Item C19C.19
t, BOARD OF COUNTY COMMISSIONERS
County of Monroe Mayor Sylvia Murphy, District 5
The Florida Keys � � � l'U , Mayor Pro Tern Danny Kolhage, District 1
�pw° Michelle Coldiron, District 2
Heather Carruthers, District 3
David Rice, District 4
County Commission Meeting
August 21, 2019
Agenda Item Number: C.19
Agenda Item Summary #5878
BULK ITEM: Yes DEPARTMENT: Project Management
TIME APPROXIMATE: STAFF CONTACT: Breanne Erickson (305) 292-4427
N/A
AGENDA ITEM WORDING: Receipt of monthly change orders for the month of July reviewed
by the County Administrator/Assistant Administrator.
ITEM BACKGROUND: There were six change orders considered and approved by the County
Administrator/Assistant Administrator during the month of July. The total cost of these change
orders is $181,768.76.
PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No 027-1998 was
adopted in order to provide that the County Administrator may approve separate, non -cumulative
change orders for construction projects and professional service contracts in amounts not to exceed
$50,000 (as amended per Ordinance No. 024-2015), or 5% of the original contract price, whichever
is greater. The BOCC requested a monthly report of all change orders considered by the county
Administrator.
CONTRACT/AGREEMENT CHANGES:
N/A
STAFF RECOMMENDATION: N/A
DOCUMENTATION:
Change Order Report - July 2019
FINANCIAL IMPACT:
Effective Date:
Expiration Date:
Total Dollar Value of Contract:
Total Cost to County:
Packet Pg. 627
C.19
Current Year Portion:
Budgeted:
Source of Funds:
CPI:
Indirect Costs:
Estimated Ongoing Costs Not Included in above dollar amounts:
Revenue Producing:
Grant:
County Match:
Insurance Required:
Additional Details:
N/A
REVIEWED BY:
If yes, amount:
Cary Knight
Completed
Chris Ambrosio
Completed
Budget and Finance
Completed
Maria Slavik
Completed
Kathy Peters
Completed
Board of County Commissioners
Pending
08/02/2019 10:49 AM
08/02/2019 11:21 AM
08/06/2019 11:57 AM
08/06/2019 1:12 PM
08/06/2019 1:26 PM
08/21/2019 9:00 AM
Packet Pg. 628
C.19.a
MONROE COUNTY CONSTRUCTION PROJECTS
CHANGE ORDERS
CONSIDERED BY THE COUNTY ADMINISTRATOR'S OFFICE
FOR THE PERIOD 07/01/19 — 07/31/19
CONTRACTOR
CO#
AMOUNT
DESCRIPTION
DATE
CAUSE
CONSIDERED
Tech of the Florida Keys
1
$1,600.00
Fitness court equipment needs to be moved from
7/16/19*
Original bid docs did not take it
Public Works at the airport to the park.
account that the equipment was r
Additional cost for move and additional 7 days
located on jobsite. Additional cc
added to contract.
accrued to have equipment moves
arley Toppino & Sons
1
$0
No cost time extension of 13 days added to
7/16/19*
Anchor design submittal from t
contract.
Engineer was delayed.
arley Toppino & Sons
2
$132,796.79
Additional scope of work to add repairs to
7/22/19*
Due to deteriorated condition
Shrimp Road and add 14 days to contract. Scope
Shrimp Rd., Engineering De
includes: remove existing asphalt, rework
elected to add additional scope
existing base, grade full width, mill and resurface
work to repair roadway.
full width and restri e.
Total $134,396.79
HURRICANE IRMA RELATED PROJECTS
* Approved
CONTRACTOR
CO#
AMOUNT
DESCRIPTION
DATE
CAUSE
CONSIDERED
Grader Mike, LLC
1
$34,652.50
Sediment Barrier line item for Long Beach Road
7/1/19*
Engineer of Record plans h
added to schedule of values. Erroneously omitted
quantity error. Missing line item
in bid docs.
sediment barrier on RFP.
co Sports Lighting, LLC
2
$1,150.00
Additional electrical work was needed to tennis
7/16/19*
Electrical conduit is undergrou
courts.
