Loading...
Task Order No. 09/DSR No. 5A 06/01/2019 • MEMORANDUM _= OFFICE OF THE COUNTY ATTORNEY "-ems 1111 12°'Street, Suite 408, Key West, FL 33040 Phone (305) 292-3470/Fax (305) 292-3516 TO: Pam Hancock Deputy Clerk FROM: Abra Campo Executive Ad istrator DATE: July 2, 2019 SUBJECT: BOCC Meeting 7/18/18; Approved Agenda Item D2 (4357) D. HURRICANE IRMA RECOVERY—Page 5 D2 SUSTAINABILITY: Approval to enter into a contract with the#1 ranked vendor, Adventure Environmental, Inc., in an amount not to exceed $35 Million, for removal of marine debris created by Hurricane Irma from canals in unincorporated Monroe County, City of Marathon and Village of Islamorada; also, authority to negotiate and enter into a contract with the next highest vendor(s),.in rank order, if necessary. Enclosed: One (1) fully executed of each Task Order listed for BOCC records. Task Order#9-DSR 3 Task Order#9-DSR 5A Task Order#10-DSR 5B s '�? Vo."1 Memorandum -_ RECEIVED To: Monica Rod . uez, CAD #1 JUL — . 2019 From: nda MONROE COUNTY ATTORNEY Date. June 26 019 Attached please find the Marine Debris June Task Orders from the marine debris vendor AEI. These are being processed after the fact as AEI was late in submitting them. Note the task '�� orders authorize work in Big Pine, Marathon and Islamorada. r 1. Please have Roman or his designee review and sign the 00000/10 w task orders. R - LA2°141 w 1/ 2. Forward them with this memo to Abra Campo, so she can provide them to Cynthia Hall to review and stamp. 3. The originals then need to be sent to Pam Hancock in the Clerk's office, with an electronic copy sent to me. Thank you. / 1 1 Jr" die ,, ' / Jr Fir /del er Joe .. Recipient Name ,..-u-if T. Your Name W: Other recipients TASK ORDER NO.9 FOR DAMAGE SURVEY REPORT (DSR) NO. 5A FOR SEDIMENT REMOVAL SERVICES BETWEEN MONROE COUNTY AND ADVENTURE ENVIRONMENTAL, INC. FOR MONROE COUNTY HURRICANE IRMA EWP - SEDIMENT REMOVAL In accordance with the Agreement for Marine Debris and Sediment Removal Services as a result of Hurricane Irma made and entered on the 18th day of July, 2018, between Monroe County hereinafter referred to as the "County" and Adventure Environmental, Inc. hereinafter referred to as "Contractor". All terms and conditions of the referenced Agreement for Marine Sediment Removal Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective on the 1st Day of June 2019 and will terminate no later than the 30:n Day of June 2019. In accordance with Article II Scope of Basic Services, Paragraph 2.1, the Scope of this Task Order is as follows: The scope of services will include Sediment Removal and Disposal (Load and Haul) of or anic, silt and sand from the USDA-NRCS eligible canals within the DSR#5A area frorr Islamorada. See Exhibit A-1 for work plan and location maps. In accordance with Article VII, Paragraph 7.1 Contract Sum, the Contract Sum of this Task Order is as follows: The Contractor shall be paid based on rates negotiated and agreed upon and shown in the Pricing Schedule in Attachment B of the agreement. The estimated quantities and equipment allocation for the DSR are based upon review of aerial maps, bathymetric surveys, and representative site visits. See Exhibit B-1 for estimated resource allocation and June estimate for DSR#5A. The County shall pay the Contractor a not to exceed amount of Three hundred and five thousand and zero cent Page 1 of 2 MONROE COUNTY HURRICANE IRMA EWP-SEDIMENT REMOVAL June 2019 `,�►►uuuii,��, IN WITNESS WHERE, Qh�� �t�V �}lsed the Task Order#9 to be executed by its duly authorized represents @....