Loading...
Item C17 C.17 BOARD OF COUNTY COMMISSIONERS County of Monroe Mayor Sylvia Murphy,District 5 The Florida Keys l'U � � Mayor Pro Tern Danny Kolhage,District 1 �pw° Michelle Coldiron,District 2 Heather Carruthers,District 3 David Rice,District 4 County Commission Meeting July 17, 2019 Agenda Item Number: C.17 Agenda Item Summary #5746 BULK ITEM: Yes DEPARTMENT: Project Management TIME APPROXIMATE: STAFF CONTACT: Ann Mytnik(305) 292-4439 N/A AGENDA ITEM WORDING: Receipt of monthly change orders for the month of June reviewed by the County Administrator/Assistant Administrator. ITEM BACKGROUND: There were five change orders considered and approved by the County Administrator/Assistant Administrator during the month of June, and three additional change orders that were approved in May that were inadvertently omitted from May's report. The total number of change orders being reported in this agenda item are eight for a total of$203,012.90. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No 027-1998 was adopted in order to provide that the County Administrator may approve separate, non-cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,000 (as amended per Ordinance No. 024-2015), or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the county Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: N/A DOCUMENTATION: Change Orders FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: Packet Pg. 1251 C.17 Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: County Match: Insurance Required: Additional Details: N/A REVIEWED BY: Cary Knight Completed 07/01/2019 4:06 PM Chris Ambrosio Completed 07/01/2019 4:36 PM Kathy Peters Completed 07/01/2019 4:44 PM Board of County Commissioners Pending 07/17/2019 9:00 AM Packet Pg. 1252 C.17.a 3 o, D CD 2 "1 3 a m� rn3 m� 3 � � � �o3i `o CD �. � a c C am, j n G 6 N � N� f/7 N 117 o o 6 (Do lsJ CD C D y C 7 Ol rr T rD T O n O y d CD rOr � I 0 D m cCD w � m n o a Z o mo to Z T to rD � o Cr ro n CD p C W 4 n �i a a O n o .. O Z ro o tn r, -P r r.. O ^ r N...... r N. o o v Z —YYYIII _ _ ....... �F `M �F /" 0 a .. = A V O 9 V N O = O w 'c�i+ o 0 0 o c° m o+ m o 0 o c rnrnnZ N Coo 2 w Oho 0 Cl 0 � �.� n = n, . c _.. _. m 4Ph 0O )NO � 4) OC7 or07 rurnm a O mQ amID o r� OZ O A O7 rt 0 7 7C 7 a O rD N f�rtD O Z rD n rn O � C3 — oj UZI °' �� Cr ro n � � �CD� O N a 70 ua A m � c rn n o'3. m Ln O n� I\+ M C �s m ro O 0 _T rD n d � U) 3 0 o n vow n Q .GC �i v ID Vl I Z ~ �s v = m I�f0 CD @ n A FI O Cr-03 °'0. rt �' m 70 Vf Z lD O CD to M p j M N CD n0 c n d rt p N X 90 O ry x C n• a) O N ro W 3 a a 0n nIn - wa� a m � _.. .__.................... A A n I m * Z O �r �r * NJ ma D PQ NJ rn m � w G r r r N m m kD � � m o km a c c c ID . N O Q N 7 N fD Q rt 7 M a(D 7 n 3_? CD [D = n. 0 n N N n g i ton n f D n LO rD O i 3 rrt a , 4 C�7 ro n . R ro a l0 Ul n0 7,K r, n� (D rt n j j a T 10 rt tp O 0 O I: n N CD O X (�D O � O l0 Cr O dI > a j. (n `C Packet Pg. 1253 C.17.a 2 o nn n n n n nnnnnn nnnn m ,r 00 0 0 0 0 000000 0000 (A m 0 C %D CO V 0) Ul -P W NJ �+ 1D CO Ili 01 U 1 1 1 1 1 1 1 1 m O C I I I I I I I 3 Cr rn rn m __ rn � rn rn rn m m rn n m m rn rn o m 8 ° w j. M m m ° rum ° m ,n m m cD m O a aa � CL a � a ;� aaaaaac aaaa n 0) C N A N rt C n Vf ? W C M W W W W W U Fy %D M W _ p C C p O C C � OOU1000,< NOOC -„ 0- C7 � o L � � rrc- aaaaa = � aaE Z (A En r•r (D rr + S 0) 0) 0, 0, 0, 0, a o, Or , p 0�, rt d n 0, a0, _ (D �< `< %< < , < 0, l< `< /f1 +0 3 = m ° _ = Sr' = v, cn cn cn ,n cn =, < cn ,n = m m Cr °1ana �Dn' ? c' fDpj � cc � cccw cc °1 O ip n O a n (D n O n a fD M fD fD fD fD N fD fD n rt ° o - o =- ^ o g o 0 0 0 0 0 0 � 0 0 0 p -0 0 =v -a N � D 0, r•rr•raaa3 a aa-a m —'0 gym — — _' — (D (D w rD rD m �< = o, rD rD rt ,CDD 3 rt r�r rr-r r° g ° n, 0, 0, a 01 of r�r 0 o' - - O O O 0, � 0, a< < [D < O CI = c c 0 0 rD m == rr =_ � a Cr Cr � °' (A Q (�D O 7 7 7 '< �' 7 W a m r=r o, N OO F+ 4k Q O0 OA O a aNm o 9c ao �O N N O (Ni, a r�r r—�r r-�r rah l0 C 3 a a a r* Cro' n _' _' a ,.t CD (D rCD a C N rDD ffDD O [D =_ d to l0 l01 O (D O� rr rt rD r�•r rt rt a W o = a O = D a K < j ° rr O O O Ort, _ * C O S S (=j O fD m 0 rt mo a a ao — � =' 30, � �+ � n, O CD O = Cl- (D CD fD 3 O fD (D , S M' S ,Or n = 2 c 1°• fD p� c, fl, rt 2 �p -1 = -h fD fD fD M - � 3 c = u, < l< '< = o a ' rn O ,n cn cn 'n a � �' m w (-1 (n �' a o �< :3 (D *Itp cr 6 6 0) � � o � � 0 o °i to cn �, rt — a n n n r• ' n a m r r = CI N D (f S �. O ((D -p p 7 7 7 10 �, rt C) -s Orti CD (D (D = n (D e�—Y @ @ O = fD Z U m c C CL cN o, _- n. '* _- na /oar nnn, _ O w _ 3 c, rY e••Y r4 r•r r r -x 3 � � � Mf� Q � a000 (D r z 00 Ena �_+ m (° ul :3Cp (gyp N N rr ? O� D y 0 n C) a S A (D .r� -t p 0=j 7 (D CD fD O = _rt O _ �i n fD =r Cl. O O v O 7 Sr 3 < O o N. N• N• 4 5' a g `n 3 at l0 C O 0) -1 0 O O = 3 :3 s Zr* (Dt a 0) a :3m o rh N N <O d 'a 'D M. Q O, Fes+ ° < o O O m 3 a3 to o 0 :0 0 0 ° ri (D N m (D (D �c�n a �` `•' 0 o 0 a 0 m v 0) 0, : o 00 rn CL N 9 m ° :3 _ _ _ Ln l° l° N' fD fD fD �p Vf rt rr n n Packet Pg. 1254 C.17.a O OE COUNTY/ G W E G/ PRoga MANAGumw C N,ACr CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO:2 East Martello Roof Replacement INITIATION DATE: TO CONTRACTOR: CONTRACT DATE: August 15,2018 Roofing by Ruff,Inc. 1010 Kennedy Drive Suite 201 Key West,FL 33040 The Contract is changed as follows: The original(Q W)(Guaranteed Maximum Price) 794,000.00 Not change by previously sulhorized Change Orders.. ... . ... .... ........... 78,261.00 The "" M (Guaranteed Maximum Price)pricy to this Change order wes. ......,..., 872,261.00 The( )(Guaranteed Maximum Price)will'be A (decreased) (unchanged)by this Change Order, 37,300.00 The now(;Q,g gJUW(Guaranteed Maximum Price)Inoiuding this Change Order is. ,,.,, 909,561.0D The Contract Time will be(jgr AM(decreased)(unchanged)b'y.. 60 days The date of Substantial Completion as of the date of this Change Order is...... ....„,,,,,...,,, .May 10,2019 Detailed description of change order and justification: 8e Exl7an ftOMeofnetc i d.g � ar end by Owner.AEOKqg kill III I labkL and Contractor CID r2jj � n ARCHITECT: ,. C Bender&aasoc to Arcicls,P.A, Date CONTRACTOR: S 2 R oq0 a by Ruf in tea e DIRECTOR PROJECT MANAGEMENT; C nig D COUNTYIDEPUTY ADMINISTRATOR: " . 23 May 2019 R, I n Gestesi Date Kev n Wilson Christine Hurley Packet Pg. 1255 C.17.a Change Order Attachment per Ordinance No. 004-1999 e Change Order was not included in the original contract specifications. Yes® No❑ If Yes, explanation: Copper chimney caps were part of the existing design, however they were a substantial tripping hazard, and not historically accurate, and as a result needed to be removed. Some patching was Included, however the areas requiring patching were greater than anticipated. The door was not Included originally because the rotting of the door was unforeseen. e Change Order was included in the original specifications. Yes ❑ No 0 If Yes, explanation of increase in price: e Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes❑ No to If Yes, explanation as to why it is not subject for a calling for bids: e Project architect approves the change order. Yes ® No❑ to If no, explanation of why: 0 Change Order is correcting an error or omission in design document. Yes []No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Packet Pg. 1256 C.17.a PCO 8 Rx Chimney Cvrs&Patch Materigis Unit Unit$ I FRT lumber&plywood 1 lot $75.00 $75.00 Alphaguard base 2 kit $350.00 $700.00 Alphaguard top 2 kit $277.70 $555.40 Alphaguard fleece 1 lot $122.85 $122.85 granulated cap sheet,torch grade 8 1 sq roll $75,41 $603.28 primer 1 5 gal $63.65 $63,65 propane 4 201b $25.00 $100.00 dump fee 1 lot $55.00 $55.00 4 panel door slab,2'6"x 6'-8" 1 lot $551.00 $551.00 paint, brushes, rags,cleaner 1 lot $162.00 $162.00 $0.00 Subtotal Materials $2,988.18 Tax 6% $179.29 Total Materials $3,167A Labor #of Man HIM Rate oa o Remove pavers, concrete pad and covers, frame 4 36 $85.00 $12,240.00 &sheath the chimney opening,flash the sheathing $0.00 &tie into roof coating, patch the concrete slab& $0.00 set new pavers $0.00 0 $0.00 Demo Kemper, prime deck&torch in 8 4 30 $85.00 $10,200.00 contiguous squares $0.00 C) $0.00 Replace door, repair stucco, paint cupola 2 40 $85.00 $6,800.00 $0.00 Labor Total $29,240.00 Week Rate Cost Scissor lift $0.00 Spot a pot 2 $110.00 $220.00 $0.00 Total Equipment $220.00 Subcontractor LP shop dwgs preparation, $800.00 Sub Mark up @ 5% $40.00 Mark up @ 10% $3,262.75 Subtotal $36,730 Bond $569.32 Subtotal $37,300 Total $37,300 Page 1 of 1 Packet Pg. 1257 C.17.a MONROE CouNTYANG E G/ PROJECT : :AEG CONTRACT CHANGE ORDER PROJECT TITLE: Monroe County Library&Adult Education Marathon Branch INITIATION DATE: 06/14/19 CHANGE ORDER NO: 1 TO CONTRACTOR: Pedro-Falcon Contractors, Inc. CONTRACT DATE: 03/21/19 31160 Ave C Big Pine Key, FL 33043 The Contract is changed as follows: The original Contract Sum................................... ..................... ,"...".,....,.,.,,$7,016,385,00 Net change by previously authorized Change Orders, $0 The Contract Sum prior to this Change order was...... .,,, .,.,$7,016,385.00 The Contract Sum will be increased by this Change Order..,....," ,........." "".....$52,920.00 The new Contract Sum Including this Change Order is....,................ .........",.,,.".,.,,. ""......$7,069,305.00 �- The Contract Time will be unchanged by............... ...................... .................... n/a The date of Substantial Completion as of the date of this Change Order is..._. „ „ ., 6/1/20 � ? �err independent rr r and justification: Detailed description of change order n r f r.Ujis ProAf, cl, The...Florid /te S /: / fir wn _q/re rr trd ull/ r s e rr /a rrra�alf+s rra. /Ie�ra//a rr l fP/ %%s rr ev llrr/al alr tr//re irrs o rr r rs" ' f a rr ' rr v�+ / irr err rrf rr c r°la sere rr / /a" l r veil/ rt lr a fr fire Sclroo/ i ri /'l r7r►ln arrrl lrr_ e Pica Team. � This clear Not Vol urr ql al ned Ow r r h f llcabge and Contr c r ARCHITECT: Date CONTRACTOR: De DIRECTOR PROJECT MANAGEMENT Xte COUNTY/ASSISTANT ADMINISTRATOR: °°" 11 June 2019 Rrrrn n Castesi Date Kevin Wilson Christine Hurley Packet Pg. 1258 C.17.a Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes X No ❑ If Yes, explanation: The role of Building Inspector was not included in the original RFP or executed contract. • Change Order was included in the original specifications. Yes ❑ No X If Yes, explanation of increase in price: 0 • Change Order exceeds$50,000 or 5%of contract price(whichever is greater). Yes❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No❑ NIA ® (by signature on first Change Order page) C3 If no,explanation of why: � • Change Order is correcting an error or omission in design document. Yes ❑ No Should a claim under the applicable professional liability policy be made? Yes ❑No Explain: Packet Pg. 1259 Pedro Falcon Contractors, Inc., General Contracting 31160 Avenue C,Big Pine Key,FL 33043-4516 (305)872-2200 a Fax(305)872-2219-falconel(Pbellsouth.net CGC1507617 Request for Change Order 13 May 2019 Project: Education Center Change Order Request No: PCO - 001 Description: Llrqjjcle I_ esA).�D Alt eLre L._j 0 ltem,I---.Provide Commercial fluildihe Permit lhvvec�Lion Services Iler Aftch ,PrOposal froaj&ll Its s metio n 'Yervices PiMowl#1 1,L2 Dakil 05108119 gect Iny L For a 12 Month Period on q Lump Sunt Basis 0 Project Inspection Services.......................... .........................$48,000.00 Overhead@ 5%............................................................... .....................................$2,400.00 Subtotal......... ....... ................ ......... ...... ................$50,400.00 0 Profit@ 5%....................................__...... ...... .........._ ............. ...... .............._32,520.00 0 Net Amount of Request for Change Order:...................................................$52,920.00 Additional Time Requested for Change: E None. Should project require additional inspections past the 12 month period from NTP Date of 01 June 2019, that are not directly caused by the Conti-actor, then an additional fee of $2,756.25 will automatically be invoiced on a monthly basis until final inspections are completed and project closed. Respectfully Submitted, Ken Bygler Prqject Manager Industrial • Commercial -Institutional • utility Established 198S Packet Pg. 1260 ALL ASPECTS INSPECTION SERVICES, LLC 24478 Overseas Hwy �� �� Summerland Key, FL 33042 US (305)745-1200 A S peg@allaspectsfikeys.com ASPEC'TS O ..