Item D09 D.9
t,* BOARD OF COUNTY COMMISSIONERS
County of Monroe Mayor Sylvia Murphy,District 5
The Florida Keys l'U � � Mayor Pro Tern Danny Kolhage,District 1
�pw° Michelle Coldiron,District 2
Heather Carruthers,District 3
David Rice,District 4
County Commission Meeting
September 18, 2019
Agenda Item Number: D.9
Agenda Item Summary #6016
BULK ITEM: No DEPARTMENT: Local Disaster Recovery
TIME APPROXIMATE: STAFF CONTACT: Helene Wetherington (305) 289-
2524
10:00am
AGENDA ITEM WORDING: Discussion and Direction on the development of the Post Disaster
Recovery Strategy and identification of priority projects for funding through the Community
Development Block Grant - Mitigation Program for Infrastructure Mitigation Projects
ITEM BACKGROUND:
Hurricane Irma, a Category 4 hurricane, made landfall in the Florida Keys on September 10, 2017,
causing the destruction and significant flooding of low-lying areas throughout the Florida Keys.
Congress recently approved additional disaster supplemental appropriations of$633,485,000 for the
Community Development Block Grant-Mitigation (CDBG-MIT) Program for Infrastructure
Mitigation. The Department of Economic Opportunity (DEO) will develop an Action Plan to
prioritize program funds and has asked the Hurricane Irma impacted region to provide feedback on
priority large-scale, regional infrastructure resilience projects. The CDBG-MIT Action Plan must be
approved by the United States Department of Housing and Urban Development (HUD). It also has
to be tailored to meet the Code of Federal Register(draft attached).
Ovid Solutions in partnership with the South Florida Regional Planning Council is developing the
Long-term Post Disaster Recovery Strategy which will:
- Include the list of prioritized projects for potential funding
- Detail the long-term recovery roles and responsibilities which were performed by Monroe County
Departments in the aftermath of Hurricane Irma and continue to the present
We seek guidance and prioritization from the BOCC on large scale, regional resilience projects
which could be funded over a twelve-year implementation schedule using CDBG-MIT funding.
This is a new program and DEO and HUD will both be looking for innovative projects that meet the
national objectives of the CDBG program. We also seek guidance on issues which will be
incorporated in the Long-term Recovery Strategy document.
PREVIOUS RELEVANT BOCC ACTION: May 22, 2019,Agenda Item D.2, #5287
Packet Pg. 1276
D.9
CONTRACT/AGREEMENT CHANGES:
NA
STAFF RECOMMENDATION:
DOCUMENTATION:
FR-6109-N-02-CDBG-Mitigation-Notice
Monroe County LT Projects-Draft
FINANCIAL IMPACT:
Effective Date: PENDING
Expiration Date:
Total Dollar Value of Contract: NA
Total Cost to County: None
Current Year Portion: NA
Budgeted: No
Source of Funds: NA
CPI:
Indirect Costs:
Estimated Ongoing Costs Not Included in above dollar amounts:
Revenue Producing: NA If yes, amount:
Grant:
County Match: $ 0
Insurance Required: 0
Additional Details:
REVIEWED BY:
Helene Wetherington Completed 09/03/2019 11:06 AM
Assistant County Administrator Christine Hurley Completed
09/03/2019 12:25 PM
Christine Limbert Completed 09/03/2019 12:49 PM
Budget and Finance Completed 09/03/2019 1:43 PM
Maria Slavik Completed 09/03/2019 1:55 PM
Kathy Peters Completed 09/03/2019 2:05 PM
Board of County Commissioners Pending 09/18/2019 9:00 AM
Packet Pg. 1277
•
.AA., t-ltaktA,„ , ...r4iii lir, , ''`''..r 1 ._1",riii(ri F`1,,,:s'' ...4177, , 7, . . fr;
11 0'' ; 1.ry t
1
5.7
v.
Proposed Hurricane Irma
RecoveryProjects
Community Development Block Grant — Mitigation
September 18, 2019
A
);\
\\--„____ .........)
