Task Order No. 10/DSR No. 3 08/01/2019 OCT 2 3 2019 TASK ORDER NO.(iD)FOR DAMAGE SURVEY REPORT(D;SFIFI FOR SEDIMENT REMOVAL SERVICES BETWEEN MONROE COUNTY AND ADVENTURE ENVIRONMENTAL, INC. FOR MONROE COUNTY HURRICANE IRMA EWP- SEDIMENT REMOVAL In accordance with the Agreement for Marine Debris and Sediment Removal Services as a result of Hurricane Irma made and entered on the 18th day of July, 2018, between Monroe County hereinafter referred to as the "County" and Adventure Environmental, Inc. hereinafter referred to as "Contractor". All terms and conditions of the referenced Agreement for Marine Sediment Removal Services apply to the Task Order, unless the,Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. • This Task Order is effective on the 1st Day of July 2019 and will terminate no later than the 31st Day of August 2019. In accordance with Article II Scope of Basic Services, Paragraph 2.1, the Scope of this Task Order is as follows: The scope of services will include Sediment Removal and Disposal (Load and Haul) of organic, silt and sand from the USDA-NRCS eligible canals within the(DSR#3{area from Biq Pine Key) See Exhibit A-1 for work plan and location maps. In accordance with Article VII, Paragraph 7.1 Contract Sum, the Contract Sum of this Task Order is as follows: The Contractor shall be paid based on rates negotiated and agreed upon and shown in the Pricing Schedule in Attachment B of the agreement. The estimated quantities and equipment allocation for the DSR are based upon review of aerial maps, bathymetric surveys, and representative site visits. See Exhibit B-1 for estimated resource allocation and July/August estimate for DSR#3. The County shall pay the Contractor a not to exceed amount of Four Hundred and Thirty Five thousand and zero cents ($74- ' 00,0 --o). Page 1 of 2 MONROE COUNTY HURRICANE IRMA EWP-SEDIMENT REMOVAL July 151,2019 #10 p\\01 nintril, I.,-1:REOF, each party caused the Task Order to be executed by its duly 0(091" ROY W:•IltatiVe- -:-. 1 Z1"ic. i a CONTRACTOR: F. Att,st: • - Z-7. ADVEN U IRONMENTAL, INC. •:.-. 0 • .,‘ ::: S. 4"''' ..Z Y/ ' •'. ' • ... r /ay 40°pi\ )5001 By: J nil lir Date Date 1 VP Title I Print Nam, /T' WOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC. 1 // By: 07/22/2019 i .,------ Date MONROE COUNTY DIRECTTR SUSTAINABILITY AND PROJECTS jil 1 1 By: ,4a. 41 ' lithil& O 451 -•nda Fl..:g . D te MONROE COUNTY COUNTY ,k,a. mINI ATOR By: 10) 2111 Roman Gastesi Date mr, c MONROE C012 ',:or A, _, , A OVED AS,X• •- , i , - tic....4111 Date:Ilnip _t_Llig,---111111.14-- 1............., - - Page 2 of 2 MONROE COUNTY HURRICANE IRMA EWP-DEBRIS REMOVAL Amgen rii,2.0E9 July 1st, 2019 p EXHIBIT A-1 Work Plan and Location Maps • . 'opi+fyyco BOARD OF COUNTY COMMISSIONERS Countyof Monroe Mayor Sylvia Murphy,District 5 :! • M �^• Mayor Pro Tern DannyKolha e,District 1 Y g The Florida Keys Commissioner Michelle Coldiron,District 2 Commissioner David Rice,District 4 Commissioner Heather Carruthers,District 3 Proposed Work Plan for the Monroe County Hurricane Irma EWP - Canal Sediment Removal Prepared for: USDA/NRCS 2614 NW 43rd Street Gainesville, FL 32606 Prepared by: Wood Environment & Infrastructure Solutions, Inc. 5845 NW 158th Street Miami Lakes, Florida 33014 Grant Agreement Award No.: NR184209XXXXCO27 • I. INTRODUCTION Provide all labor, supervision, engineering, materials, supplies, equipment, tools, transportation, surveying, layout, and protection for the proper execution and completion of all the work in accordance with the Contract Documents. The Work shall include but not be limited to that shown on the plans and detailed in the quality assurance plan and technical specifications. All work shall be conducted in accordance with all