Item D6 D.6
G BOARD OF COUNTY COMMISSIONERS
County of Monroe Mayor Sylvia Murphy,District 5
The Florida Keys l'U � � Mayor Pro Tern Danny Kolhage,District 1
�pw° Michelle Coldiron,District 2
Heather Carruthers,District 3
David Rice,District 4
County Commission Meeting
October 16, 2019
Agenda Item Number: D.6
Agenda Item Summary #6162
BULK ITEM: No DEPARTMENT: Sustainability
TIME APPROXIMATE: STAFF CONTACT: Rhonda Haag (305) 453-8774
TBD
AGENDA ITEM WORDING: Discussion and direction related to canals 82, 83 and 84 in the
Rock Harbor area of Key Largo regarding resident-requested repairs to the jetty near these canals
and/or installation of air curtains in the canals or perimeter canal.
ITEM BACKGROUND: At the September 18, 2019 Monroe BOCC meeting held in Key Largo
residents of canals 82, 83 and 84 in Rock Harbor, Key Largo presented to the BOCC during a
Sounding Board item and requested that the County fund repairs to the jetty that was damaged by
Hurricane Irma that lies outside of canals 82, 83 and 84. Residents presented that repairs to the jetty
would help control the floating vegetation that is currently floating over the top of the jetty into the
residents' canals. Commissioners asked staff to return with information on the number of jetties
throughout the Keys that would potentially be affected and the cost to repair this jetty if the County
decided to assist with the repair.
An alternate option is the installation of an air curtain at the entrance to each of the three canals to
restrict floating vegetation from entering. Reimbursement funds are available from FEMA to install
an air curtain in canals 83 and 84. An assessment would be required to fund the operations and
maintenance. The Canal 483 Combined Organic Removal and Backfilling project was the first
combination muck removal and backfilling project completed by the County.
PREVIOUS RELEVANT BOCC ACTION:
None.
CONTRACT/AGREEMENT CHANGES:
N/A
STAFF RECOMMENDATION:
DOCUMENTATION:
Packet Pg. 1240
D.6
FINANCIAL IMPACT:
Effective Date: N/A Expiration Date: N/A
Total Dollar Value of Contract: N/A Total Cost to County: TBD
Current Year Portion: N/A Budgeted: N/A
Source of Funds: N/A CPI: N/A
Indirect Costs: N/A
Estimated Ongoing Costs Not Included in above dollar amounts: TBD
Revenue Producing: No If yes, amount:
Grant: No
County Match: N/A Insurance Required: No
Additional Details:
None
REVIEWED BY:
Rhonda Haag Completed 10/01/2019 9:40 AM
Pedro Mercado Completed 10/01/2019 9:50 AM
Budget and Finance Completed 10/01/2019 10:40 AM
Maria Slavik Completed 10/01/2019 10:43 AM
Kathy Peters Completed 10/01/2019 10:50 AM
Board of County Commissioners Pending 10/16/2019 9:00 AM
Packet Pg. 1241
10/15/2019
1
Monroe County BOCC Meeting
October 16, 2019, Marathon
Item D-6 3:00 P.M.
Rock Harbor Jetty, Breakwater and Air
Curtains Discussion
Rhonda Haag
2
* Previous Procedure for obtaining homeowner
Input and approval
Jetty/Breakwater Discussion(unincorporated
Monroe County)
•
Jetty/Breakwater Ownership Evaluation
Presentation Jetty/Breakwater Discussion-Rock Harbor
morliroweskit %./ Air Curtains(C82,C83 and C84)
00
nik Li Homeowner Request
110
Options for moving forward
1
10/15/2019
Previous Procedure for obtaining 3
homeowner input and approval
BOCC previously recommended ,_
75% approval level for the
demonstration projects _.u. -.- ,„,,
• Letters sent to residents to obtain -•-^•~:-
the 75%approval threshold
based on%approvals in -�-^ •—��
returned letters '"—
2 BOCC reevaluated the criteria at
the April 11,2016 workshop •— _^
• Determine public vs.private — ==~�—
ownership for canals = .
• Public ownership requires 11
notification letter and • "WI-3—
community meeting.
• Private ownership requires "+-41 ""'°` ,, 'a" • �„
• Notification and approval :_ `
letters o • i
Easement for release of _
liability or equivalent
Estimated Inventory of Breakwater / 4
Jetties
Breakwater /Jetty ..
Inventoryk
► Aerial review- estimated
length of the breakwater/ - .
ii
jetties within unincorporated _ -
Monroe County:
• Big Pine Key 1,897 LF 4 r
• Boca Chico Key 2,900 LF
• Conch Key 810 LF
• Cudjoe Key 2,200 LF
• Duck key 10,969 LF , _ .
• Key Largo 8,421 LF _ :a;,■ ..-
j '
Long Key 380 LF •fl
ill
• Ocean Reef 2,036 LF
• Sugarloaf Key 170 LF
29,783 LF
2
10/15/2019
Recent Duck Key Breakwater / Jetty Repair 5
Request
Duck Key
_o— T, ► Provide and install
ai 164 Duck Kay MR 4 , A, boulders across a
;c+`4b,T - 10,969-foot breakwater/
� .•- jetty span.
f r 4 ► Cost= unknown
N1k3
Recent Tavernier Jetty / Breakwater 6
Repair Request
Tavernier Jetty / Breakwater
by Canal 105 Estimated repair cost
^O• .r ,_,yam A. Provide and install 2.5' -4'
boulders across a 1,500'jetty
tir�G�a
`" =-- — span. New boulders to be 3'
i. y -'+ '. above the water at high tide.