MONROE COUNTY
FLORIDA
01
Contents
OVERVIEW 4
INFRASTRUCTURE AND STRUCTURE PROJECTS 4
Critical Facilities 4
1. FEMA 361 "Saferoom"for Fire Responders at Fire Station 20—Islamorada 4
2. Key West Emergency Operations Center Upgrades—Key West 4
3. Construction of a New Emergency Operations Center—Monroe County 4
4. Jefferson B. Brown Complex Tower Relocation—Monroe County 5
5. Emergency Communications and Warning Upgrades—Monroe County 5
6. Fire Station No.3 Saferoom Upgrades—Key West 5
7. Monroe County Fire and Rescue Station 10 Mitigation/Replacement—Monroe County 5
8. Generators for Critical Facilities—Key West 5
9. Harvey Government Center—Monroe County 5
10. Monroe County Sherriff's Office Detention Center Window Upgrade—Monroe County 5
11. Countywide Emergency Back-Up Power Enhancement for Critical Facilities—Monroe County 5
12. Wind Retrofit for County Critical Facilities—Monroe County 5
13. Rebuild Fire Station 3—City of Key West 6
14. Fire Station Boat Lift—City of Key West 6
15. Wind Retrofits of Public Facilities and First Responder Facilities—City of Key West 6
16. Douglass Band Room Clinical Care Facility—City of Key West 6
17. Jefferson B. Browne Complex Chiller Relocation—Monroe County 6
Road Elevation, Relocation, Bridge Replacement, Stormwater Improvements 6
1. Relocate Public Works and Fleet Yard—Monroe County 6
2. Bimini Drive Bridge Replacement—Monroe County 6
3. Hardening six wastewater transmission pump stations—Islamorada 6
4. Rebuild Atlantic Boulevard—Key West 7
5. Raise Roadway at Bertha and 1st—Key West 7
6. Harbor Drive Bridge Replacement—Monroe County 7
7. Koehn Subdivision Resurfacing—Monroe County 7
8. Sugarloaf Boulevard Bridge Replacement—Monroe County 7
9. Twin Lakes/Sands Subdivision Improvement Project—Monroe County 7
10. Countywide Road Elevation and Drainage Improvements-Countywide 7
11. Stormwater Management System—Islamorada 7
Shoreline Protection Projects 8
1
1. Natural Restoration and Shoreline Stabilization for Sea Oats Beach—Islamorada 8
2. Indian Key Fill US 1 Shoreline Protection and Hardening—Islamorada 8
3. Residential Canal Dredging—Islamorada 8
4. West Martello Seawall Improvements—Key West 8
5. Village-wide Shoreline Hardening—Islamorada 8
Potable Water and Wastewater Grid Improvements 8
Historic Building Projects 9
1. Wind Retrofits of Historic Buildings—City of Key West 9
2. Historic Courthouse Mortar Repair and Box Gutter Replacement—Monroe County 9
Power Grid and Utilities Projects 9
1. Upgrades to System-Florida Keys Electric Cooperative 9
Natural Mitigation Feature Projects 9
1. Living Shoreline:South Roosevelt—Key West 9
2. Living Shoreline:Wastewater Treatment Plant—City of Key West 9
ECONOMIC DEVELOPMENT PROJECTS 10
Marina, Breakwater, Boat Ramp and Park Improvements 10
1. Founders Park/Plantation Yacht Harbor Marina Breakwater Stabilization—Islamorada 10
2. Big Pine Key Swimming Hole—Monroe County 10
3. Boat Ramp Kiosks—Monroe County 10
Business Corridor Improvements 10
1. Florida Keys Business Corridor Resiliency Improvements—Greater Marathon Chamber of Commerce 10
2. Morada Arts District—Islamorada 11
Transportation, Shuttle Service Improvements 11
1. Enhancing the Lower Keys Shuttle Service-Key West Transportation Department 11
Workforce Development 11
1. Upper Keys Campus Development—Florida Keys Community College 11 .
2. Expansion of the Apprenticeship Program—Florida Keys Community College 11
HOUSING 11
New Workforce Housing 11
1. New Affordable Housing/Mixed Use-Key West 11
Residential Wind Retrofits 12
1. Residential Wind Retrofits-Countywide 12
Residential Elevation Projects (Flood Retrofits) 12
1. Countywide Residential Elevation-Monroe County 12
Mobile Home Park Acquisition Projects 12
2
1. Trailer Park Acquisition and Reconstruction Site A, B,C, D, and F—Monroe County Land Authority 12
Residential Demolition and Greenspace Projects 12
1. Countywide Home Buyout/Greenspace Program 12
PLANNING, ADMINISTRATION AND PUBLIC SERVICE PROJECTS 12
Plan Updates 12
1. Update the Monroe Countywide Local Mitigation Strategy—Countywide Project 13
Stormwater Management System Study 13
Coastal Storm Risk Management Study 13
Sea Level Rise Risk Planning Projects 13
Evacuation Planning Projects 13
Emergency Services Strengthening Efforts 13
FEDERAL PROGRAM COSTSHARE 14
EDUCATION AND AWARENESS PROGRAMS 14
ATTACHMENT: COMMISSIONERS PROJECT PRIORITIZATION WORKSHEET 14
•
OVERVIEW
The U.S. Department of Housing and Urban Development (HUD) announced a new disaster recovery program that
includes areas impacted by Hurricane Irma.The State of Florida will receive$633 million in funding to support a broad
array of mitigation projects through the Community Development Block Grant—Mitigation Program. Local governments
impacted by Hurricane Irma have been asked to submit project ideas to the Florida Department of Economic
Opportunity(DEO)to be considered as they develop an action plan that will guide how this money is spent.The state
must submit this plan no later than February of 2020 and work on it has already begun. DEO has suggested they are
looking for regional projects with high impact.This likely means that they would like to see multi-jurisdictional projects
that will provide high impact results in the community.
As part of the development of the Monroe County Post-Disaster Redevelopment Strategy,county and city staff have
been working to develop project ideas to be considered for this funding and any other sources that may still be available
to support Hurricane Irma recovery.This report contains a summary of the projects developed.Staff is seeking direction
from the Board of County Commissioners to help prioritize these projects for funding and brainstorm other projjeets
ould ItG funded through caktb program.A project prioritization worksheet has been developed and is included as an
attachment to this document. Based on feedback from the Board,these projects will be incorporated into the final
Monroe County Post-Disaster Redevelopment Strategy which will be presented as a draft to the Board at a subsequent
meeting.
INFRASTRUCTURE AND STRUCTURE PROJECTS
Critical Facilities
1. FEMA 361 "Saferoom" for Fire Responders at Fire Station 20—Islamorada
Proposed Cost: $225,000(HMGP match)
The primary purpose of FEMA 361 Saferooms is to protect first responders and the limited population that must
remain behind and do not evacuate when a high-wind event,such as hurricane, is imminent or occurring.
Islamorada has entered into a subgrant agreement with FEMA and FDEM for HMGP funding up to$100,000.00
for design and engineering, and potentially$800,000 for construction.The Village's match is 25%of those
amounts.
2. Key West Emergency Operations Center Upgrades— Key West
Proposed Cost:$300,000
Improve the city's ability to respond to disasters by including roof-mounted satellite voice/data communications
system; Multiple landline-based telephones; additional web-conferencing equipment;electronic displays and a
control center; alternative fuel-based cooking& refrigeration options.
3. Construction of a New Emergency Operations Center— Monroe County r
Proposed Cost: Unknown;[iis this project alreadylfunded through another sources?J
This project will construct a new EOC building on county airport property in Marathon to improve resiliency and
increase the county's ability to respond in future storms and include saferoom enhancements ha@ Curren
4
kgaavdking aG Kgfl3 mow construction. combined projects Ilraa The County had to relocate staff
from the EOC during Hurricane Irma due to insufficient building design.
4. Jefferson B. Brown Complex Tower Relocation — Monroe County
Proposed Cost: Unknown
After a structural analysis was completed on the existing Courthouse Annex, it was determined that the building
was in a critical state and should not be used.This project will relocate the communication tower.
5. Emergency Communications and Warning Upgrades— Monroe County
Proposed Cost:$600,000
This project will improve the county's ability to communicate to citizens in times of an emergency and upgrade
current warning systems in place.
6. Fire Station No. 3 Saferoom Upgrades— Key West
Proposed Cost:$2,959,988.00
Upgrade a saferoom within the city's fire station for use as operational headquarters during a disaster.
7. Monroe County Fire and Rescue Station 10 Mitigation/Replacement— Monroe County
Proposed Cost: $5,000,000
Construct a replacement Category 5 rated fire station at Mile Market 17 on Overseas Highway(Sugarloaf Key).
8. Generators for Critical Facilities— Key West
Proposed Cost:$300,000
Install permanent generators at five critical facilities: City of Key West Fire Stations 1 and 2;the Main Police
Station;the Palm Avenue Transit Facility, and the Department of Transit Building.
9. Harvey Government Center— Monroe County
Proposed Cost: Unknown
Upgrade the facility to include installation of automatic transfer switches/overhead lighting, roofing of the
mechanical room, plumbing upgrades,finishing of the interior room and roofing and remaining A/C upgrades.
10. Monroe County Sherriff's Office Detention Center Window Upgrade— Monroe County
Proposed Cost: Unknown
A replacement for all exterior windows in the secured envelope, and includes but doesn't limit work to all cells,
recreation yards, and dormitories.
11. Countywide Emergency Back-Up Power Enhancement for Critical Facilities— Monroe County
Proposed Cost:$6,000,000
Provides emergency back-up generators, additional fuel capacity, and redundancy improvements at 39 sites
within the county. Protects 911, communications towers,fire Departments, Marathon Airport, and county
facilities.