applicable local, state, and federal standards and regulations. II. SCOPE OF WORK The Scope of Work for the canal sediment removal activities located in DSR#3 (Big Pine Key), DSR#5A (Islamorada), and DSR#5B (Marathon) consists of mechanical dredging to remove the sediment accumulation relating to Hurricane Irma. The utilization of the mechanical system will result in the collection of a slurry from the canal bottom comprised of sediment and saltwater. The vessel-based dredge excavates and places the material in a dedicated dewatering area. The contractor will utilize a passive dewatering system to handle the dredged material. The dewatering system will be located either in the canal on the barge or within the upland staging area adjacent to the canal. Once dewatered the material will be transported to an approved upland disposal location dependent on the chemical characteristics of the material. The Contractor must install temporary construction fencing, consisting of jersey barriers and construction fencing or equivalent, around the staging area(s) and remove the fencing upon completion of the project. The Contractor shall return all staging area property to its original condition or better which includes re-grading and re- sodding of disturbed areas. The County will obtain the USACE, FDEP, FKNMS, and County permits. The Contractor will be responsible to obtain any other necessary permits not identified by the Engineer. Use of private homeowner land may require a Temporary Use approval. The Contractor is required to submit a Construction Methodology Plan (CMP) to Monroe County, including a Maintenance of Traffic (MOT) Plan (including a truck hauling plan) for approval prior to initiation of construction. Given the dense layout of the communities surrounding the project area, the Contractor shall be cognizant of the logistical limitations of dewatering the dredged material and transporting fill material in the space provided in the designated staging areas. Additionally, the Contractor shall be aware of the necessity to take care during the removal of the sediment so as to not damage the boat lifts present in the canal or any other privately-owned property. Damage caused by contractor to privately owned property will be a liability of the Contractor not the engineer or the County. Florida-EWP Page 2 of 6 April 2019 The Contractor shall be cognizant that the information provided regarding surface elevations on the construction documents is an approximate estimate, and that even though the sediment thickness values are a direct observation; no guarantee is made to the accuracy of the data. Therefore, the contractor shall obtain a pre-bathymetric survey to compensate for any potential errors or lack of precision in the presented sediment volume and surface elevation information. The sequence of Major Activities are as follows: 1) Relocation of recreational vessels (if needed) 2) Inspection of the canal for the presence of T&E species 3) Establishment of the dewatering staging area 4) Mobilization of the mechanical dredge to the project site at high tide 5) Installation of the turbidity barrier at the mouth of the canal 6) Mechanical dredging of sedimentation 7) Discharging of low turbidity effluent back into the canal 8) Disposal of dewatered dredge material 9) Sponsor monitoring firm will confirm that the contractor has dredged to the prescribed elevations as shown on the plans and specifications 10)Allow settlement of canal water to ensure turbidity at canal mouth does not exceed 0 NTUs above background. 11)Demobilization of dredge 12)Restoration of the dewatering staging area 13)Remove erosion and sediment control measures. III. MATERIAL TO BE REMOVED The material to be removed is generally comprised of sand and silt. The Contractor shall complete physical and chemical analysis on the material prior to construction commencement to determine the most efficient and economical methodology for the removal and disposal of the material. The Contractor and Engineer will communicate on the quantity and location of the sediment to be analyzed to ensure it complies with all local, state and federal guidelines. IV. ARTIFICIAL OBSTRUCTIONS The Contractor shall identify all existing utilities on site before construction commencement to ensure no impacts. Additionally, the contractor shall identify and segregate all artificial obstructions within the canals that may impair the dredge equipment such as vegetative or construction and demolition debris. V. QUANTITY OF MATERIAL The Contractor shall independently estimate the sediment quantities to removed based on the pre-bathymetric survey, plans and the Contractor's independent site investigation of existing conditions. An initial estimate based on limited bathymetric data is shown in the Florida-EWP Page 3 of 6 April 2019 plans for each canal, however this figure should be used as guidance only; actual, estimated volume determination will be the responsibility of the Contractor. Prior to commencement of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. This will be classified as the pre-bathymetric survey data obtained by the contractor's surveyor. The Engineer will review this data and provide the Contractor with a proposed elevation for dredging limits based on the pre-Irma canal bottom elevations for the project area. The pre-Irma canal bottom elevations will be used as the controlling elevation for the specified area approved for sediment removal The Contractor shall take progress soundings or sweepings to verify compliance with plans, specifications and work plan. The Sponsor will use this data to verify that the Contractor does not dig below the pre-Irma canal bottom elevation. Contractor is responsible for quality control. Sponsor is responsible for quality assurance. On completion of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area using the same locations of the pre-bathymetric survey. This survey data will be classified as the post-bathymetric survey data obtained by the contractor's surveyor. The post-bathymetric survey shall be compared to the pre- bathymetric survey to demonstrate that sediment has been dredged to the pre-Irma canal bottom elevations as shown on the plans. The Contractor is allowed a +/- 6-inches dredging tolerance from the pre-Irma canal bottom elevations. As part of the Quality Assurance process, the quantity of volume removed will be compared to the pre vs. post bathymetric survey analysis and the calculated field volume by the monitor utilizing the capacity of the trucks/roll offs and percentage full of sediment. The volumetric analysis calculation between the pre versus post bathymetric survey, completed by the Sponsor, will be used as the method of measurement and payment. VI. ENVIRONMENTAL PROTECTION REQUIREMENTS The Contractor shall provide and maintain during the life of the contract, all necessary environmental protective measures. The Contractor will comply with Federal, State, and local regulations pertaining to water, air, and noise pollution. VII. DREDGE EQUIPMENT The Contractor shall utilize mechanical dredge equipment to remove the sediment. The Contractor shall be aware that removal rate may be constrained by the sediment dewatering rate and area and shall implement the appropriate equipment accordingly. Florida-EWP Page 4 of 6 April 2019 The Contractor shall maintain the plant, scows, combings, barges, pipelines, and associated equipment to meet the requirements of the work. Immediately