07th Change Order 08/12/2015 Y,
O ROE, COuNrY/ENG G/ PROJECT MANAGLWM
COXiXAGr CHANGE ORDER
PROJECT TITLE: CHANGE ORDER NO: 7
Marathon Airport Custom Facility,
Guardian Ad Liter INITIATION DATE: August f0,20f5
TO CONTRACTOR: CONTRACT DATE:July 10,2014
Pedro Falcon Electrical Contractors
31160 Avenue C
Big Pine Key,FL 33043
The Contract is changed as follows:
The orN tnai I;LM)(Guaranteed Maximum I r1 a)......... .........
Not chiange by,previously authorlxe-d Change Ofdors....... . .. . ......... .. . 90,02e,66
The (Gu,arhnteed Maximum Price)prior to this Change corder was....,,,......$1,102,332.66
The t ('Guaranteed Maximum Pdcs)will be (decreased)
(unchanged)by this Change Order,,, .3 22,381.70
The new(Contract Sumt(Guaranteed Maximum Price)Including this Change Order is.......$1.204,714.30
The Contract Time will be 4 M)(decreased)(unchanged)by....................•............. 60 Days ,
The date of Substantial Completion as of the date of this Change Order is......................October 11,2015
Detailed dascriptlon of change order and justification:
starat rldorrs tommm
_g&n and allow for
ARCHITECT: r
K2M i NJ to
CONTRACTOR: �
a ro Fa `on Electrical Contractors 5a
DIRECTOR,PROJECT MANAGEMENT a
Doug S
COUNTY/ASSISTANT ADMINISTRATOR:
Roman ds Date
Kevin Wilson
Christine Hurley
Change Order Attachment per Ordinance No. 004-1999
+ Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: The specifications included four custom made bullet resistant doors with
glass that had surface mounted hardware that didn't work. This change order re-makes the
door using the same bullet resistant glass while allowing surface mounted hardware to work
appropriately.
The original specifications indicated the swing of the door to the LAN room to swing inward.
For fire safety reasons, the door must swing outward. This change order corrects the swing
of the door.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds$25,000 or 5% of contract price (whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ®No ❑
Should a claim under the applicable professional liability policy be made? Yes ❑ No ❑
Explain: TBD
LPed'ro Falcon Contractors
q General & Electrical Contracting
31160ftvenue C,Big Pine Key,FL33043® 516
(305) 72-2200®1C (305) 72-221 •}aleonelCPbellsouth.net
CGC 1507617 l EC13003416
Request for Change Order
10 August 2015
Project I"w rrrtmmht ri Arr <3rt t tislo ri T rapina l
Change Order Request No: Seven
Description: Modify Bullet Resistant Door��taenit��� 10,5A to Accommodate
Surface Mounted Door Hardware. Provide lerla�cement Stirface Mounted Door
Ilard�yLipc Prgyide New Dpor and 1 rarrneIT t.1)o or . pcLnin&,# 1_07 to 1'v'fewet E 1: °Ss
1 e Mttrrer r rrt flr t fie�ra ct t..l Wr 5rr ftrr,S ioar SVS10111
Bullet Resistant Entry boor O )cn in gs##104 & 1,05A
U.S. Security (see attached Proposal)
Re-make Doors (4) Materials Only including Sales Tax...........,„ 32,870.25
Atlass Hardware(see attached Proposal)
Provide Surface Mounted Door Hardware.................................. .........$11,390.05
Pedro Falcon Contractors
Labor to Remove existing and Re-hang New Doors....................................$828.00
Re-install Door Hardware Previously Installed....................„...,..........,......$331.20
Repaint Doors.................................................................................$662.40
Dispose of Existing Doors.................„.,.....,.... ........ ... .,...............,....$215.00
Industriale Utility
Established 1985
LAN l ooin Door O enin 107
U.S. Security (see attached Proposal)
Re-make Door& Frame (1 Each) Materials
Only Including Sales Tax....................... ............... .........................$1,961.88
Pedro Falcon Contractors
Demo Existing Door&Frame,.............. ...... ....... ...........$248.40
Install New Door and Frame........... ...................................................$331.12
Repaint Door& Frame.................................................... .................$374.20
Patch Walls & Paint from Extensive Demo.................. .............$288.40
Project Coordination;
8 Hours @ $100.00................... ........,,a............... . ........,, ..........$800.00
SUBTOTAL LABOR, COORDINATION MATERIALS,
DISPOSAL & EQUIPMENT........................................................$20,300.90
Overhead *, 5%...................................................................................................$1,015.05
Subtotal.....................................................................................$21,315.95
Profit@ 5%.........................................................................................................$1,065.80
TOTAL ALL OF THE ABOVE:................................$22,381.75
This Request for Change Order Encompasses Only Those Items Specifically
Included Above. No Allowance Has Been Made for Time or Financial
Compensation, nor included in this Proposal, for any other work that has been or
may be affected by this work. Pedro falcon Contractors,Inc. reserves the right to
submit future Reasonable Requests for Modification relating to time or financial
compensation for any items not included in this proposal.
Permit Fees and Design Drawings are Not Included in this proposal. If additional
permit fees are required the Owner is to reimburse all permit fees.
Net Amount of Request for Change Order:...................................................$22,381.75
Additional Time Requested for Change: 60 Calendar Days
Six Weeks Lead Time From Approval to Procure and Have Materials Delivered On
Site Plus Two Weeks for Paint and Installation.Additional Time Extension May or
May Not Be Needed, and Requested,Dependent Upon the Comprehensive
Evaluation of Additional Modifications which are Currently Being Considered.
l cspcctlully Submitted,
„�.
Ken Bygler
Project Manager
i
5U.S. SECURITY SYSTEMS, I
Ken Bygler
Pedro Falcon Contractors
31160 Ave. C
Big Pine Key, FL 33043
Re:Additional Costs
Marathon Airport
Marathon, FL
Ken,
The following is a listing of the additional costs incurred on the above project
and a brief explanation of why the change was required:
1. Door Openings#104 and 105A:
Due to conflict with approved hardware and
door fabrication, both pairs of doors will have
to be re-made to "flush"security glass on exit
device side of door.Since we able to re-use
the existing size glazing,our costs involve only
fabricating the four(4) new BR rated doors.
For the sum of$2,670 7
2. Door Frame#107:,
Re-make Door opening#107 to reverse swing to be compliant
with egress requirements. P-
The cost of the other lite is$1,825. ✓. i� / � �/lD �o
Please advise as to how we are to proceed with invoicing these additional materials.
Sir ce
yR
Sohn 'Ames
Vjl� r sident
334-273.8778
tl 56 MARK.E T PLACE-MON"i`t3CbMER.Y,AL,ABA A 36117 W FAX#(334)273-9776
Quote
at P.O.Box 669477 Quote# 18915
Pompano Beach,FL 33066
T �tS HARDWARE CORP Tel:954-316-6160 Fax:954-316-1360 Quote Date Aug 6, 2015
Expiration Date : Oct 5, 2015
Customer: Ship To:
Pedro Falcon Electrical Contractors, Inc Marathon Airport
31160 Avenue C 9400 Overseas Hwy
Big Pine Key, Florida 33043-4516 Marathon, Florida 33050
Attn: Ken Bygler
Account Code PEDRO
Terms N30 Purchase Order#
Customer Job# Shipped Via Atlass Delivery Truck
Salesperson Chuck West
Order Name Marathon Airport Doors 104 and 105
Unit Extended
SAXgffldlj ri Price Price
2 Exit Device 3143 59 LC 8774 F ETE RHR 32D 2,626.19 5,252.38
2 Exit Device 3143 59 LC 8774 FETE LHR 32D 2,626.19 5,252.38
Description Price
Freight In-Finish Hardware 180.00
Pre-Tax Total 10,684.76
FL000-FL Florida State Tax 630.29
FL044-FLMONCTY Monroe County 75.00
Tax
Quote Total 11,390.05
Printed Aug 6,2015 6:16 PM