•.w ...ti ij� eOAPOq (Seal) - 2.10 CONTRACTOR: Attest: : >i SEAL "1 r c p ; 1 ` ADVENTURE ENVIRONMENTAL, INC. ¢6 G� 1 1 4. Y�8 {g9f� � By: ( llC.[Q'�� i °0A19 ee/ / `� � � Da 1.� Date ` ate Oilier"Jeynintgir / ( rc SS0 /1 Title Print Nt ie itle WOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC. By: f 06/11/2019 Date VILLAGE OF ISLAMORADA CITY MANAGER By: L�--lam 6 /3 Seth Lawless Da e MONROE COUNTY DIRECT•R SUSTA ' ABILITY AND PROJECTS �v (l. Rhonda Haag ' Date MONROE COU • COUNTY AD NI TRATOR MONROE COUNTY ATTORNEY APPROVED AS,TO FO M • 02 /0/9 Date: By- 1n ra or (l`2 Roman Gastesi Date Page 2 of 2 MONROE COUNTY HURRICANE IRMA EWP-SEDIMENT REMOVAL June 0, 2019 EXHIBIT A-1 Work Plan and Location Maps :,t• r - BOARD OF COUNTY COMMISSIONERS County of Monroe ' Mayor Sylvia Murphy,District 5 s" Mayor Pro Tem Danny Kolhage,District 1 The Florida Keys - Commissioner Michelle Coldiron,District 2 Commissioner David Rice,District 4 Commissioner Heather Carruthers,District 3 Proposed Work Plan for the Monroe County Hurricane Irma EWP - Canal Sediment Removal Prepared for: USDA/NRCS 2614 NW 43rd Street Gainesville, FL 32606 Prepared by: Wood Environment & Infrastructure Solutions, Inc. 5845 NW 158t' Street Miami Lakes, Florida 33014 Grant Agreement Award No.: NR184209XXXXCO27 I. INTRODUCTION Provide all labor, supervision, engineering, materials, supplies, equipment, tools, transportation, surveying, layout, and protection for the proper execution and completion of all the work in accordance with the Contract Documents. The Work shall include but not be limited to that shown on the plans and detailed in the quality assurance plan and technical specifications. All work shall be conducted in accordance with all applicable local, state, and federal standards and regulations. II. SCOPE OF WORK The Scope of Work for the canal sediment removal activities located in DSR#3 (Big Pine Key), DSR#5A (Islamorada), and DSR#5B (Marathon) consists of mechanical dredging to remove the sediment accumulation relating to Hurricane Irma. The utilization of the mechanical system will result in the collection of a slurry from the canal bottom comprised of sediment and saltwater. The vessel-based dredge excavates and places the material in a dedicated dewatering area. The contractor will utilize a passive dewatering system to handle the dredged material. The dewatering system will be located either in the canal on the barge or within the upland staging area adjacent to the canal. Once dewatered the material will be transported to an approved upland disposal location dependent on the chemical characteristics of the material. The Contractor must install temporary construction fencing, consisting of jersey barriers and construction fencing or equivalent, around the staging area(s) and remove the fencing upon completion of the project. The Contractor shall return all staging area property to its original condition or better which includes re-grading and re- sodding of disturbed areas. The County will obtain the USACE, FDEP, FKNMS, and County permits. The Contractor will be responsible to obtain any other necessary permits not identified by the Engineer. Use of private homeowner land may require a Temporary Use approval. The Contractor is required to submit a