„ ADDRESS PROPOSAL# 1122 Pedro Falcon Electrical DATE 05/08/2019 Contractors Inc. 31160 Avenue C Big Pine Key, FL 33043 0 DATE DESCRIPTION M:„p "°M°' RATE AMOUNT as 05/08/2019 Commercial Building Permit Inspection Services 1 48,000.00 48,000.00 Marathon Library-3490 Overseas Highway,Marathon, FI. 13,969 sf reinforced concrete masonry structure. Monroe County School District is the Authority having jurisdiction. This proposal is based on a maximum 12 month project duration. The fee will be payable on a monthly basis. ($4,000.00 per month) Should the construction schedule be accelerated to less than 12 months,a balloon payment of the balance of the fee shall be due. Should the project extend beyond 12 months,the monthly Inspection fee for this time extension will be$2,600.00 if the project is still active. If for whatever reason the project becomes inactive,the monthly inspection fee will be$1,500.00 for the period of inactivity. TOTAL $48,000.00 Accepted By Accepted Date Packet Pg. 1261 C.17.a L ASPECTS ON 24478 Overseas Highway, Summerland Key, Fl. 33042 GENERAL CONDITIONS SCOPE AND MANNER OF SERVICES: Perform as a Private Provider inspector in accordance with Florida statute 553.791. Complete all required inspections to comply with Florida Statutes, The 6th Edition of The Florida Building Code (2017), and any specific requirements of the local Building Official. Report and log all inspections to the Local Jurisdiction Building Department. Upon completion of all required inspections and re-inspections(if necessary) and the work has been complete in accordance with the approved plans and building code, a Certificate of Occupancy or Certificate of Completion will be issued by the Building Official. All scheduling and management will be based on the approved engineered plans for the project and requirements of State and/or International Building Codes and local codes and ordinances. GENERAL PROVISIONS OWNER AND/OR CONTRACTOR: The General Contractor of record will be responsible for meeting all of the requirements of the 6th Edition of The Florida Building Code as well as complying with all of the guidelines and restrictions of local regulations and ordinances. All Contractors including subcontractors shall carry and submit upon request all local and state licenses and copies of Insurance. The Contractor including subcontractors will be responsible for maintaining a current state license, competency card, and insurance throughout the duration of project. Inspections cannot be performed for any trade if license or insurance is expired or voided. E Full Coverage General Liability and Workman's Compensation as per Florida law. The Contractor including subcontractors shall be responsible for complying with all Health and Safety/OSHA laws and regulations as they are applicable to this project. All Aspects Inspection Services, LLC reserves the right to terminate this contract at any time if the Contractor or its Subcontractors does not construct the project in accordance with approved plans, does not obtain revisions from the design professional if needed, does not perform the work in accordance with current building codes, does not stay within scope of permit, does not attempt or cannot remedy deficiencies identified by All Aspects Inspection Services, LLC, does not maintain safe working conditions, or willfully and knowingly violates State Statutes or local ordinances. Page 2 of 2 Packet Pg. 1262 C.17.a MONROE COUNTY/ENGINEERING/PROJECT MANAGEMrNT CONTRACT CHANGE ORDER PROJECT TITLE: Pigeon Key Ramp Rehabilitation Project CHANGE ORDER NO:2 INITIATION DATE: 6/6119 TO CONTRACTOR:American Empire Builders, Inc. CONTRACT DATE: 12/19/18 The Contract is changed as follows: The original Contract Sum ........ .$1,960,000.00 Net change by previously authorized Change Order................... . ......$477,103.68 The Contract Sum prior to this Change order was. ....... $2,437,103.68 The Contract Sum/Time is not affected by this Change Order 2 $0.00 4) The Revised Contract Sum including this Change Order................ $2,437,103.68 TECHNICAL SPECIFICATION CHANGE ONLY O Tire to the logistics and Inability to get ready mix Class IV concrete(contract item 400-4-5) onto Pigeon they island within the FOOT specified allowable placement timeframe,the FOOT District IV and VI Materials Lab and the project; POR have approved the use of an alternate APL � approved mix that meets the 5500 d 61 requirement, in place of the plant ready mix Class IV Concrete originally specified by the iOR. The CFI concurs with this change order, The Change Order 2 docurnentation Includes: RFI14 executed by the FOR„ and the FOOT Approved Product List(APL)for the concrete being used. No microsilica„flyash or silica,furne is allowed. Notes: C) This is a technical specification change only and there are no resulting changes to the c% contract bid line Items or contract time. CONTRACTOR ... f ENGINEERING SERVICES DIRECTOR � 6 �� ,�� � % � ASSISTANT COUNTY ADMINISTRATOR �" Date � E Date .� FLORIDA DEPARTMENT OF TRANSPORTATION/FHWA Pigeon Key Ramp Bridge#904480 Rehabilitation FPN:43656,6-1 Contract: GOW60 Federal Id: D618-030-8 Acknowledgement: Date i 6.5.19 AEB CO2 PKR Packet Pg. 1263 C.17.a Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes® No❑ If Yes, explanation: Engineer of Record (Metric Engineering, Inc) specified ready mix concrete which is logistically 9 Y impossible to get to island within FDO7 specified placement timeframe. �w Change Order der was included in the original specifications. Yes❑ No If Yes, explanation of increase in price: 0 e Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Construction in progress. e Project engineer/architect approves the change order. Yes® No❑ e3 If no, explanation of why: e Change Order Is correcting an error or omission in design document. Yes[]No Should a claim under the applicable professional liability policy be made? Yes❑No C) Explain: 6.5.19 AEB CO2 PKR Packet Pg. 1264 C.17.a REQUEST FOR INFORMATION NO. 14 1"rato: Rigoberto Tirado To: Jordan Salinger American Empire:Builders, Inc WSP I Phone: 305-261-9276 Fax: Phone:305-916-5690 Fax: Project Name: Receipt Logged: Pigeon Key Rarnp Rehabilitation Project 5/28/2019 Submitted By: Date: 5/28/19 DwF)Spec No./Revision/Detail/Sect.No. Rigoberto Tirado Pay Item 0400-4-5 Concrete Class IV Substructure Subject: Concrete Class IV Substructure Problem&suggested solution: Due to availability and logistics issues with the Concrete Class IV required for the retrofitting of the foundations,we propose the use of a mix of SikaQuick-1000 cementitious mortar and gravel(Attached a you will find the product's data sheet). 0 t� Erg ineedn lDe t. Review 4) Solution We take no exception to the Contractor's request to use SIKA 1000 expanded with graded gravel for the repairs. AND .o.o...o ... , ,r E 4✓ rt�w v mud Y,r apAut?a',riG uiwhvP�u,a�"' r 4 lIuq d'ot�"In...ri a�qa� 6 p I aplo a�nu r�ruu w ot, ,rruu rti 9rwr^rrsw na con dre ,fi,enw�y r�Brh:Peer€+rI I11141urp rI"I'd -�rv,ef n,�¢C4�auuunarrvu #ur.g rGe Ur+,rweu i k rwu rucmx'e'Vlr�d urn^nw 1,1,1 Wnruni FYw 1;1c, „�„rrr r,no li„i C1,,.an rw4gagI ti,"ri uptdifkIti x", n^ I&�ara"I A 1 1w^ un,i 'rrr gt atrranu,r,t A wodp,00,,i ,'MA;'mitt,p V jk,,�Iw V m,io-ur=r+r,RK,ror u0shop'Powim iq I,•a1"101 [r urn l ,n I•¢rl'1a ;rhv ldYnwu✓I i rY N h 0 ra p,r's4r kNr;w 4A pawl✓orw,,;nl n w,"'I ON, 'a 7 ur,l eMi�r 0 .�iuumw thy r ovwwa wiry Pr oa?YoM , rw.Iu ,pI,th,ipr&Jv di;gpe 7 3y: SS Sc ltmtion ley: Soheila Sadou h,PE jute:05-29-19 la�1 . De tt. Date: Packet Pg. 1265 C.17.a PRODUCT DATA SHEET SikaQuick@-1000 RAPID HARDENING REPAIR MORTAR WITH EXTENDED WORKING TIME PRODUCT DESCRIPTION CHARACTERISTICS/ADVANTAGES 51kaQuick''-1000 is a one-component,rapid hardening, •Specially suited for warmer weather applications when early strength gain,cementitious,patching mortar for extended working time is required concrete.SikaQuick°-1000 LD is a low dust version of •Epoxy coatings can be applied as early as 6 hours at 730 this formula. F(230 Q. •Freeze/thaw resistant USES •Easy to use-labor-saving material 4) •Not gypsum-based •On grade,above grade and below grade concrete con- •High early strength ditions a Open to foot traffic in 4 hours/Open to vehicular •Highway overlays and repairs traffic In 6 hours at 730 F(230 C) •Structural repair material for concrete roadways,park- *Easily applied to clean,sound substrates ing structures,bridges,dams and ramps •SlkaQuickm-1000 LD is an available,low dust version of •Full depth patching repairs(may require multiple lifts) this product. •Economical patching material for horizontal flatwork repairs of mortar lines and concrete surfaces APPROVALS/STANDARDS •Rapid hardening as defined by ASTM C 928 PRODUCT INFORMATION Chemical Base •SikaQulck" 1000 is a blend of cement,select aggregates and specialty addit- 0 Ives ■SikaQuick'a-1000 LD is a blend of cement,select aggregates,low dust and specialty additives Packaging 50 lb(22.7 kg)bag ..,..�....�..-...�._ _ Appearance/Color Gray powder Life 12 months from date of packaging manuffa manufacture if stored properly in original,unopened pened and undamaged,sealed acka in Shelf ...�._ . ...�.....-......�w �„_ ... _ �.� ... ------ Storage Conditions Store dry at 400—950 F(40—350 C) Protect from moisture.If damp,discard material Product Data Sheet SlkaQulck•-3000 November 2019,Version 01 D5 020302040040000011 1/5 Packet Pg. 1266 C.17.a TECHNICAL INFORMATION Compressive Strength 1 day hours � 4,000(751�2 S MP,a) � (ASTM 73°F 23'C) ), 7 days 5 000 si 34 5 MPa 50%R.H. 28 days.. 7 0... P._. ,mm 0 si_ ,3 MPa)...�� Modulus of Elasticity in Co �2 .... _ ._. 6 06 psi (32 ) ._....m, ... ...m...........C- 6) ..._ X 10 SI 32 GPa _....... (ASTM C-469 Compression 28 days e 73'F(23°C), 50%R.H. ....... Flexural Strength. ,,.,,. _ __....._� ,. .....e..,. 7 days 4 700 00mpsl(4.8 MPa) (ASTM C 293) V psi(6.2 MPa) _ _ 73'F(23'C), 28 da s 1 000 i 6 MPa 50%R.H. . . ,._.. ,.w ,.,.,... Splitting Tensile Strength 1 day 200 psi(1?4m Pa _ (ASTM C 496) 7 days ,.... ....._ 10 w(2 1 MPa.).. .. 73'F(23-C), 28 da s 400 sl(7 8 MPa 50%R.H. ��.�.. .. ........� .- �...m .... .����.. ��.� .... ._..�. .,�.......�APproximately 300 psi(2.1 (ACI 503..._ cs Tensile Adhesion Strength 28 days R) MPa) 73'F(23-C), Substrate failure 50%R.H. ...................__. Shrinkage 28 da..��....... / ASTM C 157 � Vs 006 0 modified per ASTM C-928) 730 F(230 C), 50%R.H. Abrasion�Resistance — e 0f wear at (0.66 y w 730 F(230 28 days 0 026 Inch 0.66 mm (ASTM C 77 Resistance y ( ) y� � C), 50%R.H. Freeze-Th.......wo_... �y 2 y � .. ... ... . _...�. (...a._.....�.....6 � Freeze-Thaw Stability 8 days 983'0 ASTM C 66) g Resistance _ Freeze Thaw De-icing Salt 5 µ._.._.. �— .� ..,...... ��.......�. w�-.n� .w ,,,,,�...__..- 0 cycles 0.080 lb/ft2(391 grams/ (ASTM C 672) m Rapid Chloride_...._.Pe.�..._.. � �.� ...,.. _ � (�... _ Permeability <1,000 Coulombs (ASTM C 1202 AASHTO T 277) 730 F(230 C), (� 50%R.H. .... _ ...... , . ....�—.-.......... _._._.. _ ...............- . ..... .............. -... ._. APPLICATION INFORMATION Mixing Ratio Coverage Nat 5 pints(2.1—2.4 L) g ( 0.43 ft3(0.012 m3 .w..® ..., _.._ 8 ft3(0 017 m3) inch10 mm) ea ravel Exte�ded wrth25 Ib s 11.4 kg)of 3/8 0 5... .. � ...._..._ ..mww ..... . m....� (Yield figures do not include allowance for surface profile,porosity or materlal waste) p Cogsum t,on ...,-...._.._W._.. ..30�.__ .. . ,.�.... ...�.. ....._. /Yield/Dosage(PRINT single line Layer Thicknes..._..�.....-� ..._.ww.�.�...__.. � _._.....��..__ ............ ... -�.. ._..._. ._ s Min. Max.. Neat ........,-.—....... W— .1/4 6 m Inchm),__ .... 2 inches SO mm) Extended , O 1 Inch$25 m7jr 1� 6 Inches 2 rra m •Do not feather edge a Do not exceed 7 inches(178 mm)slump when extended Product Data Sheet SikaQulck"-3000 November 2018,Version 0105 020302040040000011 2/5 fIl DING T11419J °III"' Packet Pg. 1267 C.17.a Product Temperature 650—750 F(180—240 C) AmbientAir Temperature a.....�..,.. .. _ .M.......... ... �an.,. � _ ..W.e .w. - -.v,...m, A......_�.....�-. .._._w.�. m .�,,-�.,w.... ....._w.r >40o-950 F(40 350 C) ) �.... ....,,r,v . Substrate Temperature >400 (40-350 C 950 F . w .. Set Time 35—85 .. ............_._. w_. .... .... . .. .�- _nn.-. minutes (ASTM C 266) 730 F(230 C), _ 50%R.H. .._ Final Set Time � ..... .n. . '•120 minutes m..µ_.-.��...__ (ASTM C 266) 730 F(230 Q, 50%R.H. APPLICATION INSTRUCTIONS . mm. . .... , .. .a..0 �..—... ..�....�„_..... _._....��,w� .�� — ... .......... �....... MIXING SURFACE PREPARATION •Wet down all tools and mixer to be used. •Pour the required amount of clean,potable water[ap- •Concrete surface must be clean and sound. proximately 700 F(210 C)]into a suitably sized and • Remove all deteriorated concrete,dirt,oil,grease,and clean mixing container,using a calibrated measuring other bond-inhibiting materials from the area to be re- jug or similar,to ensure strict controlof the water con- paired. tent. Do not over-water. •Be sure repair area Is not less than 1/4"(6 mm)deep. •Add 1 bag while continuing to mix with a low-speed ■Preparation work should be done by high pressure wa- drill(400-600 rpm)and mortar mixing paddle,or in an ter blast,scabbler or other appropriate mechanical appropriate morter mixer. means to obtain an exposed aggregate surface profile •Once all the powder has been added,mix to a uniform of t 1/8"(3 mm)[minimum CSP-6], consistency,maximum 3 minutes,until a lump-free •To ensure optimum repair results,the effectiveness of blend is achieved. decontamination and preparation should be assessed •Thorough mixing and proper proportioning of the by a Tensile Adhesion Strength(pull-off)test. powder and liquide Is necessary. a) •Saw cutting perimeter edges of concrete repair area at a To help control setting times,colder water may be used a dovetail is preferred. in hot weather and warmer water may be used in cold •Substrate should be Saturated Surface Dry(SSD)with weather, clean water prior to application.No standing water •Inaccurate proportioning of the powder to liquid will should remain during application. result in a finished product that may not conform to •Rust,scale,mortar,concrete,dust and other loose and the typical published performance property values. deleterious material which reduces bond or contrib- utes to corrosion shall be removed from steel rein- •With water or undiluted SikaLatex'R:Pour 4.5 pints forcement. (2.1 L)of liquid into the mixing container.Slowly add Surfaces shall be prepared using abrasive blast clean- powder,mix and adjust as above.Add up to another 0 ing techniques or high pressure water blasting to 1/2 pint(0.24 L)maximum of liquid to achieve desired acheive a bright metal finish. consistency.Do not over-water. PRIMING •With diluted SikaLatex'R:SikaLatex'R admixture may be diluted up to 5:1(water:SikaLatex'R)for projects •Concrete substrate:Prime the prepared substrate with requiring minimal polymer modification.Pour 4.5 pints a scrub coat of SlkaQulck®-1000/SikaQuick•-1000 LD (2.1 L)of the mixture into the mixing container.Slowly prior to placement of the mortar.The repair mortar has add powder,mix and adjust as above. to be applied into the wet scrub coat before it dries. EXTENSION WITH AGGREGATES ■Reinforcing Steel:Steel reinforcement should be thor- oughly prepared by mechanical cleaning to remove all •For applications greater than 1"(25 mm)in depth,add traces of rust.Where corrosion has occurred due to the 3/8"(10 mm)coarse aggregate. presence of chlorldes,the steel should be high pres- •The typical addition rate is 25 Ibs(11.4 kg)of aggreg- sure washed with clean water after mechanical clean- ate per bag.It is approximately 2 gallons(7.6 L)by ing.For priming of reinforcing steel use Sika®Armatec® loose volume of aggregate. corrosion protection products(consult current Product •The aggregate must be non-reactive(reference ASTM C Data Sheets). 1260,C 227 and C 289),clean,well graded,Saturated Surface Dry(SSD),have low absorption and high dens- ity,and comply with ASTM C 33 size number 8 per Ta- ble 2. Product Data sheet S1kaqulck'-3000 November 2018,Version 0105 020302040040000011 �gglI11ryry��������ppII r 1 Ne�IW���sl �,�„l'�, '�',wu Ills 3/5 Packet Pg. 1268 a C.17.a •Variances in aggregate may result in different are used,follow cure times for the bonding agents used strengths. as a guide prior to putting SikaQuick0-1000/Sika- •Do not use limestone aggregate. Quick°-1000 LD in service.Assure suitability with the •Do not exceed a slump of 7"(178 mm).This may cause manufacturer of the bonding agent. excessive bleeding and retardation and may reduce the •SikaQuick°-1000/SikaQuick®-1000 LD does not form a strength and performance of the material. vapor barrier when cured. APPLICATION BASIS OF PRODUCT DATA •A neat mix of SikaQuicko-1000/SikaQuick®-1000 LD mortar must be scrubbed into the mechanically pre- pending upon mixing methods and equipment,Results may differ based upon statistical variations de pared,SSD substrate.Be sure to fill all pores and voids, temper- ature,application methods,test methods,actual site • Force material against edge of repair,working toward conditions and curing conditions. center. After filling repair,screed off excess. •Allow material to set to desired stiffness,then finish OTHER RESTRICTIONS with wood or sponge float for a smooth finish,or broom or burlap-drag for a rough finish. See Legal Disclaimer, •If a smoother finish is desired,a magnesium float should be used. ENVIRONMENTAL HEALTH AND SAFETY •To assist in the finishing process,use SikaFllm'finish- ing aid.Consult current Product Data Sheet, •Mixing,placing,and finishing should not exceed 30 For further information and advice regarding transporta- tion,handling,storage and disposal of chemical minutes maximum. products,user should refer to the actual Safety Data •Refer to ACI 305,the"Guide to Hot Weather Concret- Sheets containing physical,environmental,toxicological Ing"or ACI 306,the"Guide to Cold Weather Concret- and other safety related data.User must read the cur- ing when there is a need to place this product while rent actual Safety Data Sheets before using any either hot or cold temperatures prevail.Thinner place- products.In case of an emergency,call CHEMTREC at 1- ments will be more sensitive to the temperature condi- 800-424-9300,International 703-527-3887, tions. CURING TREATMENT LEGAL DISCLAIMER •As per ACI recommendations for portland cement con- a KEEP CONTAINER TIGHTLY CLOSED crete,moist curing is required. a KEEP OUT OF REACH OF CHILDREN •Moist cure with wet burlap and polyethylene,a fine a NOT FOR INTERNAL CONSUMPTION mist of water or with a water based,*compatible cur- a FOR INDUSTRIAL USE ONLY C3 ing compound meeting ASTM C 309. a FOR PROFESSIONAL USE ONLY •Curing compounds adversely affect the adhesion of fol- lowing lifts of mortar,leveling mortar or protective Prior to each use of any product of Sika Corporation,its coatings, subsidiaries or affiliates("SIKA"),the user must always •Moist curing should commence immediately after fin- read and follow the warnings and instructions on the es ishing. product's most current product label,Product Data •Protect freshly applied mortar from direct sunlight, Sheet and Safety Data Sheet which are available at wind,rain and frost. usa.sika.com or by calling SIKA's Technical Service De- 0 •To Prevent from freezing,cover with insulating materi- partment at 800-:933-7452.Nothing contained in any al(e.g,curing blanket). SIKA literature or materials relieves the user of the oblig- cs *Pretesting of curing compound N reeommended, ation to read and follow the warnings and instructions for each SIKA product as set forth In the current product; LIMITATIONS label,Product Data Sheet and Safety Data Sheet prior to •Avoid application in direct sunlight,during precipita- use of the SIKA product. tion and/or when strong winds prevail. SIKA warrants this product for one year from date of In- Use only clean,potable water stallation to be free from manufacturing defects and to •As with all cement based materials,avoid contact with meet the technical properties on the current Product aluminum to prevent adverse chemical reaction and Data Sheet if used as directed within the product's shelf possible product failure.Insulate potential areas of life.User determines suitability of product for intended contact by coating aluminum bars,rails,posts etc.with use and assumes all risks.User's and/or buyer's sole an appropriate epoxy such as Slkadur -32 Hi-Mod. remedy shall be limited to the purchase price or replace- Bonding agents(e;g.Sika'Armatec'110 EpoCem) ment of this product exclusive of any labor costs.NO should not be used.Use of the neat mortar as a scrub OTHER WARRANTIES EXPRESS OR IMPLIED SHALL AP- coat is recommended and preferred. If bonding agents PLY INCLUDING ANY WARRANTY OF MERCHANTABIL- Product Data Sheet SlkaQulck•-1000 November 2018,Version 0105 020302040040000011 4/5 B IIEI D IIING°I°IR USI° A& Packet Pg. 1269 C.17.a ITY OR FITNESS FOR A PARTICULAR PURPOSE.SIKA SHALL NOT BE LIABLE UNDER ANY LEGAL THEORY FOR SPECIAL OR CONSEQUENTIAL DAMAGES.SIKA SHALL NOT BE RESPONSIBLE FOR THE USE OF THIS PRODUCT IN A MANNER TO INFRINGE ON ANY PATENT OR ANY OTHER INTELLECTUAL PROPERTY RIGHTS HELD BY OTH- ERS. Sale of SIKA products are subject to the Terms and Con- ditions of Sale which are available at https.//usa.sika.com/en/group/SikaCorp/termsandcon- ditions.html or by calling 201-933-8300. 0 C) C) Sika Corporation Sika Canada Inc. Slka Mexicana S.A.de C.V. 201 Polito Avenue 601 Delmar Avenue Carreters Libre Celaya Km.9.5 Lyndhurst,N107071 Pointe Clalre Fracc.Industrial Balvanera Phone:800-933.7452 Quebec H9R 4A9 Corregldora,Queretaro Fax:201-933.622S Phone:514.697-2510 C.P.76920 Fax:514-694-2792 Phone:52"2 2195800 Fax:52 442 2250537 0 SikaQulck-loco-en-US-)11-2018)-1-S.pdf Product Data Sheet Sikaquick•-1000 November 20I8,Version o1 05 020302040040000011 HIPULDING rRus''r A00 5/5 Packet Pg. 1270 C.17.a i i SikaQuick 1000 (APL Product) by Sika Corporation (Manufacturer Website) Active APL Certifications • 930-008-004 (Approval Date:4/13/2010) (Service Life Expectancy: ) Previous APL Numbers • S930-0804 Product Types - Predominately Horizontal Surfaces Rapid Hardening Resource Links • FDOT Standard Specifications for Road and Bridge Construction Random Sampling Frequency There are no items to display. Limitations �? There are no items to display. Documents There are no items to display. Comments There are no items to display. to Manufacturer Detail Sika Corporation 201 Polito Ave Lyndhurst NJ 07071 201-508-6865 Contacts 1, Report Product Deficiency Other products In product type Predominately Horizontal Surfaces Rapid Hardening Packet Pg. 1271 C.17.a Cc CHANGE ORDER PROJECT TITLE: Ruth Ivins-Gutter and Awning repairs INITIATION DATE:01/0919 CHANGE ORDER NO: 1 TO CONTRACTOR: CONTRACT DATE:09/26/18 SeaTech of the Florida Keys,Inc. 131 Palomino Horse Trail Big Pine Key,FL 33043 The Contract is changed as follows: The original( )(Guaranteed Maximum Price) —.- .,$4,997.00 Net change by previously authorized Change Orders .. .......... ...........$0 The (Guaranteed Maximum Price)prior to this Change order was...,.,„...... $4,997.00 The(Contract Sum)(Guaranteed Maximum Price)will be( r M(decreased) (unchanged) by this Change Order.....,„$748.00 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is.,...,.$5,746,00 The Contract Time will be(increased)(decreased)(unchanged) by.................................. 0 weeks The date of Substantial Completion as of the date of this Change Order is.„...................... 6/01/2019 Detailed description of change order and justification; QA- e �� w t 1s elerrtp( t( ( �raclref lrclrll r Ogi I l l / t igned bv_Qwnor.Archljqctf ll' 1 r ARCHITECT: / Date CONTRACTOR: S ech r Keys, In Qata DIRECTOR PROJECT MANAGEMENT COUNTY/ASSISTANT ADMINISTRATOR; °� " 23 May 2019 1 o an Gastesi Date Kevin Wilson Christine Hurley Packet Pg. 1272 C.17.a Change Order Attachment per Ordinance No. 004-1999 I e Change Order was not Included in the original contract specifications. Yes X No❑ J If Yes', explanation: Unforeseen condition. • Change Order was Included in the original specifications. Yes®No If Yes,explanation of increase In price: e Change Order exceeds$50,000 or 5%of contract price(whichever is greater). Yes❑ No X 0 If Yes, explanation as to why It Is not subject for a calling for bids: Project architect approves the change order. Yes❑ No❑ N/A If no, explanation of why: No project architect for this project. e Change Order is correcting an error or omisslon In design document. Yes❑No X Should a claim under the applicable professional liability policy beimade? Yes❑No X Explain: Packet Pg. 1273 C.17.a sanders-steven From: Ryon LaChapelle <RyonL@seatech.cc> Sent: Sunday, May 19, 2019 2:57 PM To: sanders-steven Subject:- Ruth Jvin - RFC 01 Attachments: RFC 01 - Ruth Ivin Center- Replace Existing Brackets.pdf Steve, During installation of the replacement gutters, it was determined that the existing brackets holding the remaining gutters are very weak and need to be replaced. Please see attached a Request for Change for the replacement of the existing brackets. Feel free to contact me anytime to discuss. Very Respectfully, Ryon LaChapelle SeaTech, Inc o 305-304-8406 to to 1 Packet Pg. 1274 C.17.a MONROE COUNTYANGINEERING I PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Marathon Medical Examiner/PW Fleet Awning Replacements INITIATION DATE: May 24, 2019 CHANGE ORDER NO: 1 TO CONTRACTOR: Jones awnings&canvas Inc. CONTRACT DATE:7/12/2018 2801 1VW 22°' Teff. Pompano Beach,FL 33069 The Contract Is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price)............................................$16,475.00 Net change by previously authorized Change Orders...................................................$0 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$16,475.00 The(Contract Sum)(Guaranteed Maximum Price)will be(Increased)(decreased) (machiongg )by this Change Order.......$0 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order Is.......$16,475.00 The Contract Time will be CincreAsedgy(decreased)(unchanged)by...15 days............................... The date of Substantial Completf g y 4 orm as of the date of this Change Order Is.,.Ma , 18 2010 Detailed description of change order and Justification. k oaLai ,jnn-Le, s to needing an �s rein "4 0 oa nsf//re P ls: : arise F`iaeaf/oca/ion. ��C � � �/_��� .p.+ nf4�g .px'Mk�mprcfr� t) we n yqh rr r /n sr/ a sir vhl nor ll w I�afa�I. 8 8 /mil r f e tension ..._._.......... This change order is 0%of the original contract price. C3 N' t vaii+d until ne t� r rciait+act if a Ii tale nd Cont ac or' � ARCHITECT: NIA Date CONTRACTOR: _ _ I / � le DIRECTOR PROJECT MANAGEMENT ate COUNTY/ASSISTANT ADMINISTRATOR: ALAY 20-1.9. o' an 3astesl Dale Kevin Wilson Christine Hurley Packet Pg. 1275 C.17.a I Change Order Attachment per Ordinance No. 004-1999 0 Change Order was not included in the original contract specifications. Yes❑ No If Yes,explanation: e Change Order was Included in the original specifications. Yes❑No If Yes,explanation of Increase In price: e Change Order exceeds$50,000 or 5%of contract price(whichever is greater). Yes❑No If Yes,explanation as to why It Is not subject for a calling for bids: C) e Project architect approves the change order. Yes❑No If no,explanation of why: NIA C� e Change Order Is correcting an error or omission In design document. Yea[]No Should a claim under the applicable professional liability policy be!made? Yes❑No Explain: Packet Pg. 1276 C.17.a sanders-steven From: Derrick Silva <derrick@jonesawnings.com> Sent: Thursday, May 23,2019 3:04 PM To: sanders-steven Subject: RE: Proof of Insurance for-Jones Awnings &Canvas Inc i Good afternoon, This email is in regards to needing an additional 15 days in order to install the awnings at the Medical Examiner's office and the Public Works Fleet location. We needed this additional 15 days due to unfavorable weather conditions such as rain and high winds which do not allow us to install.We appreciate you giving us this extension. Thank you, Derrick Silva Jones Awnings 0 From: sanders-steven [ S rakers-& rJ_ n � Q Sent: Thursday, May 23, 2019 10:02 AM To: Borf j r1 rr i «c tn; Jones Awnings&Canvas, Inc Cc: mil--;fi r a r & il,; Eables-Patricia Subject: RE: Proof of Insurance for Jones Awnings&Canvas Inc 4 Derrick, to As per our phone call on Monday? We are still waiting for your e-mail response to request the time extension you need?This is so we can process a No Cost change order for the Clerk before they will make payment for this project. Please send us the e-mail to request for additional 15 days due to??delays„ we need this from you so we can get this project closed out?You should of been completed on May 1, and we signed it off for you on May 15 and also please CD sign in blue ink for same day May 15,on the two substantial completion forms we have attached now, and e-mail them back with your time request. Thank you, Steven Sanders Project Manager Monroe County Public Works & Engineering Project Management Department Office: (305)295-4338 Cell: (305)395-8283 sanders-steven monroecount -fl. ov PLEASE NOTE: FLORIDA HAS A VERY BROAD RECORDS LAW. MOST WRITTEN COMMUNICATIONS TO OR FROM THE COUNTY REGARDING COUNTY BUSINESS ARE PUBLIC RECORDS AVAILABLE TO THE PUBLIC AND MEDIA UPON REQUEST. YOUR EMAIL COMMUNICATION MAY BE SUBJECT TO PUBLIC DISCLOSURE. From: sanders-steven Sent: Friday, May 10, 2019 1:45 PM To: derr �n.[tug gr ; Jones Awnings&Canvas, Inc Cc: fail v r c:s4, i Subject: RE: Proof of Insurance for Jones Awnings &Canvas Inc Packet Pg. 1277 C.17.a Mayor Sylvia J.Murphy,District 5 County of Monroe Mayor Pro Tem Danny L.Kolhage,District 1 The Florida Ke S Michelle Coldiron,District 2 Y Heather Carruthers,District 3 David Rice,District 4 BOARD OF COUNTY COMMISSIONERS Memorandum DATE: 05/22/2019 TO: BOCC FROM: Kevin G. Wilson, P:E SUBJECT: Proposed Change Order to be Approved 0 Attached is proposed Change Order 4 1 for the Ruth Ivins—Gutter and Awning Repairs project. This change order increases the final contract sum by $748.00. The substantial completion date remains the same. 0 Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change-order under that authority. 0 t� Packet Pg. 1278 u C.17.a MONROE COUNTYANG NEERING/ PROJECT ECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Fence Repairs at Big Pine Parks INITIATION DATE:05/31/2019 CHANGE ORDER NO:4 TO CONTRACTOR: Florida Fence Corp. CONTRACT DATE:10117/18 The Contract is changed as follows: The odglnal(Contr gt§y )(Guaranteed Maximum Price)...... .....$579,000.00 Net change by previously authorized Change Orders......... ..... ... . $5,180.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$584,180.00 The(Contract Sum)(Guaranteed Maximum Price)will be (changed)by this Change Order...... .$16,000.00 The new(Contract Sum _(Guaranteed Maximum Price)including this Change Order is....... $600,180.00 0 The Contract Time will be(changed by 14 days............................... The new date of Substantial Completion effective after this Change Order is ...06/23/19 Detailed description of change order and justification: Vi a s�I)Fiel T lt: C LIA l r' Corr ratrrtr 1 r t rrrar"; art rro lra l f'e .(�tttr "q .8,1RMA,and r 2+M&cernent This r r 1ofe lie wvo ra r d ar o ale t 1 1 N �1 g ��1e0 �1 ����1e�r�rr � t M a .3 ��. � eta/ C 2.76338 Kff rigs traC�11 valid until signed _O rn r Architect If a li l n C aoroto ARCHITECT: Date CONTRACTOR: D7a DIRECTOR PROJECT MANAGEMENT ate COUNTY/ASSISTANT ADMINISTRATOR: 10 June 2019 Ran Gastesi Date Kevin Wilson Christine Hurley Packet Pg. 1279 C.17.a Change Order Attachment per Ordinance No. 004-1999 r Change Order was not included in the original contract specifications. Yes ElNo® If Yes, explanation:. e Change Order was included in the original specifications. Yes❑No® If Yes,explanation of increase in price: 0 e Change Order exceeds$50,000 or 5%of contract price(whichever is greater), Yes No CD If Yes,explanation as to why it is not subject for a calling for bids: C) e Project architect approves the change order. Yes❑No® If no,explanation of why: C) e Change Order is correcting an error or omission in design document. Yes❑No® Should a claim under the applicable professional liability policy be made? Yes❑No Explain: Packet Pg. 1280 n C.17.a MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CoNTRAcr CHANGE ORDER PROJECT TITLE: INITIATION DATE:June 4, 2019 Watson Park Baseball Field Lighting Repair CHANGE ORDER NO: 1 i TO CONTRACTOR: Musco Sports Lighting, LLC 100 1'1 Ave W Oskaloosa IA 52577 CONTRACT DATE: February 20,2019 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price)............................................$42,892.00 Net change by previously authorized Change Orders............... ......$0 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$42,892.00 The(Contract Sum)(Guaranteed Maximum Price)will be increased by this Change Order..$9,780.00 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is.......$52,672.00 The Contract Time will be(grlchanaed)by.................................................................. 0 Days The date of Substantial Completion as of the date of this Change Order is.....................June 18, 2019 4) Detailed description of change order and justification: Power Was en r r"zed to the b seball 1"ieki Pi Ming after initial y ,nit and the tannis rourtl!a)thyLtLs connected to the strap grvrc�. Itra enfris cou�e�trical Dods o/:� ipplap ire orrt r„tea properly function and with /of thi rk will7 This change order is 22.801455%of the original contract price. o' valld ura II si ne b Ovwnor Architect If a iicabie tl Contra+ctor ARCHITECT: NIA Date CONTRACTOR: , " E . , ate DIRECTOR PROJECT MANAGEMENT D ea COUNTY/ASSISTANT ADMINISTRATOR: 11n ° ?l9 . . Vie'0 an Gastesi Date Kevin Wilson Christine Hurley Packet Pg. 1281 C.17.a Change Order Attachment per Ordinance No. 004-1999 e Change Order was not included in the original contract specifications. Yes❑ No%01 If Yes, explanation: e Change Order was included in the original specifications. Yes❑Not If Yes, explanation of increase in price: 0 a Change Order exceeds$50,000 or 5%of contract price(whichever is greater). Yes No 4) If Yes, explanation as to why it is not subject for a calling for bids: C) 0 Project architect approves the change order. Yes❑No® If no, explanation of why: e Change Order is correcting an error or omission in design document. Yes❑No C) Should a claim under the applicable professional liability policy be made? Yes❑No Explain: Packet Pg. 1282 C.17.a ONROE COUNTYANGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Stock Island II Roadway Improvements Project CHANGE ORDER NO: 1 INITIATION DATE: 6/20/19 TO CONTRACTOR: Charley Toppino and Sons, Inc,. CONTRACT DATE: 3/21/19 The Contract is changed as follows: The original Contract Surn $3,423,967.26 Net change by prevro�,rsly authorized Change Order .$0 The Contract Sum prior to this Change order was $3,423,967 26 The Contract Sung is(increased)by this Change Order#Y $86,264.90 The Revised 1 Contract.Sum including this Change Order $3,510,232.16 Pursuant to contract article 722, the cost or credit to the owner resulting from a change in the Work shall be deten7nined in one or more of the following: 7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation 7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon o 7.2.2.3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee As a result of deteriorated conditions of curb inlets not identified in the original contract documents additional inlets are required as per the Construction Engineering Inspection (CEI)consultant and Monroe County staff. The existing manhole pipe inverts would not work with the new pipe inverts, so the Engineer of Record (EOR) requested to add one additional manhole. 0 E The Green Bike Lane striping was not included in the original bid. FHWA guidelines advise green bike lane striping to be applied in areas of vehicular conflict and approved by the Engineer of Record(EOR). Bid item _. _. ..... 0 Description Quantity Utd�fl Unit Cost Amount 0) fUo 1A Mobilization �"�' �'�" 425 1 Sw __..... ..._ _ 26 600 0 101- �- >10 _�_ 5 EA.._ ,� 37535 $ . 51 Inlets Curb T e P-5 $�75 25-132 Inlets Curb TAP 6 >10 1A $7 725.00 $71 501 725.007 ��W� 4 _ 71425 2-41 Manhope P-7o10 1 16-231 Patterned Pavement, Vehicular Area-Green 408 SY $65 $26,520,00 Bike Lane u _.W OH P' e �) Patterned Pavement Green $2 74 ,00 Bike Lane $8�a„2fi4.90 This Change Order is 2,52% of the original contract price. CONTRACTOR . ._ ENGINEERING SERVIC �..5 IRECTOR ,. ��"��,� �Date � ta ASSISTANT COUNTY-ADM INISTRATO " �°' Da Date MAYOR Date 6.20.19 Charley Toppino and Sons, Inc. C.O. 1 Packet Pg. 1283 C.17.a RS&H 3100 Overseas Highway Marathon Florida Monroe County Engineering Department June-4,-2019 Judith Clarke,P.E. 110 Simonton Street Key West,FL 33040 Project:442001-1-54-01 Stock Island II Subject: Change Order#1 The summary of contract dollar changes is shown below: i Original contract amount.., ....................... ........„.... ,....... ......,.......$3,423,967.26 Net change by previous authorized change orders ............ ......... ,,.., ..„.„„„.„ „............$0.00 The contract sum prior to this change order ......,. .......„, $3,423,967.26 The contract sum will be increased by this change order#1 The new contract sum including this change order................................................$3,507,490.43 0 Below is a detailed description of change order#1; Pay Item 101-IA Mobilization The Green Bike Lane striping was not included in the original bid,which requires addition mobilization. This resulted in an 4) overrun of 1 LS �a Pay Item 425-13-51 Inlets,Curb,Type P-5>10 C3 Due to the deteriorated condition of the existing P-Top inlets Monroe County decided to replace them. U) Replacing S-3, 9, 13, 17 and one at station 26+00 right. This resulted in adding this new pay which has a quantity of 5 EA. 4) Pay Item 425-13-62 Inlets,Curb,Type P-6>10 0 Due to the poor condition of the existing P-Top inlets Monroe County decided to replace them. Replacing S-7, 15,32,&55.This resulted in adding this new pay which has a quantity of 4 EA. C) Pay Item 425-2-41 Manhole,P-7,<10 The existing manhole pipe inverts would not work with the new pipe inverts, so the FOR requested to add one additional manhole. This resulted in an overrun of 1 EA. Pay Item 711-16-231 Patterned Pavement,Vehicular Area-Green Bike Lane This item was not included in the original bid,this pay item is being added to the contract. This resulted in an overrun of 408 Sy. Due to the additional work the contract time will be increased by 10 days. If you have any questions or need clarification of the above item summaries, please call Jackson Taylor at 561-436- 2860. Sincerely, Jackson Taylor, Project Administrator, RSH Cc: Judith Clarke,Clark Briggs,Jacki Hart,RE,File Packet Pg. 1284 np I �u o inl 1; C.17.a li PRICE QUOTATION Attention:Jackson Taylor DATE: 5/23/19 RS&H 3100 Overseas Hwy Marathon,FL 33050 ITEMIZED QUANTITIES Location: Stock Island,FL 0 Scope: Curb Inlet Replacements as peremail dated 5%23H5 Item L7escri Ilaan Quanti Units Cos[per Unit Line Item-Cost Notes ESTAB 6SHED PAY ITEMS. I 425-135-5 Inlets Curb,T e 5,Partial 5,00 EA $ 5,37535 $ 26 876.75 425-136-5 Inlels„Crub T 6,Partial 3,00 EA $ 5,375.34 $ 16,126.02 Suolotai $ 43.002 77 Ci°1SP 1f1% $ Extended Total $ 43,002,77 Q Subtotal $ 43,002,77 Performance/Ps meat Bonds $20"00f-rhousand 1 M LS $ $ MoWlxallon/DeanoNliraticn 1,001 LS $ $ Cenwall Conditions 1.00 LS $ $ OS t�9 Total• $ 43,002,77 U) Notes: Inclusions; Exclusions: t�9 Prepared by: Estimator Charlele To no 8 Sons Inc. � Sheet 1 of 1 Date: 5123119 � Packet Pg. 1285 PRICE QUOTATION Attention:Jackson Taylor DATE: 5121/19 RS&H 3100 Overseas Hwy Marathon,FL 33050 ITEMIZED QUANTITIES Location: Stock Island,FL 0 Scrape: Green Patterned Pavement Las er RFI 002) Item best ri pier uanti Units Cost er Unit Line Item Cost- Nis SUBCONTRACTED WORK Mobilizations 1.0 EA $ 900.00 $ 900.00 Green Bike Lane Pattemed Pavement Coatin 408.00 SY $ 65,00 $ 26,920.00 ..See alsel#ertlacku OS Subtotal $ 27,420.00 OH&P 10% Extended Total $ 2,742 00 $ 30,162 00 Og OS Subtotal $ 30,162,00 OS Perform anoailla ment Bonds $20 00rrhousand 1„00 LS $ $ Mobilization/Demobilization 1,00 LS $ $ General Conditions 1„00' LS $ $ Total: $ 30,162,00 4) Notes: Inclusions: Exclusions: a. Estimator E Prepared by: mator Charte To Imo&Sonta Inc. Sheet 1 of 1 Date: 5d ltfia Packet Pg. 1286 C.17.a Change Order Attachment per Ordinance No. 004-1999 r Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Engineer of Record (Metric Engineering, Inc) plan quantity error 0 Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: 0, Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ® No ❑ 0 If Yes, explanation as to why it is not subject for a calling for bids: Construction in progress. 0 • Project engineer/architect approves the change order. Yes ❑ No If no, explanation of why: Approved by Monroe County staff. • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Sediment Barrier quantities were omitted from the bid documents. 6.20.19 Charley Toppino and Sons, Inc. C.O. 1 Packet Pg. 1287