06th Change Order 08/06/2015 ^ u MON OE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO:6 Marathon Airport Custom Facility, Guardian Ad Litem INITIATION DATE: June 26,2015 TO CONTRACTOR: CONTRACT DATE:July 16,2014 Pedro Falcon Electrical Contractors 31160 Avenue C Big Pine Key,FL 33043 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price)................•..... ..........$1,091,403.00 Net change by previously authorized Change Orders......................... ......................$ 84,624.82 The JQQatr@gLjVj33j(Guaran,teed Maximum Price)prior to this Change order was,..... The(Q r ) )(Guaranteed Maximum Price)will be w r (decreased) (unchanged)by this Change Order.......$ 6,304.73 The new(Contract Sum)(Guaranteed Maximum Prig)Including this Change Order is.......$1,182,332.55 The Contract Time will be(increased)(decreased)( j)by.., .„• •....... NIA The date of Substantial Completion as of the date of this Change Order is.... .....•....August 12,2015 Detailed description of change order and justification: n I"P , contractB l ARCHITECT: 10 ate CONTRACTOR: XD P ro con Electricai Contractor DIRECTOR, PROJECT MANAGEMENT ADoug poslto COUNTY/ASSISTANT ADMINISTRATOR: vInWilson Gastsl Date Christine Hurley T Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The original specifications specified data cables running to the Customs and Border Patrol server. These cables are to be installed in the other existing offices. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No ❑ Explain: TBD , w , Pedro, Falcon Contractors General & Electrical Contracting 31160 Avenue C,Big Pine Key,FL,33 3- 16 (305) 72-220 -Fax(305)g72-2219-falc®nelC ellsouth.net C C'150717/ EC13003416 Request for Change Order 26 June 2015 Project Marattion Arc® CpsA1om',sTerj...n z aal Change Order Request No: Six Description: 1 c�niove S.ieci lied Leaja Cable at GAI, ace and i tin New data Cables t� 1,x,i,s.ta ng 1_pgrt,QV 1.1n:iversal Cabling 8 sttems Lnc. Remove CAT6 cables from Room 120 and 121 to LAN Room 107 Install New CAT6 cables from Main Terminal IT Closet to Rooms 120 (three F2 outlets) and Room 121 (one F2 outlet):........................... .......­­$2,123.00 One additional cable terminated above ceiling in Conference Room(not shown in quote)............... ....... ...$145.00 Total Universal Cabling.................................................................$29268.00 Pedro Falcon Electrical Provide conduit raceway run on exterior of building from Airport IT closet to GAL space (conduit exposed as entry/exit points and shallow underground along perimeter of building) and rough-in box for additional cable in Conference Room Industrial J Established 1985 u Materials (including tax.....................................................................$717.82 Labor 35 MHS at$48.30 (+Taxes Insurance @38%).................. . ............$2,332.75 Total Electrical............................................................................$3,050.57 Project Coordination: 4 Hours (a,$100.00.........................................................................$400.00 SUBTOTAL LABOR,COORDINATION MATERIALS, DISPOSAL & EQUIPMENT...........................................................$5,718.57 Overhead (c 5%.............................................................................................-.........$285,93 Subtotal.....................................................................................$6,004.50 Profit(a,) 5%............................................................................................................$300.23 TOTAL ALL OF THE ABOVE:.................................$6,304.73 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order: ........ .......... ........ ...................$69304.73 Additional Time Requested for Change: 0 Calendar Days Respectfully Submitted, Ken -Bygler Project Manager Universal Cabling Systems, Inc. Proposal Customer Name/Address Pedro Falcon Electrical 31 160 Avenue "C„ Date Proposal# Big Pine Key, Florida 33043-4516 6/26/2015 5341-MVSD Project Estimator Marathon Airport Customs-Change Order MV Description Qty Cost Total Attention: Ken Bygler Ref: Marathon Airport Customs- Change Order for Data Outlets- Room 120/121 to Existing Airport IDF Universal Cabling Systems, Inc. will supply labor and material for the removal of CAT6 cables from Room 121 and 120 to LAN Room 107. Universal Cabling Systems, Inc. will supply labor and material for the installation of CAT6 cables from Main Terminal IT Closet to Rooms 121 (one F2 outlet), and Room 120 (three F2 outlets), for a total of 8 CAT6 cables. Total Change Order 1 2,123,00 2.123.00 This Proposal is valid for(30)days from this date: 6/26/2015 All drawings,specifications and related documents are the copyright property or the Contractor and must be returned upon request. Reproduction of drawings, Total $2,123.00 specifications,and related documents in part or whole is forbidden without the Contractors written pennission.