repair leaks or breaks along pipelines. Immediately remove dredged material discharged in wetlands or other areas outside of the identified project area due to leaks and breaks. Removal of material shall bring the impacted area back to original condition and shall be conducted at Contractor's expense. Operations shall be immediately halted if a pipeline breaks or a leak occurs. Except where authorized in the plans and specifications, dredge pipelines or open ditches shall not block roads or Rights of Way (ROW) or otherwise interfere with access unless approved. VIII. DEWATERING OF EXCAVATED MATERIAL The Contractor shall implement a passive dewatering system. The passive dewatering system is dependent on the material consistency. The Contractor shall provide the Sponsor a dewatering plan for review and approval. It shall be noted that the final hauling weight of each load (load = sediment + truck + trailer) is not to exceed Standard Highway Loading rates or a gross weight of 11,000 ton/axle, whichever is less. The effluent from the dewatering system will be discharged back into the canal. The Contractor is required to operate the dredging and dewatering operations such that mandated permitted turbidity limits are not exceeded. The State turbidity requirements are 0 NTU increase above background levels in the Florida Outstanding Waters outside the canal mouth. The Contractor will make any required adjustments to the operations to ensure compliance with these limits. The monitor will measure the turbidity throughout the project to ensure compliance with permits using a Hach 2100Q portable turbidity monitor, or equivalent. IX. DISPOSAL OF EXCAVATED MATERIAL The Contractor shall provide for safe and legal transportation and disposal of dredged materials according to plans, specifications and quality assurance plan. The deposit of dredged materials in unauthorized places is forbidden. Spoil material inadvertently spilled on roads, public ROWs and private property shall be promptly removed and the area restored by the Contractor. The dredged material may not be disposed of under an unrestricted use scenario. Therefore, the Contractor shall provide their proposed method of disposal, dependent on the chemical analysis for the dredged material to Engineer and County for approval. The tentative final disposal locations are as follows: Landfill: South Dade Landfill 23707 SW 97th Ave Homestead, FL 33032 Florida-EWP Page 5 of 6 April 2019 Beneficial Reuse: Florida Keys Country Club 4000 Sombrero Blvd. Marathon,Florida 33050-0969 X. MEASUREMENT Surveys prior to Work 1. Prior to commencement of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. Surveys during Progress of Work 1. Preliminary checks of design depth will be determined by soundings or sweepings taken behind the dredge and barge as the work progresses. The Contractor shall take progress soundings or sweepings to verify compliance with plans, specifications and quality assurance plan requirements. Final Examination and Acceptance: 2. On completion of the sediment removal, the Contractor shall engage a licensed surveyor in the State of Florida to provide a 10-foot by 10-foot bathymetric survey grid of the project area. The post-bathymetric survey shall be compared to the pre- bathymetric survey to demonstrate that sediment has been dredged to the pre-Irma canal bottom elevations as shown on the plans. To assure excavation to the minimum depths, the Contractor is allowed a +/- 6-inches dredging tolerance from the pre-Irma canal bottom elevations so as to not impact hard bottom. Florida-EWP Page 6 of 6 April 2019 1 1 2 I 3 I 4 1 S 1 5 1 GENERAL SCOPE OF SITE WORK FOR USDA NRCS EWP GRANT NO. NR184209XXXXCO27 __ wood SEDIMENT REMOVAL POST HURRICANE IRMA FOR - „.... ENVIRONMENT& INFRASTRUCT,,, SOLUTIONS.Ir1. - 10 RESIDENTIAL CANALS IN BIG PINE KEY, CITY OF MARATHON 5845 NW 158TH MIAMI LAFES,EL AND VILLAGE OF ISLAMORADA 300)R26.�Sbb' PROJECT LOCATIONS-.` MONROE COUNTY, FLORIDA ' D ATTENTION IS DIRECTED TO THE FACT THAT THESE PLANS MAY NAVE BEEN CHANGED IN S11 E BY REPRODUCTION. THIS MUST BE COHSCCRED WHEN OBTAINING SCALED DATA. SHEET INDEX MERITING SPECIFICATION% THE PROJECT DEVELOPMENT CODE; 1. SEDIMENT REMOVAL COVER SHEET =CD EN PART I AND 1 MONROE COUNTY PUBLIC WORKS MANUAL DATED SEPTEMBER 1983; FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION(MEP); 2. SEDIMENT REMOVAL — CANAL #1 48 — DSR5A FLORIDA KEYS NATIONAL MARINE SANCTUARY(RIMS) 3. SEDIMENT REMOVAL — CANAL #157— DSR5A UNITED STATES ARMY CORPS OF ENGINEERS(USAGE); IN THE EVENT of A CONFLICT.THE MOST aESTRIcrnT APPLES. — 4. SEDIMENT REMOVAL — CANAL #257 —DSR5B f 5. SEDIMENT REMOVAL — CANAL #268 —DSR5BIlli 6. SEDIMENT REMOVAL — CANAL #269 —DSR5B CANAL LOCATIONS TABLE 7. SEDIMENT REMOVAL — CANAL #282 —DSR3 �' ;. CANAL # LATITUDE LONGITUDE • 8. SEDIMENT REMOVAL - CANAL #293 -DSR3 'dil" a,, •3 • �7 148 LOWER MATECUMBE KEY 24.869326' -B0.704148' MONROE COUNTY 9. SEDIMENT REMOVAL — CANAL #297 —DSR3 , 157 LOWER MATECUMBE KEY 24.852399' -80.734650' HURRICANE IRMA - C 10. SEDIMENT REMOVAL — CANAL #299 —DSR3 )FGFNO 257 MARATHON 24.697964' -81.079706' EWP-PHASE III 11. SEDIMENT REMOVAL CANAL #300 —DSR3 "' "— "^` CANAL FOOTPRINTS SEDIMENT REMOVAL 12. SEDIMENT REMOVAL DETAIL SHEET BIG PINE KEY (DSR#3) 268 MARATHON 24.691252' -81.079741' LOCATION MAP 269 MARATHON 24.691880' -81.081228' 282 BIG PINE KEY 24,684035' -81.355360° n - i 293 BIG PINE KEY 24.674409' -81.342066° 1 MK.KO ® 297 BIG PINE KEY 24.673093' 81340948' I,-,' r y Y^I 299 BIG PINE KEY 24.672419' -81.340753' 300 BIG PINE KEY 24.671803' -81.339915' 8 SUNSHINE 811 • CALL BEFORE YOU DIG ® Viwl"' o '® 1-800-638-4097 ISLAMORADA (DSR#5A) MARATHON (.DSR#5B) 1. CAL 1-B00-638-4097 TWO FULL BUSINESS DAYS(BUT NOT MORE THAN MI BEFORE DIGGING TO FIND OUT WHERE BURIED FACILITIES(ELECTRIC,CAS, — LOCATION MAP LOCATION MAP TELECOMMUNICATIONS.CABLE WATER.SEWER)ARE LOCATED. _ _ 2. WAIT THE REQUIRED TINE FOR THE UTILITIES DN SITE TO BE LOCATED AND MARKED WITH COLOR-COOED PAINT,FLAGS OR STAKES IND CONFIRM THAT THE SITE HAS BEEN LOCATED. 3. RESPECT AND PROTECT THE MARKS DURING THE PROJECT,IF MARKS ARE I DESTROYED.REQUEST A NEW LOCATE TICKET. LA IL GIG WELY.USING EXTREME CAUTION MIEN DIGGING WITHIN 24 INCHES ON EITHER SHEET TITLE' A P R I L 2019 SIDE OF THE MARKS TO AVOID RUING THE BURIED UTILITY ONES. SEDIMENT REMOVAL A COVER SHEET i 1 OF 12 1 1 2 I 3 1 4 1 5 1 5 1 I I 2 I j I I 5 I ` I �. .. +y ) r � " s , .,.� - w 7 I,. �� a ,_ wood. Y P W K ..!`. 4 7 "`yy�m� �y I-"_ t �Jj(:` "' �, ,; �� ....A /, MEAT 1< 4 M 4 � ` �.;� ' NAL #282 DSRp3 - BIG PINE KEY JFRADTRUCTI,, ownon � --��� � �� ' �, y`. - NW 158TH IIFIlrl GUI.of . - = Iff.1 ti T � 4` . i t - ',tit a '-, . 'PT-I T., . ' 1 "'. ' D -kw,„.slt ,,,. ,'S , ,A(Tt1.lOfly St ——��ilk � � I FGFND ' •` .' I'. * 'FPi: ,ate ��PROPOSED SEDIMENT REMOVAL AREA d I-. • ***.. ., / '� :::i POTENTIAL UPLAND STAGING AREAS -+_. sal *H RT* s ' _ MONROE COUNTY PARCELS.2010 yrn } 4. ( '?'� �� s: m-�FLOATING TURBIDITY BARRIER ,,, gall `, I= t. . a " 4 ' � ... APPROVED SEDIMENT REMOVAL AREA ', arm ' FROM STATION 5+50 TO 7+25 -- r k _ ' , MONROE COUNTY �` *`` "-'' _ • HURRICANE IRMA - - aCN(ctpJej 0Nb9NNen Ai(Wtl D502018 HERE = .'