16th Change Order 08/21/2006 MONROE COUNTY f ENGINEERING /FACILITi-k-3 E L rE NT CONTRA(,-f CHANGE ORDER U, PROJECT TITLE: CHANGE ORDER NO: 16 Freeman Justice Center INITIATION DATE: N/A Jackson Square Key West, FL CONTRACT DATE: June 16, 2004 TO CONTRACTOR: The Tower Group,Inc. 405 SW 148f"Avenue Suite One Davie, FL 33325 The Contract is changed as follows: $13,804,000.00 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $ 912 743.17 Net change by previously authorized Change Orders ................................................ The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $14,716,743.17 The (Contract Sum) (Guaranteed Maxim(unchanged) m Priceed will be this Chan e Orecreased) $ 49,670.51 ( 9 ) Y g The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $14,766,413.68 The Contract Time will be (increased) (decreased) (unchanged) by .................. ( ) N/A The date of Substantial Completion as of the date of this Change Order is ..................January 25, 2007 Detailed description of change order and justification: • Chan a Order to include 83 L.F. of reinforced concrete retainin wall and footer to resolve grade conflicts including excavation and backflll and excluding curb sidewalk and e o intro . • Furnish and Install type `DD'louvers to resolve grade conflicts on Contract Drawing. • Change the scope of electrical work for the fire and alarm system_in Stair#1. • Modify cabinets at the sinks in the Hearing Rooms Jury Rooms, and Grand Jury Room to meet the "Forward Reach"criteria of the ADA Standards rather than the "Side Reach" criteria. • See attached itemized costs. This Change Order is.36% of the original contract amount. Not valid until signed by Owner Construction Manager and Contractor ARCHITECT: N/A Date CONTRACTOR: Date The Tower Group DIRECTOR, FACILITIES DEVELOPMENT: Date Jerry B tt, COUNTY ENGINEER: Date David .Koppel, P . COUNTY ADMINISTRATORS at P Thomas Willi/Debbie Frederick-Deputy Change Order to include 83 L.F. of reinforced concrete retaining wall and four to resolve grade conflicts includinc,Lexcavation and backfill and excludin-g curb sidewalk aftji edit painti�tp Approximately 83 linear feet of reinforced concrete retaining wall and footer. E.G. Braswell Construction, Inc. $20,980.00 Overhead and Profit 2,098.00 Reroute underground chilled water piping to accommodate retaining wall. Weathertrol Maintenance Corporation $1,213.71 Overhead and Profit 121.37 Sales Tax on Material and Equipment 64.71 Replace Sand Bedding for Electrical Ductbank, 23 Tons @ $24.13 Charley Toppino & Sons, Inc. $554.99 Temporary Fuel Surcharge 8.00 Sales Tax 42.22 Subtotal Change Order Request $25,083.00 5% Profit/Overhead, TheTower Group ($25,083.00 - $106.93 sales tax) 1,248.80 Total Change Order Request $2 �331.8Q Furnish and Install type`DD'louvers to resolve-grade conflicts on Contract Drawin-g: One Mark DD Louver, 10'-4"X 6-2'/2" $1,950.00 3 1/"X 4" LG. Wedge Anchors (three packs of 25) 63.87 Sales Tax 151.04 Installation by The Tower Group at $18.50 per hour @ 24 hours 444.00 Subtotal Change Order Request $2,608.91 10% Profit/Overhead, TheTower Group ($2,608.91 - $151.04 sales tax) 245.79 Total Change Order Request $2,854.70 Change the scope of electrical work for the fire and alarm system in Stair#1- Additional Conduit, Wire and Hom Strobe Patrick Power Corp. $463.20 10% Overhead/Profit 46.32 Sales Tax 10.52 Air Conditioning Receptacle in the Elevator Machine Room Patrick Power Corp. $1,157.86 10% Overhead/Profit 115.79 Sales Tax 27.03 Changes to the Roof Fan Breakers Patrick Power Corp. $83.64 10% Overhead/Profit $.36 Sales Tax 6_27 Duress