Loading...
PK Courthouse-Threshold Inspection 01/22/2020 GJ.ZcougrQcl,1 o�/ Kevin Madok, CPA 4av ;o• TA/J Clerk of the Circuit Court&Comptroller—Monroe County, Florida DATE: February 4, 2020 TO: Breanne Erickson, Contract Administrator Project Management FROM: Pamela G. Hanc•(. ��" SUBJECT: January 22 BOCC Meeting Attached is an electronic copy of the following item for your handling: C16 Task Order with M. T. Causley, Inc. to provide State required Threshold Inspection Services for the Plantation Key Courthouse Project in the amount of$90,000.00. Should you have any questions, please feel free to contact me at(305) 292-3550. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING 500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Florida 33070 305-294-4641 305-289-6027 305-852-7145 305-852-7145 TASK ORDER FOR PROFESSIONAL SERVICES BETWEEN MONROE COUNTY AND M.T. CAUSLEY, LLC FOR PLANTATION KEY COURTHOUSE AND DETENTION CENTER In accordance with the Consultant Contract for Professional Support Services, made and entered into on March 19, 2014, and as First Amended on August 14, 2014, and as Second Amended on February 18, 2015, and as Third Amended on March 18, 2015, and as Fourth Amended on February 10, 2016, and as Fifth Amended on November 14, 2017 and as sixth amended on March 21, 2018, and as seventh amended on May 16, 2018,and as eighth amended on February 20,2019, between MONROE COUNTY, hereinafter referred to as the "County," and M.T. CAUSLEY, LLC hereinafter referred to as "Consultant," where professional services, including Inspection Services, are allowed, hereinafter referred to as the "Contract". All terms and conditions of the Contract as amended apply to this Task Order, unless this Task Order amends, adds, or modifies a provision or an Article of the Contract of which will be specifically referenced in this Task Order and the amendment, addition, or modification shall be precisely described. These additions apply only to the project referenced in this Task Order. This Task Order is effective on the 3rd day of January, 2020. WHEREAS,the State of Florida building code requires owners to retain the services of a Threshold Inspector to oversee the construction of structural elements of buildings that reach a specific height, occupancy load, or square footage; and WHEREAS, the new Plantation Key Courthouse and Detention Center meets those threshold specifications necessitating the inspector requirement; and WHEREAS, the County desires to retain the services of the Consultant to perform the threshold inspection services for the Plantation Key Courthouse and Detention Center. NOW, THEREFORE, in consideration of the mutual promises and covenants set forth below, the parties agree as follows: 1. In accordance with Article II, SCOPE OF BASIC SERVICES of the Contract, the Consultant will perform services as described in the Threshold Inspection Plan (Attachment A) and as outlined in the Proposal (Attachment B). The duties of the Consultant will include but not be limited to the documentation of and the publication of: Page 1 of 2 Attachment A- Threshold Inspection Plan Attachment B- MTCI Proposal • Inspection reports " • Areas of inspections • Special records • Placing and Curing concrete • Field changes *Per State of Florida's Requirements for threshold inspections 2. In accordance with Article III(COMPENSATION)of the Contract, the County shall pay the Consultant a lump sum fee of Ninety Thousand and 00/100 Dollars($90,000.00)paid monthly based upon completion of work performed and upon approval of the Project Manager and the Director of Project Management. All other Terms and Conditions of the Task Order shall remain in accordance with the Contract as amended. ,, <l-i Vt S WHEREOF,each party caused this Task Order to be executed by its duly authorized 1143 Aittif kerrspnt*v, rd � �;��'`(StA*���; BOARD OF COUNTY CONIlVIISSIONEIRS ' �t yttl st.(1 11,I1J MADOK Clerk OF MONROE CO TY FLORIDA '�Avyas�c " `� BIr: -- By: , .. Deputy Clerk Mayor/Chairm _-_ Date: z 2, yo c: 'c, r1: (SEAL) CONSULTANT: = -n Attest: M.T.CAUSLEY,LLC r a By: ,t By: 2 JPOY1/7/ff T 'o Printed Name. L � /u� Printed Name:, �(���I :: Title: r.11 V1I(. A't Title: ?(/fiIé1t T ?YArrr MONROE COUNTY ATTORNEYS OFFICE APPROVED AS TO FORM / !. AMP A H ".i_ 1- . 