and any damages could not
assessed until work be an.
o Air Mechanical Service
1
$11,569.47
Change in equipment and additional controllers
7/24/19*
Incorrect equipment with incorrf
Corp.
required.
curb adapters in previous proposa
Total $47,371.97
$181,768.76 Total (capital + hurricane)
* Approved
6
E
Packet Pg. 629
C.19.a
CHANGE ORDERS HAVE CUMULATIVE TIME EXTENSIONS OF OVER 6 MONTHS (180 DAYS):
ements — Stock Island Jail Complex. Original date of substantial completion was 02/20/17:
J substantial completion 31 days due to delays in procuring the Air Handlers.
J 60 days due to delays in procuring the Air Handlers.
J 90 days due to delays in the installation of Chiller #1.
J 120 days. 28 day delay to repair the concrete spalling on the roof for the cooling tower and 92 day due to delays
J by Hurricane Irma.
J 30 days due to delays in coordinating with the sub -contractor.
J 30 days due to delays in coordinating with the sub -contractor.
J 30 days due to delays in coordinating with the sub -contractor.
J 35 days due to the deteriorated security bars found that had to be removed and replaced.
J 30 days due to the fabrication and lead time needed for the security bars in CO #11.
J 60 days due to an error and omission in the original specifications. Contractor has to recommission two Daiken Chillers
ft up the condenser water pumps to be controlled by the chillers.
J substantial completion by 60 days to install two control valves in the condensate lines at the towers, and one equalizing
)etween the towers. These were omitted from the drawings and specifications.
d substantial completion by 30 days due to delays in scheduling the recommission and support to the two Daiken Magnetic
r Cooled chillers.
d substantial completion by 30 days due to delays in scheduling the recommission and support to the two Daiken Magnetic
Water Cooled chillers.
id substantial completion by 45 days due to delays in scheduling the recommission and support to the two Daiken
ietic Water Cooled chillers.
id substantial completion by 120 days due to delays as stated above and three automatic valve failures.
J substantial completion by 90 days due to engineering problems with the cooling towers overflowing.
days from beginning substantial completion to July 30, 2019 is 891 days.
Packet Pg. 630
Le- M ill # I z aft 9 L"'; NMI
PROJECT TITLE:
Bernstein Park Fitness Court
TO CONTRACTOR:
Sea Tech of the Florida Keys
131 Palomino Horse Trail
Big Pine Key, FL 33043
The Contract is changed as follows:
INITIATION DATE: (June 19, 2019)
CHANGE ORDER NO: I
CONTRACT DATE: February 7, 2019
The original (Contract Sum) (Guaranteed Maximum Price) ................................... .......... $49,925.00
Net change by previously authorized Change Orders- ............ ...... — —$0
The (gqntraqt_aym j (Guaranteed Maximum Price) prior to this Change order was— .... --$49,925.00
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) by this Change Order,.$1,600.00
The new (Contract Sum) I _(Guaranteed Maximurn Price) including this Change Order is ...... —.$51 525.00
The Contract Time will be (increased) by .......... ...... ...... ..................... ................. 7 Calendar
Days
The date of Substantial Completion as of the date of this Change Order is ....... ..............July 16, 2019
Detailed description of change order and justification:
This chaporder includes addin, ill Dicking up and n7oving, all fitness COUrt Dart S and materials from, Public,
Works on North Roosevelt to Bernstein Park on Stock Island. This will also include a tirrae extension of 7
This change order is 3.204807% of the original contract price,
ZM=Kmiu
ARCHITECT:
CONTRACTOR:
DIRECTOR PROJECT MANAGEMENT
COUNTY/ASSISTANT ADMINISTRATOR:
�i
0j
Jul 2019
Mriian Gastesi Date
Kevin Wilson
Christine Hurley
I Packet Pg. 631 1
Change Order Attachment per Ordinance No. 004-1999
0 Change Order was not included in the original contract specifications. Yes n Noo
If Yes, explanation:
# Change Order was included in the original specifications, Yes E] Noo
If Yes, explanation of increase in price:
0 Change Order exceeds $50,000 or 5% of contract price (whichever is greater), Yes El No (9
If Yes, explanation as to why it is not subject for a calling for bids,
• Project architect approves the change order. Yes F-1 Nolo
If no, explanation of why:
Change Order is correcting an error or omission in design document. Yes [INoo
Should a claim under the applicable professional liability policy be made? Yes n No
Explain:
6
E-11
I Packet Pg. 632 1
Monroe County Engineering
Attn: Matthew Howard
1100 Simonton Street, 2-216
Key West, FL 33040
Re: Bernstein Park Fitness Court
Subject: Change Order #0 1 — Transport Fitness Equipment, Install Irrigation & Sod
We hereby propose to furnish materials, equipment and perform the labor necessary to complete the
following:
1- Field Overhead
1.1
Dump Fees
1
ea
@
200
1.2
Supervision
48
hrs
@
50
Field Overhead Subtotal
2 - Install
Irrigation and Sod area around Fitness Court
21
Irrigation Installation
1
Is
@
6500
22
Sod materials including delivery
2800
sf
@
0,85
2.3
Skid Steer
8
hrs
@
125
2.3
Installation of Sod (3 Men)
24
hrs
@
120
Install Irrigation and Sod area around Fitness Court Subtotal
3 - Load and Transport Fitness Equipment
2,1
Truck & Trailer
8
hrs
@
125
2.2
Labor to load equipment
8
hrs
@
80
Load and Transport Fitness Equipment Subtotal
Overhead
Profit
TOTAL
$200,00
$2,400.00
$2,600.00
$6,500.00
$2,380,00
$1,000.00
$2,880,00
$12,760.00
$1,000,00
$640.00
$1,640.00
$15,36000
5% $76&00
$16,128,00
5% $806,40
$16,934.40
All material is guaranteed to be as specified and the above work to be performed in accordance with the
manufacturer's specifications and completed in a substantial workmanlike manner for the sum of:
Sixteen Thousand, Nine Hundred Thirty Four and 40/00 ............. $16,934.40
Page 1 of 2
6
E-11
I Packet Pg. 633 1
MoNwE CouNTYANGiNEERiNG/ PRojEcT MANAGEmENT
CONTRACr CHANGE ORDER
PROJECT TITLE:
Big Coppitt Ramp Repairs
TO CONTRACTOR:
Charley Toppino & Sons)
129 Toppino Industrial Drive
Key West, FL.
The Contract is changed as follows:
INITIATION DATE: 07102119
CHANGE ORDER NO:
CONTRACT DATE: 2/20/19
The original (Contract Suan) (Guaranteed Maximum Price) ................ .............. -.1252,000.00
Net change by previously authorized Change Orders .................. .................. ..$0
The (gqnkg�2t S am (Guaranteed Maximum Price) prior to this Change order was, ....... —$0
The (Contract SUM) (Guaranteed Maximum Price) will be (Lin_cr&a§qdj (decreased)
(unchanged) by this Change Order —
The new (Contract Sum)_(Guaranteed Maximum Price) including this Change Order is... .... $252,000.00
The Contract Time will be (increased) (decreased) (un_changed) by .................................. 13 days
The date of Substantial Completion as of the date of this Change Order is ................. . —... 7/19/19
Detaiiled description of change order and )ustificatiow
Due to a delay in an anchor desion submittal from the Late needs to be
delayed bv 13 days.
This change order is 0 % of the original contract price.
ARCHITECT:
CONTRACTOR:
DIRECTOR PROJECT MANAGEMENT
COUNTY/ASSISTANT ADMINISTRATOR:
Roplian Gastesi
Kevin Wilson
Christine Hurley
M
16 July 201
Date
I Packet Pg. 634 1
Change Order Attachment per Ordinance No. 004-1999
0 Change Order was not included in the original contract specifications. Yem[D No
IfYes, explanation: Adelay ononanchor submittal was not included inthe original oonhouL
0 Change Order was included inthe original specifications. Yes []Nm[I
0Yes, explanation ufincrease inprice:
0 Change Order exceeds $5O,000or5Y6ofcontract price (whichever isgroater. Yes []No2
KYes, explanation antowhy his not subject for acalling for bids:
� Project architect approves the change order. Yes ����
No[]
.^
Uno, explanation ofwhy: Submitted for his signature.