12. Wind Retrofit for County Critical Facilities— Monroe County
Proposed Cost: $8,837,280
Conduct a comprehensive assessment of 13 County owned critical facilities to determine wind load capability,
safety, and benefit cost analysis. Conduct wind load retrofit of up to 13 facilities based upon analysis.
5
13. Rebuild Fire Station 3—City of Key West
Proposed Cost:
Fire Station No. 3 is an older structure and in a low-lying area.This project will result in a new,safer building.
14. Fire Station Boat Lift—City of Key West
Proposed Cost:
This boat lift will extend the life of the fire boat and allow water transport to be used when roads are not
available.
15. Wind Retrofits of Public Facilities and First Responder Facilities—City of Key West
Proposed Cost: $10,000,000
The City operates several public buildings that are used for critical post-storm services to residents and
businesses.This project would install impact-resistant windows, replace/upgrade roofs and doors and install
hurricane strapping on these facilities.
16. Douglass Band Room Clinical Care Facility—City of Key West
Proposed Cost: $1,500,000
The Bahama Village Community needs a clinical care facility for residents who live in low-income housing.
Establishment of a Health Department Office at the city's band room property would provide crucial care for our
most vulnerable populations both before and after hurricanes.
17. Jefferson B. Browne Complex Chiller Relocation — Monroe County
Proposed Cost: Unknown
After a structural analysis was completed on the existing Courthouse Annex, it was determined that the building
was in a critical state and should not be used.This project would relocate the chillers.
Road Elevation, Relocation, Bridge Replacement, Stormwater Improvements
1. Relocate Public Works and Fleet Yard— Monroe County
Proposed Cost: $9,000,000
Move the.County Public Works and Fleet yard from Key West's airport to a county property on Rockland Key
where construction on the center will occur.This will allow for the Key West airport to grow.
2. Bimini Drive Bridge Replacement— Monroe County
Proposed Cost: Unknown
Replacement of the current bridge on Duck Key to include mitigation measures to harden infrastructure.
3. Hardening six wastewater transmission pump stations— Islamorada
Proposed Cost: $900,000
This project proposes to implement several hazard mitigation initiatives that will,acting collectively, prevent
damage to critical wastewater infrastructure and eliminate (or significantly reduce)functional downtime
following a natural hazard event.These initiatives include: adding additional emergency pump-out connection
6
points, increased wastewater retention capacity for mainline breaks, auxiliary generator connections, portable
generator capacity, and dam doors(flood-proofing)for critical wastewater infrastructure throughout the Village.
4. Rebuild Atlantic Boulevard — Key West
Proposed Cost:$300,000
Atlantic Blvd. is one of the lowest lying, high traveled right of ways shared by cars, pedestrians and bicycles.
Raising and protecting this road will assist with mobility after a storm and increase resiliency to sea level rise.
5. Raise Roadway at Bertha and 1st— Key West
Proposed Cost: $4,000,000
Improve drainage and raise roadway to above 2040 minimum sea level rise projections to reduce flooding along
a high-volume, low-lying, cross-town corridor.
6. Harbor Drive Bridge Replacement— Monroe County
Proposed Cost: Unknown
This bridge currently has weight restrictions and needs to be replaced. it is near Bimini Drive Bridge which is also
in the design phase for replacement.
7. Koehn Subdivision Resurfacing— Monroe County
Proposed Cost: Unknown
Koehn subdivision on Big Pine Key was not paved as part of the Cudjoe Sewer Plant work; roads are in very poor
condition and need resurfacing/reconstruction. Staff applied for and received FDOT Small County Outreach
Program grant funds totaling$1,357,500 to partially fund engineering design and construction.
8. Sugarloaf Boulevard Bridge Replacement— Monroe County
Proposed Cost: Unknown
The Sugarloaf Blvd. Bridge needs to be replaced, becoming a single span bridge, eliminating intermediate piles in
the water with a 70-year lifespan.
9. Twin Lakes/Sands Subdivision Improvement Project— Monroe County
Proposed Cost: Unknown
This project will result in drainage improvements and roadway elevation work to improve resiliency to sea level
rise.
10. Countywide Road Elevation and Drainage Improvements - Countywide
Proposed Cost: $367,004,000
This project would conduct countywide improvements to roads to increase drainage and ensure resiliency to
flooding and sea level rise.
11. Stormwater Management System— Islamorada
Proposed Cost:$8,000,000
The project includes construction of stormwater management system in the Venetian Shores neighborhood in
Islamorada.The stormwater management system will utilize a combination of Miami curbing, exfiltration
trenches,stormwater piping,catch basins and a surface water discharge.The project would add resiliency to
future storms by diminishing stormwater and flooding in the neighborhood including managing and protecting
water resources of the region by balancing and improving flood control,water quality and natural systems.
7
Shoreline Protection Projects
1. Natural Restoration and Shoreline Stabilization for Sea Oats Beach — Islamorada
Proposed Cost:$10,000,000
Sea Oats Beach was severely eroded during Hurricane Irma.The project would reestablish the beach and beach
berm at this location, providing resiliency to future storm damage for U S Hwy#1(the Overseas Highway)while
also re-establishing sea turtle nesting habitat.This project would serve the entire Monroe County.As the only
road through the Keys, U S Hwy,#1 (the Overseas Highway) is also the sole route for rescue and recovery
providers and supplies. If this area were inundated or washed away, no resources could be brought into the Keys
south of this area to Key West by land.
2. Indian Key Fill US 1 Shoreline Protection and Hardening— Islamorada
Proposed Cost:$1,950,000
This project would implement shoreline protection and hardening measures at Indian Key Fill.
3. Residential Canal Dredging—Islamorada
Proposed Cost:$3,500,000
Maintenance dredging for the removal of sediment within five (5) residential canals in Islamorada to restore
water depths to pre-Hurricane Irma conditions.This project will involve mechanical and hydraulic dredging to
remove a total of approximately 16,000 cubic yards of sediment within the five (5) impacted residential canals.
The sediment being dredged with this project was all deposited in the canals from Hurricane Irma-related storm
surge.The project will also reduce future storm flood potential.
4. West Martello Seawall Improvements— Key West
Proposed Cost: $500,000
This project would improve the sea wall located at West Martello to ensure future resiliency to flooding and sea
level rise.
5. Village-wide Shoreline Hardening—Islamorada
Proposed Cost:$3,000,000
This project would conduct shoreline hardening throughout Islamorada to ensure future resiliency to flooding
and sea level rise.
Potable Water and Wastewater Grid Improvements
Potable water and wastewater grid improvements can be funded through this program.Some projects that would
benefit wastewater systems have been included in the appropriate category.
8
Historic Building Projects
1. Wind Retrofits of Historic Buildings—City of Key West
Proposed Cost:$4,500,000
This project will install impact-resistant windows, replace/upgrade roofs and doors, and install hurricane
strapping.The city operates in several public buildings through which it provides crucial post-storm services to
its residents and businesses.
2. Historic Courthouse Mortar Repair and Box Gutter Replacement— Monroe County
Proposed Cost: Unknown
Re-point the brick(mortar repair) on the two-floor historic courthouse structure.Also there is significant
moisture buildup in the brick walls.Approximately 20—30 percent of fire-facing on the brick has been lost
(mostly near the base of the building) and that brick needs to be replaced. In addition the existing box gutters
have a history of leaking and have been patched multiple times.They are now leaking into the interior of the
building and require complete replacement.
Power Grid and Utilities Projects
1. Upgrades to System— Florida Keys Electric Cooperative
Proposed Cost:$3,002,500
This project will upgrade main feeder pole (distribution) as well as 100 other poles.
Natural Mitigation Feature Projects
1. Living Shoreline: South Roosevelt— Key West
Proposed Cost:$1,000,000
South Roosevelt is an important alternative route in and out of Key West that has been damaged in the past.
This project would use green infrastructure to protect South Roosevelt Seawall that acts as a barrier for the
airport, homes and major hotels.
2. Living Shoreline: Wastewater Treatment Plant—City of Key West
Proposed Cost: $300,000
Wastewater treatment is a critical function to maintain.This project would use green infrastructure to protect
the Fleming Key Wastewater Treatment Plan.
9
ECONOMIC DEVELOPMENT PROJECTS
Marina, Breakwater, Boat Ramp and Park Improvements
1. Founders Park/Plantation Yacht Harbor Marina Breakwater Stabilization — Islamorada
Proposed Cost: $1,831,000
The breakwater at Founders Park,which runs outside of the Village's Plantation Yacht Harbor Marina has
suffered extensive damage including break-throughs from erosion and wash-over from sea level rise and
hurricane-related storm surge.The breakwater creates a barrier to protect the entire marina infrastructure
along with adjacent park infrastructure. Repair and stabilization of the natural fill, rip rap and concrete are
necessary to protect this infrastructure and to protect the vessels that rent space at the marina.The project
would entail design, permitting, and construction of improvements to fortify the breakwater,which would
include adding a layer of new armor stone rock to increase the breakwater width and crest elevation. Severe
erosion to the breakwater occurred as a result of Hurricane Irma storm surge and wave activity.This project
would also elevate,fortify and stabilize the breakwater, contributing to resilience to future storms and sea level
rise.
2. Big Pine Key Swimming Hole— Monroe County
Proposed Cost: Unknown
Transform a man-made borrow pit into a park with swimming hole to be enjoyed by the community,which
include low-and moderate-income families.
3. Boat Ramp Kiosks— Monroe County
Proposed Cost: Unknown _
Design and installation of educational kiosks at county-owned boat ramps to increase public knowledge of
boating requirements and issues.
Business Corridor Improvements
1. Florida Keys Business Corridor Resiliency Improvements—Greater Marathon Chamber of Commerce
Proposed Cost: $6,150,000(max project cost per business is proposed to be$30,000 and businesses would
contribute$10,000 per project would provide up to$2,000,000 in private match)
The US 1 Corridor serves as the main artery of transportation residents and visitors each year in Monroe County
and is where most businesses are located. Many businesses (around 200)sustained various amounts of physical
damage to the exterior of their properties.These businesses were slow to reopen and those that are open are
still missing important signage, landscaping, and visual appeal to attract patrons/customers.This effects their
ability to operate,generate revenue,sustain employment, and provide services. In addition, many
business/commercial properties are in dire need of mitigation projects to improve their resiliency to future
storms. Namely in the form of upgraded roofing systems,windows, and flood proofing technologies/systems
that all meet current building code.
10
2. Morada Arts District—Islamorada
Proposed Cost: Unknown
This project would make improvements to the Morada Way Arts and Cultural District, home of the Art Walk.
This is a creative space that brings together artists,vendors and residents to celebrate Florida Keys Art and
Culture. It allows emerging artists, musicians,chefs and local retailers to showcase their creativity.
Transportation, Shuttle Service Improvements
1. Enhancing the Lower Keys Shuttle Service— Key West Transportation Department
Proposed Cost: Unknown
The County is reviewing the Lower Keys/Key West Shuttle service for usability and accessibility.They are working
to identify what aspects of the system may need to be enhanced.The Lower Keys Shuttle Service will assist with
job retention and could serve as an evacuation option for individuals who need assistance in the event of a
storm.
Workforce Development
1. Upper Keys Campus Development— Florida Keys Community College
Proposed Cost:$15,000,000
The College of the Florida Keys will be developing the Upper Keys campus.This will provide an additional
campus to have the College provide education and training around the County to reinvigorate the workforce
2. Expansion of the Apprenticeship Program — Florida Keys Community College
Proposed Cost: $20,000,000
The Florida Keys Community College is working to expand its apprenticeship program to offer this opportunity to
all campuses around the county. [this program targetedgo?€013G-OR Workforce Recovery Training Program
hould CEO include?
HOUSING
New Workforce Housing
1. New Affordable Housing/Mixed Use— Key West
Proposed Cost:$35,000,000
The City of Key West is working on providing affordable housing to accommodate existing community members
that are not able to return to their homes due to damage. Replace housing stock that was damaged in the d to
accommodate recently homeless community members.
11
Residential Wind Retrofits
1. Residential Wind Retrofits—Countywide
Proposed Cost:$1,925,000
This project would result in wind retrofits of residential homes to harden them against the impact of future
hurricanes.
Residential Elevation Projects (Flood Retrofits)
1. Countywide Residential Elevation— Monroe County
Proposed Cost:$3,596,427
This project would elevate homes within the county as flood retrofits and improve resiliency to sea level rise.
Mobile Home Park Acquisition Projects
1. Trailer Park Acquisition and Reconstruction Site A, B, C, D, and F—Monroe County Land Authority
Proposed Cost:Site A-$4,800,000;Site B-$3,025,000;Site C-$2,100,000;Site D-$3,900,000;Site F-
$5,800,000
Many mobile homes were damaged and/or destroyed in Hurricane Irma.This project will acquire existing trailer
parks and convert them to workforce housing
Residential Demolition and Greenspace Projects
1. Countywide Home Buyout/Greenspace Program
The County recently submitted an application to DEO on behalf of residents to buyout flood-prone homes and
return the area to greenspace/parks or use in stormwater management. Residents expressed a significant
amount of interest in this program with approximately$40 million in homes to be bought out.The current
program limits the Florida Keys to$10 million in set-aside.This project would buyout the remaining homes that
couldn't be purchased through the first round of funding.
PLANNING, ADMINISTRATION AND PUBLIC SERVICE PROJECTS
Plan Updates
12
•
1. Update the Monroe Countywide Local Mitigation Strategy—Countywide Project
Proposed Cost: Unknown
The Countywide Local Mitigation Strategy is due to be updated soon.An overall update is needed to consider
information on impacts from Hurricane Irma,future flooding conditions, FIRMs, repetitive losses and other
pertinent information.
Stormwater Management System Study
Stormwater management system studies can be funded through this program.The update to the Local Mitigation
Strategy will include a component of this type of work.At this point in time there are no additional staff identified
projects for these studies.
Coastal Storm Risk Management Study
Coastal storm risk management studies can be funded through this program.The update to the Local Mitigation Strategy
will include a component of this type of work.At this point in time there are no additional staff identified projects for
these studies.
Sea Level Rise Risk Planning Projects
Sea level rise risk plans can be funded through this program.The update to the Local Mitigation Strategy will include a
component of this type of work. At this point in time there are no additional staff identified projects for these plans,
however there are many projects proposed that would implement other resiliency plans that include sea level rise
adaptation.
Evacuation Planning Projects
Evacuation planning projects can be funded through this program.At this point in time there are no staff identified
projects for these projects.
Emergency Services Strengthening Efforts
Emergency services strengthening project can be funded through this program.At this point in time there are no staff
identified projects for these studies.
13
FEDERAL PROGRAM COSTSHARE
Funding can be used to match other programs such as the FEMA Public Assistance and FEMA Hazard Mitigation Grant
Program. Some match projects have been included in appropriate categories above.
EDUCATION AND AWARENESS PROGRAMS
Education and awareness programs can be funded through this program.At this point in time there are no staff
identified projects for these studies.
ATTACHMENT: COMMISSIONERS PROJECT PRIORITIZATION WORKSHEET
14
Monroe County Board of County Commissioners
Community Development Block Grant—Infrastructure Mitigation Program
Project Prioritization
Project Category Number of Commissioner Comments/Staff Direction
Projects Priority
(High=H,
Medium=M,
Low=L,NA=Not
Important)
1. Infrastructure and Structures
Critical Facilities 17
Road Elevation/ 11
Bridge Replacement/Storm water
Shoreline Protection 5
Water/Waste Water Grid 1
• Historic Buildings 2
Power Grid and Utilities 1
Natural Miti.ation Features 2
2. Economic Development
Marina/Breakwater/Boat Ramp 3
Business Corridor 2
Transportation/Shuttle Service 1
Workforce Development 2
3. Housing
New Workforce Housing 1
Wind Retrofit 1
Elevation/Flood Retrofit 1
Mobile Home Park Acquisition 1
Demolition/Greenspace 1
4. Planning, Administration and Public Service— Local Plans and Regulations
Plan Updates 1
Stormwater Management System Study 1
Coastal Storm Risk Management Study 1
Sea Level Risk Planning 1
Evacuation Plan 0
Stren.then emer.enc services 0
5. Federal Program Cost Share
TBD
6. Education and Awareness Programs
TBD
Commissioner Signature: Date:
fs
COMMUNITY DEVELOPMENT BLOCK GRANT - MIT - ,
HURRICANE IRMA FUNDING
INFRASTRUCTURE MITIGATION PROGRAM
$633, 485, 000 STATEWIDE
MONROE COUNTY BOARD OF COUNTY COMMISSIONERS
SEPTEMBER 18, 2019
Program Process and
Timing
DEO solicits
HUD receives HUD Releases DEO Drafts HUD DEO
County input on
Disaster Federal riorit State Action Approves Implements
Supplemental Register Infrpriority
structure Plan for HUD State Action Program
Appropriation Resilience Approval Plan
Projects(2/2018) (2/2020) (4/2020)
(8/2019) (ongoing) (TBD)
CDBG - MIT Grant Purpose
• Advance long-term resilience through strategic, high impact
activities that reduce risk in the long-term (12 year implementation
timeline)
• Align with other planned capital improvements
• Promote community-level and regional planning for current and
future disaster recovery efforts and additional mitigation
investments
• CDBG-MIT funds do NOT require a "tie-back" to the specific
qualified disaster that has served as the basis for fund allocation
Benefit Low Income Populations
• Funds must benefit vulnerable, lower-
income people and communities and
target the most impacted and distressed
areas
Project Focus : Overview
• i. Infrastructure Projects (p.42):
• Develop Disaster resistant infrastructure
• Upgrading water, sewer, solid waste, communications, energy,
transportation, health and medical, and other public infrastructure
• 2. Economic Development (p.42):
• Assist businesses in installing mitigation improvements and technologies
• Hardening of commercial areas and facilities
• Financing critical infrastructure sectors to allow continued commercial
operations during and after disasters
• Promote economic development through coordination with Opportunity
Zones (City of Marathon)
Project Focus : Overview
• 3. Housing (p.42)
• Housing Mitigation Program: Buyouts, Elevation (rehab, reconstruction, new
construction), flood proofing, hardening
• Single and Multi-family units
• 4. Planning, Administration and Public Service (p.42)
• Development of modernized and resilient building codes, land use plans
• Update Hazard Mitigation Plan
• Integration of mitigation planning with other local and reginal mitigation
community development, land use and other plans
• Upgrade mapping, data, and other capabilities
• Activities necessary to enhance CRS incentive program
• 5. Federal Program Match (p.43)
Priority Project List : 1 . Infrastructure
• Critical Facilities (s7 Projects)
• Enhance Emergency Power
• Wind Loading / Hardening
• Reconstruction / Relocation „Wt.
• Communications / Warning .r � � .
4,,
�..... °J1;1_ '.. ' rep«ftut„,1 h
• Road Elevation / Bridge Replacement . , ``�'�' �` ``
I Stormwater Enhancement (ii �� " -,
Projects) - - -
• Elevating Roadways I
• Replacing/upgrading bridges AIIIIIL'
• Storm Water System installation (curbing,
exfiltration trenches, piping, catch basins,
surface water discharge, etc.)
Priority Project List
1 . Infrastructure
• Shoreline Protection (5 Projects)
• Green infrastructure to protect seawall, critical
facilities, homes
• Shoreline Stabilization and Hardening
4
• Water/Waste Water Grid (i Project)
• Hardening wastewater transmission pumps z 9 +� .. ► `
• Historic Buildings (2 Projects)
• Wind / Flood Retrofit
• Power Grid (i Project)
• Natural Mitigation Features (2)
Priority Project List
2 . Economic Development
• Marina / Breakwater (3 Projects)
• Business Corridor Enhancement (2
Projects)
• Transportation / Shuttle Service / Rail (i
Project)
• Workforce Development (2 Projects)
WN T
4 .... A.FOE o,NTN
Priority Project List
3 . Housing
• New Workforce Housing
• Wind Retrofit
• Elevation / Flood Retrofit
• Trailer Park Acquisition
• Demolition / Greenspace
,1
(Consider setting up programs for any or all of
these initiatives)
Priority Project List
4 . Planning, Administration and Public
Service
• Storm-water Management System Study
• Coastal Storm Risk Management Study Further
Discussion
• Sea Level Risk Study / Mapping Recommended
with
• Evacuation Planning Rhonda Haag
• Strengthen Emergency Services
Priority Project List 5: Federal Program Cost Share/Match
Commissioners Prioritization
• Each Commissioner is asked to prioritize
their projects by : wiWor Projectect Prioritization P,oa,.m
arowyTt.
wear W c arum
w5--twee.,W.W..I.
• H - High Priority OrAwatFec,.es .=w�w
RaM Ek+.non
• M — Medium Priority &We
WW.Va..W.GM
• L - Low Priority M.o.Banm ;
Power G.era la..
Nets.Wrgebon Features 0
• NA - Not a Priority Merwe:a,e..wekr,soe,New 2
Business Gmaer
Vren.Wrt..on:Shuttle S.nnw 2
New WW1..Nou.eq ,
• Commissioners should complete E4eri von/Pb V uC ReOE, ;
Treeer P.kAwe.. ,
prioritization by October ii so that staff GemoaarGreensPace
Slows-we.M.n.,emeM System
may tally the results for presentation at the 5 Storm Ruw
La
October 16 BOCC meeting in Marathon and ek
E" Re
submission to DEO for guidance in
development of the state Action Plan. °° er= w
fr
2:°Ei�'a,Ci�!':sS6a4's'�Kt�>ts 2JF1z.$`^R�, .JA",4Rt;*. .... .�i..,
Disaster Recovery Strategy : Roles and
Responsibilities
• Meeting with each Department to review the Long-term Recovery
Roles and Responsibilities (next week)
• Work with EM to draft the Long-term Recovery Organization Chart
(next week)
• Present complete Post Disaster Recovery Strategy to staff for
comment (end of September/early October)
• Present Post Disaster Recovery Strategy to BOCC for approval
(November)
• Forward Board approved recommendations to DEO (November)
•
EDA Grant Fun In - Kin Match
Monroe County Disaster Recovery Strategy In-kind Time Match Tracking Form
Funded through a grant from the Economic Development Administration:04-69-07349
Date: June 3.2019 Time 9 i0 am-3:00 rim 145far with lunch break)
Activity:Participation in the Business and Tourism Disaster Recovery Workshop Marathon Florida
Name a�n;a.ton� Yo u r T i m e in Valuable !
Hourly Rate(rounded): L4 5 hr) Total In-hod Match:
I,hereby,confirm that the above time was allocated in support of the development of EDA funded Disaster Recovery Strategy for Monroe
County.
Signature. Date.