Alarm in Courtroom 'A' Patrick Power Corp. $1,563.99 10% Overhead/Profit 156.40 Sales Tax 58.14 Telephone System changes in the Senior Deputy Room and the Deputy Court Ad # trator Room Patrick Power Corp. 2,170.64 10% Overhead/Profit 217.06 Sates Tax 31.73 Subtotal Change Order Request $6,116.95 5% Overhead/Profit The Tower Group ($6,116.95- $133.69 Sales Tax) 299.16 Total Change Order Request �41a11 N!o& cabinets at the sinks in the rind Rao ,im Rooms, and Grand 4M Room to meet _Agthe "Forward Reach"criteria of the ADA Standards rather than the "Side Reach"criteria: Eleven 34"HX34"W Base Cabinets; Six "HX1 7"W Base Cabinets; Two 34"HX28W Base Cabinets Baron Manufacturing Inc. $7,200.00 Six Capitol entry doors Baron Manufacturing 4,980.00 10% Overhead and Profit 1,218.00 Subtotal Change Order Request $13,398.00 5%Overhead/Profit The Tower Group 669.90 Total Change Order Request _ �4 Total All Change Order Requests 9,670.51 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: This Change Order includes resolving grade confhcts,,prrd mddifications to previous specifications. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no, explanation of why: The Architect is not required to approve Change Orders for the Freeman Justice Center. • Change Order is correcting an error or omission in design document. Yes [:]No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: The Tower Group, _ RANGE ORDER REQUEST 405 SW 148 Avenue No. 00015-RI Suite One Phone: (954)476-3200 Davie, FL 33325 Fax: (954)474-3111 TITLE: Retaining Wall DATE:6/28/2006 PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT-N-( 1 - II onr;e(;ounty Monroe County Facilities Development f 1010`0hs Dev,�9c,)pnjen,' 1100 Simonton Street Key West FL 33040 "0.� �' 20,0 Phone: 305 295-4306 Fax: 305 295-4321 RECENIED BY:— RE: PCO To: TTG From: EGBRAS WE Number: EGO 11 R 1 DESCRIPTION OF PROPOSAL This Change Order Request(COR)addresses the changes to add a retaining wall as part of resolving the grade conflicts that The Tower Group(TTG)first identified and made known to Monroe County Facilities Development and Gonzalez Architects via Request For Information(RFI)#9, dated November 9,2004. Gonzalez Architects issued a revised Site Plan Drawing, #C-1,dated December 10, 2004, in response to RFI#9 but these revisions did not address the grade conflicts as outlined by TTG Letter#0417-00259,dated December 28,2004. Gonzalez Architects had not yet provided a resolution to these grade conflicts at the time of their contract termination by the Monroe Board of County Commissioners in October 2005. In December 2005, the replacement Architect, Currie Sowards Aguila Architects(CSA), issued Drawings to resolve the grade discrepancies: #SK-2 and SK-2A for the proposed retaining wall, #SK-3 for a proposed wall to enclose the parking garage exit(COR#16), and#A3.10 for proposed parking lot and swale modifications (Re: COR#34). These modifications were approved by the replacement Civil Engineer in March 2006, and CSA issued Drawing#A2.00S in April 2006(8.5x11 copy attached), compiling the above-referenced changes. The value and the scope of Work for this COR are based on the June 14, 2006 proposal from our Concrete Subcontractor,E.G. Braswell Construction(EGB),(copy attached,4 pages)and the February 1,2006 proposal from Weathertrol for chilled water piping modifications. This proposal also includes compensation for the cost to replace the electrical ductbank bedding material that was removed during excavation for the re-routed chilled water piping. The Tower Group proposes to implement these changes for an$26,331.80 increase to the Contract Price and no change to the Contract Time. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Approx.83 LF of reinforced 1.000 Ls $23,078.00 0.00% WOO $23,078.00 - concrete retaining wall and footer including excavation and backfill,and excluding curb, Sidewalk and epoxy painting. 00002 Reroute underground chilled 1.000 LS $1,335.08 0.00% $0.00 $1,335.08 water piping to accommodate retaining wall(less sales tax) 00003 Replace sand bedding for 1.000 LS $562.99 0.00% $0.00 $56299 electrical ductbank(less sales tax) Unit Cost: $24,976.07 Unit Tax: WOO Unit Total: $24,976.07 Subtotal: $24,976.07 Description Markup Percent Markup Amount Sales Tax $106.93 ' v Profit 5.000% $1,248.80 a ' _ Total Cost. $26 331.80 �1 o "" $ "fa5 � :D U U O Q V� <a <�xa z K UJ W `' E O w f� o a u �.� a I I 0 V '' :_q aJ _ F Z IX Q �II I_j 1 ! -- \t r N E Ca 11:29 FROM.CLRRIE IL 561-243-8104 TO:1 7 P.2 1 � J N �z QMcn cr- $ IpI 1 -� i JJ L x _ a> u Cf _I 1I�� W A G i 1=1 IMF 11=1 I IZ 1=1 �Sl i I � - . _ � az l zW�� U sa z Noou 1 m > � z lo ��III III 111�- 1 l -{ �� Z Y.'r M m rn _ 2 CN E I I® m g 9 II Dim �Ili=l i 1=1 I-1 ! Np f ( o f I !M I ICI ( ( ___i v ll:lIE�lll I I;III ` t' 'E rm It oSP rm em ME L L 2:01 bB.B-�b2-T95 lins)j 3I :22 -2-2-D30 CONTRA 70RS/CYJPY`RETE )OdRY SMELL WfiT 3 CTORS POO 23 SI7E W&L 0 DATED 12-%-0 EVAI LM&FAXED 6-14-X E. G. BRASWELL CONSTRUCTION, INC. GENERAL CONTRACTORS CONCRETE AND MASONRY SHELL CONTRACTORS 647E THERD STREET, KEY'WEST FLORIDA 33040 Phone (305) 296-0305 Fax (305)296-1824 FROM RUCK TUCKER 6/14/2006 Project: FREEMAN JUSTICE CENTER Architect: CSA PCO#23 Plans : SKETCHES 3 EA A3.10 SITE RETAINING WALL A3.10 TYP RETAIN WALL Contractor : THE TOWER GROUP SECTION WATER PIPE Address : Dated 12J1912005 BID Date : Time Attn : TIM CLARKE,JOHN CHANDLER Addenda: Phone : 305-2W2521 Fax : 305-2W2587 Divisions: SPEC BOOK�oC PER YOUR REQUEST: RETAINING WALL AND FOOTING HARD COST WALL APPROX 83'LONG, HT VARIES $ 20,980 DEEP MACHINE EXCAVATION CONCRETE, FORMS, REBAR BACKFILL ETC 'NEW CURES'NOT INCLUDED WALK NOT INCLUDED EPDXY PAINT NOT INCLUDED -SUBTOTAL S 20,9W 104'u OVERHEAD&PROFIT S 2,M f SUBTOTAL S 23,078 h� t4,1 a BOND 3 TOTAL BID 9 &11 96 1:21 PM 1 � LIJ � -j Ld♦ 1-121fl - .Tr to ¢ e a a f7L 'Jill: N a 1 '_''� ,�sr, ♦ �. � III'.__•_.-.----• ,. ------------ Li � 1 I I I L 1 1 1 I toll moww�' Weathertrol Malintenance Corporation PR ?OSED CHANGE ORDER No. WT003 7250 NE 4th Ave. Phone: 305-908-1000 Miami,FL 33138 Fax: 305-908-1039 TITLE:Relocate U/G Chiller Lines DATE:2/1/2006 PROJECT:Freeman Justice Center(FJC) JOB: 0417 TO: Attn: John S. Chandler CONTRACT NO:0417-004 The Tower Group,Inc. 302 Fleming St. (Jobsite Trailer) Key West,FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 RE: COR To: MCCM From: TTG Number: 00015 DESCRIPTION OF PROPOSAL Weatber-trol Change Order Request No.04-790-0007,dated February 1,2006,with corrections as follows: Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Labor 3,000 Hr. $96.44 0.00% $0.00 S28932 00002 Labor Overhead&Profit(101% 1-000 Ls $28.93 0.000% $0-00 $28.93 of Item 1) 00003 Material 1.000 LS S75439 7.00% $52.81 S75439 00004 Material 0/14&Profit(I ft.of 1,000 Ls $75.44 0.001% $0.00 $75.44 Item 3 excluding tax) 00005 EquipmentAith Operator 2.000 Hr. $85.00 700% $I 1.90 $170,00 00006 Eqpt with Operator O/H& 1.000 Ls $17.00 O.W/. $0.00 $17.00 Profit(100/.of Item 5 excluding tax) Unit Cost: $1,335.08 Unit Tax: $64.71 Unit Total: $1,399.79 By: By: Hector Ruiz John S. Chandler Date: Date: Feh 2 - 2006 3 : 5 8 P M 1NE"—',ERTROL MAINTENANCE CORP No 1549 P . 1 ORDERCHANGE U E T° � we�tbert o Change Order Request#: 04-790-0007 MAINit MANIC OVl1DU Nn/IUN Date: 2/1/2006 Project: Freeman Justice Center Project : 04-790 To: The Tower Group @ Freeman Justice Center From: Weathertrol Attn: John Chandler Hector J. Ruiz 600 Whitehead St. 500 Whitehead Street Key West, FL 33040 Key West, FL 33040 Ph,: (305)296-2521 Fax: (305) 296-2587 Ph.: (305) 908-1000 Fax: (305) 908-1039 We hereby propose to make the following changes: Main Chiller Water Lines underground relocation Change Order Price $2,730.47 Original Contract Amount $1,069,000.00 This price is good for 0 days. If conditions change, this price Is void, We are requesting a time extension of 0 days In conjunction with this change. Hector J. Ruiz 2/1/2006 Author Date Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless cthenMse specified. Authorized Signature Date of Acceptance E 649 P . eh . 2 . 2066 3 E9PM WE'A -7-R ROL MAINTENANCE CORP No CHANGE ORDER REQUEST SUMMARY Project; Freeman Justice Center COR : 0 -790-0 07 Labor Labor Type MI-Ire- $/Hr Burden Fringe Tax Tatsl Pipefltter foreman extra tim 8 $51.26 $0,00 $0.00 $0,00 $307,58 Pip®fitter journeyman extra 8 $45.18 $0,00 $0.00 $0,00 $271.08 0 $0.00 $0.00 $0,00 $0.00 $0.00 Subtotal $578.64 Material Materlal Quantity Gost Tax Total 4"Preinsulated extra lenth of pipe 1 $390.39 $27.33 $417.72 Extras 4"90 dog ells 4 $84.75 $23.73 $302.73 Extra cleaner,solvent,cement,etc.... 1 $25,00 $1.75 $26,75 Subtotal $807.20 Equipment Type Qu.antlfy Coat Tax Total Extra backhoe w/operator 4 hre w/trevel 1 $340.00 $25.60 $365.50 Subtotal $365,50 Expense Expense Type. ,.:quantity cost '' Tax Total.Cost Pipefltter foremen(Extra travel time 1/2 way) 4 $51.26 $0.00 $205,04 Pipefltter Journeymen(Extra travel time 1/2 way) 4 $45,18 $0,00 $180.72 SubTotal $385,76 Subcontracts Subcontractor. Da:crlptlor7" Total Extra thrust block in place Furnished by GC $0.00 Subtotal $0,00 Total Cost $2,137.10 Overhead $320 57 Profit $245.77 Subcontract $0.00 Bond $27.03 Total $2,730,47 CHARLEY TOPPINO & SONS, INC. P. . BOX 787 KEY WEST, FL 33041 Invoice No: 24622 Date 01/10/2006 (305)296-5606 Rage 1 of 1 Billing Information: (invoice Description: THE TOWER GROUP, INC. FREEMAN JUSTICE CENTER 405 SOUTHWEST 148TH ST DAVIE, FL 33325 G ( (544)763-200 Item Date Description of Work Units Unit CoT8,OO mount 1 11/02/2005 SCREENINGS DELIVERED-TICKET#4796 24.13 2554.99 2 11/02/2005 TEMPORARY FUEL SURCHARGE 1.00 8.00 . 3 Sales Tax @ 7.50% 42.22 Total Invoice Amount 605.21 2006 JAN py (q p 1 'MILE MARKER 9, HWY 1,,ROCKLAND KEY, FLORIDA P.O.'BOX 1149 KEY WEST, FL 33041 •1305) 296-9934® FAX (305) 296-2396 AN EQUAL OPPORTUNITY EMPLOYER CASH ❑ CHARGE D-' C.O.D. ❑ J i.l ry C, i I f Sub-total $ Tax Del.Chg. $ Total $ ❑ PEA ROCK ❑ 1/2 ROCK ❑ MIAMI#57 ❑ BOLDERS El MASON SAND ❑ PIT ROCK El #57 RECYCLED ROCK El MIAMI SCR - ❑ BLENDED MATL ❑ DOT CR ROCK ❑ LOCAL SCR ❑ TOP SOIL 'ONST. DEBRIS ❑ #4 LOCAL' ❑ LOCAL INGOT ROCK ❑ OTHER I We Do i OT ACCEPT. Garbage, Contaminants, To rc st ,it Medical Waste j Driver Rec'd BY .. Customer or his agent hereby agree to accept full responsibility for any damagos resulting from deliveries beyond curb line.All past-due balances shall accrue interest at the rate of 18%per annum.If any past-duo account is placed with an attorney or collection agency,the customer shall he liable for all collection costs including reasonable attorney's fees for trial and appellate proceedings and/or a collection charge in an amount of not less than 15%of the past-due balance. P s � White/Invoice Green/Spare Copy Yell owlBool(l(eeping PinlclCustonier.Copy Gold/Field Office ra lie Tower r u , Im. 4 ANGE ORDER REQUEST 302 1`lerning St. No. 0001.6R I (Jobsite Trailer) Phone: (305)296-2521 Key West, PI, 33040 Fax: (305)296-2587 TITLE: Louver @ Col. 