'v.'tr. ,- ANT COUNTY ATTORNEY Page 2o�ff22 DATE: /r ttialcashetd.lacpectfon Plan Attachment B- MTCI Proposal 4m McCarthy and - - Associates 601 N.Congress Avenue A Division of Unit 106A Delray Beach,FL 33445 ATTACHMENT A T:561-265-6864 F:561-265-6866 www.pennoni.com STRUCTURAL INSPECTION PLAN FOR THRESHOLD BUILDING INSPECTIONS Project: Monroe County Courthouse and Detention Facility McCarthy Project No. CSAA1702 Prepared By The Engineer-of-Record: Robert J. Selinsky,P.E. Florida Reg. #49952 Special Inspection#1145 McCarthy and Associates A Division of Pennoni Associates, Inc. COA No.4187 601 N. Congress Avenue, Unit 106A Delray Beach, Florida 33445 (561) 870-8826 December 13,2017 r] Ufa'ryegM�r+mn,s�W Robert J Seli risky'°. t ';,��,�r�, Threshold Inspection Plan Page 2 Monroe County Courthouse and Detention Facility STRUCTURAL INSPECTION PLAN PREFACE 1. The Threshold Inspection Services as described herein shall be paid for by the Owner, in accordance with Florida Statutes. 2. The Special Inspector(S.I.) shall be a registered structural Engineer, licensed by the Florida Board of Engineers to perform Threshold Inspections and included on the list of approved S.I.'s. 3. This inspection plan is intended as a minimum guideline for the S.I. and not intended to surrogate the Building Official's or the Engineer of Record's requirements. Further, it is not intended that the Contractor's contractual and statutory obligations are anyway relieved or foregone by the presence of the S.I. The Contractor has the sole responsibility for any deviations from the Structural Construction Documents. The S.I. does not replace the duties of the Building Official nor the quality control personnel of the Contractor. 4. In addition to the requirements of the Board of Engineers,the S.I. shall have a minimum of five years experience in inspection and actual design of similar structures. The S.I.'s authorized representatives shall have a minimum of five(5)years experience in inspection of similar structures and shall also meet the requirements of the Board of Engineers. 5. The authorized representative must dedicate his time on-site to the inspection requirements of this plan. He shall not be required to perform other work on the project, including materials testing services. 6. Prior to work,the S.I. shall become familiar with the specific structural components that are to be inspected and develop a thorough knowledge of the Contract Documents. 7. The Contractor shall cooperate with and assist the S.I. in performing his inspection duties as specified below. The S.I. shall have free access to the project at all times. The contractor shall review this plan and coordinate the schedule of work to accommodate the required inspections. The contractor shall provide a minimum of twenty-four(24)hours notice to the S.I. for all inspections. 8. The Owner shall arrange for all necessary Contract Documents,including electronic copies of all drawings and specifications,the geotechnical report and materials testing reports,to be furnished to the Special Inspector during the progress of the work in a timely manner. Provide the Special Inspector with electronic copies of all structural changes,revisions, addenda, etc. PROCEDURES AND SCHEDULE 1. The S.I., or his authorized representative, shall perform site visits at a frequency determined by the engineer-of-record to maintain inspections are being performed in accordance with this plan. 2. Minimum required inspections: a. Inspections are to be made three days of each week during construction as a minimum. b. The S.I. shall personally conduct an on-site inspection a minimum of once every two weeks. c. All reinforcing bars are to be inspected prior to the concrete pour. This includes all masonry reinforcing in addition to concrete reinforcing. d. Inspector is to observe all concrete and grout pours from start to finish of each pour. 3. The Contractor shall advise the S.I. in advance of construction schedules and planned operations in order to assure timely and appropriate observation inspection. 4. The S.I. shall cooperate with the Contractor and shall refrain from directing work, as this is expressly not part of the S.I.function. Threshold Inspection Plan Page 3 Monroe County Courthouse and Detention Facility OBLIGATIONS The S.I. is obligated to both Owner and the Building Official for observing that the work is executed in substantive accordance with the Structural Contract documents, which include the permitted drawings and specifications,addenda, and change orders, issued sketches and revision drawings, etc. It is the obligation of the S.I. to notify the Contractor,Building Official,Architect/Engineer of Record,and Owner of the following: 1. Observe the construction of the primary structural components as outlined in this plan and report that these components are being built in general conformance to the Contract Documents. 2. The use of materials or workmanship which do not conform to the Structural Construction Documents or which will cause improper construction which is not acceptable. 3. Work which is not being done in accordance with the approved Structural Construction Documents. Items to be inspected include,but are not limited to,those listed herein. 4. The recommended removal of faulty construction or of construction performed without inspection and not capable of being inspected in place. 5. The request for interpretations from the Architect/Engineer of record. 6. The contractor shall, upon being informed by the S.I., immediately cause to eliminate such discrepancies and deviations. CONSTRUCTION OBSERVATION The S.I. shall visit the site at intervals appropriate to the stage of construction in order to observe the progress and quality of the Work completed by the Contractor. Such visits and observation are not intended to be an exhaustive check or a detailed inspection of the Contractor's work but rather to allow the S.I.,as an experienced professional,to become generally familiar with the Work in progress and to determine, in general, if the Work is proceeding in accordance with the Structural Construction Documents. The S.I.shall not be responsible for inspection of any building component that is not shown or specified on the structural contract documents. The S.I. shall not supervise, direct or have control over the Contractor's work nor have any responsibility for the construction means, methods, techniques, sequences or procedures selected by the Contractor nor for the Contractor's safety precautions or jobsite safety programs in connection with the Work. These rights and responsibilities are solely those of the Contractor. The S.I.shall not be responsible for any acts or omissions of the Contractor,subcontractor any entity performing any portions of the Work, or any agents or employees of any of them. The S.I. does not guarantee the performance of the Contractor and shall not be responsible for the Contractor's failure to perform its Work in accordance with the Contract Documents or any applicable laws,codes,rules or regulations. FIELD REPORTS The S.I.shall provide written Field Report to the Owner, Contractor,Architect, and Building Official after each site inspection. Reports shall be signed/sealed by the S.I. and shall contain the following: 1. Key people present at site 2. Report number 3. Project name, date,Contractor,project location Threshold Inspection Plan Page 4 Monroe County Courthouse and Detention Facility 4. Name of special inspector&of S.I's representative 5. Permit number • 6. Weather/temperature 7. Record progress/working conditions 8. Observations and recommendations given to the Contractor 9. Deviations from the Contract Documents,with reasons and problems encountered and recommended solutions 10. Type/location of area inspected 11. Presence and activity of testing agency 12. Identify corrections to deficiencies in previous reports 13. If no problems were discovered in a specific area,write "no problems found" NON-CONFORMANCE LOG S.I. shall keep a log of all deficiencies and review it on a daily basis with Contractor, updating as corrections are completed. The S.I. shall issue a Non-compliance Notice to the Contractor for any items that are not corrected in a timely manner. The S.I. shall not issue "Certification Letter" until all non-conformance items have been resolved and closed. INSPECTION GUIDELINES The following is general inspection guidelines outlined as minimum requirements necessary to confirm that the work complies with the Contract Documents as performed by the Special Inspector. Threshold Inspection Plan Page 5 Monroe County Courthouse and Detention Facility FOUNDATION/SLAB-ON-GRADE 1 Compliance with the structural contract documents 2 Excavation/subsurface preparation/bearing capacity/densification/compaction/testing agency 3 Slab thickness, slopes,steps,recesses,construction joints,sawcut control joints 4 Installation of vapor retarder 5 Clean forms 6 Placement and sizes of welded wire fabric/fibrous reinforcing/anchor bolts/rebar/dowels —grade of steel, lap splice, embedment 7 Concrete cover 8 Moisture protection(de-watering) 9 Refer to reinforced concrete section for additional requirements including concrete placement AUGERCAST PILE FOUNDATIONS 1 Compliance with the structural contract documents 2 Type of piling 3 Independent testing laboratory on site to inspect installation 4 Number of piles 5 Location of piles 6 Placement and sizes of rebar/dowels/grade of steel 7 Embedment of pile in pile caps. 8 Cracking or spalling of pile caps 9 Test pile program, if required. 10 Clean forms. 