4th Change Order 6/23/1999 JUN 2 5 1999 MONROE COUNTY • r/v�1 ENGINEERING/CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Plantation Key Detention Facility Addition CHANGE ORDER NO: 4 Total Previous Change Orders $ 78,427.32 Current Change Order $ 7,636.32 % of Original Contract Amount 2.85% % of Contract after Prior C/O 2.20% Original Contract Amount $268,000.00 Revised Contract Amount $354,063.64 Detailed description of change order and justification: Change Order No. 4 is required by the Fire Marshall and Monroe County Sheriffs Office. It is described as follows: 1) Replacement of rusted fire sprinkler system in the existing building. Fire Marshall $3,004.23 requirement. 2) Two additional fire extinguishers. Fire Marshall requirement. 102.24 3) CADD drawings of the existing facility fire alarm system as required by the Fire Marshall. 1,595.21 4) Install a different type of electronic security hinge on security doors as requested by the 2,934.64 Sheriffs Office. Change Order No. 4 thereby increases the design/build contract with Gomez Construction Company by $7,636.32, from $346,427.32 to$354,063.64. Contract time remains unchanged. CONTRACTOR: /(.i J1/W 9 cr Gom struction Company Date ARCHITECT: - 1(?' JC'''t` C•rwi rc i:: Date CONSTRUCTION MANAGER: -=; � � C0`il'�{ Step fi • Pi- 411nos... Date COUNTY ENGINEER: David Kop el, P. Date DIRECTOR OF PUBLIC WORKS: - ,-J r 6"17'S5 Dent Pierce Date COUNTY ADMINISTRATOR: — — � zg James L. Roberts ate CMD007-11/03/97 MEMORANDUM DATE: June 14, 1999 TO: James L. Roberts County Administrator • • FROM: Dent Pierce, Director Public Works Division RE: Absence of Division Director CC: Jim Hendrick Danny Kolhage John Carter Public Works Department Heads Please be advised that I will be out of the office for a family emergency as of Monday, June 14, 1999, and will return at 8:00 a.m Monday, June 21, 1999. During my absence, Dave Koppel, County Engineer, will have full authority to act in my behalf, including attendance at meetings and execution of agenda, fiscal and payroll documents. Should you have any questions concerning Public Works during the above period, please contact Mr. Koppel at extension 4426. CDP/bpl JUN151999 LJL_ Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: This change order was not included in the original specifications because the Fire Marshall required Items 1 thru 3 prior to final inspection. Item #4 was a requested by the Sheriff's Office. • • Change Order was included in the original specifications. Yes ❑ No El If Yes, explanation of increase in price: N/A • Change Order exceeds$25,000 or 5% of contract price (whichever is greater). Yes ❑ No El If Yes, explanation as to why it is not subject for a calling for bids: N/A • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: N/A • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No El Explain: N/A .iCC; 305 661 0504; Jun-8-99 2:53PM; Page 2 PLANTATION KEY DETENTION FACILITY RCO 10 ✓ITEM 1: Fire Marshall required replacement of rusted fire sprinkler riser and rusted secondary branch feeder. $3,004.23 V/ITEM 2: Fre Marshall required installation of 2 additional fire extinguishers. $102.24 ITEM 3: Fire Marshall required installation of a scatty air pack holder. $0.00 Courtesy Installation By GC ,A4M 4: Fire Marshall regulresl.CAPD drawing and riser of existing facility fire alarm system to be shown as one system together with new facility on a single drawing. $1,595.21 ✓ ITEM 5: MCSO request to install door position hinges at three door locations. $2,934.84 ITEM 6: x MCSO request to install an aluminum gutter system. $712.88 . ITEM 7: MCSO request to install a photo cell or door edge stop to motorized fence gate. $959.12 • ITEM S: Provide a telephone gutter box system at rear of new facility and home run all telephone conduits to gutter box in lieu of ceiling stub-ups. $0.00 Courtesy Installation By GC (over$2,000.00) v"ITEM 9: Provide a new concrete walk at rear of building and grade area in lieu of installing sod. $0.00 This item is a wash, one off sets itself for the other.