1st Change Order 06/28/2019 Mayor Sylvia J.Murphy,District 5 County of Monroe r Mayor Pro Tem Danny L.Kolhage,District 1 The Florida Keys r , Michelle Coldiron,District 2 3' Heather Carruthers,District 3 David Rice,District 4 BOARD OF COUNTY COMMISSIONERS Memorandum DATE: 06/26/2019 TO: BOCC FROM: Kevin G. Wilson, P.E. SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order# 1 for the Stock Island II Roadway Improvements project. This change order increases the final contract sum by $86,264.90. The substantial completion date remains the same. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority. MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER -- --PROJECT TITLE: Stock Island II Roadway Improvements Project CHANGE ORDER NO: 1 INITIATION DATE: 6/20/19 TO CONTRACTOR: Charley Toppino and Sons, Inc. CONTRACT DATE: 3/21/19 The Contract is changed as follows: The original Contract Sum $3,423,967.26 Net change by previously authorized Change Order $0 The Contract Sum prior to this Change order was $3,423,967.26 The Contract Sum is(increased)by this Change Order#1 $86,264.90 The Revised 1 Contract Sum including this Change Order $3,510,232.16 Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the Work shall be determined in one or more of the following: 7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation 7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon 7.2.2.3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee As a result of deteriorated conditions of curb inlets not identified in the original contract documents additional inlets are required as per the Construction Engineering Inspection (CEI)consultant and Monroe County staff. The existing manhole pipe inverts would not work with the new pipe inverts, so the Engineer of Record (EOR) requested to add one additional manhole. The Green Bike Lane striping was not included in the original bid. FHWA guidelines advise green bike lane striping to be applied in areas of vehicular conflict and approved by the Engineer of Record (EOR). Bid item Description Quantity UOM Unit Cost Amount No 101-1A Mobilization 1 LS $900 $900 425-13-51 Inlets, Curb, Type P-5>10 5 EA $5,375.35 $26,876.75 425-13-62 Inlets, Curb, Type P-6>10 4 EA $5,375.34 $21,501.36 425-2-41 Manhole, P-7, <10 1 EA $7,725.00 $7,725.00 711-16-231 Patterned Pavement, Vehicular Area-Green 408 SY $65 $26,520.00 Bike Lane OH&P (10%) Patterned Pavement Green $2,742.00 Bike Lane Total $86,264.90 • This Change Order is 2.52%of the original contract price. • CONTRACTOR Date ENGINEERING SERVIC S IRECTOR /� G.z,S 17 • Date ASSISTANT COUNTY ADMINISTRATO 0)'zyf Date MAYOR Date 6.20.19 Charley Toppino and Sons, Inc. C.O. 1 RSSII 3100 Overseas Highway Marathon Florida - - Monroe County Engineering Department June-4,-2019 Judith Clarke,P.E. 110 Simonton Street Key West,FL 33040 Project:442001-1-54-01 Stock Island II Subject: Change Order#1 The summary of contract dollar changes is shown below: Original contract amount $3,423,967.26 Net change by previous authorized change orders $0.00 The contract sum prior to this change order $3,423,967.26 The contract sum will be increased by this change order#1 $86,264.90 The new contract sum including this change order $3,507,490.43 Below is a detailed description of change order#1; Pay Item 101-1A Mobilization The Green Bike Lane striping was not included in the original bid,which requires addition mobilization.This resulted in an overrun of 1 LS Pay Item 425-13-51 Inlets,Curb,Type P-5>10 Due to the deteriorated condition of the existing P-Top inlets Monroe County decided to replace them. Replacing S-3,9, 13, 17 and one at station 26+00 right.This resulted in adding this new pay which has a quantity of 5 EA. Pay Item 425-13-62 Inlets,Curb,Type P-6>10 Due to the poor condition of the existing P-Top inlets Monroe County decided to replace them. Replacing S-7, 15,32,&55.This resulted in adding this new pay which has a quantity of 4 EA. Pay Item 425-2-41 Manhole,P-7,<10 The existing manhole pipe inverts would not work with the new pipe inverts,so the FOR requested to add one additional manhole.This resulted in an overrun of 1 EA. Pay Item 711-16-231 Patterned Pavement,Vehicular Area-Green Bike Lane This item was not included in the original bid,this pay item is being added to the contract. This resulted in an overrun of 408 SY. Due to the additional work the contract time will be increased by 10 days. If you have any questions or need clarification of the above item summaries, please call Jackson Taylor at 561-436- 2860. Sincerely, Jackson Taylor, Project Administrator,RSH Cc: Judith Clarke,Clark Briggs,Jacki Hart,P.E,File s Sbss tiC HEY WES1 EL~ PRICE QUOTATION Attention:Jackson Taylor DATE: 5/23/19 RS&H 3100 Overseas Hwy -- Marathon,FL 33050 ITEMIZED QUANTITIES Location: Stock Island,FL 0 Scope: Curb Inlet Replacements(as per email dated 5/23/19) Item Description Quantity Units Cost per Unit Line Item Cost Notes -ESTABLISHED RAYITiEMS: ®-®- 425-135-5 Inlets,Curb,Type 5,Partial 5.00 EA $ 5,375.35 $ 26,876.75 425-136-5 Inlets,Grub,Type 6,Partial 3.00 EA $ 5,375.34 $ 16,126.02 Subtotal $ 43,002.77 OH&P(10%) $ - Extended Total $ 43,002.77 Subtotal $ 43,002.77 Performance/Payment Bonds($20.00/Thousand) 1.00 LS $ - $ - Mobilization/Demobilization 1.00 LS $ - $ - General Conditions 1.00 LS $ - $ - Total: $ 43,002.77 Notes: Inclusions: Exclusions: Prepared by: , 4e*" r`442e.ee Estimator .Charley Toppino&Sons,Inc. Sheet 1 of 1 Date: .5/23/19 4211121111111., IOrplf®) &SONS HNC NEY WEST,F; PRICE QUOTATION Attention:Jackson Taylor DATE: 5/21/19 RS&H 3100 Overseas Hwy Marathon,FL 33050 - ITEMIZED QUANTITIES Location: Stock Island,FL 0 Scope: Green Patterned Pavement(as per RFI 002) Item Description Quantity Units Cost per Unit Line Item Cost Notes SUBCONTRACTED WORK _ ®® - Mobilizations 1.0 EA $ 900.00 $ 900.00 Green Bike Lane-Patterned Pavement Coating 408.00 SY $ 65.00 $ 26,520.00 **See proposal for backup Subtotal $ 27,420.00 OH&P(10%) $ 2,742.00 Extended Total $ 30,162.00 Subtotal $ 30,162.00 Performance/Payment Bonds($20.00/Thousand) 1.00 LS $ - $ - Mobilization/Demobilization 1.00 LS $ - $ - General Conditions 1.00 LS $ - $ - Total: $ 30,162.00 • Notes: Inclusions: Exclusions: • Prepared by: ,adua rr�yg,¢4:ee Estimator • Charley Toppino&Sons,Inc. Sheet 1 of 1 Date: 5/21/19 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications.- Yes Z No If Yes, explanation: Engineer of Record (Metric Engineering, Inc) plan quantity error • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5% of contract price(whichever is greater). Yes ® No ❑ If Yes, explanation as to why it is not subject for a calling for bids: Construction in progress. • Project engineer/architect approves the change order. Yes ❑ No If no, explanation of why: Approved by Monroe County staff. • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No El Explain: Sediment Barrier quantities were omitted from the bid documents. 6.20.19 Charley Toppino and Sons, Inc. C.O. 1