11 Concrete cover. Threshold Inspection Plan Page 6 Monroe County Courthouse and Detention Facility REINFORCED CONCRETE 1 GENERAL a. Compliance with the structural contract documents 2 REBAR a. Condition-damage/excessive rust b. Size/grade/bending/length/quantity/configuration c. Placement and clearances d. Sufficient wire ties e. Length and splices/laps/hooked bars/embedments f. Clean before pour-free of rust or other coating that may prevent concrete bond to rebar g. Additional reinforcement around openings 3 EMBEDDED ITEMS a. Anchor bolts,bolt clusters,bearing plates,welded plates- in place and secured b. Pipe sleeves c. Frames d. Inserts e. Interference with rebar f. Edge distance 4 PLACEMENT/FINISHING OPERATIONS a. General monitor of concrete pour b. Check concrete truck tickets: concrete mix, mix number,placement,batch time, etc. c. Independent testing lab taking cylinders for testing d. Slump:water added at job site? e. General conformance of formwork per shop drawings f. Wet formwork and reinforcing g. Internal vibrators/consolidation h. Construction and contraction joints—pre-approved i. Curing method j. Maximum vertical drop height k. Clean forms and equipment prior to placement 1. Disruption of rebar m. Honey combing/voids/repair n. Properly spaced conduit in slab to ensure integrity of slab SHORING AND RESHORING 1 General compliance with approved signed/sealed shoring and re-shoring drawings 2 Maintain shoring in place until specified concrete compressive strength is attained 3 Shoring engineer's inspection Threshold Inspection Plan Page 7 Monroe County Courthouse and Detention Facility PRECAST,PRE-STRESSED CONCRETE 1 Compliance with structural contract documents and approved shop drawings 2 Condition after transport and erection. 3 Width,depth, length 4 Bearing length 5 Flush bearing 6 Unauthorized field modifications 7 Connections/special hangers 8 Expansion joint/construction joint 9 Inserts/blockouts 10 Special items/bolts,Teflon plates,panels,etc. MASONRY 1 Compliance with structural contract documents 2 Thickness,size,strength, and weight of block units 3 Mortar and grout type/mixing/placement 4 Bond pattern 5 Tie-in at intersecting walls. 6 Condition of block units after placement 7 Tie beam/tie columns-spacing size/location 8 Control joints 9 Horizontal joint reinforcing 10 Grouted cells 11 Lintels 12 Steel placement/lap lengths/location of poured in vertical steel in same cell as dowel 13 Dovetails 14 Grouted/vertical bar embedment length in tie beam 15 Verification of filled cells/observation holes at base course/grout consolidated STRUCTURAL STEEL 1 Compliance with structural contract documents 2 Size and location of all steel components/quality/quantity/steel grade/finishes/straightness&camber 3 Plumbness/alignment/conformance to erection plan 4 Connections—welded and bolted—type and size/column bases—levelness/grout 5 Bolt tightening/calibrated impact wrench 6 Unauthorized field modifications Threshold Inspection Plan Page 8 Monroe County Courthouse and Detention Facility _ STEEL OPEN WEB JOISTS&JOIST GIRDERS 1 Compliance with structural contract documents 2 Compliance with approved shop drawings 3 Condition of joists after installation 4 Size and location of all joists and joist girders 5 Bridging 6 Bearing length 7 Flush bearing _ 8 Connections—welded and bolted 9 Unauthorized field modifications 10 Stiffener angles,headers, etc. METAL DECKING 1 Compliance with structural contract documents 2 Condition,size,thickness,type and finish of decking 3 Deck bearing 4 Attachment to supports—size, spacing, etc. 5 Side lap fasteners STRUCTURAL LIGHT GAUGE METAL FRAMING(INCLUDING TRUSSES) 1 Compliance with structural contract documents 2 Compliance with approved shop drawings 3 Size,gauge, location and spacing 4 Bracing/bridging 5 Approved fasteners 6 Connections 7 Anchorage 8 Unauthorized field modifications CERTIFICATION UPON COMPLETION OF PROJECT Upon completion of the project, and prior to the issuance of a Certificate of Occupancy, the S.I. shall have performed his duties properly to the extent that he shall file a signed and sealed statement with the Building Official,Architect, Engineer, and General Contractor in the following form: "To the best of my knowledge and belief,construction of all structural load bearing components complies with permitted documents and the shoring and reshoring conforms with the shoring and reshoring plans submitted to the enforcing agency". ATTACHMENT B 1111 1VET Cl( PRIVATE PROVIDER SERVICES, LLC CONSTRUCTION PLANS REVIEW, INSPECTIONS &CONSULTING PROPOSAL January 2, 2020 To: By: Monroe County MTCI Private Provider Services Att: Kevin Wilson —Assistant County 866 Ponce De Leon Blvd Administrator 2nd Floor Coral Gables, FL 33134 MTCI Private Provider Services proposes to provide Threshold Building Inspection Services required per Florida Building