Loading...
2nd Change Order 07/22/2019 g"� Mayor Sylvia J.Murphy,District 5 %.1ounty of Monroe � � tz'y Mayor Pro Tern Danny L.Kolhage,District 1 Michelle Coldiron,District 2 The Florida Keys t �j� Heather Carruthers,District 3 David Rice,District 4 BOARD OF COUNTY COMMISSIONERS Memorandum DATE: 07/19/2019 TO: BOCC F fd 1 FROM: Kevin G. Wilson, SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order# 2 for the Stock Island 11 Roadway Improvements project. This change order increases the final contract sum by $132,796.79. The substantial completion date will be increased by 14 days. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority. ONROE COUNTYANGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Stock Island II Roadway Improvements Project CHANGE ORDER-NO: 2 INITIATION DATE: 07/16/19 TO CONTRACTOR: Charley Toppino and Sons, Inc. CONTRACT DATE: 03/21/19 The Contract is changed as follows: The original Contract Sum .$3,423,967 26 Net change by previously authorized Change Order _ $86.264 90 The Contract Sum prior to this Change order was __ _ _ ..$3,510.232 16 The Contract Sum is(increased) by this Change Order#2 _ _$132,796 79 The Revised 1 Contract Sum including this Change Order $3,643,028 95 Pursuant to contract article 7 2,2, the cost or credit to the owner resulting from a change in the Work shall be determined in one or more of the following: 7 2 2 1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation 7 2 2 2 unit prices stated in the Contract Documents or subsequently agreed upon, 7 2 2 3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee Due to the deteriorated condition of Shrimp Road from 5t" Avenue to 1,202 feet south, it was elected to add an additional scope of work to the Stock Island II Project The scope includes: remove existing asphalt, rework existing base, grade full width 542 feet in length, mill and resurface full width 660 feet in length, and restripe the area. This Change Order accounts for a credit of $ (45,600 00) to adjust (24) existing curb drainage inlets and adds an additional (17) inlets to be installed as a result of the deteriorated condition of the existing inlets_ A total of 14 days is added to the contract time to perform additional work as a result of the increased scope to the Stock Island II Project ....... . w.. ........ �.... -- ._.._.. _ _.._. __....... Bid item Description Quantity UOM Unit Cost Amount No $4,000.00 110-1-!A Cleann as Grubb Traffic ..... 1 w LS_ $w6.000 m00 ... $6�000 00 285-7 Optional Base Rework 1445 SY $18 15 $26,226.75 Mil i_ ..........3 770 Existing al Pavement 1467 _- SY� - $5 80 �$ , �0 21600 $ 147200 41Supepave AsphaltConcretePavement, 192 TN _. Traffic A �.���'_.. _ . ... _9 EA_ $5 375.34 $486978 06 425-4 Inlets Ad ustment 24 EA $1,900 00 $45, 00 1... .. >100, 8 ..._._..� .- .. $5 375 36 425135 1 Inlets Curb T e 425 002,88 706-3 Retro-Reflect a Pavement ITIT ._ IT ment Markers 32 EA $4.00 $128 00 711-1112-5 Thermo. STD, White, Solid 24" 49 LF $4 00 $196 00 . _.. $2125 00 $484 50 711-16-231 Thermo, STD,....OTHYellow, Ski 6�- 0 228 mm GM --�-�---,� $13 Total 2,796.79 This Change Order us 3 88%of the original contract price CONTRACTOR w ate ENGINEERING SERVICES DIRECTOR ASSISTANT COUNTY ADMINISTRATO ,, Date r � `� ._ 22 a 2019 Date MAYOR Date 7.16.19 Charley Toppino and Sons, Inc. C.O. 2 RS&H 3100 Overseas Highway Marathon Florida Monroe COUnt\ Engineering Department Jule 15, 2019 Judith Clarke, P.E. 110 Simonton Street Kev West, FL 33040 Project: 442001-1-54-01 Stock Island II Subject: Change Order#2 The summary of contract dollar changes is sho\�n bclo\%: Original contract amount ._ ,, _. ,,,. ., . $3.=423,96726 Net change by previous authorized change orders ....... , ... $86.264.90 The contract sum prior to this change order ... ..,..........$3_5 I0,232 16 The contract sum will be increased by this change order #2 , ...._.. . '....5132,796 79 The new contract sum including this change order..................................$3,643,028.95 BeloN\ is a detailed description of change order 92. Due to the deteriorated condition of Shrimp Road from-5'h Avenue to 1.202 feet south_ Monroe County elected to add an additional scope of«ork to the Stock Island 11 Project.The scope includes: Remove existing asphalt. reN\ork existing base,grade full width -5 42 feet in length, mill and resurface full width 660 feet in length, and restripe the area. Bclo\N is a list of the pa\ items need to complete the Nvork. Pay Item 102-1A Maintenance of Traffic Due to the additional \pork on Shrimp Road there is additional MOT This resulted in an overrun of I LS Pay Item 110-1-1A Clearing and Grubbing Due to the additional \\ork on Shrimp Road there is additional clearing and grubbing. This resulted in an ovemun of l LS. Pat Item 285-7 Optional Base Rework Due to the additional %pork on Shrimp Road the contractor \\ill have to rck\ork/regrade the existing base material and add material as needed to meet the desired template. This resulted in an overrun of 1_4=4-5 SY. Pay item 327-70-1 Milling Existing Asphalt Pavement Due to the additional work on Shrimp Road the contractor will have to do additional milling. This resulted in an o-vcrrun of 1.467 SY, Pay item 334-1-1 Superpave Asphalt Concrete Pavement, Traffic A Due to the additional work on Shrimp Road the contractor vv ill be pay ing full Nv idth and 1,202 lineal feet of roadway. This resulted in an oNcrrun of 192 TN. Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Additional work on Shrimp Rd was added to this contract. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No ❑ If Yes, explanation as to why it is not subject for a calling for bids: Construction in progress. • Project engineer/architect approves the change order. Yes ❑ No If no, explanation of why:Approved by Monroe County staff. • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 7.16.19 Charley Toppino and Sons, Inc. C.O. 2