'A' btwn. '6' & '7' DATE: 5/11/2006 PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT NO: 1 Monroe County Facilities Developmentw�h� i��,��1 1100 Simonton Street Ivey West, FL 33040 Phonc: (305) 295-4306 Fax: (305) 295-4321 RE: PCO To: TTG From: CSI Number: CS001 DESCRIPTION OF PROPOSAL Change Order Request(COR)#16-R1 is our proposal to furnish and install an additional Type 'DD' louver at Column Line'A' between Column Lines '6'and 'T, based on Drawing 9SK-3 furnished by CSA Architects (attached, I page). This modification is required to resolve grade conflicts on Contract Drawing 8C-2. This COR excludes the additional shell work and cast stone, which will be addressed in separate COR(s) for the comprehensive changes to the concrete/masonry and cast stone scopes of work. This COR also excludes time extension and associated costs. The time extension and associated costs related to the Work to resolve the grade conflicts will be submitted once all the issues are reconciled(i.e. retaining wall, parking lot drainage, and sally port access modifications). Please provide means of payment via Change Order in the amount of$2,854.69 for this additional work. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Furnish one(1)Type'DD' 1.000 LS $1,950.00 0.00% $0.00 $1,950.00 louver, 10'-4"x C-2-1/2"(See attached C/S Group Proposal dated 12/29/05) 00002 Furnish 1/4"x 4"LG.wedge 3.000 25-PK $21.29 0.00% $0.00 $63.87 anchors @ 6"spacing all around(See attached page from Grainger Catalog 097) 00003 Install one(1)Type'DD'louver 24.000 manhoms $18.50 0.00% $0.00 $444.00 10'-4"x 6'-2-1/2 Unit Cost: $2,457.87 Unit Tax: $0.00 Unit Total: $2,457.87 Subtotal: $2,457.87 Description Markup Percent Markup Amount O/H & Supervision 5.000% $122.89 11ro it 5.0000/, $122.89 Sales Tax for Items #1 & #2 $151.04 Total Cost: $25854.69 —CAST STONE CAFE BALCONY --CAST STONE SILL lit H \ -- BRICK EXTERIOR _ 2,'-0° � CURRIE EE. ITT FLOOP� CAST STONE CROWN SOWARDS �s AGUILA ARCHITECTS Arc—Ntecto, Pig^Rrs& /- EXISTING BEAM interior 11II// AAD002271 134 N.E Itt A,,w CAST STONE PANEL TEL 5811 278 4� 1�"` FAX M1 243-8184 E'^+a7. RCCPpCURRtEAAC_C0Y CAST STONE HEADER 20'-0' PEN,tie- B e T10nI .O.T. SEA l SRO Jt+-'! TITLE SEALENT r \�---SEALENT FREEMAN USTICE \�---- NEW LOUVER TO MATCH CAST STONE COLOR,, SIZE TO MATCH THATOF GENERATOR LOUVER z--SEALENT r /Z� i CAST STONE SILL IN - I �- CAST STONE PANEL I (2'-0" k _ — NEW CMU WALL F14RKING LEVEL > GRADE VARIES = s I I SECT�ON.DWG k —GRADE BEAM _ i �a NEW r _ FOOTING r , 1 2.20.051 DKWH �y 0 J0701 CONSTRUCTION SPECIALTIES, INC. m mar;ke b products that GReMpke buildings Netter" 49 MEEKER AVENUE CRANFORD, NJ 07016 � 1 TEL.: 908-272-5200 FAX; 908-272-2920 04,li Date: 1212912005 CSE# C�CDCI Project: Freeman Justice Center Rep: BUILDERS SPEC., INC. 665 S. E. 10TH STREET Loc: Key!Nest, FL DEERFIELD BEACH, FL 33441 Tel: 954f725-9230 C/S Job# 379723 Fax: 954r725-8884 Customer: The Tower Group Inc. Change Order #1 Contact: Change Order #1 The original contract sum $ 16,745,00 Net change order(s) previously authorized $ - Contract sum prior to this change order $ 16,745.00 The Contract sum will INCREASE $ 1,950.00 by change order amount of The New Contract sum $ 18,695.00 F.O.B. Plant,Freight Allowed Excluding Tax. Scope of Change Order As requested, the above add is to provide additional louvers as follows: 1 ea. Mark DD louver @ 10'-4" X 6-2 1/2" Model, finish and screen to remain unchanged. Proposal Issued by: Chris Rowland Post-Order Change Order Accepted By: I The Tower Group Inc. — CUSTOMER By Date Terms and Conditions: 1. All original contractual terms and conditions apply. A member of the C/S Group of Companies o 0 c N ap v; Cd �. c� Q (U (D a) CDc. C o ~ = N LO _ O O Q O U cn a) U -O cn G � a) -o W .L77 [L ^-... w r ' ONE E p Cl) <— cr� Q N N J �° E d � � z .