Loading...
13th Work Order 05/17/2015 .71 ' BOARD OF COUNTY COMMISSIONERS County of Monroe Mayor Sylvia J. Murphy,District 5 t. q Mayor Pro'rem.Danny L. Kolhage,District I The Florida Keys .‘ George N Carruthers, s,Diictstrict 2 \ Heather Carruthers,District3 �`� David Rice, District 4 MEMORANDUM PUBLIC WORKS& ENGINEERING DATE: May 20, 2015 RECEIVED TO: Lindsay Ballard MAY 21 2015 FROM: Pamela G. Han..$;-"i " MONROE COUNTY ATTORNEY Executive Assist!Jf)/ . SUBJECT: URS Corporation Southern Enclosed is Work Order#13 with URS Corporation Southern for the Traffic Impact Analyses- Multi Way Stop Application along Crane Boulevard that has been signed by Kevin Wilson on behalf of Monroe County. Please file for the record Should you have any questions, please feel free to contact me at 4529. Thank you. 10 - IXn eJC-/SI 6OCC-• ("QC,0 _ Cog /S cc: Engineering \ n County Attorney/ \ �}-a 0)1\I R L —i `- Finance IJ `�) D-"( ryLic( ki"- art g, /c Llw, e Enclosure(I) a�ev�dir� Crll � � � 4f Lo ram. D,M AMC WO 13 Crone 131 ud a� Is . /Yew ;1 name : 5.20. 5 Tsar' c I mpaci- 4 SCANNED ti9 Cie�,,1\`y �.5 SCOPE OF SERVICES FOR WO# 13 -Traffic Impact Analyses-Multi-Way Stop Application along Crane Boulevard URS Corporation Southern proposes to provide the services identified below for the task entitled "Traffic Impact Analyses -Multi-Way Stop Application along Crane Boulevard". pursuant to its Professional Service Agreement with Monroe County for 'Transportation Planning', dated March 16, 2011. PURPOSE The purpose of this document is to describe the scope of work and the responsibilities of the CONSULTANT and the COUNTY in connection with the traffic impact analyses for the Multi-Way Stop Application along Crane Boulevard. The CONSULTANT will perform the following planning and engineering services required to prepare the study. The final product of this task will be a Traffic Impact Technical Memorandum. The analysis will provide a recommendation towards the implementation of Multi-Way Stop sign control along Crane Boulevard at its intersections with Hawksbill Lane and Loggerhead Lane. It will be the CONSULTANT'S responsibility to utilize the standard engineering judgment, practices and principles possible during the prosecution of the work commissioned under this task. As applicable, the CONSULTANT will use the Federal Highway Administration (FHA) Manual on Uniform Traffic Control Devices (MUTCD), Section 2B.07 Multi-Way Stop Applications. The CONSULTANT will demonstrate good project management practices while working on this task. These include communication with the COUNTY and others as necessary: management of time and resources, and documentation. The CONSULTANT should make every effort to make use of all past studies and information gathered, and not repeat tasks that have been completed through other studies. The COUNTY will provide contract administration, management services, and technical reviews of all work associated with the development of this Study. The COUNTY will provide job specific information and/or functions as outlined in this agreement. 1. BACKGROUND RESEARCH The CONSULTANT will investigate and compile existing relevant data, studies and roadway characteristics. The existing studies include planning, and engineering documentation which is readily attainable. 2, DATA COLLECT The CONSULTANT will conduct field observations and approach volumes at two intersections: 1) Crane Boulevard and Hawksbill Lane; and 2) Crane Boulevard and Loggerhead Lane. If required as part of the analysis, The COUNTY will provide crash data for the two subject intersections. URS Corporation Sout0ern 7800 Congress Avenue,Suite 200 Boca Raton,FL 33087-1350 Tel:581994.8500 Fez:561.904.6535 'mow wos 13-Traffic Impact Analyses—Multi-Way Stop Application along Crane Boulevard U iYW\ April 24,2015 Page 2 of 4 If required as part of the analysis, the CONSULTANT will collect average delay data on the minor-streets during the highest hour. Alternative, the CONSULTANT may calculate delay based on traffic operational analysis procedures on the Highway Capacity Manual (HCM). 3. DEVELOP TRAFFIC VOLUMES FOR ANALYSES The CONSULTANT will utilize the field data to develop volumes to be use in the analyses. The information will include AM, PM and AADT volumes. 4. TRAFFIC OPERATIONAL ANALYSIS The CONSULTANT will furnish analysis to establish a recommendation for the application of multi-way stop sign control at each of the two subject intersections. 5. DOCUMENTATION The CONSULTANT will document the findings in the Traffic Impact Analysis Technical Memorandum. The memorandum will be submitted to the COUNTY, initially in a DRAFT format to solicit input prior to submitting the FINAL memorandum. 6. MEETINGS AND COORDINATION There are no meetings anticipated during the course of this study. Deliverables: Two (2) deliverables are anticipated to accomplish this project.They are: 1. DRAFT Design Traffic Technical Memorandum. 2. FINAL Design Traffic Technical Memorandum. The draft submittal to the COUNTY will include one (1) hard copy of 81h"xl 1" written documents and on electronic copy for review and circulation. The final submittal will include three (3) signed and sealed technical memorandums. Project Schedule: Within forty five (45) calendar days after the Notice-To-Proceed, the CONSULTANT will submit the DRAFT technical memorandum to the COUNTY. Within fourteen (14) calendar days upon receiving comments on the initial submittal, the CONSULTANT shall submit the FINAL technical memorandum. Quality Control: The CONSULTANT will be responsible for the professional quality, technical accuracy and coordination of all submittals and other services furnished by the CONSULTANT under this task in accordance with the standard of care in the industry and based on the circumstances of the work. The CONSULTANT may rely upon and use in the performance of its services information supplied to it by the County or its consultants or agents without independent verification and CONSULTANT will not be responsible for defects in its services attributable to its reliance upon or use of such information. \/iYI WO*13-Traffic Impact Analyses—MulO.Way Stop Application along Crane Boulevard April 24,2015 Page 3 of 4 Although not anticipated in this project, any cost opinions or estimates provided by CONSULTANT will be on a basis of experience and judgment, but since CONSULTANT has no control over market conditions or bidding procedures; CONSULTANT cannot and does not warrant that bids, ultimate construction cost, or project economics will not vary from such opinions or estimates. Neither the Agreement nor the services provided hereunder will constitute or provide for, and CONSULTANT shall not be considered to have rendered, any legal or financial opinion(s) regarding the feasibility of this project or any other project matter. Compensation for Services The Consultant shall be paid a lump-sum amount of $7,575.48 for satisfactory performance of work as stated in this scope of services. The staff-hour estimates and the fee are attached. Invoices will be submitted monthly, reflecting the compensation for proportional completion of the task. Acceptance and approval of this Work Order by both parties by signatories below constitute authorization for the Consultant to proceed. ACCEPTED AND APPROVED ACCEPTED AND APPROVED Monroe County �� �//�f� URS Corporation Southern (Sin )0�S�.c-r.�"' ( 9natu e) kr Luis CauTx free fies/97i (Name &Title) (Name &Title) / M 2orS 04//9 (Date) (Date) WO 013-Traffic Impact Analyses—Multi-Way Stop Application along Crane Boulevard April 24,2015 Page 4 of Study Tasks and Staff Hours Estimate WO# 13 -Traffic Impact Analyses-Multi-Way Stop Application along Crane Boulevard TASK Projm2Nner. Senior Eng. 6M. Tech. CIMUI Tad Mom Budget by TASK-1:BACKGROUND RESEARCH Ten 1. Collett relevant available dots&initial Coordination. 2 2 137740 SUBTOTAL 0 2 0 0 0 2 Ii3M40 TASK—2:FIELD OBSERVATIONS/DATA COLLECTION 1.Field Obesnations 12 12 S126976 2. Treks Data Collection(6 Locations) 16 16 S1556as 3.Traffic Ds4 Sammy 2 2 SI945 SUBTOTAL 0 0 12 13 0 30 53,022.50 TASK—3:DEVELOP TRAFFIC VOLUMES 1.Ombp TrafflcVolumes 1 2 3 $46016 SUBTOTAL 0 1 2 0 0 3 $400.16 TASK—4:TRAFFIC OPERATIONAL ANALYSIS 1.MI S.Beg Stop Sign Control Application-Hawksbill Lane I 4 5 181162 2. Mu84Wy Stop Sign Control Application-Loggerheadtene I 4 5 161162 SUBTOTAL 0 2 a 0 0 10 31,223.24 TASK-5: DOCUMENTATION 1.Oerdap DRAFT Design Traffic Technical Memorandum 2 4 8 14 S153978 2. Dmbp FINAL Design Traffic Technical Memorandum 1 2 2 5 ge502 SUBTOTAL 0 3 6 11 0 19 $2,174.78 TASK—6:COORDINATION A MEETINGS I. The iaO In/lodes coordination.No meetings an mpsctad 2 2 SSP40 SUBTOTAL 0 2 0 0 0 2 4E7.40 TOTAL STAFF HOURS 0 11 24 2/ 0 M 66 Conb&iHW4y Rates 5225.55 518870 S16573 10743 1597 TOTAL BUDGET $&00 $1,111100 $2,960.M $2,728.04 $0.00 $7615.40 $1,5T5.AS