Construction Methodology Plan (CMP) to Monroe County, including a Maintenance of Traffic (MOT) Plan (including a truck hauling plan) for approval prior to initiation of construction. Given the dense layout of the communities surrounding the project area, the Contractor shall be cognizant of the logistical limitations of dewatering the dredged material and transporting fill material in the space provided in the designated staging areas. Additionally, the Contractor shall be aware of the necessity to take care during the removal of the sediment so as to not damage the boat lifts present in the canal or any other privately-owned property. Damage caused by contractor to privately owned property will be a liability of the Contractor not the engineer or the County. Florida-EWP Page 2 of 6 April 2019 The Contractor shall be cognizant that the information provided regarding surface elevations on the construction documents is an approximate estimate, and that even though the sediment thickness values are a direct observation; no guarantee is made to the accuracy of the data. Therefore, the contractor shall obtain a pre-bathymetric survey to compensate for any potential errors or lack of precision in the presented sediment volume and surface elevation information. The sequence of Major Activities are as follows: 1) Relocation of recreational vessels (if needed) 2) Inspection of the canal for the presence of T&E species 3) Establishment of the dewatering staging area 4) Mobilization of the mechanical dredge to the project site at high tide 5) Installation of the turbidity barrier at the mouth of the canal 6) Mechanical dredging of sedimentation 7) Discharging of low turbidity effluent back into the canal 8) Disposal of dewatered dredge material 9) Sponsor monitoring firm will confirm that the contractor has dredged to the prescribed elevations as shown on the plans and specifications 10)Allow settlement of canal water to ensure turbidity at canal mouth does not exceed 0 NTUs above background. 11)Demobilization of dredge 12)Restoration of the dewatering staging area 13)Remove erosion and sediment control measures. III. MATERIAL TO BE REMOVED The material to be removed is generally comprised of sand and silt. The Contractor shall complete physical and chemical analysis on the material prior to construction commencement to determine the most efficient and economical methodology for the removal and disposal of the material. The Contractor and Engineer will communicate on the quantity and location of the sediment to be analyzed to ensure it complies with all local, state and federal guidelines. IV. ARTIFICIAL OBSTRUCTIONS The Contractor shall identify all existing utilities on site before construction commencement to ensure no impacts. Additionally, the contractor shall identify and segregate all artificial obstructions within the canals that may impair the dredge equipment such as vegetative or construction and demolition debris. V. QUANTITY OF MATERIAL The Contractor shall independently estimate the sediment quantities to removed based on the pre-bathymetric survey, plans and the Contractor's independent site investigation of existing conditions. An initial estimate based on limited bathymetric data is shown in the Florida-EWP Page 3 of 6 April 2019 plans for each canal, however this figure should be used as guidance only; actual, estimated volume determination will be the responsibility