-� U N O d O :5 c'j a) 'IT >1 � i a � � � U LO N Q 'IT � (0 L7 C:) o O � 0 0 = cl) � O_ N LL F— � U p M L) T C C CD CD rn w p C-) o (D CL < -O N �CD N ■ n a r O L IL T � � a; CL. 0 U- o 4t c) CI al O o _ CD (n E _ CMS • i .� (n n- C) � a CID w � a' c c N to 0 cnn ElLL - C swam c G a � o � � b 0 p r O � bJ) z r m CJI 3 cn c"I U C7, dJ cil C) < CL T) (D (1) C 0 ID -D ci o 0 <C 0 U) < is . CD C C,3 < —0 U) CVC-�) C) r- I- CD LL C\1 N Cj Lo D Z N 0) m m a 0 CD U) CL E 0 cn co cu E cy) —J ry r- cu 0 (D CL U) U) 0 X U) 0 E 0 a) bf LU (2) 0 m O (D bi The Tower Group, Inc CPA,,NGE ORDER REQUEST No. 00020-Ri 302 Fleming St. Phone: (305)296-25?-1 f.Jobsite Trailer) Fax: (305)296-2587 Key West, Fl, 33040 TITLE:Mi see]laneou s Electric Changes DATE:4/14/2006 PROJECT: Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT NO: M 0 M11 R 0 1 11 0 1)Ail'Fl,", Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 RE: COR To: MCCM From: TTG Number: 00020-RI DESCRIPTION OF PROPOSAL Change Order Request(COR)P20-R.1 seeks compensation for changes to the scope of electrical work via BFI's and drawing revisions. COR fl20-R1 revises and supersedes COR 420 to incorporate corrections to Patrick Power Corporation Proposed Change Order(PCO)#8 and 1111. These corrections are implemented in this COR via PCO H8-R I &It I I-RI (items 9 1 &114). COR#20-RI proposes an increase to the Contract Price of$6,715.26. COR 420-R I proposes no change to the Contract Time. Item Description Sioclig Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Fire&Alarm Changes per RFI 1.000 LS $509.52 0.00% $0.00 $509,52- 462(PCO#PPC008RI)00002 Add Receptacle for A/C in 1.000 LS $1,273.64 0.00% $0.00 $1,273.64 Room#G028 per RFI#89 (PCO#ppC009) $0.00 $92.00 00003 Change EF Breakers per RFI 1.000 i's $92.00 0.00% 4106(PCO#PPCO 10)00004 Add Duress Alarm in 1.000 Ls $1,72039 0.00% $0.00 $1,720.39 Courtroom Wper RFl 1)165 (PCO#PPCO I I-R 1) $0.00 $2,397.70 00005 Add Telephone Conduits in 1000 Ls $2,387.70 0.00% Rooms#2005&42028 per revised Dwg.#131.03(PCO #PPCO12) Unit Cost: $5,983.25 Unit Tax: $0.00 Unit Total: $5,983.25 Subtotal: $5,983.25 Description Markup Percent Malt-h-up Amount Overhead 5.000% $299.16 Profit 5.000% $299.16 Sales Tax for Item #1 $10.521- Sales Tax for Item #2 $27.03 Sales Tax for Item 93 $6.27 Sates Tax for Item J14 $58-14 Sales Tax for Item 95 $31 .73 ,," Total Cost: $6,71526 Xj I _. PROPOSED CHANGE ORDER Patr5691 N.E. 14th Avenue Phone: 954-491-7745 Ft. Lauderdale„ Fl. 33334 Fax: 954 772--2126 TITLE:Fire & Alarm in Stair #1 DATE: 4/3/2006 PROJECT:Freeman Justice Center (FJC) JOB: 0417 Attn: John S. Chandler CONTRACT NO:0417-002 TO: . The Tower Group, Inc. � 302 Fleming St. 1 (Jobsite Trailer) Key West, FL 33040 �$ Phone: (305) 296-2521 Fax: (305) 296-2587 'L RE: RFI To: GA From: TTG Number: 00062 DESCRIPTION OF PROPOSAL Proposed Change Order(PCO)#PPCO08-R1 addresses the cost to incorporate the changes to the scope of work for the Fire&Alarm System in Stair 91 via the Architect's answer to RF1 962. PCO 9PPCO08-RI revises and supersedes PCO#PPC008,which was rejected for missing a copy of the "Quotes" referenced in the "Proposal Request Summary." A copy of the quote is included in PCO #PPC008-R l. Item Description' Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Add conduit,wire