1st Change Order 07/16/2019 MONROE COUNTYIENGINEERINGI PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Big Coppitt Ramp Repairs INITIATION DATE: 07102119 CHANGE ORDER NO: TO CONTRACTOR: Charley Toppino& Sons) CONTRACT DATE:2/20119 129 Toppino Industrial Drive Key West, FL. The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price)............................................$252,000.00 Net change by previously authorized Change Orders............................................... ..$0 The(Contract Sum)(Guaranteed Maximum Price) prior to this Change order was.............$0 The(Contract Sum) (Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order . ....$ The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is.......$252,000.00 The Contract Time will be(increased)(decreased)(unchanged)by........................ ......... 13 days The date of Substantial Completion as of the date of this Change Order is...................-... 7/19/19 Detailed description of change order and justification: Due to a delay in an anchor design submittal from the Engineer, substantial completion date needs to be delayed by 13 days. 1l This change order is 0 %of the original contract price. a��1 O� Not valid until siqned by Owner, Architect (if applicable),and Co*accttgr NO, 48982 STATE OF ARCHITECT: fiG> g �. Ein k ® ate CONTRACTOR: 2dClaL ac �6rr�°� 712/19 Yale DIRECTOR PROJECT MANAGEMENT Date t COUNTY/ASSISTANT ADMINISTRATOR: _�" �_ �'r� - ,��ti, ___ 16 July 2019 F;onian Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 ® Change Order was not included in the original contract specifications. Yes ® No❑ If Yes, explanation: A delay on an anchor submittal was not included in the original contract. • Change Order was included in the original specifications. Yes❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes X No ❑ If no, explanation of why: Submitted for his signature. • Change Order is correcting an error or omission in design document. Yes ®No❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Due to the dynamic nature of parts within the design, this submittal needed to be addressed for an accurate sizing. 1 i e i Charley Toppino&Sons 129 Toppino Industrial Dr Key West, FL 305-296-5606 June 27,2019 Rob Tutor P.M. Monroe County Public Works&Engineering Dear Rob, Charley Toppino&Sons is requesting a time extension for the Big Coppitt Boat Ramp due to changes in the anchor design. We would like to request a substantial completion date of 7/19. Thank you, Jordan Mannix-Lachner Charley Toppino&Sons An Equal Opportunity Employer