1st Change Order 08/27/2019 MONROE CouNriy1ENGwEERiNG1 PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Cudjoe Fire Station No. 11 INITIATION DATE: 07/24/2019 CHANGE ORDER NO: 01 (West CPR#001) TO CONTRACTOR: West Construction, Inc. CONTRACT DATE: 08/15/2018 The Contract is changed as follows: The original (�Qoratract Sum) (Guaranteed Maximum Price)..................................... .—., $3,884,185.00 Net change by previously authorized Change Orders.................................................... $0.00 The(Co ntract Surat) (Guaranteed Maximum Price) prior to this Change order was................. $3,884,185.00 The (Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order...—. ,. $26,000.00 The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is..,......$3,910,185.00 The The date Contract Substantial Coranc eta ) (decreased) (unchanged) by.......................... ,. ...... 0 days p s of the date of this Change Order is.......... ..... ... 11/12/2019 Detailed description of change order and justification: There is one issue that per uires Mis change order., ) A forma strata it ona tlae ro'ect site arras oiscovertacl to contain a large r tray lit of or` araic ararl other unstailable rnaterr`aL The contractor excavated and rdisposed of the rttastar"table material, fillet/the excavated oil with c/ean f nnerock and compacted the pit to re triter/densit . Thp- CountZ and West Construction have mutually agreed upon an incremsed araaount of 26'000.00 t'or this additional work and materials, Not valid until si ned by Owner Architect if applicable). and Contractor CEI: none " Date CONTRACTOR: Dat DIRECTOR PROJECT MANAGEMENT '!" Date ... COUNTY/ASSISTANT ADMINISTRATOR: �� � �"-��.��� d� �-���- 27 AUG 2019 l�o.nan Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The location of possible organic or other unsuitable materials was discovered by a Geotech survey conducted as part of the project design. However, the extent and quantity of such material was not completely defined by the Geotech report. Although the Contractor should have expected to encounter some unsuitable materials, the exact quantity and level of effort to remove and replace said material was not known at the time of bidding. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No❑ If no, explanation of why: . • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: