Loading...
11/19/2019 Agreement TASK ORDER FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES BETWEEN MONROE COUNTY AND WILLIAM P.HORN,ARCHITECT FOR JACKSON SQUARE LIGHT POLE REPAIR ASSESSMENT In accordance with the Consultant Agreement for Professional Architectural and Engineering Services,made and entered into on December 19,2018 between MONROE COUNTY, hereinafter referred to as the"County,"and WILLIAM P. HORN,ARCHITECT,hereinafter referred to as"Consultant,"where professional services are allowed if construction costs do not exceed Two Million and 00/100 Dollars($2,000,000.00),or for study activity if the fee for professional services for each individual study under the contract does not exceed Two Hundred Thousand and 001100 Dollars($200,000.00),hereinafter referred to as the"Agreement". All terms and conditions of the Agreement apply to this Task Order, unless this Task Order amends,adds,or modifies a provision or an Article of the Agreement of which will be specifically referenced in this Task Order and the amendment, addition, or modification shall be precisely described. These additions apply only to the project referenced in this Task Order. This Task Order is effective on the 19th of November,2019. As a result of Hurricane Irma damages to several light poles and fixtures on the Historic Jackson Square site,the County desires an assessment for replacement, in-kind of three light fixtures and two poles. The Consultant is qualified to conduct an assessment of the missing lighting fixtures and report the findings,provide recommended fixes and estimated cost and duration of those fixes. NOW,THEREFORE,in consideration of the mutual promises and covenants set forth below,the parties agree as follows: 1. In accordance with Article 11, SCOPE OF BASIC SERVICES of the Agreement the Consultant will perform services as described below: a. Consultant shall conduct an on-site evaluation to assess the available electrical infrastructure and investigate the lighting reparations, including inspection of the poles and fixtures. b. Consultant shall provide written documentation of the findings and recommended fixes to replace damaged lighting,paying strict attention to electrical lighting codes, (Including the Florida Dark Sky movement,to reduce light pollution to the area and Page 1 of 2 neighboring homes) and specify an estimated cost and duration of the work to complete. c. Consultant will provide the Following deliverables: i. Design and specifications to install new lighting poles and fixtures, to include an electrical plan set; Bidding assistance and Construction support not include in this Task Order. 2. In accordance with Article VII,paragraph 7.1.1 of the Agreement,the County shall pay The Consultant a lump sum fee ofTwo Thousand tour Hundred and 00/100 Dollars($2,400.00) paid upon document review and approval by the Director of Project Management. All other Terms and Conditions of the Task Order shall remain in accordance with the Agreement. IN WITNESS WHEREOF,each party caused this Task Order to be executed by its duly authorized representative. Ruvfe$v: Contract Management Reviai : 9- Cary Knight,Director,Project Management CONSULTANT: William P.Horn,Architect Date °hw MONROE NTY: 9 w Roman Clastesi,County Administrator Date w (or designee) 'OUMY AT n)WE I'8 OFFICE LAST O L PATH Ti F R A Page 2 of 2 WILUAM P. HORN ARcHrrEcT, PA. Ur-rNSC No.AA 0003040 WWW WILUAMPH019HARCHMECTPA cO DAT13 IV12/19 JACKSON SQUARE LIGHT POLE & FIXTURE REPLACEMENTS- FEE PROPOSAL STOCK ISLAND. FLORIDA THE ARCHITCTURAL & ENGINEERING PEE FOR THIS PROJECT HAS BEEN ESTIMATED AS FOLLOWS: SCOPE OF WORK INCLUDES REPLACING THREE LIGHT FIXTURES AND 2 (POSSIBLY 3) LIGHT POLES TO MATCH THE EXISTING LIGHTING ON THE SITE. THE NEW LIGHT POLES AND FIXTURES WILL. MATCH THE EXISTING POLES AND FIXTURES ON THE SITE BUT WILL NESD TO MEET NEW CODE REQUIREMENTS. WORK INCLUDES GETTING HARC APPROVAL AND PRODUCING PLANS AND SPECIFICATIONS FOR PERMIT AND CONSTRUCTION. THE PEE WILL BE AS FOLLOWS: ARCHITECTS WORK INCLUDES COORDINATION WITH THE COUNTY STAFF. HARC STAFF AND THE ELECTRICAL ENGINEER AND PRODUCING THE EXISTING SITE PLAN. FEE=: $700.00 ELECTRICAL ENGINEERS CONSTRUCTION DOCUMENTS AND SPECIFICATIONS: FEE= $1,700.00 THE TOTAL FEE IS S2.400.00. THE BID AND CONSTRUCTION PHASE ARE NOT INCLUDED IN THE SCOPE OF WORK. IF WORK IS NEEDED IN THESE PHASES IT CAN BE COMPLETED AT OUR STANDARD HOURLY RATES AS PER OUR ANNUAL CONTRACT. THE COUNTY WILL PROVIDE THE ARCHITECT A SITE PLAN BASE. PLEASE CALL IF HAVE ANY QUESTIONS. THANKS. BILL WILLIAM P. HO ARGI�IT�GT.PA WILL IA HORN. R.A. NGARB.LFED AP PRINCIPAL