3rd Change Order 08/27/2019 ONROE CouNTYANG E G/ PROJECT MMAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE:
Cudjoe Fire Station No. 11 INITIATION DATE: 0726/2019
CHANGE ORDER NO: 03
TO CONTRACTOR: (West CPR#004)
West Construction, Inc.
CONTRACT DATE: 08/15/2018
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum Price)................................... $3,884,185.00
Net change by previously authorized Change Orders..................................................... $27,972.19
The(Contract.Suml (Guaranteed Maximum Price) prior to this Change order was.........., $3,912,157.19
The.( orrtract Sum) (Guaranteed )' (��) (decreased) $2,348.03
u.raranteed Maxina�rm Price will be wreased decreased,
(unchanged) by this Change Order...................
The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is.... $3,914,505.21
The Contract Time will be(incr ed) (decreased) (unchanged) by........................ 0 days
The date of Substantial Completion as of the date of this Change Order is................ 11/12/2019
Detailed description of change order and justification:.
There is crrre issue that requ s this change order.-
1) At the d to he added to
the decontaraaination shower�altradv cfesi serf for this fire station. A make and model similar to
e e wash stations installed in other Counter stations was .aria cased. The Contract has
provide,d the aLha rahgq_quote to install this eye wash station.
This change order is 0.06% of the original contract price.
Not valid until signed by Owner Architect if ap 21licablel, and Contractor
CEI: none
Date
CONTRACTOR:
r ate
DIRECTOR PROJECT MANAGEMENT
Dat
PI
,d^
COUNTY/ASSISTANT ADMINISTRATOR: .: w,. - 27 AUG 2019
R�onian Gastesi Date
Kevin Wilson
Christine Hurley
Change Order Attachment per Ordinance No. 004-1999
Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: The original design for this station includes a decontamination shower in the
apparatus bay. Based on the current building codes, the decontamination shower serves as both a
full body shower and a face & eye wash, therefore a separate eye wash station is not required by
code. Every other fire station in the County has an eye wash station, but only a few have a
decontamination shower. The Fire & Rescue Department is requesting the addition of an eye wash
station, so that staff that may not be familiar with a decontamination shower will be able to quickly use
the eye wash instead.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No❑
If no, explanation of why: .
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No