and 1.000 LS $463.20 0-00% $0.00 $46120 strobe/horn in Stair tt 1 per RP1 462 Unit Cost: $463.20 Unit Tax: $0.00 Unit Total: $463.20 Subtotal: $463.20 Description Markup Percent Markup Amount Overhead 5.000% $23.16 Profit 5.000% $23.16 Sales Tax $10.52 Total Cost: $520.04 13y: By: Ivan Casamayor John S. Chandler Date: Date: i rr it �� II,A b y b ContractorsElectrical f ' COMMERCIAL INSTITUTIONAL N D U S T R I L. April 3, 2006 The Tower Group Mr. John Chandler 405 SW 1481h Avenue, Suite 1 Davie, Florida, 33325 Ref: Freeman Justice Center—RF1#62 Subject: Cost Proposal —Fire & Alarm Stair#1 Revised. PROPOSAL. After carefully reviewing the changes in the Fire & Alarm system at the stair #1 on drawing E1.01 (Power Ground Floor Plan), there was a cost impact found on our scope of work as a charge for the amount of$520.04 Our proposal is good for 30 days or until conditions change. An example of change on conditions will be pouring of the slabs. Layout, Coring, Cutting and Patching has not been included in our proposal. Please contact me if I can be of any further assistance. Sincerely, Ivari'Pasam•'yor Project Manager cc: Michael J. Driscoll, PPC Jose Clausell, PPC 5691 N.E. 14th Avenue Fort Lauderdale, Florida 33334 Telephone (954) 491-7745 v Facsimile: ( 4) 77 w i f PAT RICK ELECTRICAL CONTRACTORS & ENGINEERS 5691 N.E 14th Ave PHONE (954) 491- 7'745 FORT LAUDERDALE, FL 33334 FAX (954) '/7 2-212 6 PROPOSAL REQUEST SUMMARY TO: THE TOWER GROUP DATE: 3 14 2oo5 405 SW 148th Avenue Suite 1 PROJECT: Freeman Justice Center Davie Florida - 33325 OUR JOB #: 04-007 ATTENTION: JOHN CHANDLER REQUEST#: RFI #62 REQUEST DESCRIPTION: ADDITIONAL FA STAIR#1 - Rev 1 MATERIAL ................. ... .............. .. _ $ 59.12 ................. ................... ................. ................. 2 FREIGHT CARRIER . .............. — 3 WASTE FACTOR ............ 2.00% j OF LINE 1 = $ 1.18 4 STORAGE FEE .............. - ................ ................... ................. ................... — 5 QUOTES ........... ................. ................... ................. ................... _ $ 80.00 6 EQUIPMENT RENTAL ................. — ................. ...... ............ ......... 7 TOTAL (LINES 1-6) ... .............. ................. ................... ................. ................... _ $ 140.30 8 FLORIDA SALES TAX ... ......... 7.50% I OF LINE 7 = $ 10.52 ................. ................... 9 TOTAL (LINES 7 & 8) ............ .............. ................... ................. .............I..... _ $ 150.82 10 SERVICE CHARGE ............ OF LINE 9 _................. ................... $ - 11 TOTAL MATERIAL (LINES 9 & 10).......................................... .............. . ................... _ $ 150.82 12 LABOR HOURS STRAIGHT TIME 5.85 HOURS @ $45.00 RATE _ $ 263.25 13 LABOR HOURS OVERTIME HOURS @ $62.32 RATE _ $ - 14 FOREMAN HRS STRAIGHT TIME 0.88 HOURS @ $55.00 RATE _ $ 48.40 15 FOREMAN HOURS OVERTIME HOURS @ $76.41 RATE _ $ - 16 PROJECT MANAGERS HOURS 0.15 HOURS @ $75.00 RATE _ $ 11.25 17 WAREHOUSEMAN HOURS HOURS @ RATE _ $ - 18 EQUIPMENT OPERATOR HRS HOURS @ RATE = $ - 19 TOTAL (LINES 12-18) ..................... .................... ................. .......I........... = $ 322.90 20 TESTING & CLEANUP ... ......... 0.00% OF LINE 19 ................. ................... = $ - 21 LOST TIME FACTOR ........I... 0.00% OF LINE 19 = $ 22 TOOL REPLACEMENT 0.00% OF LINE 19 ................. ................... = $ 23 TOTAL (LINES 19-22) .... = $ 322.90 ........................ ................. ............... 24 LABOR ESCALATION ............ 