1st Change Order 04/14/2020 DocuSign Envelope ID: FE6D22E1-05813-41F5-B268-6CBAOD933E3F MONROE CouNTYANGINEERING/ OMANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: 1 Historic Courthouse Gutters INITIATION DA4/3/20 CONTRACTT 1/22/20 TO CONTRACTOR: Roofing by Ruff, Inc. 1010 Kennedy Drive, Suite 201 Key West, Florida 33040 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ........................................... 152,851.00 Net change by previously authorized Change Orders................................................... n/a The(Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ............ 152,851.00 The(Contract Sum) (Guaranteed Maximum Price)will be(increased)(decreased) (unchanged) by this Change Order.............$ 6, 90.47 The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is .......$159,741.47 The Contract Time will be(increased) (decreased) (unchanged)by................................. 0 days The date of Substantial Completion as of the date of this Change Order is........................ 3/26/20 Detailed description of change order and justification: An allowance of 50'of damaged wood, underlying the Courthouse gutters was established in the original contract documents. The Contractor encountered an additional 90'of damaged wood that needed to be replaced(totaling 140'). Materials and labor documentation is attached. Change order is 0.05 to of odg;gal contract orr'ce Not valid until signed by Owner Architect Jif applicable),and Contractor ARCHITECT: Ben er Assor ` -s Architects ate Docusigned by: 4/7/2020 I CONTRACTOR: 6' - 7F783ADCC353S36.. I®vv.—u my .'U..' u.1c. Date Digitally signed by Cary Knight Cary Knight Date:2020.04.13 11:21:58 DIRECTOR PROJECT MANAGEMENT -O'Vou Cary Knight, Director Date Project Management Digitally z g-d by Kevin G.Will-PE. ' r � DN.—Ke-G.WI PE. �Aonroe Counry FL(tbe Ff-da COUNTY/ASSISTANT ADMINISTRATOR: � - wil k °n,��°°�fl.g°°`-°s Roman Gastesi Date Kevin Wilson Christine Hurley DocuSign Envelope ID: FE6D22E1-05813-41 F5-B268-6CBAOD933E3F Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes Z No❑ If Yes, explanation: It was assumed that there would be an estimated 50' of damaged facia and underlying wood to the box gutters that would need to be replaced. Upon commencement of work and demolition, the Contractor found 90' of additional damage (beyond the 50' allowance) for a total of 140' of wood needing to be replaced. • Change Order was included in the original specifications. Yes❑ No Z If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5%of contract price(whichever is greater). Yes❑ No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes Z No El If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes❑ o Z Should a claim under the applicable professional liability policy be made? Yes ❑ No Z Explain: Wood Repairs Materials Qtv Unit UaLj Extended $ 1x4x12' 4.0 ea $6.57 $26.28 1 x8x8' 16.0 ea $7.98 $127.68 2x4x10' 1.0 ea $5.98 $5.98 2x4x4' 2.0 ea $3.37 $6.74 Fasteners 1.0 lot $12.00 $12.00 Subtotal Materials $178.68 Discount for 50' included ($44.67) Tax 7.50% $10.05 Total Materials $144.06 Labor #of Men Hrs Rate Cost Replace/repair deteriorated wood 3.0 32.0 $85.00 $8,160.00 Labor credit for replacement included in bid 3.0 (8.0) $85.00 ($2,040.00) Labor Total $6,120.00 Equipment Days Rate Cost Total Equipment $0.00 Subcontractor Subtotal $6,264.06 Sub Mark up @ 8 % $0.00 Mark up @ 10 % $626.41 Total $6,890.47 Time Extension Page 1 of 1