR J. / / ASSI TY ATTORNEY -3 2 Date Exhibit A—Scope of Work (12/15 -51) Monroe County Key West International Airport(EYW) Departure Hall Renovations—Restroom and Pet Relief Station Design (12/15 - 21) - Supplemental#1 SCOPE OF WORK Jacobs will provide architectural,structural,plumbing,HVAC and electrical engineering documents for the expansion of the existing departure hall, approximately 700 square foot+/-,to include an additional 55+/-passenger seats.The scope will also include the addition of a women's room stall and reduction of the service animal relief area. See attached exhibit B.These improvements will be located at the Key West International Airport in Key West,Florida. All design work shall comply with the Florida Building Code 2017. Jacobs will also provide an architectural rendering of the terminal expansion project. This will be an exterior view rendered at an eye level perspective from the curbside. EXISTING CONDITIONS The current departure hall gift shop shall remain.The exterior area that will be impacted by the addition includes an exterior planter,rain water leader, art wall, sidewalk, exterior CMU wall and storefront system. DESCRIPTION OF WORK The data collection, design, and construction support services will include: Article A—Data Collection Field Verification: Visit and inspect the site (1 visit) to determine if existing conditions match construction documents of the terminal complex. Take photographs and make written documentation, sketches, notes or reports to confirm and record the general conditions of the existing facility and site. Within this initial phase we will review all applicable requirements. Initial Meeting: Conduct a meeting with representatives from Monroe County and the design A/E team to include architect, mechanical engineer, electrical engineer and structural engineer. The purpose of the meeting is to discuss the project features, existing conditions and review submittal requirements with the design team,and answer questions developed by the Jacobs team. Data Collection phase will also include: • Review available record drawings • Perform a site investigation Services for Article A will be provided under a lump sum basis. Page 1 of 4 Article B—90%Design The specific tasks Jacobs will perform are as follows: After the site visit and data collection phase Jacobs shall prepare the 90% Construction Documents setting forth in detail the requirements for the construction of the project. During this work phase, we will prepare all required construction documents for permit and construction of the building. We will provide detailing for the completion of the building. This work effort will include architectural,structural,mechanical(Plumbing and HVAC)and electrical plans. Documents shall be revised to include the following for the additional scope of work: • Life-safety plans to show exit strategy,rated doors,emergency wall openings and ramps. Fire extinguishers, emergency lighting,exit signs, smoke and fire dampers,and other life safety-equipment relevant to the facility shall be indicated by symbol. • Floor plans including: All dimensions and any target notes explaining the extent of work, wall types, or other component,assembly or direction regarding the construction for the new scope. • Reflected ceiling plans. • Room finish plans. • Exterior elevations showing location of the rain water leaders, openings and light fixtures. • Interior elevations showing revised restroom,pet relief area and additional departures lounge elevations. • Building and wall sections to establish vertical controls and construction types for the Project. • Interior signage to include room identification, emergency exiting and equipment signs, and any other items pertinent to the identification of the project. • Room finish schedule coordinated with the floor plans. • Structural Engineering foundation plans, structural schedules and details. • Structural analysis and calculations. • Fire Protection Engineering: Detail of Fire Protection(suppression and fire alarm)design. • Mechanical Engineering: Detail of HVAC system to communicate the design intent and coordination with other disciplines. Detailed design of