Code for construction of the Plantation Key Judicial Courthouse and Detention Facility project located in the Village of Islamorada, Florida. The project consists of a one-story detention center and a two-story courthouse. This proposal is based on the EOR's Structural Inspection Plan, attached hereto this proposal, provided to MTCI on 12.9.19. Scope of work to be provided is limited to the following: Threshold Building Inspection Services: Scope of work includes field inspections during construction of the referenced project. Field inspections will be limited to the inspection of the main structural components of the building shell. The Special Inspector shall observe that the work is executed in substantial compliance with the permitted Official Contract Documents. The Official Contract Documents are defined as the permitted plans, recorded addendums, and the specifications with all amendments thereto, including the Structural Inspection Plan provided by the Engineer of Record. 1 - DUTIES The Special Inspector and his/her authorized representative shall maintain a record of the progress, working conditions, observations given to the Contractor and suspected deviations from the Official Contract Documents. The reports shall be in writing and shall be made out promptly at the end of each day. The reports 866 Ponce De Leon Blvd., 2"d Floor, Coral Gables, FL 33134 * P: 305.262-0628 • Courthouse and Detention Facility 01.02.20 will be present at all times on the job site in the form of a jobsite log and an inspection field report for each day an inspection is made. The report may consist of any or all of the following: A. Report of each inspection B. Jobsite log of area inspected C. Special records (pile driving logs, mill tests, concrete tests) D. Record of placing and curing concrete E. Changes made in the field during a particular observation 2 - REPORTING INFORMATION AND OBSERVATIONS It is the duty of the Special Inspector to perform following duties and notify the Contractor, Architect/Engineer of Record, and the Owner of the following: A. Inspect all primary structural components as outlined in Structural Inspection Plan prior to their concealment, for compliance with the permitted drawings on file with Monroe County and all standards of the Florida Building Code; Report non-compliance with permitted documents and anomalies. It is the responsibility of the contractor to submit to Monroe County any revisions to the permitted documents. B. The use of materials, equipment, or workmanship which does not conform to the Official Contract Documents or which may cause improper construction and is not acceptable. C. Work which is not being done in accordance with the approved Official Contract Documents. D. The recommended removal or repair of faulty construction or of construction performed without inspection and not capable of being inspected or tested in place. E. The request for interpretations from the Architect/Engineer of Record. 3 - REQUIREMENTS OF THE OWNER A. The Owner shall arrange for all necessary construction records to be furnished to the Special Inspector during progress of the work in a timely manner. Such records shall consist of but may not be limited to: concrete cylinder test reports, soil density test records, mill records, shop drawings, shoring drawings, pile logs, etc. that may be requested by the Special Inspector and available to the Owner or his/her Consultants. Page 2 of 8 Courthouse and Detention Facility 01.02.20 B. The Owner shall request that the Contractor provides a shoring and reshoring plan to the Building Department, which is signed and sealed by an Engineer registered in the State of Florida. Such registered engineer may represent the form supplier. Confirm that shoring and reshoring has been inspected and approved by the Shoring Engineer. C. The owner shall arrange for the services of the geotechnical engineer that will certify all piling, if used, and filling compaction prior to pouring pile caps or footings and slabs on grade. D. The owner will arrange for the services of a testing agency to perform and report all testing required by the contract documents. 