1` ' B. Estimated Cost = $380,900
y *t'� `' 4 construction only.
i ',.;�; C. Not Included: Permitting,
�' 40' engineering, procurement,
• '% b inspection, process fees or
\ mitigation fees
ter...
3
10/15/2019
Current Rock Harbor Jetty / Breakwater 7
Repair Request
Residents request County obtain and
,j�
pay for permits and engineering fees to ; ' .$)
raise jetty 3'above mean high water " > "
for 500 LF+/ Estimated cost=$200- :fr, +, r
300K.
Residents informally offered to pay for Y • •� t—0(• •
the construction of the Jetty(estimated [�
$300,000 with no mitigation) if
necessary Y f
Residents requested jetty project to be
added to USACE Coastal Risk
Management Project-no guarantee ,
of acceptance.
Residents did offer to pay for air curtain
in perimeter canal.However didn't
indicate whether they wanted a
county assessment to pay for O&M.
• If not,floating seaweed can
still enter and migrate to
canals 82,83 and 84.
Rock Harbor Jetty / Breakwater 8
Ownership Evaluation
T Ore r321 a&Spa.l
Ownership of future
jetties/breakwaters for . `+ ` .
repairs will need to be � • #
evaluated on a case by
case basis i .,
State owns the Rock
Harbor jetty/
breakwater, the land
underneath and
waterward --- -
4
10/15/2019
Air Curtains on Canals 82, 83 and 84
9
If jetty repairs do not move
forward, need an air curtain P
Cgnal 82
on each canal to keep out
floating vegetation. _
90 residents on 3 canals have ,ate- Y`
differing needs and wants, no Canal 83 /
majority opinion. $1.6 M Restoration
Canal 83 already restored for r•
$1.6 Million.No air curtain yet. •
p i
Canals 82 and 84 not restored .—^um,
yet, also needs an air curtain
111
anal 84
el
41.
Air Curtains C82, C83 and C84 1 o
County Costs Residents Cost
A. BOCC has specified that
An Air curtain costs the County an residents must pay the
estimated$150,000 each to permit, operations and maintenance
design,install and inspect. costs
B. O&M costs are added together
County has$200,000 tentatively and divided up among the
approved for FEMA reimbursement owners,either by parcel or lot
for an air curtain in Canals 83 and c Notice of Intent of assessment
84 needs to be completed by
December 2019 to collect in
• These are Federal November 2020
REIMBURSEMENT funds with D. Assessment is set up by County
stringent requirements and
timelines • Not voluntary
•
• Deadline to design,permit,and Everyone pays
• Count
construct projects is March rresidentmanagesthe program for the
s
2020. • Funds collected can only be spent on
canal O&M costs...i.e.power,repairs.
Canal 82 air curtain not included in maintenance,insurance and
FEMA reimbursement replacement of equipment
• Typical 20-year assessment period
5
10/15/2019
Proposed Air Curtains Site Plan ,!J` v; , Legend
i Proposed Tudddy Curtain Lan aborts
/ ra
s C�
anal j' , ;:
i�
•
c as ' " v r c ' /� .' . .: .. . '.
4N1
' .E'y \
Funding Availability & Restriction,
1. RESTORE Funding($478K)
1. Project should include design,permitting,construction and monitoring
2. Deadline:Constructed by February 2021
3. Restriction: Needs to meet the Water Quality improvement target to increase
Dissolved Oxygen in canal
2. FEMA Tentative Reimbursement Funding($200,000)
1 Funds shifted from destroyed air curtains on C287 and C290 on Big Pine Key to
potential NEW C83 and C84 air curtains
2. Project to include design,permitting,construction and Inspection
3. Restriction:If project not construction by deadline,funds will be lost unless an
extension can be obtained from FEMA
4 Deadline:Constructed by March 31,2020
3. COUNTY Funding
1. $0 available in County budget
6
10/15/2019
Options For Moving Forward 1 3
t. County does nothing and expends no County funds.County does not design or permit the Jetty
repairs nor install the air curtains in canals 82,83 or 84.
2 County pays for Jetty design and permitting($50,000;/-)with no regard to needed air curtains.
• Residents pay for construction and any mitigation costs(potential 51,000,000 per UMAM
credit)and construction.
3 County expends resources to research how many residents on each canal (82, 83 and 84)
support paying an assessment for the operations and maintenance of an air curtain on their
canal and County proceeds with air curtain installations based on resident response.
-. If yes:residents on canal 83-already restored by the County - are willing to pay the assessment move
forward at full speed to install an air curtain(already designed)to take advantage of the FEMA-authorized
project before the FEMA deadline of March 2020.Then move forward with assessment set up.
• If no:C83 residents don't support an assessment BOCC must decide if County wants to move forward
with an assessment regardless to protect the County's$1.6 M investment in the previous restoration.
rr, It yes:if residents on canal 84 are willing to pay the assessment,move forward at full speed to design and
install an air curtain in their canal to take advantage of the FEMA-authorized project before the FEMA
deadline-currently March,2020. May need FEMA extension.Put canal 84 on a waitlist for restoration when
funding become available.
• If no:do not restore canal 84.Lose potential for FEMA reimbursement for air curtain.
If yes:If residents on canal 82 are willing to pay the assessment,put them on a waitlist for restoration and an
air curtain when funding becomes available.
• If not:do not restore canal 82