Loading...
08/15/2019 Agreement TASK ORDER FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES BETWEEN MONROE COUNTY AND WILLIAM P. HORN ARCHITECT,PA. FOR BERNSTEIN PARK FITNESS COURT IRRIGATION ZONE In accordance with the Consultant Agreement for Professional Architectural and Engineering Services, made and entered into on December 19, 2018, between MONROE COUNTY, hereinafter referred to as the"County,"and William P. or Architect, PA, hereinafter referred to as "Consultant," where professional services are allowed if construction costs do not exceed Two Million and 00/100 Dollars ($2,000,000.00), or for study activity if the fee for professional services for each individual study under the contract does not exceed Two Hundred Thousand and 00/100 Dollars ($200,000.00), hereinafter referred to as "Agreement" the parties enter into this Task Order. All terms and conditions of the Agreement apply to this Task Order, unless this Task Order amends,adds, or modifies a provision or an Article of the Agreement of which will be specifically referenced in this Task Order and the amendment, addition, or modification shall be precisely described. These additions apply only to the project referenced in this Task Order. This Task Order is effective on the 15"of August 2019, WHEREAS, with the addition of a fitness court complex added into Bernstein Park on Stock Island, it is now necessary to detail the surrounding park area around the court. This will include adding an irrigation zone to the existing irrigation system. This includes, installation of the correct valves, pvc pipe and fittings, wiring, and irrigation heads and incorporate a new irrigation zone into the current irrigation controller and original as-builts. NOW, THEREFORE, in consideration of the mutual promises and covenants set forth below, the parties agree as follows: 1. In accordance with Article If, SCOPE OF BASIC SERVICES of the Agreement the Consultant will perform services as described below: a. Consultant shall conduct an oh-site evaluation to assess the current irrigation system and effectively add the new irrigation zone. b. Consultant shall review the irrigation layout and incorporate the new irrigation zone into the as-built drawings that are pen-nit-able and show technical specifications, as available, Page 1 of 2 i c. Consultant shall prepare an irrigation construction drawing to extend the existing i irrigation system into the existing areas on either side of the fitness court (approximately 2,800 square feet). d. Bid phase and construction phase services will be provided as needed for the position of Architect at$175.00/Hour. e. The County will provide the Consultant architect a survey of existing conditions, i f. Construction drawings shall be completed within fourteen (14) calendar days of delivery of the survey of existing conditions to the Consultant. 2. In accordance with Article VII,paragraph 7.1.1 of the Agreement,the County shall pay the Consultant a lump sum fee of One Thousand Five Hundred and 00/100 Dollars($1,500.00) paid upon document review and approval by the Director of Project Management. All other Terms and Conditions of the Task Order shall remain in accordance with the Agreement as amended. IN WITNESS WHEREOF,each party caused this Task Order to be executed by its duly authorized representative. CONSULTANT• WiIlia,rill, Horn Architect,PA. Ve MONROE COUNTY: - t eniinistr°ator or Designee Date MONROE COtJ'NTY ATTCPNi V Y Page 2 of 2