Effective Date ectdb 6r Task Order No. 2019-06A
Client Project No. 3 6110 S- Sb0 b 30 Engineer Project No. _18221.68
K-R-0I5r)- S3o3i0
This Task Order is entered into on the effective date noted above pursuant to the"Master Agreement for
Professional Services" between Monroe County, Florida ("Client") and McFarland-Johnson,Inc.
("Consultant"),dated February 15,2017("Agreement"). The Agreement is incorporated herein and forms
an integral part of this Task Order.
Services Authorized: Addional Field Survey and Project Design Services for a new'hydrant and
waterline, and storm water drainage improvements near the FBO parking area at Key West
International Airport as part of the EYW Access Road and Impacted Parking Design - Phase 2
project,
Client authorizes Consultant to perfonn the Engineering Services described in Exhibit A attached hereto
and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of
six(6)page(s).
Pricing
• N/A Time and Expense per Agreement and Appendix B to the Agreement.
. X Finn Fixed Price of$ 12,853.00
N/A Other(Describe):
Schedule
Services may commence on Execution
Services will cease by 365 days {�{
Other
•
Approval: Approval:
t•
raffor
/'4recthr* i:orts Asst. owrty imstrator
CONSULTANT:
MCFARLAND-JOHNsoN,INC.
By `e f
Witness .4tA44-4"'"
Title CaffLiiv:airreixt-,
�ti�
Pile: ON OEovE COU RNEY
u 1
Page 1 of 1 PED
Date
teeSIS AN/COUNTY ATTORNEY/3 2a 2�
(/ /,
Exhibit A
Key West International Airport (EYW)
Monroe County, Florida
Access Road and Impacted Parking Area Design - Phase 2
Scope of Work- Design Amendment A
PROJECT DESCRIPTION
The proposed project is a two-lane landside access road that provides connectivity from S. Roosevelt Boulevard
to Key West International Airport (AIRPORT). The proposed access road is located on the west side of EYW
adjacent to the current Department of Motor Vehicles (DMV) office and one-hour parking lot and will require
reconfiguration of the impacted parking areas and commercial transportation staging area.
This project consists of final design, environmental permit coordination and preparation and bidding and award
phase services associated with the construction of the new access road, fuel delivery route, reconfigured
commercial transportation parking at the AIRPORT and conversion of Gate #5 to a Sally Port gate. The project will
consist of the construction of an approximately 550' long two-lane landside access road that provides connectivity
from S. Roosevelt Boulevard to EYW's fuel farm, fixed base operator (FBO), overflow parking, commercial
transportation and airport support areas (see Figure 1). The proposed access road will separate airport support
services from airport passenger traffic on Faraldo Circle, reducing congestion in the terminal area. The proposed
access road will also eliminate fuel truck and other large vehicle traffic from ingress/egress to the passenger
terminal area, as well as reconfiguring impacted parking and staging areas to provide enhanced customer parking
and hotel shuttle and Transportation Network Company(TNC)staging away from the congested terminal curb.
Figure 1
•
•
,,;r- 7 _ • ,V�.
—
WIPP
S • It,'
• iliasi;t4 •' •
McFarland Johnson
Key West International Airport (`
Access Road—Phase 2 `) McFarland Johnson
Design Amendment A—Scope of Services
PSO 2019-06
The access road will be designed in accordance with the American Association of State Highway and Transportation
Officials (AASHTO) Guidelines for Geometric Design of Low-Volume Roads, dated 2019, the latest version of the
Florida Department of Transportation (FDOT) Manual of Uniform Minimum Standards for Design, Construction and
Maintenance for Streets and Highways, commonly known as the"Florida Greenbook"and FDOT's Design Manual.
SCOPE OF WORK
The CONSULTANT (McFarland-Johnson, Inc.) will provide the following additional professional services under this
scope of work as related to the above described project including the installation of a fire hydrant in the vicinity of
the FBO buildings including the necessary connections to the water line on South Roosevelt Blvd. and replacement
of a dry well within the project limits that is currently not working properly.
1. Administration/Project Management
The following items of work shall be completed under the Administration/Project Management task:
A. Submission of construction, documents and a utility permit application to the Florida Keys
Aqueduct Authority.
B. Conferences (2 conference calls) and coordination efforts with the Florida Keys Aqueduct
Authority to discuss and prepare an FKAA Utility Permit.
C. Attend a pre-application meeting with the Florida Keys Aqueduct Authority.
2. Preliminary Design(50%)
A. The CONSULTANT will develop a preliminary layout showing the fire hydrant location and its
connection to the water main on South Roosevelt Blvd.
B. Incorporate the water line and fire hydrant into the Preliminary Design plans for the Access Road.
C. Incorporate the replacement of the existing dry well into the overall drainage and stormwater
design for the Access Road and parking areas.
D. Incorporate specifications for the water line and fire hydrant into the preliminary set of
specifications(project manual)for the Access Road and parking areas.
E. Include water line,fire hydrant and dry will replacement into the Preliminary Engineer's Opinion
of Probable Costs for the project.
3. Final Design(100%)
A. Incorporate water line,fire hydrant and dry well replacement into final plans and specifications for
bidding and construction purposes.
Key West International Airport
Access Road—Phase 2 �`> McFarland Johnson
Design Amendment A—Scope of Services 2
PSO 2019-06
B. Obtain permits, as required, to allow construction of the project. At this time, the anticipated
additional permit required for the water line and fire hydrant are as follows:
• Florida Keys Aqueduct Authority Utility Permit
DESIGN ASSUMPTIONS
The following assumptions form the basis of this scope of work. Any changes to the following assumptions will be
considered and change in project scope and may require a change in the project budget:
• Based on preliminary discussions with the FKAA, it is assumed the water line will connect to an
existing main at South Roosevelt Blvd. in the vicinity of the access road entrance and will require a
reduced pressure detector assembly at the right-of-way line prior to the water line continuing to the
new fire hydrant.
• The dry well will either be replaced or the stormwater will be directed to another location within the ,
revised drainage system being constructed as part of the access road.
End Scope of Work
Key West International Airport
Access Road—Phase 2 McFarland Johnson
Design Amendment A—Scope of Services 3
Key Wes!International Jrpod-Access Rd-Ph Amend A
Monroe County
Febnzary 2020
FEE SUMMARY ��,S4 McFarland Johnson
DESIGN/PLANNING
SERVICES.
1.DIRECT TECHNICAL LABOR $3,3i3.00
2.SUBCONSULTANTCOSTS S2,300.00
Aviom-SoNey__.__.__ _ -.
3.TOTAL FEE ESTIVATE $12,863.00
4 TOTAL LUMP SUM FEE FOR ALL SERVICES S1$853
e
Key West International Airport-Access Rd-Ph 2 Amend A
Monroe County McFarland Johnson
February 2020
ESTIMATED HOURS
HOURS BY CLASSIFICATION
VP DM SPM SPE/P PE/P SE/P AE/P JE/P ST
$306.80 $228.80 $213.20 $176.80 $153.92 $13510 $119.60 $98.80 $104.00 $93.60 $78.00
PHASE I TASK DESCRIPTION
'Phase 2--Scope cif Se/vice§ I, I I I
1 Administration/Proiect.Management I 1 6 4 I I I ii
2 Preliminary Design(50%),- - I 1 6 16 16 I I I 39
3 Final Design(100% I 1 2 8 8 I I I 1s
- •47 En ironmental PermitCoordination - - I I I I
. 5 I Bidding-and•Award Assistance- . - " - I I I
I
I I I
I• - I -.'I I I I I
I - I I I I
I I I I
. I I
•
Total Hours-Design l Planning Services 3 14 • 28 24 69
Total Labor Cost-Design/Planning Services $686 $2,985 $3,786 $2,496 $9,953
•
Scott D. Kunselman
From: • Keith Chee-A-Tow <Keith@aviromsurvey.com>
Sent: Tuesday, February 4,2020 9:48 AM
To: Scott D. Kunselman
Subject: RE:,McFarland Johnson Subconsultant Agreement for Survey Services by Avirom for
EYW Access Rd PH 2 Project
Scott,
The fee for my subconsultant is$1,200.00 because they will be mobilizing from Broward County.
My fee to locate the mark and add to the drawing will be$500.00 if it is done within the next three weeks because I
have crews-in Key West at the moment.
If after three weeks,we will have to add$1,200.00 for mobilization.
Thanks.
Keith M.Chee-A'-Tow,P.L.S.
Project Surveyor
�. r�e AVIROM &ASSOCIATES; INC.
0.t3 Surveying &Mapping
Boca Paton Key West Stuart
#4 ir..� ' Keith M. Chee-A-Tow, P.LS.
- Project Manager
50 SW 2ndAvenue,Suite 102 561 392 2594
Boca Raton,Florida 33432 561 212 2662 Cell
vAvcv:AvlrornSurev-corn
Keith@AviromSurvey.com
This message is intended only for the named recipient If you are riot the intended recipient you are notified that disclosing,copying,distributing or taking any action
in rellance.on the contents.of this information is strictly prohibited,
Avirom&Associates,Inc-makes no guarantees that this e-mail and/or attached flies are free and clear of the presence of computer viruses,have been tampered with,
or contain questionable material or content and accepts no responsibility for the loss or corruption of any data on the addressee's computer as a result of opening this
email All efforts have been mode to assure that messages and files generated from this office are free and clear of this type of material,
From:Scott D. Kunselman<SKunselman@mjinc.com>
Sent:Tuesday, February 4, 2020 9:28 AM
To: Keith Chee-A-Tow<Keith@aviromsurvey.com>
Subject: RE: McFarland Johnson Subconsultant Agreement for Survey Services by Avirom for EYW Access Rd PH 2 Project
Thanks
Scott D. Kunsehnan, PE • Senior Project Manager
McFarland-Johnson, Inc,
450 South Gulfview Blvd • Unit '1103 • Clearwater, FL 33767
Phone: 727-463-4037
www:miinc com
i