* Change Order iscorrecting anerror uromission indesign document. Yes ZNo[J
Should mclaim under the applicable professional liability policy be made? Yes ElNoZ
Explain:
Due to the dynamic nature of parts within the design, this submittal needed to he addressed for an
accurate sizing.
6
6
qW
Charley Toppino & Sons
129 Toppino Industrial Dr
Key West, Ft
305-296-5606
June 27, 2019
Rob Tutor P.M.
Monroe County Public Works & Engineering
F171"T Wl *3
Charley Toppino & Sons is requesting a time extension for the Big Coppitt Boat Ramp due
to changes in the anchor design. We would like to request a substantial completion date of
7/19.
Thank you,
Jordan Mannix-Lachner
Charley Toppino & Sons
An Equal Opportunity Employer
I Packet Pg. 636 1
C.19.a
ONROE COUNTYANGINEERING/ PROJECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE: Stock Island II Roadway Improvements Project - - CHANGE ORDER -NO: 2
INITIATION DATE: 07/16/19
TO CONTRACTOR: Charley Toppino and Sons, Inc. CONTRACT DATE: 03/21/19
The Contract is changed as follows:
The original Contract Sum .$3,423,967 26
Net change by previously authorized Change Order _ $86.264 90
The Contract Sum prior to this Change order was _ _ _ _ ..$3,510.232 16
The Contract Sum is (increased) by this Change Order #2 _ _ _$132,796 79
The Revised 1 Contract Sum including this Change Order $3,643,028 95
Pursuant to contract article 7 2,2, the cost or credit to the owner resulting from a change in the Work shall be
determined in one or more of the following:
7 2 2 1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit
evaluation
7 2 2 2 unit prices stated in the Contract Documents or subsequently agreed upon,
7 2 2 3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or
percentage fee
Due to the deteriorated condition of Shrimp Road from 511 Avenue to 1,202 feet south, it was elected to add an
additional scope of work to the Stock Island II Project The scope includes: remove existing asphalt, rework existing
base, grade full width 542 feet in length, mill and resurface full width 660 feet in length, and restripe the area.
This Change Order accounts for a credit of $ (45,600 00) to adjust (24) existing curb drainage inlets and adds an
additional (17) inlets to be installed as a result of the deteriorated condition of the existing inlets_
A total of 14 days is added to the contract time to perform additional work as a result of the increased scope to the
Stock Island II Project
This Change Order us,3 88% of the original contract price
CONTRACTOR'µ "
ENGINEERING SERVICES DIRECTOR,
ASSISTANT COUNTY ADMINISTRATO
MAYOR
MV
Date
22 u� 20:
Date
Date
7.16.19 Charley Toppino and Sons, Inc. C.O. 2
Packet Pg. 637
C.19.a
Monroe COUnt\ Engineering Department Jule 15, 2019
Judith Clarke, P.E.
110 Simonton Street
Kev West, EL 33040
Project: 442001-1-54-01 Stock Island II
Subject: Change Order #2
The summarN of contract dollar changes is sho\� n bclo\%:
Original contract amount ._ ,, _. ,,,.., . $3.=423,96726
Net change by previous authorized change orders ....... , ... $86.264.90
The contract sum prior to this change order . ....... .................... ................ $3_5 I0,232 16
The contract sum will be increased by this change order #2 ,........._....... 5132,796 79
The new contract sum including this change order .................................. $3,643,028.95
BeloN\ is a detailed description of change order 92.
Due to the deteriorated condition of Shrimp Road from -5'h Avenue to 1.202 feet south_ Monroe County elected
to add an additional scope of «ork to the Stock Island II Project. The scope includes: Remove existing asphalt.
reN\ork existing base, grade full width -5 42 feet in length, mill and resurface full width 660 feet in length, and
restripe the area. Bclo\N is a list of the pa\ items need to complete the Nvork.
