Loading...
2017-02C Emergency Power-Sally Port MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM • Effective Date: (I 2 I 19 Task Order No. 2017-02C Log— (03om— 5(0obvo Client Project No.: G Pt-t<i) I v9 —5.3o 3) 0 Engineer Project No. 18221.02 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and McFarland Johnson Inc. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Engineering Design and Bidding Services for Customs and Border Protection Facility,Phase III to Final at Key West International Airport(EYW)—Amendment for Emergency Power and Sally Port Gate Improvements Client authorizes Consultant to perform the Engineering Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 5 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$46,062 >/ N/A Other(Describe): Schedule Services may commence on Execution Services will cease by December 31,2019 Other Approval: Approval: 3/ACV Sr.Director of Airport Asst./ ounty Administrator CONSULTANT: MCFAxr, JO SON INC By . Witness 1-2/Pft:S SIJP/�G57�4 Title ONROE CO RNEY r Alb ,ROV� File: �� PED J.MER' Page 1 of 1 ASSISTA COUNTY ATTORNEY,_//( c) Date Exhibit A Key West International Airport-CBP Phase Ill to Final -Amendment for Emergency Power and Sally Port Gate Improvements Monroe County July 2019 s FEE SUMMARY `�) McFarland Johnson ✓ (Avcot4 DESIGN/PLANNING Uct SERVICES 1. DIRECT TECHNICAL LABOR $5,146.00 2. DIRECT EXPENSES $1,450.00 3. SUBCONSULTANT COSTS $39,466.00 AVCON Inc. I '^$39,466 4. TOTAL FEE ESTIMATE $46,062.00 t/ 5.TOTAL LUMP SUM FEE FOR ALL SERVICES $46,062 ✓ soneollmillil L%'! [1gro 1►'1 mmiii KEY WEST INTERNATIONAL AIRPORT (EYW) ANNEX/ CUSTOMS AND BORDER PROTECTION FACILITY EXTERIOR SECURITY AND ACCESS CONTROL IMPROVEMENTS SUPPLEMENTAL SCOPE OF SERVICES I. PROJECT UNDERSTANDING AVCON, as part of the MJ team, is currently working on the architectural and engineering design for the Annex Building / Customs and Border Protection Facility improvements at Key West International Airport. These improvements include implementation of a new internal layout of the building to accommodate an expansion and improved functionality of the current CBP facilities. In conjunction with the CBP Facility improvements, the existing vehicle gate (Gate #1), located to the east of the CBP and FedEx buildings, will need to be connected into the Airport's security and access control system and a guard shack installed to monitor traffic entering and exiting the SIDA. The guard shack will be a prefabricated modular building with a packaged HVAC unit, and electrical and comm service. The guard shack and gate control will need to be connected to the emergency generator located within the CBP Facility. a "- , IFy t r ROLLING GATE ✓ ow 4_ ...4....'1,:itik,,_.**:„. 4,..1:14::: :::' ,..,„. 1.4,±_,,,,,,,,,,:.--, y_ .:NE..EW GUARD SHACK k: s � gyf.p . CBP FA ,,,,,,,, CILITY .er. . , € _a�, 1 _.„ .s.a _ 5'SIDEWALK IFEDEX BUILDINGI GATE#1 x — -9 ry x ma t Pa . 1 I* Y x x x �a—x-- [-1 J FEDEX CUSTOMER ROLLING GATE PARKING RELOCATED I 1 Q emu CBP TRASH BIN t oot g, ,l8J A Transforming Today's Ideas into Tomorrow's Reality Page 1 of 3 The work in this supplemental will consist of Engineering Design Services for preparation of construction documents, plans, and specifications for the guard shack, security and access control improvements, and emergency power connection associated with Gate#1. II. DESIGN PHASE A. /gecurity and Access Control for Gate #1 — The access control gate shall be automated with gate operator, access control, and video surveillance. The access control and VSS shall be interfaced with the existing EYW systems. A new communications cabinet shall be provided for security data terminations and a power source shall be provided for electrical requirements of the gate operators, lighting, and guard shack. It is currently assumed that each of the two sliding gates associated with Gate#1 will require an operator, loop, card reader, security camera, and light pole. B. /guard Shack—The guard station shall be a pre-fabricated structure with electrical panel, pre-wired lighting and general power, telcom service, packaged HVAC unit, and all ancillaries. A performance specification will be developed for the pre- fabricated structure, which will include requirements for the building and associated services. Foundation and anchorage, handicap ramp (if required), and grounding shall be designed to accommodate the pre-fab building. No bathroom facilities are anticipated for this Guard Shack. C. imergency Power — Emergency power service will be provided for the FedEx Shipping Center and Gate #1. The existing generator in the EYW Terminal Annex (CBP Facility) shall be evaluated for capacity to provide backup power to the 240/120/1 phase service in the shipping facility and the new guard shack and Gate #1 systems. The generator will be reviewed to determine if a spare output breaker is available or if one can be added. Feeders and pathway will be provided from the generator output to a new automatic transfer switch at the FedEx Facility. A code review for the emergency power will be performed to ensure that all design is compliant and that there are no issues should one building lose power but the other does not. Transforming Today's Ideas into Tomorrow's Reality Page 2 of 3 I 1_1 4_.1rt III. ASSUMPTIONS A. The client will provide copies of as-builts or other similar drawings that are available of all subject project buildings and related areas. B. Modifications to the existing fencing and gate layout associated with Gate #1 are being done by Others. Fencing and Gate plans will be provided to AVCON for use in the design of the security and access control elements and guard shack associated with Gate#1. C. A performance specification will be developed for the Guard Shack and associated features. It is assumed that the Contractor will submit shop drawings for the pre- fabricated building and associated equipment, which will be reviewed during construction phase services for conformance with the specifications and codes. D. While the scope of work does include a field assessment of the existing FedEx Building electrical system, a comprehensive code review of the building is not included. No electrical improvements to the building are anticipated. E. No security or access control improvements are being made to the FedEx Building. F. Construction Document Submittals shall be made at 90%, and 100% milestones for review and discussion with the client and other stakeholders as appropriate. Construction documents will be coordinated and phased with the on-going design and development of construction plans for the internal improvements to the CBP facility. The Exterior Security and Access Control Improvements will be included as an Additive Alternate to the Bid Package. 100% milestone is currently scheduled for September 2"d to coincide with advertisement of the CBP Bid Package. G. No bidding or construction phase services are associated with this supplemental. It is assumed that the Exterior Security and Access Control Improvements will be done as part of the Annex Building /CBP Facility improvement project. END OF SCOPE OF SERVICES Transforming Today's Ideas into Tomorrow's Reality Page 3 of 3 • • ATTACHMENT A-CONSULTANTS COMPENSATION PROPOSAL BREAKDOWN OF LUMP SUM FEES • KEY WEST INTERNATIONAL AIRPORT ANNEX BUILDING/CUSTOMS AND BORDER PROTECTION FACILITIES DESIGN-EXTERIOR SECURITY AND ACCESS CONTROL IMPROVEMENTS 15 July 2019 Position: PRINCIPAL Project Manager Senior Engineer Senior Engineer CADD Administrative TOTAL • OA/OC MEP/Civil - Structural TECHNICIAN Rate($/Hour): $294 $199 $153 $153 $94 $83 Avg.Hourly labor hours Cost labor hours Cost labor hours Cost labor hours Cost labor hours Cost labor hours Cost labor hours Cost Rate SECURITY AND ACCESS CONTROL FOR GATE#1 Electrical Design 0 $0 2 $398 16 $2,448 0 $0 0 $0 0 $0 18 $2,846 $158 Comm/IT Design 0 $0 2 $398 16 $2,448 0 .$0 0 $0 0 $0 18 $2,846 $158 Civil Design 0 $0 2 $398 4 $612 0 $0 10 $940 J 0 $0 16 $1,950 $122 • Preparation of Construction Document Package and Specs 4 $1,176 2 $398 10 $1,530 0 $0 32 $3,008 4 $332 52 $6,444 $124 SUB TOTAL: 104 $14,086 GUARD SHACK Development of Performance Specification • 0 $0 6 $1,194 2 $306 0 $0 0 $0 2 $166 10 $1,666 $167 Foundation Design 0 $0 2 $398 - 0 $0 8 $1,224 0 $0 0 $0 10 $1,622 $162 Electrical and Grounding Design 0 $0 2 $398 8 $1,224 0 $0 0 $0 0 $0 10 $1,622 $162 Civil Design 0 $0 2 $398 4 $612 0 $0 10 $940 . 0 $0 16 $1,950 $122 Preparation of Construction Document Package and Specs 4 $1,176 2 $398 10 $1,530 0 $0 32 $3,008 • 4 $332 •52 $6,444 $124 SUB TOTAL 98 $13,304 EMERGENCY POWER Field/Code Review 0 $0 0 $0 8 $1,224 0 $0 0 $0 0 $0 8 $1,224 $153 Electrical design 0 $0 2 $398 20 $3,060 • 0 $0 0 $0 0 . $0 22 $3,458 $157 Preparation of Construction Document Package and Specs 4 $1,176 2 $398 10 $1,530 0 $0 32 $3,008 4 $332 52 $6,444 $124 • SUB TOTAL: - 82 $11,126 TOTAL LUMP SUM LABOR FEE: I 121 $3,5281 261 $5,1741 1081 $16,5241 81 $1,2241 1161 $10,9041 141 $1,16211 2841 $38,5161 $136 REIMBURSABLES Units Cost Printing and Reprograhics LS $ 350 Travel(1 trip) LS $ 600 _ • SUBTOTAL $. 950 • LUMP SUM TOTAL LABOR AND REIMBURSABLESII I $39,4661 • • •