4 - LIMITATIONS Unless otherwise provided in written requests, this contract limits the Special Inspector to provide services only with regard to the Structural Frame of the Building including primary framing systems, and all items included in the Structural Inspection Plan. Piling, if used, and soil compaction inspections will be provided by the geotechnical consultant hired by the owner. This Contract does not include inspection of any safety provisions as required by OSHA or other safety standards, which apply during the construction period nor does it apply to elements such as windows, doors, glazing, balcony railings, fire protection, roofing, Mechanical/Electrical systems, Architectural components, site work or other elements not contributing to the capacity of the structural building frame. We are available to perform inspections for installation of the windows, doors, glazing and guardrail systems, if so authorized. All certifications issued will refer to the completed work being in substantial accordance with the Official Contract Documents. Inspection reports of our findings will be furnished on a weekly basis. Inspectors assigned to this project will be individuals with substantial experience in Special Inspections for Threshold Buildings. We are available to cooperate with the Developer/Contractor's schedule, even if inspections are required seven days a week and/or 24-hours per day. We propose to have one part-time, experienced field representative inspector at the site to start the project. However, during peak construction additional inspectors will be assigned to this project on as needed basis, if requested by the Owner and the Contractor. The number of inspectors and hours required will be established in coordination with the Owner and the Contractor. Page 3 of 8 Courthouse and Detention Facility 01.02.20 We propose to provide Threshold Building Inspection Services based upon approximately 20 hours per week, Monday through Friday, and not upon an 8-hour day; i.e. some days could be 10 hours and other 6 hours depending on the Contractors schedule. Any time over 40 hours per week will invoiced additionally and at 1 1/2 times the standard rate. Inspections requested on Saturdays will be invoiced at 1.5 times the standard rate and 2 times the standard rate for inspections requested on Sunday and US Federal recognized holidays. If two inspectors are required, they will have basic 40- hour weeks. It is not envisioned that the single inspector will be on site for 20 hours per week but some weeks for more and others a lesser hourly period. Special Inspector for the Threshold building will be a registered professional engineer and will check the work being performed by his/her field representative inspector. His/her time is based on a standard rate of$150.00 per hour. In order to estimate the Threshold and Building Inspection budget for this project, we have considered thirty (30) weeks construction for the shell portion of the entire project. Threshold and Special inspections will be needed during construction of only the structural framing members of the project. Fee for Threshold Inspections for the Main Frame of the building One inspector at 20 hrs/wk for 30 wks (20 x 30 x$125.00): $ 75,000.00 Registered Engineer Supervisor for 30 weeks: $ 15,000.00 Main Frame Inspection Allowance for 30 weeks construction: $ 90,000.00 Invoices will be issued monthly upon the first inspection at the rate of$7,500 per month with the assumption of this $90,000 project to be completed within twelve (12) months. The fee is a based upon the parameters described above and does not include inspections and certifications of auger pile installation, if used. Construction of the pile caps and construction above the pile caps is included in the fee. We shall provide Special Inspection for Threshold Building Services at $7,500 per month. Inspections requested on Saturdays will be invoiced additionally at 1.5 times the standard rate and 2 times the standard rate for inspections requested on Sunday and US Federal recognized holidays. The Inspector shall perform inspection of the structural components and any special inspection during construction and attend construction coordination meetings with the Contractor and other entities involved on an as needed basis during his/her involvement on full time basis. Checking of the shop drawings, RFI's and review of submittal and response is not included in the scope of work of the field inspections, which will be performed by the Architect and Engineer of record. Testing laboratory retained by the Owner shall make concrete test cylinders, perform testing, and submit reports for review. Page 4 of 8 Courthouse and Detention Facility 01.02.20 Terms and Conditions > Terms and conditions stipulated in this Proposal shall be valid for 60 days from date of issuance. > Courier Services will be billed at $48/hr. > Inspections requested on Saturdays and after 5 pm will be invoiced at 1.5 times the standard rate and 2 times the standard rate for inspections requested on Sunday and US Federal recognized holidays. > Reimbursable expenses, such as permit, upfront and impact fees as well as copies and Fed-Ex/UPS delivery charges, will be invoiced plus 20%. > Additional meetings will be charged at $125 per hour for inspectors and $150 for MTCI's Architect, Engineer and Principal. > Please include invoice contact information upon execution of this Proposal. ➢ Additional terms and conditions on page 7 Page 5 of 8 Courthouse and Detention Facility 01.02.20 Acceptance The parties have read the foregoing, understand the agreement completely and scope of work, and willingly enter into this agreement which will become effective on the date signed below by the CLIENT. Name &Title of MTCI Authorized Representative Name of Client and Title (print) Signature of MTCI Authorized Representative Signature of Client's Authorized Representative Date INVOICE CONTACT INFORMATION: (Contact Name) (Address,City,State,Zip) Telephone Number: Facsimile Number: E-Mail: Upon receipt of this executed Proposal inspections and permit status may be monitored via our website at www.mtciprivateprovider.com. Page 6 of 8 Courthouse&Detention Facility 01.02.20 [ADDITIONAL TERMS AND CONDITIONS 1. INVOICE & PAYMENT STRUCTURE. MTCI will invoice Client on a obligation in the event of failure to perform Services in accordance monthly basis. All payments are due to MTCI within 15 days of invoice with the terms of this Section shall be re-performance of the Services receipt. Payments owed to MTCI but not made within 30 days of by MTCI. invoice date shall bear simple interest at the rate of 1.5% per month. If payment is not received within 30 days of invoice date,Services will 7. INDEPENDENT CONTRACTOR & THIRD PARTY RELIANCE. MTCI is an be discontinued until all invoices and interest are paid in full. independent contractor,and neither MTCI,nor any employee or agent thereof,shall be deemed for any reason to be an employee or agent 2. CHANGES TO SCOPE OF SERVICES. Any changes to Services between of Client. Agreement is intended for the mutual benefit of the Parties Client and MTCI shall be made in writing that shall specifically hereto and no third party rights are intended or implied. designate changes in Service levels and compensation for Services.No changes shall be binding absent a written Amendment executed by both Parties. 8. INSURANCE. MTCI agrees during the term of this Agreement to procure and maintain,at its own cost,a policy or policies of insurance 3. TERMINATION. Either party may terminate this Agreement upon 10 sufficient to insure against all liability, claims, demands, and other days written notice, with or without cause. In case of such obligations assumed by MTCI pursuant to this Agreement. Such termination, MTCI shall receive payment for work completed up to insurance shall be in addition to any other insurance requirements and including the date of termination within 15 days of the imposed by law. termination. Upon receipt of notice of termination, MTCI shall discontinue all services and work in connection with the performance 9. DISPUTE RESOLUTION&ATTORNEY FEES. In the event a dispute arises of this Agreement and shall deliver to Client, in electronic and/or out of or relates to this Agreement,or the breach thereof,and if said other formats all finished and unfinished documents and work dispute cannot be settled through negotiation, Parties agree first to product prepared by MTCI under this Agreement. MTCI shall not be try in good faith to settle the dispute by mediation,before resorting to responsible or liable in any manner for Client's use of unfinished work arbitration, litigation, or some other dispute resolution procedure. product or documents listed above. The cost thereof shall be borne equally by each Party. In the event of dispute resolution or litigation to enforce any of the terms herein, 4. CLIENT OBLIGATIONS. Client shall timely provide all data information, each Party shall pay all its own costs and attorney's fees. plans,specifications and documentation required by MTCI to perform Services at no cost to MTCI. 10.GOVERNING LAW AND VENUE. Agreement shall be construed under and governed by the laws of the State of Florida and all services to be 5. LIMITS OF LIABILITY. MTCI expressly disclaims any and all warranties or any provided will be provided in accordance with applicable federal,state kind,whether express or implied,including without limitation any warranties and local law,without regard to its conflict of laws provisions. of merchantability, fitness for a particular purpose, error-free operation, performance,accuracy,or infringement. In no event shall MTCI or client be 11. COUNTERPARTS&WAIVER. Agreement and any amendments may liable to one another for indirect, incidental, consequential, reliance, be executed in one or more counterparts, each of which shall be exemplary,or special damages including without limitation,damages for lost deemed an original,but all of which shall constitute one and the same profits, lost revenues. Lost data or other information, or lost business instrument. For purposes of executing this Agreement, scanned opportunity,regardless of the form of action,whether in contract,indemnity, signatures shall be as valid as the original. Failure to enforce any negligence,'warranty,strict liability,or tort,even if advised of the possibility of provision of this Agreement shall not be deemed a waiver of that such damages and notwithstanding the failure of essential purpose of any provision. Waiverpf any right or power arising out of this Agreement remedy other than with respect to payment of obligations for services. In no shall not be deemed waiver of any other right or power. event shall the liability of client or MTCI under this agreement from any cause of action whatsoever(regardless of the form of action,whether in contract, 12.ENTIRE AGREEMENT. Agreement,along with exhibits,constitutes the tort or under any other legal theory, and whether arising by negligence, complete, entire and final agreement of the Parties hereto with intended conduct,or otherwise)exceed the lessor of the amount of fees paid respect to the subject matter hereof, and shall supersede any and all to MTCI pursuant to this agreement, or the available limits of insurance previous communications, representations, whether oral or written, specified herein. with respect to the subject matter hereof. Invalidation of any of the provisions of this Agreement or any paragraph sentence, clause, 6. PERFORMANCE STANDARDS. MTCI shall perform Services using that phrase, or word herein or the application thereof in any given degree of care, skill, and professionalism ordinarily exercised under circumstance shall not affect the validity of any other provision of this similar circumstances by members of the same profession performing Agreement. substantially same services. Client's sole remedy and MTCI's sole Page 7 of 8 • A�R J CERTIFICATE OF LIABILITY INSURANCE DATE(MM`DDFVYY,n 9/25/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(Ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT RBN Insurance Services PHONE FAX 303 E Wacker Dr Ste 650 (Arci No Ram312-856-9400 KmtrAu ,No):312-856-9425 Chicago IL 60601 *Dorms; ckostl?I rbninsurance.com INSURER(S)AFFORDING COVERAGE WIC INSURERA:Hartford Fire Insurance Co. 19682 INSURED SAFELLCO1 INSURERS:Hartford Casualty Insurance Co 29424 M.T.Causley,LLC 866 Ponce De Leon Blvd,2nd Floor INSURER c:Navigators Insurance Company 42307 Coral Gables FL 33134 INSURER O:Twin City Fire Insurance Co. 29459 INSURER E:Great American E&S Ins.Co. 37532 INSURER F: COVERAGES. CERTIFICATE NUMBER:2055027380 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADOL SUER POUCY EFF POLICY EXP UNITS LTR INS/ wVD POUCY NUMBER JMMIDDIYYYYI IMMIDOIYYYY) A X COMMERCIAL GENERAL LIABILITY 83UENZV3951 101312019 10/3/2020 EACHOCCURRENCE 51.000.000 DAMAGE TO RENTED CLAIMS•MADE X❑OCCUR PREMISES Ma accurrenoe1 5300.000 _ MED EXP(Any one person) S 10.000 _ PERSONAL d ADV INJURY 5 1.000.000 GENt AGGREGATE LIMIT APPliES PER; GENERAL AGGREGATE ,52.000,060 POLICY El 110 T Ux PRODUCTS-COMPIOPAGO 52.000.000 —ll OTHER: S B AUTOMOBILE LIABILITY 83UENPY9100 10/312019 10/312020 WaMaBoldNdeOn SINGLE LIMIT S 1,000,000 X ANY AUTO BODILY INJURY(Per person) S OWNED SCHEDULED BODILY INJURY(Per accident) S AUTOS ONLY AUTOS xHIRED x NON-OWNED PROPERTY DAMAGE S AUTOS ONLY — AUTOS ONLY /Per acodenll S C UMBRELLAUAB X OCCUR CH19EXC8856001V 10/3/2019 10/3/2020 EACH OCCURRENCE 510,000,000 X EXCESS LIAR Iil CLAIMS-MADE AGGREGATE S 10400000 OED 1 X RETENTIONS n p AND EMPLOYERS' 83WECE0623 511212019 5(12/2020 X PER ER- AND EMPLOYERS'LIABILITY Y ANYPROPRIETORIPARTNERIEXECUTIVE El N!A E.L.EACH ACCIDENT 51.000.000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) EL.DISEASE.EA EMPLOYEE 51,000,000 If es,describe under DESCRIPTION OF OPERATIONS below EL DISEASE POLICY LIMIT S 1.000.000 E Professional Llabifity TER285.99.95 1013/2019 10/3/2020 Each Claim/Aggregate 9,000,000 DESCRIPTION OF OPERATIONS 1 LOCATIONS 1 VEHICLES(ACORD 1D1,Additional Remarks Schedule,may be attached If mate space Is requited) The Monroe County Board of County Commissioners is an Additional Insured as respects General Liability and Automobile Liability as required by a written contract AP BY PO M WA! C •ERTIFICATE76,4,ED CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Monroe County Board of County Commissioners 1100 Simonton Street AUTHORIZEDREPRESENTATIVE Key West FL 33040 D 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD