12/15-57 Terminal Plumbing Assessment MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
Effective Date: 741 — Task Order No. 12/15-57
40' - 4v3 ►0I - 53oygo
Client Project No.; &ft ,,)9 H r 53o 3 10 Engineer Project No. E9Y37957
This Task Order is entered into on the effective date noted above pursuant to the "Master
Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS
PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The
Agreement is incorporated herein and forms an integral part of this Task Order.
Services Authorized—MTH Terminal Plumbing Assessment
Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and
incorporated herein, which Exhibit A is marked with the above noted Task Order No. and
consists of 2 page(s).
Pricing
N/A Time and Expense per Agreement and Appendix B to the Agreement.
X Firm Fixed Price of$ 13,083.00
N/A Other(Describe):
Schedule
Services may commence on Execution
Services will cease by 180 da s
Recommended: Approved:
3� yB nCDireoct sst. oouuiintYic,mYiinni✓slsratlrora
tor
CONSULTANT:
JACOBS PROJECT MANAGEMENT CO
Vice President,Geographic Operations Manager
Wia ess Title
.. .. �' ,NRO ATTOMOY
File: .11STR APS ,Monroe County t
Page 1 of 1 MERCADO
ASSIST 0
Date _,
Exhibit A (12/16 - 67)
Scope of Services
Monroe County Airports
The Florida Keys Marathon International Airport
MTH Terminal Plumbing Assessment
SCOPE OF WORK
Jacobs will perform an assessment of the existing Plumbing systems located at the Florida Keys
Marathon International Airport in Marathon. These systems include:
• First and second floor interior terminal plumbing systems
• Chiller/Emergency Generator building.
DESCRIPTION OF WORK
The data collection, assessment,and report will provide the following:
Article A—Site Visit
Field Verification: Visit and inspect the site (1 visit) to assess the interior terminal existing
plumbing system conditions. Take photographs and make written documentation, sketches, notes
or reports to confirm and record the general conditions of these systems and conformance to codes.
Initial Meeting: Conduct a meeting with representatives from Monroe County Airports and the
design plumbing engineer. The purpose of the meeting will be to brief the Jacobs team on the
project features, review existing conditions and known deficiencies with the design team, and
answer questions developed by the Jacobs team
m
• Review available record drawings
• Perform a daytime site investigation
Services for Article A will be provided under a lump sum basis.
Article B—Report Phase
The specific tasks Jacobs will perform are as follows:
A teleconference meeting with Monroe County will be held to review the draft report and generate
comments towards the final report. The report will include the following:
• Introduction
• Executive Summary
• Plumbing System Assessment
• Assessment Exhibits
• Assessment Images
• Plumbing Repair Recommendations
• Order of Magnitude Cost Estimate for Repairs
Page 1 of 2
Any cost estimates provided by Consultant will be on a basis of experience and judgement. Since
Consultant has no control over market conditions or bidding procedures, Consultant does not
warrant that bids or ultimate construction costs will not vary from these cost estimates.
Services for Article B will be provided under a lump sum basis.
QUALIFICATIONS AND ASSUMPTIONS
For the purpose of providing a stipulated fee amount,this proposal has been based on the following
qualifications and assumptions:
• As-built documents will be provided by owner, if available.
• Construction Documents will not be provided.
• Other services not described in the scope of work are excluded.
Items identified as not included or limited in the scope of services can be provided or
expanded upon as additional services under a separate agreement or supplemental to this
agreement.
REFERENCES
The client will need to provide the following documentation to Jacobs before commencing with
our scope of work.
• As-built documentation of the existing facility, if available.
COMPENSATION
See attached spreadsheet.
SCHEDULE
We anticipate completion of the deliverables in accordance with the following schedule:
The overall duration of this effort will be as noted below:
A. Site Visit: 10 business days from agreement authorization
B. Report Phase: 20 business days from initial meeting and site condition
assessment.
Page 2 of 2