Pay Item 102-1A Maintenance of Traffic
Due to the additional \pork on Shrimp Road there is additional MOT This resulted in an overrun of l LS
Pay Item 110-1-1A Clearing and Grubbing
Due to the additional \\ork on Shrimp Road there is additional clearing and grubbing. This resulted in an
ovemm of 1 LS,
Pat Item 285-7 Optional Base Rework
Due to the additional ��ork on Shrimp Road the contractor \\ill have to rck\ork/regrade the existing base
material and add material as needed to meet the desired template. This resulted in an overrun of 1_4=4-5 SY.
Pay item 327-70-1 Milling Existing Asphalt Pavement
Due to the additional work on Shrimp Road the contractor will have to do additional milling. This resulted
in an o-vcrrun of 1.467 SY,
Pay item 334-1-1 Superpave Asphalt Concrete Pavement, Traffic A
Due to the additional work on Shrimp Road the contractor vv ill be pav ing full Nv idth and 1,202 lineal feet of
roadway. This resulted in an oNcrrun of 192 TN.
Packet Pg. 638
C.19.a
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
Additional work on Shrimp Rd was added to this contract.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No ❑
If Yes, explanation as to why it is not subject for a calling for bids:
Construction in progress.
• Project engineer/architect approves the change order. Yes ❑ No
If no, explanation of why: Approved by Monroe County staff.
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
7.16.19 Charley Toppino and Sons, Inc. C.O. 2
6
E
Packet Pg. 639
C.19.a
ONROE COUNTY/ENGINEERING/ PROJECT MANAGMENT
CONTRACT CHANGE ORDER
PROJECT TITLE: Hurricane Irma Roadway Repairs II CHANGE ORDER NO: 1
INITIATION DATE: 6120119
TO CONTRACTOR: Grader Mike, LLC CONTRACT DATE: 4/17/19
The Contract is changed as follows:
The original Contract Sum ...................................... ..................................... -- .......... $350,503.30
Net change by previously authorized Change Order ....,...„ . . ............... $0
The Contract Sum prior to this Change order was ........... ..................................... «.......$350,503.30
The Contract Sum is (increased) by this Change Order #1.... $34,652.50
The Revised 1 Contract Sum including this Change Order $385,155.80
Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the Work shall be
determined in one or more of the following;
7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit
evaluation
7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon
7.2.2.3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or
percentage fee
The addition of line item in Schedule of Values for Long Beach Road for Sediment Barrier that was omitted in Bid
Documents:
P ___
10 3 e
UOM
104 Sedimnt Barrer 13,861
Bid item No Descri tion uan itr _......
LF
This Change Order is 9.99% of the original contract price.
CONTRACT
ENGINEERING SERVICES DIR
ASSISTANT COUNTY ADMINISTRATO
Date
1 July 2019
Date
MAYOR
Date
Packet Pg. 640
C.19.a
Change Order Attachment per Ordinance No. 004-1999
0 Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
Engineer of Record (Metric Engineering, Inc) plan quantity error
e Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
0 Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ® No ❑
If Yes, explanation as to why it is not subject for a calling for bids:
Construction in progress.
e Project engineer/architect approves the change order. Yes ❑ No
If no, explanation of why: Approved by Monroe County staff.
Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
Sediment Barrier quantities were omitted from the bid documents.
6.20.19 Grader Mike C.O. 1
6
E
Packet Pg. 641
C.19.a
Grader Mike, LLC.
2 Bay Drive
Key West, FI.33040
Director of Engineering Services
Monroe County Engineering Dept.
1100 Simonton Street
Key West, FI.33040
05/07/2019
Change Order# 1
Pursuant to that agreement between Monroe County, described herein as OWNER and Grader Mike,
