Loading...
05th Change Order 06/30/2015 w MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 5 Marathon Airport Custom Facility, Guardian Ad Litem INITIATION DATE: July 23,2015 TO CONTRACTOR: CONTRACT DATE:-July 16,2014 Pedro Falcon Electrical Contractors 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)......................................... $1,091,403.00 Net change by previously authorized Change Orders...................................................$ 81,868.57 The(Contract Sum) (Guaranteed Maximum Price) prior to this Change order was.............$1,173,271.57 The(Contract Sum) (Guaranteed Maximum Price)will be(increased) (decreased) (unchanged)by this Change Order.......$ 2,756.25 The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is.......$1,176,027.82 The Contract Time will be(increased) (decreased) (unchanged) by.................................. N/A The date of Substantial Completion as of the date of this Change Order is.....................August 12, 2015 Detailed description of change order and justification: Repair to the 6"6re s rinkler trunk line that asses thr au.,.. ,h the ceili,09, This chap a Order is.002%of the on final contract rice. Not valid until signed bv Owner.Architect if applicable), a d Contractor ARCHITECT: 1 .D,esig an ,e: Date CONTRACTOR: 11 Pe 'ro Falcon Electrical Contractors :te DIRECTOR, PROJECT MANAGEMENT I Doug SposNt ate COUNTY/ASSISTANT ADMINISTRATOR: Roman as s Date Kevin 1lllii :fin Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No❑ If Yes, explanation: The fire sprinkler trunk line was discovered leaking during construction after removal of the ceiling tile. • Change Order was included in the original specifications. Yes❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: e Project architect approves the change order. Yes ® No ❑ If no, explanation of why: e Change Order is correcting an error or omission in design document. Yes ❑No ED Should a claim under the applicable professional liability policy be made? Yes❑ No ❑ Explain: qFPedro Falcon C6ntractors General & Electrical Contracting 31160Avenue C,Big Pine Key,FL 330434516 (305)872-2200•Fax(305)872-2219•falconel@bellsouth.net CGCJ507617/ EC13003416 Request for Change Order 23 June 2015 Project: l lyratl�,aiµr� ��°Ia � w(w�,► t w� C e rt tru Change Order Request No: Five Description 1,i.amc Spti � „i1tr la �� m�tl_ �airt N, lb `41:...,}r +�t�r„1rcitM, t, tr Move.4 r rrox. 8 i".f"or E".vr'sfin 6". riti ler Line tltttt Ls Iw -ft Ga s Plumbing, and Fire Inc. Fire Sprinkler Line Repair per attached estimate dated 6/16/16.................... ............................»........u...,.,.,.......a....,.—.32,100,00 Project Coordination................. .......... .....$400.00 SUBTOTAL LABOR,COORDINATION MATERIALS, DISPOSAL& EQUIPMENT...........................................................$2,500.00 Overhead@ 5%......................................................................................................$125.00 Subtotal......................................................................................$2,625.00 Profit @ 5%.............................................................................................................$131.25 TOTAL ALL OF THE E ABOVE:..................................$29756.25 Industrial • Commercial •Institutional • Utility Established 1985 u m. Permit Fees and Design Drawings are Not Included in this proposal.If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order:...................................................$2,756.25 Additional Time Requested for Change: This item will not cause delay to the project schedule pursuant to a timely approval of modification. Respectfully Submitted, Ken Bygler Project Manager OF ' Gary's Plumbing and Fire,Inc. Estimate 6409 2nd Terrace Suite 1 Key West,FL 33040 Date Ph.(305)296-6013 Fax(305)292-4978 6f,t6J2wS Now/Address Pedro Falcon 3116o Avenue C Key West,FL 33043 Project Marathon Customs F... l;a °�ptivnCwt Tow Ref; Fire Sprinkler System Sub Replacement of leaking line Lac: Marathon Airport Provide all la liar,material and equipment to replace section of 6"overheaisprinldcr sullply line caln endy Ic aski as Bn to o l"space below, ce slaB�r•a��rlana�teBy S"�af'f�'"laiBae,„l��Biaty tea Brae a"e°"Sch ias lFaly manauaAal pipe rvit''Bw ftrorsra�nY eoaaB�lings, . put,wysm,o back iaa o 64n-vkc, Repair Cost 2,100.00 2,100.00 We appreciate your continued businam. II Signature I Title