.;{4'. D s as EVVP-PHASE III SEDIMENT REMOVAL Sediment Volume Sediment Removal Acummulation Post "'I+-,:r. Canal u DSR U Canal Area(Sq ft.) Area(Sq ft.) Irma(CY) �, 282 BIG PINE KEY 3 84795.03 10985.9 610.33 — o.a I IIIIIIIIIPPOI \„ -z... B 3.0 NOTES. -70� I)MEAN LOW LOW WATER(MLLW) WANED Al. LW. ELEVATIONS REFERENCED FROM DRAWN BY. SAC -B.o� APPROVED SEDIMENT REMOVAL AREA NOM TIDE STATION 8724201 IFfFND CHECKED B1': RH s_ FROM STATION 5*50 TO 7+25 2)ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH PRE HURRICANE IRMA APPROVED BY. RH CANAL BOTTOM DATE. 10/01/20ie — AMERICPN VERTICAL DATUM OF 1988(NANO BB) 7)THE PROFILE IS JUST A REPRESENTATION OF THE IMPACTS - POST HURRICANE IRMA SHEET TITLE 2.s nw -IY TO THE CANAL SYSTEM,IN SOME INSTANCES NOT ALL CANAL BOTTOM A 7 O�.W 7. 00 RACER kA ALSI AR MPAE CTS ARE TNTECAL WITHIA NCROS SECT M �,,_,-,_,-,_ SEDIMENT REMOVAL „_.,„_ HURRICANE IRMA CANAL 282 — ® R❑SS—SECTI❑N AND ARE PART OF HE EVA UA ON TO BE RESTORED. SEDIMENT REMOVAL AREA DSR3 4)CONTRACTOR SHALL ENSURE TURBIDITY OUTSIDE CANAL IS 0 ,mow MLLW ELEVATION (-1.27 NTO ABOVE BACKGROUND ATR ALL TIMES DURING FT NAVD85) CONSTRUCTION ACTIVITY, SHEET I�UMHER. REV.B 5)NO CORAL MANGROVE SEAGRASS OR HAND BOTTOM 7 OF 12 IMPACTS ARE PROPOSED FOR THE SEDIMENT REMOVAL `MEET OF SHEETS • ACTIVITIES. 1 I Z I 3 I 4 I 5 I 5 I • I I 2 I 3 I 4 I 5 I B I 1 • I� �. .e' - �0 FE -wRog_ CANAL #293 - DSR#3 - BIG PINE KEY ' T ;T T T 1 �.>..y. `'. _ T T RONMENT `- ^^R` ' l' INFRASTRUCTURE �` "�" '1 1 ,�,• BaaSOLUTIONS,INC — > I I s>1 '� MIAMI LAFES,FL 3301, ( TEL (305)82_G-5588 w ,..„, ., ir.,_, . . 1 I . ,•'-' - 1 ,• 'i 1 , ' ii N5il ca5I Ma irr 13CI D � u #L t . . St '`'tee wl . _:e I _ -�I y 1 va I ,.. I FOFNR �' _ 1 �' II 77Z PROPOSED SEDIMENT REMOVAL AREA ii APPROVED SEDIMENT REMOVAL AREA * n -#'. �',. « I I .:.POTENTIAL UPLAND STAGING AREAS I FROM STATION 3+50 TO 7+27 `F-... #,4 111 ,z,.' ' ,`.y; , e - I 0 MONROE COUNTY PARCELS, 2010 ^t' '' 1 al_ __ J FLOATING TURBIDITY BARRIER '' �' .. :,'AVIpflue,;H /LN1.111A'J�J Lit PR(11E I I _;_ ' . „ - .,- MONROE COUNTY � � - e ' '.- HURRICANE IRMA - C —_ EWP-PHASE III Sediment Volume Sediment Removal Acummulation Post SEDIMENT REMOVAL Canal# DSR# Canal Area(Sq ft.) Area(Sq ft.) Irma(CY) 293 BIG PINE KEY 3 39597.96 19403.1 2874.53 1 — 000I I I 1 I I I I . , -I _ I FSFND / 00- + PRE HURRICANE IRMA -z.0o- - CANAL BOTTOM - _ POST HURRICANE IRMA REVISIONS - CANAL BOTTOM NO DATE NO APPROVED B -4.00- _ -Ti-irn-„ HURRICANE IRMA ----= SEDIMENT REMOVAL AREA -5.00- _ - — - MLLW ELEVATION (-1.27 -0 _ II NAY FT NAVOBB) lIs NOTES: -7 I— — - 1)MEAN LOW LOW WATER(MLLW) Do- --- — — III— — ELEVATIONS REFERENCED FROM _ _ NOM TDE STATNJN 8724201 — Goo- —E m 2)ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE UNSOLD Br. AWL -900- I� _ —m —ill _ — W— — — "y - NORTH AMERICAN VERTICAL DATUM OF 1988(NAND DNABN B1A CWC ' -l0.ao- — — —I - — — - 88) CHECKED BY'. RN ll Ti THE PROFILE IS JUST A REPRESENTATION OF THE ARRROVED MI RH I I= I— DATE: I O/01/201 B u0o- - IMPACTS TO THE LL IL SYSTEM.IN SOME x-ree _ - REPRESENTED NOT ALL FINGER CANALS ARE I REPRESENTED WITH A CROSS SECTION HOWEVER SHEET TITLE. -12' I 1 I I APPROVED SEDIMENT REMOVAL AREA - THE IMPACTS ARE TYPICAL WITHIN EACH SEGMENT FROM STATION 3+50 TO 7+27 _ RAND ARE ESTORED PART OF THE EVALUATION TO BE SEDIMENT REMOVAL A 30° - CANAL #293 — _lap0 I I 1 I 4)CONTRACTOR SHALL ENSURE TURBIDITY DSR3 J.000 4,0'000 S+d0.W 6,4000 744000 742100 OUTSIDE CANAL IS 0 NTU ABOVE BACKGROUND AT 1 I . I . " ® R O S S—SECTION ALL TIMES DURING CONSTRUCTION ACTIVITY 5)NO CORAL,MANGROVE,SEAGRASS,OR HARD BOTTOM IMPACTS ARE PROPOSED FOR THE 8 OF 12 SEDIMENT REMOVAL ACDVITIES. -- --- A,Lt ... / I I 2 I 3 I 4 I 5 I 6 I 1 I 2 1 3 I 4 1 5 I 6 I 1 1 1 1 I' I ,? 4_ , d. ,-.* W .. I , 0 CANAL #297 - DSR#3`-BIG PINE KEY WOO ka I rY. I t NVIRONMENT& "ter IFRASTRUCTURE I 1 V w I L: I ,OLU DONS.INC. 1 -- -' -" A '` RE NW 158TH STE' IWIP— -....- .-.. _ MI LAKE',FL 3301.; -4 r—- 1 :L (30.)82G 558r - j„r Pine key doh ) r ' @' llfrr. -. .