3rd Change Order 08/27/2019 ONROE CouNTYANG E G/ PROJECT MMAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Cudjoe Fire Station No. 11 INITIATION DATE: 0726/2019 CHANGE ORDER NO: 03 TO CONTRACTOR: (West CPR#004) West Construction, Inc. CONTRACT DATE: 08/15/2018 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)................................... $3,884,185.00 Net change by previously authorized Change Orders..................................................... $27,972.19 The(Contract.Suml (Guaranteed Maximum Price) prior to this Change order was.........., $3,912,157.19 The.( orrtract Sum) (Guaranteed )' (��) (decreased) $2,348.03 u.raranteed Maxina�rm Price will be wreased decreased, (unchanged) by this Change Order................... The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is.... $3,914,505.21 The Contract Time will be(incr ed) (decreased) (unchanged) by........................ 0 days The date of Substantial Completion as of the date of this Change Order is................ 11/12/2019 Detailed description of change order and justification:. There is crrre issue that requ s this change order.- 1) At the d to he added to the decontaraaination shower�altradv cfesi serf for this fire station. A make and model similar to e e wash stations installed in other Counter stations was .aria cased. The Contract has provide,d the aLha rahgq_quote to install this eye wash station. This change order is 0.06% of the original contract price. Not valid until signed by Owner Architect if ap 21licablel, and Contractor CEI: none Date CONTRACTOR: r ate DIRECTOR PROJECT MANAGEMENT Dat PI ,d^ COUNTY/ASSISTANT ADMINISTRATOR: .: w,. - 27 AUG 2019 R�onian Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The original design for this station includes a decontamination shower in the apparatus bay. Based on the current building codes, the decontamination shower serves as both a full body shower and a face & eye wash, therefore a separate eye wash station is not required by code. Every other fire station in the County has an eye wash station, but only a few have a decontamination shower. The Fire & Rescue Department is requesting the addition of an eye wash station, so that staff that may not be familiar with a decontamination shower will be able to quickly use the eye wash instead. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No❑ If no, explanation of why: . • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: