Loading...
Notice to Proceed -".-..— BOARD OF COUNTY COMMISSIONERS ,,. MAYOR Wilhelmina Harvey,District 1 0 U NTY FM O N RO E --•r'' 1I•R Mayor Pro tem Shirley Freeman,District 3 KEY WEST FLORIDA 33040 = .�- -T' George Neugent,District 2 (305)294-4847 ; rf` Nora Williams,District 4 , •:.Z Mary Kay Reich,District 5 pi, • r-ILIVAka. • 1.r.. November 13, 1998 Gomez_Construction Co. 100 S.W.44th Street Miami,FL 33155 Attention: Orlando J.Gomez Dear Mr.Gomez: This will serve as your official Notice to Proceed effective immediately at the Plantation Key Detention Facility. Substantial Completion should be no later than April 11, 1999. Enclosed is the original change Order No. 1 in the amount of$51,965.00 for modifications. This was approved by the Monroe County Board of County Commissioners on November 12, 1998. Please sign the original Change Order and mail back to us as soon as possible for execution. Thank you for your cooperation. We are looking forward to a successful project with you and your company. If you have any questions,do not hesitate to call me at(305)292-4429. Sincerely, 11 Ste. • ' ARB AIA Cons'• -tion ....ger SWP/amm cc: ,Danny KolhageJ Dent Pierce David Koppel 5100 College Road Tel: 305-292-4429 Key West FL 33040 Fax: 305-295-4321 MONROE COUNTY ,_:vs; ENGINEERING/CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Plantation Key Detention Facility CHANGE ORDER NO: 1 Total Previous Change Orders $ 0.00 Current Change Order $ 51.965.00 Original Contract Amount $268.000.00 Revised Contract Amount $319.965.00 Detailed description of change order and justification: Gomez Construction Company was awarded a design/build contract at the Plantation Key Detention Facility at the January 16. 1996 BOCC meeting: Modifications to proposed drawings dated 12/6/96. requested by the Judges.and minor modifications by the Sheriffs office.include: • Labor.material. &equipment to construct 2 additional meeting rooms(app. 8'x10'each). $27.741.00 • Provide accessibility from the Court Building for two storage spaces and block up from detention side. 3.052.00 • Provide a 3'x3'borrowed light with security glazing at N.wall of Booking Room No. 103.680.00 • Provide electrically operated security lock at door No. 1 to be controlled from the existing Control Room. 1.667.00 • Provide a security type shower at Juvenile Holding Room 105. 3.611.00 • Fill all masonry cells with concrete at walls of Janitor Room No. 107, 0.00 • Provide janitor type sink in lieu of elevated for Maint, Shop Room No. 110. 0.00 • Delete door 12 at Maintenance Shop. 0.00 • Enlarge existing control room by removing south wall and provide a new partition approximately 10'south of present location. 6.533.00 • Remove existing exit door communicating Court Building with proposed addition and provide new 3'0"wide door to meet accessibility requirements. 0.00 • Provide 24"x36"vision panels with security glazing at door No's 1.2.3.5.6.&9. 2,747.00 • Negotiated credit for the above work. (443.00) • Architectural Services to incorporate all the above additions and deletions. 3,000.00 • Reimbursement for Buildina Permit from Islamorada.Village of Islands. 1.900.00 • Courthouse windows to have one hour fire resistive separation. (Fire Marshal Requirement) 1.000.00 • Exterior door to be equipped with a panic hardware device, (Fire Marshal Requirement) 477.00 The contract with Gomez Construction therefore increases in contract price by $51.965.00, from $268.000.00 to $319.965.00. and substantial completion time extends 150 calendar days, from date of BOCC approval (11/12/98)to-April 11. 1999. CONTRACTOR: Go'-z •n•`t ctio Company Date 49 CONSTRUCTION MANAGER: � '*\` - _IP, Stephe►v�. Date COUNTY ENGINEER c /o 3 d- ,43 David . ppe Date DIRECTOR OF PUBLIC WORKS /��f � Dent Pierce Date BOARD OF COUNTY COMMISSIONERS (SEAL) OF MONROE COUNTY, FLORIDA ATTEST: DANNY L. KOLHAGE, CLERK By By. Mayor/Chairman Deputy Clerk CMD007-11/03/97 APP•OVED AS TO FibRM ROBERT N. '`i FF