03rd Change Order 04/07/2015 ONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 3 Marathon Airport Custom Facility, Guardian Ad Litem INITIATION DATE: March 26, 2015 TO CONTRACTOR: CONTRACT DATE:July 16, 2014 Pedro Falcon Electrical Contractors 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price) $1,091,403 00 Net change by previously authorized Change Orders. ... $ 32,368 37 The(Contract Sum)(Guaranteed Maximum Price) prior to this Change order was $1,123,771 37 The(Contract Sum)(Guaranteed Maximum Price)will be increased (decreased) (unchanged)by this Change Order ,.$ 42,400.43 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is , .$1,166,171 80 The Contract Time will be(increased)(decreased)(unchanged)by 28 days The date of Substantial Completion as of the date of this Change Order is. . August 12, 2015 Detailed description of change order and justification. (",%fauaa lofl'o.p"gvAtdta vassal om t a(( rart(pia r�(rr..1.e°au¢(a�a r d,.arAr.,wirra�t rd c� f a �(('(�raovy T fr+r a nlqqa s On co ts drr;t heater, condensing units, air co ,prcr P6 (wp�fr heater. I'hrs d hgtt . f p."f�rr(rrr f. 3 Ply" u of l an crfrpdnal ,osafrea f f f r . .. Not raa06a�rH......_�. ntil slg.irroa. 9 � c� b. rr INrC ar rf f rlta aLtlWa wr rtw a. s.. ., ARCHITECT: K2 � t 4�hVgD, Inc i-at Q CONTRACTOR: IIFalcon Electrical Contractors PROJECT MANAGERS f f Doug Date DIRECTOR PUBLIC WORKS/ENGINEERING f rrli a:; `s 6 APR 2015 Date COUNTY/DEPUTY ADMINISTRATOR' '„ ( y a:r ou G,aA sa h--bbie Frederick t`1 t:r;r Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Electrical hook up power was inadvertently omitted from the drawings for the electrical provisions for air conditioning equipment and hot water heater. The electrical panel on-site does not provide enough space for the addition of electrical provisions for the above equipment. A sub-panel must be installed. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No ❑ Explain: To be determined. ............. Pedro Falcon Contractors q General & Electrical Contracting 31160 Avenue C,Big Pine Key, FL 330.43-4516 (30.5)872-2200-Far(,305)872-2219 Piet CGC1507617 / EC1300.3416 .... ..................... Request for Change Order 26 Mareli 2015 Project: klan�fthon I Change Order Request No: Three Description: Flectricid Nyloddlc�s(IMIS ,4(fif Power Feeftv hr Equipineoit Not included-in Contract Elearical Sub-panel M!r Revised 1,,21.2 & E3�0-? Section A New Sub-Panel Materiak (1) 200 Amp 120/208V 3PH 4W 42 -CUit PWlei. __$550M(i) 200 Amp GE TFL23 6200WL.... ............ 31,125 M (1201LF) 2-1/2" EM'I' Conduit.,........................ ...... . -335T40 (15) 2-1/2" EMT Coupl ings. ........ ...... $W75 (3) 2-1[/2" EMT90's..... ................. ....... ........._$49.50 (6) 2 1/2" EMI' Connectors... ................_$46.20 (15) 2-1/2" EN11' Supports....... ...... _$41.25 (70 LF) 2 1/2" Sch 40 PVC Conduit... ... ....... _$126M (2) 2-1/2"' Sch 40 Ell & Coupling.. ...... ...._.AM89 (10) 2-1/2" Scli 40 Fitting,. ... ... ......._$28.60 (30 1 Y) 2.5" G RS Conduit, .. .... .... .. . ..... ......_3297.00 (4) 3" GRS Term..... ....................................... .. . ... ... $74.3 6 (6) 3" GRS Support.......................................... ... 144.29 (3) 12" x 12" x 6' DP Junction Box....................... ... .......... ..._$13100 Industrial - Cap mynercial - Institutional Utility Establis4ied 1985 (920 LF) #4/0 AWG TH" CU Wire............... ...................................$3,542.00 Excavate/Core Drill Equipment............. .......... .................. —$506.00 Landscape Restoration........................................ti ,.,.. .......,...,..$100.00 Subtotal Materials. ..... ...$7,130.24 Sales Tax on Materials;.. ,........ ............................... ................$534.77 TotalMaterials:.......................„.. . ............ ...........«..«.................$7,665.01 Labor; 87.54 MHS (a, $48.30............................................,.„.......... ... $4.,22�.1 Taxes/Insurance, Etc. @i; 38%.... TotalLabor:.......................... . ....... ....... --..........$5, 34. 9 Electrical Suet. General Conditions.....................................................$850.00 Project oor i i . 80 Hours (a>$100.00..............................................................,........ 8,000.00 SUBTOTAL LABOR,COORDINATION MATERIALS, DISPOSAL & EQUIPMENT............................................ .,...........$22,349. 0 Overhead (a) 5%.......................................................................... ........ .. ..........$ ,117.5 Subtotal....................................................................................$23,467.40 ProfitCad 5%..........................................................................................................$1,173.37 TOTAL ALL OFT E ABOVE SECTION A:.........$24,640.77 Section B mower Feeds for Equipment Materials: (140 1,F) 1/7." 1 -F Conduit.... . . ... ....... ............... 44 66 (14) 1/2" Em'r Couplings.... . . .......,.... ,.,,, .,..,.,,........,.$4.62 (30) %" EM 1'Coununectors., .,....... (14) 1/2"' KNIT Supports- ..., ..... ............o.....$1 1 25 (l 50 LF):' /4" EMT Conduit.. ....... ... ..............,...,...$7.5.90 (15) 1/4" EMIT C.one.pilings.......................... .... ..... .......... ........ ........$p3.20 (25)-/4" lENITConneettors. ........ ..�... ....... ,,,,,,.,............,...,.,..,... 22 ®0 (1.5) 1/4" EM•_p... Supports.................. ................................................--.' .,,$144 85 (9)-�J4" Flex 1.::°onnnecttion...,. .�... ......,.�.., ,............ ..... .. ... ...............$1.24 '74 (2) 1/4" Sealt�itteConnection. ... ........,..,..,....,..,...$3 . 08 (710 LF') 12 A.WG 'YH. CU Wire Sttranded ...,.. ................ .........3101A6 (600 LF) #10 AWG THWN CU Wire Sttranded...,.......„................. ...........$122,03 (40 LF)# ,rHW"N CU Wire.-......... . ................. ......... .. ......., ..............$12.95 ( 0 1_,F)#6 ,1'11WNN CU Wire......,., .. ... ,.......$.39.19 (6) Motor Rated S W"s.....................,..,,..,��.....,.,,.,,........,.,,..,.....,,,........,$297.,00 (2) 30 Amp .3R Disconnects C U's. , $40TO11 Subtotal Materials.......... . ..,.�..................,,,,...,...... ................$1.,13 .4 Sales tax on Materials, ........... TotalllMaterials:....,.............................................,.,........u,.w.®.........-...$1, 3 . 7 1_,abm 79.54 M1-1S fc�� $4 .30,. .. .....,.....,. ......$3, 41.7 7Caxes/1mura .ee" Otte. ( ), ,3 a%............ .,....... ...,.... ....... ..,,,...31"4.59. TotalLabor:...............................................................................$5,301.66 Electrical Supt. General Conditions.....................................................$350.00 Multiple Electrical PM Site Investigations..........................................$1,018.00 Project Coordination: 80 Hours (aD $100.00......................................................................$8,000.00 SUBTOTAL LABOR, COORDINATION MATERIALS, DISPOSAL & EQUIPMENT.........................................................$16,108.53 OverheadO 5 /®......................................................................................................$805.43 Subtotal................................................................. ....... ..........$16,913.96 Profit , 5%.............................................................................................................$845.70 TOTAL ALL OF THE ABOVE tl :......... Permit Fees and Designra i s are Not Included in this proposal. If additional permit ees are required a Owner is to reimburse all permit fees. Net Amount e est for Change Order:...................................................$ , . 3 Additional i e Requested for e: Aption i" Urre.rt,ly_ is Im;��a�rq;�a�l �aN��Sw ����t�°_�.w1 �7t.�' �..��i�G��ur����� tl�a �rrm&b Qied��q I work.�'.�. Respectfully Submitted, Ken Bygler Project Manager