water and sanitary lines for the additional stall at women's room and reduction in size of the pet relief area. • Electrical Engineering:Drawings for lighting, including circuiting and luminaire identification and switching. Convenience outlets and circuiting. Power systems and equipment. Panel schedules, applicable installation details,general legend and abbreviations. • Security Design:Provide new hardware,access control and video surveillance for the new exterior access/delivery vestibule. System shall be designed to be compatible with the existing security and access control systems at the airport. • 90%construction order of magnitude cost estimate. Services for Article B will be provided under a lump sum basis. Article C—100%Design The specific tasks Jacobs will perform are as follows: Page 2 of 4 Based on the approved 90%Design Phase we will prepare the bid and construction documents for permit and construction of the building. We will finalize the construction documents and incorporate final owner comments from the 90% review. The construction documents will include signed and sealed architectural, structural, mechanical (Plumbing and HVAC) and electrical plans. Documents shall include the following final drawings for the additional scope of work: • Life-safety plans to show exit strategy,rated doors, emergency wall openings and ramps. Fire extinguishers,emergency lighting, exit signs, smoke and fire dampers,and other life safety-equipment relevant to the facility shall be indicated by symbol. • Floor plans including: All dimensions and any target notes explaining the extent of work, wall types, or other component,assembly or direction regarding the construction. • Reflected ceiling plans including all discipline coordination. • Room finish plans coordinated with finish schedules and interior elevations. • Exterior elevations showing location of the rain water leaders, openings and light fixtures. • Interior elevations showing revised restroom, pet relief area and additional departures lounge elevations. • Building and wall sections to establish vertical controls and construction types for the Project. • Details of the following: Door jamb,head and sill conditions. Wall types. Window head, sill and jamb conditions.Interior signage to include room identification,emergency exiting and equipment signs,and any other items pertinent to the identification of the project. • Room finish schedule coordinated with the floor plans. • Structural Engineering foundation plans, structural schedules and details. • Structural analysis and calculations. • Mechanical Engineering: Detail of HVAC system to communicate the design intent and coordination with other disciplines. Detailed design of water and sanitary lines for the restroom and pet relief area modifications. Coordination with other disciplines. • Fire Protection Engineering: Detail of Fire Protection(suppression and fire alarm)design and coordination with other disciplines. • Electrical Engineering: Drawings for lighting, including circuiting and luminaire identification and switching. Convenience outlets and circuiting.Power systems and equipment. Panel schedules, applicable installation details, general legend and abbreviations. • Security Design:Provide new hardware,access control and video surveillance for the new exterior access/delivery vestibule. System shall be designed to be compatible with the existing security and access control systems at the airport • 100%construction order of magnitude cost estimate. • Services for Article C will be provided under a lump sum basis. QUALIFICATIONS AND ASSUMPTIONS For the purpose of providing a stipulated fee amount, this proposal has been based on the following qualifications and assumptions: Page 3 of 4 • Design shall be based on previously approved planning / schematic design documents attached. See attached exhibit B. • Proposal is based on the existing electrical systems having adequate capacity to properly serve the renovation and addition.No major modifications to the existing electrical systems are included in this proposal. • Services do not include"design to cost".Jacobs will assist the owner in evaluating and offering cost reduction strategies as requested by client.The "design to cost"is basically noting that if Jacobs receives direction from the client or one of its sub-consultants on how to design the project and if any changes are required due to the project being over budget,then the re-design required to bring the project back within budget is not a part of the lump sum fee and shall be treated as additional services. • Any cost estimates provided by Consultant will be on a basis of experience and judgment. Since Consultant has no control over market conditions or bidding procedures, Consultant does not warrant that bids or ultimate construction costs will not vary from these cost estimates. • Construction Administration services are not included. • Any Services not described in the scope of work are not included. Items identified as not included or limited in the scope of services can be provided or expanded upon as additional services under a separate agreement or supplemental to this agreement. COMPENSATION See attached spreadsheet. Direct project expenses will include printing, presentation material, travel, travel related costs, delivery, research fees, photography and other costs directly associated with the performance of our work shall be billed at cost. SCHEDULE We anticipate completion of the deliverables in accordance with the following schedule: The overall duration of this effort will be as noted below: Item Duration A. Data Collection Site visit 10 business days B. 90%Design 60 business days from site visit. C. 100%Design 25 business days from approval of the 90% Design Submittal. Page 4 of 4 4- — V 4— �.,..—, _I RESTAURANT 144 I ‘RTURE GATE DEPARTURE GATE DEPARTURE GATE DEPARTURE GATE ® IneI MI II - - - - : " - - - : ❑ EEO Off: ❑ HOLDI It I/ W C NM EE NEE �Ell (/: Mid NM HOLD®OM • Elii 17=F EE c i. NEN Ell EE l `II EXISTING RETAIL SPACE 01, I tam , o CCCC CCCCI❑CCC2J III .. �� NA _ r�� _ 00 oO . 1/ J :PAGE , �, 11 El NEW HOLD • - STAI' 1 ROOM ~' "r; R'IGE.. IN MI NO IMI ——7 . ..o" • I 01 A �_— ❑ ❑ •• • • • ' u'(0 (� .- Ala? _�, L I —- I — -1 LEGEND � I _ I _ 4 PATH TO FOLLOW N NEW HOLD ROOM • OPROPOSED FLOOR PLAN(fW 700 SF �E 55 SEATS CLIENT: PREPARED BY: sl�rxuemm }, KEY WEST INTERNATIONAL AIRPORT J�COBS DEPARTURE HALL �_. ., . ;0 MONROE COUNTY DEPARTMENT OF 3750NW871h AVENUE,SUITE 750 RENOVATIONS -PLANNING' A e AVIATION MIAMI,FLORIDA 33178 EXHIBIT 3491 S.ROOSEVELT BLVD. E`r c TEL:305.718.0599 • B KEY WEST,FL 33040 Designed by:KR scale: �;f TEL:305.809-5200 FAX:305.718.8077 ' WWW.MONROECOUNTY-FL.GOV H'Jacobs.cDm Drawn by LP FLORIDA Ecmm.CcoxaoxA LICENSEoaccooiio ROma ENOINtFneo cexnncwTEAuTHOWAnon nvr Checked hy: Date:11.2ri.2111ri JACOBS ENGINEERING GROUP 03.14.19 Monroe County Airport: Key West International Airport Project: Departure Hall Renovations-Restroom and Pet Relief Station Design (12/15-21) Supplemental#1 -12/15-51 FEE SUMMARY BASIC SERVICES Hours Fee PHASE 1 ArticleA: Data Collection 122 $ 19,388 Article B: 90% Design 451 $ 63,355 Article C: 100% Design 223 $ 31,287 TOTAL BASIC SERVICES LUMP SUM PROJECT FEE 796 $ 114,030 SPECIAL SERVICES Hours Fee One Architectural'Rendering-Eye Level at Curbside 5,000 TOTAL SERVICES LUMP SUM PROJECT FEE $ 119,030 Page 1 of 4 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Departure Hall Renovations-Restroom and Pet Relief Station Design(12115-21)Supplemental#1-12115-51 Article A:Data Collection Sr. Sr. Sr.FP/ FP/ Sr. Sr.Project Sr.Project Project Structural Stuctural Mechanical Mechanical Electrical Electrical IT/Security WORK ITEM Manager Architect Architect Engineer Engineer Engineer Engineer Engineer Engineer Engineer Clerical TOTAL I Coordinate kith Client(Initial 2 2 Meeting) 2 Prepare for and Perform site visit 20 20 20 20 20 20 120 TOTAL HOURS 22 0 20 20 0 20 0 20 0 20 0 122 RATE S 174.00 S 169.00 S 112.00 S 135.00 S 90.00 S 135.00 $ 75.00 S 17100 $ 97.00 $ 225.00 $ 54.00 -- PAYROLL ESTIMATE S 3,828 S - S 2.240 S 2,700 S - S 2.700 $ - $ 3.420 $ - S 4.500 $ - $ 19,388 Task Subconsultants TOTAL PAYROLL S 19,388 Expenses Lump Sum Fee Total $ 19.388 Task Expenses: TOTAL FEE $ 19,388 2 of 4 • JACOBS ENGINEERING GROUT JOB HOUR AND FEE ESTIMATE Monroe County Airport: Y West Inteenabond Arrport Project Departure Hall Renovaoonl•Res noon and Pet Relief Sta0on Design I12215-211 Supplemental el-1LIS•51 Sr,ON Sr.Project Sr Project Project Sr.Suter al Sleudural Mee aa1Fnp Meehan4alLegl Near., FP B.O.399, Sr.IT/Security 33 ORA1:,6 111 Manager lrchrtert Architect T.apan m EnRlnerr neer n Eaglnee .01.er Engineer Clerked TOTAL Generalb.0 General No , bmiatione b Cole info 2 General Ill • 3 General Ra Reference Nrc flat III 0 a Life Salem Pia III 1 a t 1 .anNlsnral Flan Plea III 2 1 24 21 6 Arthitectral Rand.Ceding flan 111 1 12 IA t ARNO .Roma Flub Ram(1) 1 a 9 I Arthitcoral Roof Rae(D I a 9 9 Building Seolan(l) I 16 It 10 Wall Sectrm IN 1 24 (I Architectural Exterior Elevations 111 I (6 IT 12 ArtNtatmallnlerior El0atio9(1) 1 I 9 II Schets.(2) 1 4 S 14 OaaY0 0) 1 16 11 IS Structural Fmmdsa Plea 111 30 30 16 SmaturG Reef Frame.Plan(I) 20 21 11 Strucvd Waleae DOAN dal 10 11 11 hkchariw Flan 111 am Y 19 FIcalue.d Schcdda seal Details(4) - 3 20 PlumHng Rn111 ! g 21 Plumbing S.h1JWa anal lkIile(a) I 22 Electrical Nmu Rn1H 16 - le 23 Elauriul Lighting Hen NI 16 _ II Elearixal ScheOfa,Rica and Doer's26 (!) I 11 25 Fire Sprinkle Plat IN 6 6 12 26 Fire Sprialer DOW.(I) 2, F.Nam Ras01 2 2 4 29 Fire Mane°Hils0) I 30 TT Security Der(II a 1 31 R.Seciaire Dab O) I g 32 Develop 90••Spci0cson I 1 33 Develop 90,Cog estimate I 10 Swmnl.WM1ru and Cal-Morse 0 Prepare for and Kona sec,m Awls" If eubdmat ole r and pr .:Pagreaa 11maW1-. 2 2 _ a - If Amend inn 36 'HOovner/I attnende o sllie n ong l 3 I 2 _ 1 3 lg nmJees by rchuml Jl Coordinate anddinibur3 pans 4 4 38 Preparbee of Hdb Baerb 4 4 39 QAQC I 4 4 I 1 4 26 tl Prepare for aedamd Jint mice 12 (2 24 meeting 41 Adbas[dial Comma. 2 1 1 3 TOTAL HOURS 30 It 153 N 52 61 13 21 0 451 RATE 5 17100 5 16900 5 112LN S 13900 3 WOOWOOS 135.00 5 00 5 Ill.00 S 97.00 S 22900 S 5100 PAYROLL FSTDIATY 5 5120.00 5 64100 S 17.0600 S 9.11000 5 - S 9020.Io 5 Io0m S 11,623.00 S I,16100 S 4,725.00 S - S 63J55.04 rI 4 IS35Yft TOTAL PAYROLL S 61JSe Sukconsulunts S - EiPrum S Lump Sum Tee foal S 63,355 TOTAL FEE S 63.350 3W1 • JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport'. Y VVe st International Airport Protect: Departure Nall Renovations-Rest,ram and Pa Relief Station Design 112/1S-211 Supplemental H-12/16-51 burl.C.Ion°/.D..mm Sr Sr.FP/ Sr.Project Sr.Project Project Sr.Sruaural Sntcdurel Alerbanical1npn Mechanica1940 EUHION 99/Hatfield Sr R'/Seamrity .WORRIED/ Mrafrr Architect Architect Hoarser Engineer ter - tear Engineer Engine. Fwpaaer tiered TOTAL I Title 36m11/ 0 2 C e Abbrev iation.l Code info0 A31 3 Ceara!Row A Site H111 I d e I 4 Life Safety Plan III I _ 3 5 Architectural Floorly II/ I I v 10 6 NdtcErd Rd4+d OOP Re(I) I l .4dncnral Room Feed Nan l I) f Arcbitslv.I Roof Plm 111 I 9 Building Sanaa II/ I S 10 Wall Sectioml2I I I Y N d.t Atcv.tl Erma Elevations 111 I a 5 12 Ndileaval IMia Ekuation011 I J I 13 ScladWal21 - 2 14 Details 141 I 0 9 15 StauN+l FBWaion Rae III It 15 16 Stavnal RoofFnany RmIN IS IS Il Smamal Sddules&DeaYl.) 10 1• If Akokosieal Plan III I 1• 19 Aleeluul Schedules and Main 141 0 20 Medan Plan III 4 4 21 Plumbing Scbdub ad Debi,141 0 22 Electrical Power Plan(I) 4 2 6 2 Elcninal Lighting Mae lD 4 2 6 24 Eleanal Sdmdda.Rms ad Main 14) 2 25 Fire SpridJrr Plan 111 3 3 6 26 Fee Sneakier Main I II I 27 Fire Alarm Rao(II I I 2 29 Fire Anm0et1Y III • ITIScv4y Rao 11/ 2 2 31 IT'SeuryDev,Y 0) 2 2 32 Develop tar.Spmfaaiom 2 2 33 Develop 1005.CM mWa 2 2 34 Slrumal Analysis andCalcdviom I 33 Propere fad a aped meeting to Moms 2 2 _ 2 2 la mMmiml and prnjat place.(Intemall•2 36 Maid 111Deign Cwndntinn mating with 2 2 2 2 2 2 14 ovine(by lawn) 37 Coordinate and distribute plan 2 4 6 35 Q4.QC 2 2 4 2 2 _ 2 16 39 Adds Clines Common 1 1 2 I 1 I 1 0 40'Addr a.permatrts am4 I ♦ 1 1 1 1 IJ TOTAL NOIRS 14 Il 74 40 0 If 4 24 0 16 0 223 RATE S 11400 S 169.00 S 11100 S 131.00 S 90.00 f 13100 5 75.00 5 111.00 5 97.00 S 225.00 S 54.00 PIYROLLESTOLSTE f 2436.00 S 057300 S 0.22200 S 6.4roA0 5 - 5 2430.00 S 300.00 6 4104.00-S T6.00 S 3.600.00 S - S 31.202.01 Ta.4 F.00nam. TOTAL PAYROLL S 3E267 Subcoudts6 S - Expensesf Lump Sum Fee Taal S 31.207 TOITAI.FEE S 3t.2271 Pape 4 el4