LLC. described as Contractor, dated 04/17/2019.
The following change is made in the specifications and scope of work to be performed:
The addition of line item in Schedule of Values for Long Beach Road for Sediment Barrier that was
omitted in Bid Documents:
13,861 LF. @ $2.50/If. = 34,652.50
All payments agreements and contract conditions will remain the same as contained within the above
mentioned contract dated 04/17/21019
Not Valid until signed by Owner and Contractor
The Original Contract sum was $ 350,503.30
Net Change by previous authorized change orders $ .00
The contract sum prior to this change order $ 350,503.30
The contract amount will be increased by this change order by amount of $ 34,652.50
The new contract sum including this change order is $ 385,155.80
The contract time will be unchanged by 0 days
The substantial completion date will remain unchanged
CONTRACTOR:
OWNER:
Title:
Packet Pg. 642
C.19.a
MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE:
Watson Park Baseball Field Lighting Repair
TO CONTRACTOR:
Musco Sports Lighting, LLC
100 15r Ave W
Oskaloosa IA 52577
The Contract is changed as follows:
INITIATION DATE: June 26, 2019
CHANGE ORDER NO: 2
CONTRACT DATE: February 20, 2019
The original (Contract Sum) (Guaranteed Maximum Price)............................................$42,892.00
Net change by previously authorized Change Orders...................................................$9,780.00
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was.............$52,672.00
The (Contract Sum) (Guaranteed Maximum Price) will be increased by this Change Order.,$1,150.00
The new (Contract Sum) -(Guaranteed Maximum Price) including this Change Order is ....... $53,822.00
The Contract Time will be (unchanged) by................................................................. 0 Days
The date of Substantial Completion as of the date of this Change Order is.....................June 18, 2019
Detailed description of change order and justification,
I"�l.arrltr !'tl.t�tlt cif' Iho e1�t�fiai t tte t�rtlris c: � !r w t�rc�t � ! �rtk rt��h�ac�al�ct'lit���,fr�rcftms�c�ncl sa
La (-I-( "('! eP w l f )lo e 1110 pfoiect inchi r i exposing the old )i e !''oino�+ins; an t ro ,�d Gina the coltlltlit,
a ! httin !listfilnction w va i'!tg 1!!'rt lgJ to ltt wkl art11( r lan�Lr d-'QLt; 1?allr_Ir a hart olt tec1 ltr�c,l It tr
This change order is 2.183323 % of the original contract price.
Not valid until si ned bv Ownner. Architect lif a p licable and C tractor
ARCHITECT„
CONTRACTOR:
DIRECTOR PROJECT MANAGEMENT
COUNTY/ASSISTANT ADMINISTRATOR:
N/A
„ A�an
6 ul 2019stesi Date
Kevin Wilson
Christine Hurley
Packet Pg. 643
C.19.a
Change Order Attachment per Ordinance No. 004-1999
Change Order was not included in the original contract specifications. Yes ❑ NA
If Yes, explanation:
Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
0 Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No®
If Yes, explanation as to why it is not subject for a calling for bids:
Project architect approves the change order. Yes ❑ No®
If no, explanation of why:
o Change Order is correcting an error or omission in design document. Yes ❑No�
Should a claim under the applicable professional liability policy be made? Yes ❑ No
ky
Explain:
Packet Pg. 644
C.19.a
Brin -Keith
From: ecsinc25@aol.com
Sent: Wednesday, June 26, 2019 12:20 PM
To: Deb DeVos; Bring -Keith
Cc: Gene Fynaardt
Subject: Re: Musco Work Order - Watson Field Tennis Electrical Repairs
Deb/keith
We had to repair a damaged section of conduit to pull the wire. My proposal had an additional charge of
$1150 if that occurred. Please add that to your invoice to Monroe county. Keith is aware of it. Pictures of the
damaged conduit are attached. The job is complete at this time.
i
Packet Pg. 645
C.19.a
m
6
E-11
I Packet Pg. 646 1
I C.19.a I
Packet Pg. 647
C.19.a
Thanks, chuck
Sent from my iPhone
On Jun 13, 2019, at-4:06-PM, Deb DeVos <deb.cle os(,ih usco.com> wrote:
Hi Chuck.
Attached is a revised work order for Watson Field to include the additional electrical
repairs required on the tennis court lighting for $9,780. Please complete the following
service:
- Provide and install 1 new 100 amp outdoor panel
- Provide and install new 38 wire to feed Tennis Lights (2 circuits total)
- Provide acid install i new contactor and tulle clock on Tennis Pole
Please contact the Site Contact(s), as stated below, prior to arrival to make arrangements for
someone to
meet you on site. Contact: Keith Bring, Project Management b i ng-kej tIva)n1on,roCC0Lin tyfL gy,
305-292-4523
Job location: Watson Field, 30150 South Street, Big Pine Key, FL 33043
Please contact me when the work is complete for processing purposes.
Thank you.
Deb DeVos
Musco Sports Lighting, LLC
Service and Parts Coordinator
800.825.6020 x.2380 (CST)
6/13/2019
<Watson Field (revised 6.13.19) SVC-414624.pdf>
4
Packet Pg. 648
Via. f
A
LI Kox, N m A'jor"MINJO401.4 -L—
PROJECT TITLE- MCSO MaIke up Air units (2) GAANGE ORDER NO: 1
INITIATION DATE. 3122118
COUT-T4CIF
I ' 2700 Avenue of the Americas ewo 7ogo, Englewood, FL. 342�24
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum (Price).. ............... ......... 116,700
Net change by previously authorized Change Orders...... . ........... $0
The (Contract Sumi) (Guaranteed Maximum Price) prior to this Change order was,...., 116,700
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order.,... .,$11,569.47
The new (Contract Sum)_(Givaranteed Maximum Price) including this Change Order is.—...$28,269.47
The Contract Time will be (increased) (decreased) (unchanged) by.. . ......... ...... 0 weeks
The date of Substantial Completion as of the date of this Change Order is., . ......... 5/30/19
X III
MISM. =-Mzazm�- =EENZI=
Incorrect egerr pinert with incorrect cur q adootern it 0sal and additional controllers and
egu)Qrnent re aired.
This change Ordet'is 59 % of the o6ginal contrLaqigt�r�ce.
1101571W.1 Wril, in UNIMMM a �-- �11 WIL40011 40,
. .. ....................... . . . ....... ... . ................ . . ........... . . . .................................... . ....... . .. ......... ..... - .
10101 ? I I ILYTIT4 &11010
DIRECTOR C;uc.Zli�,!ej
reTsing 1 111 g a IF-j 11
A-
gate
Date
date
24 July 2019
0 an Gastesi Date
Kevin Wilson
Christine Hudey
RM
0111
I Packet Pg. 649 1
C.19.a
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: The original parts assumed in the price quotation were incorrect. This change
order corrects the contract based on correct parts.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater).Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids: cv
0
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain: N/A
Packet Pg. 650
C.19.a
em�Vc.�a�Mi 1140,
„O
Na.
� ",uVQ� +hvii�uu�uuiWutl Ulm +Murnr�uiir,� 325 �kuTr�rorD1 Road3d�uil� �3arorao�waotlVrt* IiUuaUl7�ra°IM
a�°ul,ua 6 � 33614 Euu�dui���+tumid �u h, V �,� ° P �, ��s�D�N u��U�U ��"��l. d'�Ud" 11,ulll��u�� u��a�U:,�d'q��"r�uU�au
a�up� FL 33684
MONCNFLT
MONROE COUNTY FAC MAINT
3583 S. ROOSEVELT BLVD
KEY WEST, FL 33040
58429
MONROE COUNTY GOVERNMENT
STOCK ISLAND JAIL
STOCK ISLAND JAIL
EXHAUST FANS REPLACEMENT
5501 COLLEGE RD
KEY WEST, FL 33040
94081 RE\
B U.IL "PHRU ... TERMS MGM::= DATE PAC �
Net30 7/17/19 ' 1 n
PROVIDE LABOR AND MATERIAL TO REMOVE AND REPLACE (2) ROOFTOP MAKEUP/EXHAUST =
FAN UNITS. DATE OF INSTALLATION IS 05/30/19.It-
cv
JOB #31802321
1 TOTAL AMOUNT 28,269.47 28,269.47*
*PRICE REFLECTS INCORRECT EQUIPMENT WITH INCORRECT CURB
ADAPTERS IN PREVIOUS PROPOSAL AND ADDITIONAL CONTROLLERS 0
REQUIRED. cm
* means item is non-taxable
28,269.47
$28,269.47
A N.P N�AA1unpQN1 „u 4, 0 AVAr.OUANESS u°wu68M 04C 60-W301855 FAX sn",b,3•5,'J. ntl'allo
F I 4 II.1 I![f7 NI I ➢i eA
Packet Pg. 651