5th Change Order 08/07/2019 MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE-ORDER PROJECT TITLE: Fence Repairs at Big Pine Parks INITIATION DATE: 07/24/2019 CHANGE ORDER NO: 5 TO CONTRACTOR: Florida Fence Corp. CONTRACT DATE:10/17/18 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price) $579,000.00 Net change by previously authorized Change Orders............................... $21,180.00 The(Contract Sum) (Guaranteed Maximum Price)prior to this Change order was $600,180.00 The(Contract Sum)(Guaranteed Maximum Price)will be increased)(unchanged) (decrease)by this Change Order $-8,000.00 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is $592,180.00 The Contract Time will be(changed)by 0 days The new date of Substantial Completion effective after this Change Order is 06/23/19 Detailed description of change order and justification: Watson Field and Big Pine Community Park tennis courts net posts, total of eight(8), have documented damages from Hurricane IRMA and require replacement. Change order 4 was for$16.000.00 to remove the old posts&sleeves, and concrete in new net posts/sleeves. During the repair Florida Fence exposed the underground sleeves and came to the conclusion with Project Management that there was no damage underground to the sleeve only to the posts, which reduced the scope of work resulting in the$8,000.00 credit to this contract since the extent of the labor and new concrete was not performed. This Change Order is 0.013%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor • ARCHITECT: N/A Date CONTRACTOR: �' ,,i/ r/U~ 1 2 I/Cj e DIRECTOR PROJECT MANAGEMENT , 14. , a / Date COUNTY/ASSISTANT ADMINISTRATOR: �! va ze./2 'fin Ga:tesi Date Key' W' on Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ❑ No® If Yes, explanation: • Change Order was included in the original specifications. Yes ❑ No® If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No® If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: thik Pvc sleeves have a little paint and rust color from old posts but sleeves are schedule 80 pvc and asphalt has discoloring from collar of old post wipe down takes most of it off but once painted will look perfect