—. .._.t.. - ----- 1 i i ° I 1 t I Nt I 1 ."1 I 1, •.~ T— APPROVED SEDIMENT REMOVAL AREA ,� 1 I ( FROM STATION 3+30 TO 4+42 ;ar � r 1 I LEGEND a "� T lilk 1 I °%r1)777 3 PROPOSED SEDIMENT REMOVAL AREA 1._ „�, _ :w:.POTENTIAL UPLAND STAGING AREAS a N L - ""R•,*, - --- _,MONROE COUNTY PARCELS,2010 enct a. 11 hoi y 4 ��j ., ,4 ; >6�IWlr ,R " /r\�L6�:� { FLOATING TURBIDITY BARRIER - -- „ -' 1 4' r T T �°`——— T:.' I MONROE COUNTY s /� 1400 ' 1 1 1 I ! I D11 HURRICANE IRMA - EV4P-PHASE III Sediment Volume SEDIMENT REMOVAL Sediment Removal Acummulation Post Canal B DSR B Canal Area(Sq ft.) Area(Sq ft.) Irma(CV) 297 BIG PINE KEY 3 19962.11 4151.4 153.76 \.. _2 I FGFND *a 0,i PRE HURRICANE IRMA f/' CANAL BOTTOM -3 POST HURRICANE IRMA ... CANAL BOTTOM - -4 _n ., Avvk�vED „_„_„_„_� HURRICANE IRMA B 111_-71 =0=="-'° SEDIMENT REMOVAL AREA rcl 1 _: 1-: 1 y MLLW ELEVATION(-1,27 FT NAVD88) • NOTES • -T' I)MEAN LOW LOW WATER(MLLW)ELEVATIONS REFERENCED FROM NOM TIDE STATION 8724201 - DESIGNED 8, OWL 3- 2)ELEVATIONS SHOWN HEREON ARE RELATNE TO THE DRAWN BY GWC _ APPROVED SEDIMENT REMOVAL AREA NORTH AMERICAN VERTICAL DATUM OF 1988(NAND 88) CHECKED BY: kH _9,,FROM STATION 3.30 TO 4.42 _ 3)THE PROFILE IS JUST A REPRESENTATION OF THE EO BY. FH 1 -fed IMPACTS IMPACTS TO THE CANAL SYSTEM,IN SOME INSTANCES DATE: 10/01/_U18 NOT ALL FINGER CANALS ARE REPRESENTED wal A TYPICAL - -1 CROSS SECTION HOWEVER THE IMPACTS ARE TYPI SHEET TITLE WITHIN EACH SEGMENT AND ARE PART OF THE EVALUATION TO BE RESTORED. SEDIMENT REMOVAL A 0 n3.000 4. 00 4. 00 4)CONTRACTOR SHALL ENSURE TURBIDITY OUTSIDE CANAL CANAL #297 — IS 0 NTU ABOVE BACKGROUND AT ALL TIMES DURING DSR3 e RDSS-SECTION NONCTRALTION. IA.,, 5)NO CORAL.MANGROVE,GROVE.SEAGRASS.OR HARD NUMin.,- REV d BOTTOM IMPACTS ME PROPOSED FOR THE SEDIMENT REMOVAL ACTNMES. 9 OF 12 1 I 2 I 3 I 4 I 5 I 6 I I I 2 I 3 I 4 I 5 I B I y -_ C',0 '-1�1 `CANAL k299 - DSRu3 - BIG PI > _ A i-_ . IFS 1 1 /y • "w s ' }' ' 2.+a ap ^ 1. .. - * . `` , ,=_: *I **II tow Z11 ' .,,,,-.' ' . A. r I .x l fl p 1 APPROVED SE DIMENT REMOVAL AREA -.#e. FROM STATION 4.50 TO 6+20 1 + { - )FGEND $ I LL - fI - .T V 77 PROPOSED SEDIMENT REMOVAL AREA —_.— J �-- 1- 1- _ K ---_ _ —_L L_ _1_- x..x.,POTENTIAL UPLAND STAGING AREAS n ,., _ _ MONROE COUNTY PARCELS, 2010 y ; 44. y . 4.. "MT" 1'r.i L 'I I` ' I J FLOATING TURBIDITY BARRIER k ' 1 iii. 1 e I MONROE COUNTY EWP-PHASE III Sediment Volume SEDIMENT REMOVAL Sediment Removal Acummulation Post Canal 8 DSR N Canal Area(Sq ft.) Area(Sq ft.) Irma(CY) 299 BIG PINE KEY 3 24435.77 5356.8 396.80 i - A I FGEND klAF U. PRE HURRICANE IRMA , CANAL BOTTOM .I"IIIIIIIIIIIIII POST MA _ -'-' HURRICANE AREA CANAL BOTTOM 9 -z.,, iT-„ _, HURRICANE IRMA ���� � SEDIMENT REMOVAL AREA a ' 'II—II�Il l—III'111 II II MLLW ELEVATION(-1.27 _ LI-I NOTES. FT NAVD88) 11 H H H I—I I-11 I-11 I 1 I)MEAN LOW LOW WATER(MLLW) ' "C"_"—' " ELLEVAOTIONS 8724201 REF REFERENCED FROM NOM TIDE _ 11—I11—I11-111-111-1 — 5 , �I—II—I ' ' 2)ELEVATIONS SHOWN HEREON ARE LE,I.NIL H, RELATIVE TO THE NORTH AMERICAN L4'AWN H, .. -6, VERTICAL DATUM OF 1988(NAND 88) ,,,, ,H, 3 3)THE PROFILE IS JUST A REPRESENTATION AI'PF„�tL h -T'' APPROVED SEDIMENT REMOVAL AREA OF THE IMPACTS TO THE CANAL SYSTEM, LIAIL. FROM STATION 4.50 TO 6+20 IN SOME INSTANCES NOT ALL RNGER CANALS ARE REPRESENTED WITH A SNI.I:1 IITII -e" CROSS SECTION HOWEVER THE IMPACTS ARE TYPICAL WITHIN EACH SEGMENT AND SEDIMENT REMOVAL ARE PART.OF THE EVALUATION TO BE A - _50' RESTORED CANAL #299 - n ® T)CONTRACTOR SHALL ENSURE DSR3 R❑SS SECTI❑N ABOVE UE CANT D NDU ONSE BACKGROUND AT ALL TIMES DURING CONSTRUCTION ACTIVITY. I i I ti. 5)NO CORAL,MANGROVE.SEAGRASS,OR 10 OF 12 HARD BOTTOM IMPACTS ARE PROPOSED FOR THE SEDIMENT REMOVAL ACTMTIES. 1 I 2 I 3 I 4 I 5 I 3 I • I I 2 I 3 I 4 i 5 I 6 I enueg . ,ct ,- 4 -, o 1 lA � FM E , ; ��. 1ilk 1 � wood. IL11 �� diiir I it, NFRAS RUENT TU E • ` I I V 5845 NW SOLUTONS,INC 15BTM STREET I `• MIAMI LAKES.FL 33014 yR • + ' a _ TEL (305)826-5588 4 IS L i.._ wIR� F� Vim. �. r" i . l I III m �" I 1 'ry � 'APPROVED SEDIMENT REMOVAL AREA I ,I I I • FROM STATION 4+00 TO 4+75 ,5� I I I. I CANAL #300 DSR#3 - BIG PINE KEY 1 $. '- I = r `' I I 1 ` i I 1 F7JJ2 PROPOSED SEDIMENT REMOVAL.AREA 1t ——— ——— —— — —'—_ ——— 1 R:R:4 POTENTIAL UPLAND STAGING AREAS �'- AVenUE' ... ' "` - nue°D. ,'✓ J FLOATNG TOUR IBDITYRBARRIER2010 b ..,.ply H \ I ) T �� MONROE COUNTY I w s I,:mOhlk HURRICANE IRMA - C EWP-PHASE III Sediment Volume SEDIMENT REMOVAL Sediment Removal Acummulation Post Canal# DSR# Canal Area(Sq ft.) Area(Sq ft.) Irma(CV) 300 BIG PINE KEY 3 22435.75 3507.73 649.58 f4` ° I Frrun A _ PRE HURRICANE IRMA J�. 1. CANAL BOTTOM // _2 POST HURRICANE IRMA • CANAL BOTTOM I_T, II"'. e HURRICANE IRMA zit=18'_'11_� _l_��_ _" - SEDIMENT REMOVAL AREA n a B ii1.1 _ -4. - 1... MLLW ELEVATION (-1.27 I FT NAVD88) -- �_ '--1I" NOTES. -5' - _" .. 1)MEAN LOW LOW WATER(maw) 11,_1 I1I I._..:i ELEVAPONS RERRENCED FROM .1l-1!..y MOM TIDE STATION 8724201 - - 11111 I! 2)ELEVATIONS HEWN HEREONARE REUTME TO THE NORTHAMAMERICAN tll Ti VERTICAL DATUM OF 1988(NAVD 88) EWA.B b, ,,W, �1 CHECKED D1 .W,. y 3)THE PROFILE IS JUST A REPRESENTATION AEFREvU NS HH BA IN THE IMPACTS ES THE AL SYSTEM, hFPRJVLU H, °- C SOME INSTANCES R NOT ALL HANGER _ CANALS ME REPRESENTED WITH A CROSS SAIL '1 - "...APPROVED SEDIMENT REMDVAL AREA SECTION HOWEVER THE IMPACTS ARE FROM STATION 4.00 TO 4475 TYPICALHHIN EACH SEGMENT AND ARE SHEET Ti TL1 THE OF THE EVALUATION TO BE -,(1,° RESTORED. SEDIMENT REMOVAL A - 4)CONTRACTOR SHALL ENSURE CANAL #300 - -IL TURBIDITY OUTSIDE CANAL IS 0 NTU DS R3 °- 4. 4. to ABOVE BACKGROUND AT ALL TIMES DURING / CONSTRUCTOR ACTMTY. 7 I,... ® R O S S-SECTION 5)NO CORAL.MANGROVE.SEAGRASS•OR ---- - „ HARD BOTTOM IMPACTS ARE PROPOSED FOR 11 OF 12 THE SEDIMENT REMOVAL ACTMTIES. I I 2 I 3 I 4 I 5 I 5 I 1 1 2 I 3 1 4 1 5 I 6 I E / wood. EXISTING SEAWALL EXISTING SEAWALL - EITHER CONCRETE EITHER CONCRETE ENVIRONMENT& OR EARTHEN OR EARTHEN INFRASTRUCTURE SOLUTIOIIS,INC. 5845 NW 158TH STREET 1.11AM1 LAKES,FL 33014 TEL: (305)826-5588 D N—MEAN LOW WATER ELEVATION 11-11-1-11- I =1 IHIHI-I- 1=0=1 1-11 �11 POST HURRICANE IRMA GRADE 1•I II-I I-111II \ OF CANAL BOTTOM 11r-11-111-1=If�11 HURRICANE IRMA PRE HURRICANE IRMA GRADE SEDIMENTATION IMPACTS — OF CANAL BOTTOM BEFORE CONSTRUCTION /// PROJECT: / \�/� E COUNTY HURRICANE MONR IRMA- D / �X EWP-PHASE III SEDIMENT REMOVAL EXISTING SEAWALL EXISTING SEAWALL SPONSOR: • EITHER CONCRETE EITHER CONCRETE OR EARTHEN OR EARTHEN j\/- - REVISIONS B v v v v N. NO. DATE BA APPROVED "—MEAN LOW WATER ELEVATION PRE HURRICANE IRMA GRADE__,,, OF CANAL BOTTOM DESIGNED DV: cwc AFTER CONSTRUCTION DRAWN BC SAC CHECKED BS: RH APPROVED DV: RH _ DATE: 10/01/2018, SHEET TITLE: SEDIMENT REMOVAL A DETAIL SHEET NAME OF REACH:FLORIDA KEYS CANALS SHEET NUMBER: REV.V 12 OF 12 SHEET OF SHEETS 1 I 2 I 3 I 4 _ I 5 I 6 I EXHIBIT B-1 Estimated resource allocation and 30 day estimate for DSR#3 MONROE COUNTY CANAL DEBRIS REMOVAL & DREDGING DSR: 3 07/01/2019-08/31/2019 TASK ASSIGNMENT REQUEST CANALS ANTICIPIATED FOR SERVICE: 299,293,300 # DESCRIPTION UNIT UNIT RATE EST. MONTHLY TOTAL QUANTITY 001 MOBILIZATION LS $30, 000.00 1 $30, 000.00 002 NON-HYRDAULIC CY $150.00 1, 000 $150, 000.00 SEDIMENT REMOVAL 003 TRANSPORT CY $45.00 1, 000 $45, 000.00 NO ARSENIC 004 TIPPING FEE N/A N/A N/A $20, 000.00 005 TURBIDITY BARRIER LF $100.00 600 $60, 000.00 006 UPLAND DEWATERING DAY $2000.00 20 x 3 $120, 000.00 SITE 60 SURVEYS AND LAB 007 WORK N/A N/A N/A $10, 000. 00 1 TOTAL $435, 000.00