of the Contractor. Prior to commencement of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. This will be classified as the pre-bathymetric survey data obtained by the contractor's surveyor. The Engineer will review this data and provide the Contractor with a proposed elevation for dredging limits based on the pre-Irma canal bottom elevations for the project area. The pre-Irma canal bottom elevations will be used as the controlling elevation for the specified area approved for sediment removal The Contractor shall take progress soundings or sweepings to verify compliance with plans, specifications and work plan. The Sponsor will use this data to verify that the Contractor does not dig below the pre-Irma canal bottom elevation. Contractor is responsible for quality control. Sponsor is responsible for quality assurance. On completion of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area using the same locations of the pre-bathymetric survey. This survey data will be classified as the post-bathymetric survey data obtained by the contractor's surveyor. The post-bathymetric survey shall be compared to the pre- bathymetric survey to demonstrate that sediment has been dredged to the pre-Irma canal bottom elevations as shown on the plans. The Contractor is allowed a +/- 6-inches dredging tolerance from the pre-Irma canal bottom elevations. As part of the Quality Assurance process, the quantity of volume removed will be compared to the pre vs. post bathymetric survey analysis and the calculated field volume by the monitor utilizing the capacity of the trucks/roll offs and percentage full of sediment. The volumetric analysis calculation between the pre versus post bathymetric survey, completed by the Sponsor, will be used as the method of measurement and payment. VI. ENVIRONMENTAL PROTECTION REQUIREMENTS The Contractor shall provide and maintain during the life of the contract, all necessary environmental protective measures. The Contractor will comply with Federal, State, and local regulations pertaining to water, air, and noise pollution. VII. DREDGE EQUIPMENT The Contractor shall utilize mechanical dredge equipment to remove the sediment. The Contractor shall be aware that removal rate may be constrained by the sediment dewatering rate and area and shall implement the appropriate equipment accordingly. Florida-EWP Page 4 of 6 April 2019 The Contractor shall maintain the plant, scows, combings, barges, pipelines, and associated equipment to meet the requirements of the work. Immediately repair leaks or breaks along pipelines. Immediately remove dredged material discharged in wetlands or other areas outside of the identified project area due to leaks and breaks. Removal of material shall bring the impacted area back to original condition and shall be conducted at Contractor's expense. Operations shall be immediately halted if a pipeline breaks or a leak occurs. Except where authorized in the plans and specifications, dredge pipelines or open ditches shall not block roads or Rights of Way (ROW) or otherwise interfere with access unless approved. VIII. DEWATERING OF EXCAVATED MATERIAL The Contractor shall implement a passive dewatering system. The passive dewatering system is dependent on the material consistency. The Contractor shall provide the Sponsor a dewatering plan for review and approval. It shall be noted that the final hauling weight of each load (load = sediment + truck + trailer) is not to exceed Standard Highway Loading rates or a gross weight of 11,000 ton/axle, whichever is less. The effluent from the dewatering system will be discharged back into the canal. The Contractor is required to operate the dredging and dewatering operations such that mandated permitted turbidity limits are not exceeded. The State turbidity requirements are 0 NTU increase above background levels in the Florida Outstanding Waters outside the canal mouth. The Contractor will make any required adjustments to the operations to ensure compliance with these limits. The monitor will measure the turbidity throughout the project to ensure compliance with permits using a Hach 2100Q portable turbidity monitor, or equivalent. IX. DISPOSAL OF EXCAVATED MATERIAL The Contractor shall provide for safe and legal transportation and disposal of dredged materials according to plans, specifications and quality assurance plan. The deposit of dredged materials in unauthorized places is forbidden. Spoil material inadvertently spilled on roads,public ROWs and private property shall be promptly removed and the area restored by the Contractor. The dredged material may not be disposed of under an unrestricted use scenario. Therefore, the Contractor shall provide their proposed method of disposal, dependent on the chemical analysis for the dredged material to Engineer and County for approval. The tentative final disposal locations are as follows: Landfill: South Dade Landfill 23707 SW 97th Ave Homestead, FL 33032 Florida-EWP Page 5 of 6 April 2019 Beneficial Reuse: Florida Keys Country Club 4000 Sombrero Blvd. Marathon,Florida 33050-0969 X. MEASUREMENT Surveys prior to Work 1. Prior to commencement of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. Surveys during Progress of Work 1. Preliminary checks of design depth will be determined by soundings or sweepings taken behind the dredge and barge as the work progresses. The Contractor shall take progress soundings or sweepings to verify compliance with plans, specifications and quality assurance plan requirements. Final Examination and Acceptance: 2. On completion of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. The post-bathymetric survey shall be compared to the pre- bathymetric survey to demonstrate that sediment has been dredged to the pre-Irma canal bottom elevations as shown on the plans. To assure excavation to the minimum depths, the Contractor is allowed a +/- 6-inches dredging tolerance from the pre-Irma canal bottom elevations so as to not impact hard bottom. Florida-EWP Page 6 of 6 April 2019 • I I 2 I 3 I 4 1 6 1 S I 40 — , -• Ng %-- GENERAL SCOPE OF SITE WORK t,, T,,._ ''FOR USDA NRCS EWP GRANT NO. NR184209XXXXCO27 `�h� ` wood.SEDIMENT REMOVAL POST HURRICANE IRMA FOR �� �� ENVIRONMENT& ' 114FRA3 TRUC TURF SOLUTIONS,INC — 10 RESIDENTIAL CANALS IN BIG PINE KEY, CITY OF MARATHON `�+. tt�� \ NBAAS M NAKESW 58THSIR,FLE(' �� TEL (305)1326-5588 AND VILLAGE OF ISLAMORADA PRO.ECT LOCATIONS MONROE COUNTY, FLORIDA ! e 0 ATTENTION 5 DIRECTED TO TM FACT TINT MESE RUNS MAY HAVE BEEN CHANGED IN C� 'fin` SIZE BY REPRODUCTION. MR MOIST BE CONSIDERED WHEN OBTNNING SCALED CAUL W' (JX 1. SEDIMENT REMOVAL COVER SHEET mE251 PARTIAE08 A CT DEVELOPMENT 04 08 OUNTY PUBLIC WORKS MANUAL DATED SEPmIBER 1963; 2. SEDIMENT REMOVAL — CANAL #148 — DSR5A FLORIDAORI KDsSNA`NT MPN.IwaNESSµCTUALNnY(DINMS)(`DEp)' 3. SEDIMENT REMOVAL - CANAL #157- DSR5A Ir.IT�E SEwES ° s MIOSi RE(US WC NE SIC MP E5. - 4. SEDIMENT REMOVAL - CANAL #257 -DSR5B 5. SEDIMENT REMOVAL - CANAL #268 -DSR5B 6. SEDIMENT REMOVAL — CANAL #269 —DSR5B CANAL LOCATIONS TABLE 5- ti 7. SEDIMENT REMOVAL — CANAL #282 —DSR3 CANAL • LATITUDE LONGITUDE Ro Ec' 8. SEDIMENT REMOVAL CANAL #293 -DSR3 m 148 LOWER MATECUMBE KEY 24.869326' -80.704148' MONRO9. SEDIMENT REMOVAL - CANAL #297 -DSR3 i 157 LOWER MATECUMBE KEY 24.852399' -80.734650' COUNTY C 10. SEDIMENT REMOVAL - CANAL #299 -DSR3 iFCFND HUURRICARRICA NE IRMA - 11. SEDIMENT REMOVAL - CANAL #300 -DSR3 257 MARATHON 24.697964• -81.079708' EWP-PHASE III 12. SEDIMENT REMOVAL DETAIL SHEET (—J CANAL FOOTPRINTS SEDIMENT REMOVAL BIG PINE KEY (DSR#3) 268 MARATHON 24.691252' -81.079741' LOCATION MAP 269 MARATHON 24.691880' -81.081228' SPONSOR 282 BIG PINE KEY 24.684035' -81.355360' ® 293 BIG PINE KEY 24.674409' -81.342066" 0 ® ® - • 297 BIG PINE KEY 24.673093' -81.340948' 'N • 299 BIG PINE KEY 24.672419' -81.340753• t . - 300 BIG PINE KEY 24.671803' -81.339915• 00 DATE REVISIONS ETT MPROIED • ` SUNSHINE 811 CALL BEFORE YOU DIG *17 ® 1-800-638-4097 - ISLAMORADA (DSR#5A) MARATHON (DSR#5B) 1. CALL I-ROD-635-4O97 TWO FULL BUSINESS DAYS(BUT NOT MORE THAN ENE) BEFORE DIGGING TO FIND OUT WHERE BURIED FACILITIES(ELECTRIC,CAS, LOCATION MAP LOCATION MAP TELECOMMUNICATIONS.CABLE WATER.SEWER)ARE IOGTEO DESK VIED BY GWC 2. WAIT THE REQUIRED TIME FOR THE UTILITIES ON STE TO BE LOCATED AND WAKED No,BY. GWC MM COLOR-WOED PALM,FLAGS OR STAKES AND CONBRM TNT THE SITE WS BEEN LOCATED CHECKED BY. RN 3. RESPECT AND PROTECT THE MARKS W ARE RING THE PROJECT,II MWKS E APPROVED BY. RH DESTROYED,REQUEST A NEW LOCATE TICKET. DATE. 10/01/I0113 4. DIG SAFELY,USING EXTREME CAUTION WHEN DIGGING WITHIN 24 INCHES ON EITHER SHEET TITLE A P R I L 2019 SOF OF THE MARKS TO AVM NOTING ME BURIED OUT'LINES A SEDIMENT REMOVAL COVER SHEET N- - SMEET NUMBER REV R 1 OF 12 SHEET OF SHEETS I 1 2 I 3 I 4 I 5 I 5 I 1 1 2 I 3 1 4 1 5 1 8 1 tit 0** . r'''. , f w. 114 4 ilit‘, ,,, 4, • aver Motecumbe Key �' � ' wood. , „ 'CANAL #148 DSR#SA ISLAMDRADA i �r-..u_A.::.r. :: ENVIRONMENT h INFRASTRUCTURE 1 SOLUTIONS,INC. 5545 NW 158TH STREET - - �'- MIAU LAKES,FL 33014 l t TEL (305)826-5588 e ; e��' - \ APPROVED SEDIMENT REMOVAL AREA O �1. \\ FROM STATION 2+00 TO 5+25 / � A.4�i .!8 I FCFun `,( �`, •' 1 'I PROPOSED SEDIMENT REMOVAL AREA s / \ \\ I I •V POTENTIAL UPLAND STAGING AREAS / \ \ \ ' X y', •� T.MONROE COUNTY PARCELS, 2010 \ ,,s,FLOATING TURBIDITY BARRIER PROJECT: \ \ MONROE COUNTY HURRICANE IRMA - C ► W EP-PHASE III A SEDIMENT REMOVAL \ \ \ \ \ • \ / SPoNsoa \ \ \ \ \ \ / \ \ / \ \ \ \. \ \./ \ \ -- Sediment Volume Sediment Removal Acummulation Post I 1 \ '. Canal# DSR# Canal Area(Sq ft.) Area(Sq ft.) Irma(CY) ' 148 LOWER MACUMBE KEY SA 48436.97 13461.1 498.56 TIMID PRE HURRICANE IRMA NO DATE By RENSI IV APPRDYEO CANAL BOTTOM B __„ -r_ POST HURRICANE IRMA V. CANAL BOTTOM -- HURRICANE IRMA I I SEDIMENT APPROVED REMOVAL AREA ,es,wy MLLW ELEVATION(-2.08 NO U. - TES: FT NAVD88) 'DESIGNED BY CWC ` I)MEAN LOW LOW WATER(MLLW)ELEVATIONS REFERENCED DRAWN BY: 0WC -e. FROM NOAA TIDE STATION 8723851 CHECKED BY: RH -9" 2)ELEVATIONS SHOWN HEREON ARE REIATME 10 THE NORTH APPROVED BY: RH APPROVED SEDIMENT REMOVAL AREA FROM STATION MEN TO MO23 AMERICAN VERTICAL DATUM OF I988(NAND 88) DATE. TO/O1/2018, 3)THE PROFILE IS JUST A REPRESENTATION OF THE IMPACTS SHEET TITLE. _ -11.0, TO THE CANAL SYSTEM,IN SOME INSTANCES NOT ALL .00 FINGER CANALS ARE REPRESENTED WITH A CROSS SECTION SEDIMENT REMOVAL •A f.a-r.n ROSS-SECTION® SEGMHOWENTTMPACTS AREPART AND ARETHEIOF THE EVALUATION TOH BE CANAL #148 - RESTORED DSRSA 4)CONTRACTOR SHALL ENSURE TURBIDITY OUTSIDE CANAL IS I 0 e I"' 0 NST ABOVE BACKGROUND AT ALL TIMES WRING "SHEET NUMBER. REV.1 CONSTRUCTION ACTIVITY. 5)NO CORAL,MANGROVE,SEAGRASS,OR HARD BOTTOM 2 OF 12 AN IMPACTS ARE PROPOSED FOR THE SEDIMENT REMOVAL `SHEET OF SHEETS ACTIVITIES. 1 I 2 I 3 I 4 I 5 I 5 I 4. 1 1 2 1 3 1 4 1 5 I 6 I •< Lowy Mottrumdr Key `•a r „ft. •. A, ..All.{i��; APPROVED SEDIMENT.REMOVAL AREA i ' DMr �`4mbeKe� • FROM STATION 28+50 TO 31+50 - - IOO� ' - � • T w "+ T -.. ` f: ENVIRONMENT a �! Jyy�\ 7"+ ‘ � ` ' \ INFRASTRUCTURE ,� mac" .I 1r ..' '- _ NSao FRAST u INC. `,s � 5845 NW 1513TH STREET ./f{-� dA ^ j r, LA MI LAKES,FL 3301A W7 . + ` d• Y rtt. TEL (305)826-5588 F-�' I ANAL 14157 - DSR#5A -ISLAMORADA ` � - _ LEGEND 1 i A J" 1111 F— 1 PROPOSED SEDIMENT REMOVAL AREA - 1 T '` K POTENTIAL UPLAND STAGING AREAS d -,,1,' B • III __,MONROE COUNTY PARCELS, 2010 ndI�E �`. a0000 FLOATING TURBIDITY BARRIER • t )' ` APPROVED SEDIMENT REMOVAL AREA op.,. �i C 1� i'i ATi� FROM STATION 9+00 TO 12+00 1 ,r l .r ,�` . ♦ PROJECT: S - MONROE COUNTY tSea- A HURRICANE IRMA - COJe 4 EWP-PHASE III A� `f SEDIMENT REMOVAL e. __ ".", .-__-_.-r- SPONSOR. Sediment Volume Sediment Removal Acummulation Post bs� Canal# DSR# Canal Area(Sq ft.) Area(Sq ft.) Irma(CY) R .A) 00. 157LOWERMACUMBEKEY SA 380278.79 67724.62 2508.32 -I. REVISIONS No DATE BY APPROVED -T'• APPROVED SEDIMENT REMOVAL AREA - -5.. _e.•• FROM STATION 28+50 TO 31+50 - AGESIGNED BY OWE -9. I I.- DRAWN EN GWC u A ` //11111 T .r APPROVED BY'. RH - NOTES: I FC.FNQ DATE. 10/0//2018 13 MEAN LOW LOW WATER(MLLw)ELEVATIONS REFERENCED FROM NOM TOE STATION 8723851 _ -T..• PRE HURRICANE IRMA 5:, HALE. 2)ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 CANAL BOTTOM APPROVED SEDIMENT REMOVAL AREA (NAYD 138) SEDIMENT REMOVAL FROM STATION 9+00 TO 12+00 POST HURRICANE IRMA A 3)THE PROFILE IS JUST A REPRESENTATION OF THE IMPACTS TO THE CANAL SYSTEM,IN SOME CANAL BOTTOM CANAL #157 - - INSTANCES NOT ALL FINGER CANALS ARE REPRESENTED WITH A CROSS SECTION HOWEVER THE DSR5A • IMPACTS ARE TYPICAL WITHIN EACH SEGMENT AND ARE PART OF THE EVALUATOR TO BE RESTORED. HURRICANE IRMA R- -a." I I SEDIMENT REMOVAL AREA 9....Eo 10.•LOB II. 30 12. .00 fi) 4)CONTRACTOR SHALL ENSURE TURBIDITY OUTSIDE CANAL IS 0 MU ABOVE BACKGROUND AT ALL SHEET NUMBER RE TIMES OURINC CONSTRUCTION ACTMTY MLLW ELEVATION (-2.08 R❑SS—SECTI❑N avvve 3 OF 12 — 5)NO CORAL,MANGROVE,SEAGRASS,OR HARD BOTTOM IMPACTS ARE PROPOSED FOR THE SEDIMENT FT NAVE88) REMOVAL ACTMTIES SHEET OF SHEETS I 1 2 1 3 I 4 1 5 1 6 I EXHIBIT B-1 Estimated resource allocation and 30 day estimate for DSR#5A MONROE COUNTY CANAL DEBRIS REMOVAL & DREDGING DSR: 5A 06/01/2019-06/31/2019 TASK ASSIGNMENT REQUEST CANALS ANTICIPIATED FOR SERVICE: 157&148 ✓ ✓ # DESCRIPTION UNIT UNIT RATE EST. MONTHLY TOTAL QUANTITY 001 MOBILIZATION LS LS N/A $0.00 002 NON-HYRDAULIC CY $150.00 1,000 $150,000.00 -I SEDIMENT REMOVAL 003 TRANSPORT CY $45.00 1, 000 $45,000.00 .1 NO ARSENIC 004 TIPPING FEE N/A N/A N/A $20,000.00 -t. 005 TURBIDITY BARRIER LF $100.00 0 $0.00 006 UPLAND DEWATERING DAY $2000.00 20 x 2 $80,000.00 SITE Z Sky SURVEYS AND LAB 007 WORK N/A N/A N/A $10,000.00 TOTAL $305,000.00