0.00% OF LINE 23 = $ 25 TOTAL LABOR (LINES 23 & 24) ...................... ................... ................. ................... = $ 322.90 26 PERMIT FEE - ................. ................... ................. .................. — 27 ENGINEERING LAYOUT = $ - 28 AS BUILT DRAWINGS = $ - 29 SITE VEHICLE ... ......... 0.00% OF LINE 12 ................. ................... = $ 30 TOTAL COST (LINES 7, & 25-29) ....................... ................... ................. .................. = $ 463.20 31 5.00 ° OVERHEAD ....................... ................... ................. ................... = $ 23.16 32 SUB-TOTAL (LINES 30 & 31) .............. ................... ................. ... ............... = $ 486.36 33 1PROFIT .............. ................. ................... ................. ....I.............. = $ 23.16 34 SUB-TOTAL (LINES 32 & 33) ....................... ................... ................. ......._. ........ = $ 509.52 35 1 0.00% BOND .. . $ - _ 36 QUOTATION TOTAL (LINES 34 & 35) ...................... ..I......_..__ . . ............... = $ 520.04 Date : Mar 14,2006 reeman Justice Center 04-007 Various Changes Time : 01:3BPM Page : 1 an <Additional Fire Alarm Stair#1> Description Oty U Net Labor U !Total Mat($) Total Hours l 1 3/4 EMT CONDUIT 24 C {I 107,351 6.20 C 25.76 1.49 2 I 3/4' EMT DC SS CONN 2 C f 80.30 12 00 C 1.61 0.24 3 3/4' EMT DC SS CPLG 2!C 86401 6.00 C 1.73 0.12� 4 3/4' EMT 1-H STEEL STRAP 3 C i 32 04' 5 F 00 C 0.96 0.15 5 1#12 THHN 79 M ( 210 62 7 50 M 16.64, 0.59 6 16-14 NYLON INSUL FORK RB14-10 2 C 46.70 10.00 C 0.93 0.20 7 B2-1 RED WIRE CONN 3 C ( 14.65 0.00 C 0.44 0.00 8 4x2 1/8" SQ BOX COMB KO 1 C 636.01 35.00 C 6.36 0.35 9 4" SO BLANK COVER 1 C 148.49 9.00 C 1.48 0.09 10 4" SO 1 G PLSTR RING 1/2" RISE 1 C 220.84 20.00 C 2.21 0.20 11 A/V UNIT 1 E 0 00 1.17E 0.00 1.17 12 410x 3/4' P/H SELF-TAP SCREW 2 C 8.04 20.00 C 0.16 0.40 13 #10x1 P/H SELF-TAP SCREW 3 C 8 48 20.00 C 0.25 0.60 14 MSF MTL STUD SNAP-ON BOX SUq 1 1 C 58.82 25 00 C 0 59 0 25 IT-tals 1 - --- - - - 59 12� IVAN CASAMAYOR 0 3/1A 2006 15.38 3:052,924905 BARHES WL11,71 'DY'DIEM ►- rr rr yion Quotat I nc- 3201 FIgler Avenue Suite 03 Key et, FL 33040 Qu()te Number: horn device Patrick Power Quote Date: 5691 N.E. 14.th Avenue i4ar 13, 200� Ft, Lauderd aie, rL 333M pacle: — Sales Custarner ICE Good Thru payment Terrrws ' _-.. pat_iO,01 4/12/06 T7e't 15 nays - - Description Unit Price Extension {quantity Item -- 80.00 8 b. 1,.00 whe-mt--24-1sm� vf,r Wheelock 24 VoltHorn strobe, Red. Subtotal 80 .00 Voice, SaiesTax G .00 Fax: 1.-305-2')2-4905 Freight State artifi d EF'2-0000482 B6 .00 _ ----Total I-- Patrick Power Corp. PROPOSED CHANGE ORDER No. PP O L� Y 5 691 N.L. 14th Avenge Phone: 954-491-7745 1"t. Lauderdale„Fl. 33334 Fax: 954-772-2126 TITLE:A/C Receptacle in Elevator Mach. Rm. DATE: 12/2/2005 i PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: John S. Chandler CONTRACT NO:0417 OQ � 4 p The Tower Group, Inc. 1 . 302 Fleming St. ' - (Jobsite Trailer) Key West, FL 33040 EN ' t0-1 Phone: (305) 296-2521 Fax: (305) 296-2587 - dv RE: RFI To: GA From: TTG Number: 00089 DESCRIPTION OF PROPOSAL Proposed Change Order(PCO)#PPC009 address the cost to add a receptacle in the Elevator Machine Room(#G028)for Air Conditioning as directed by the Architect in their response to RFI #89. Item Description _ Stock# Quantity. Units Unit Price Tax Rate Tax Amount Net Amount 00001 Add A/C receptacle in the 1.000 LS $1,157.86 0.00% $0.00 $1,157.86 Elevator Machine Room per RF1#89 Unit Cost: $1,157.86 Unit Tax: $0.00 Unit Total: $1,157.86 Subtotal: $1,157.86 Description Markup Percent Markup Amount Overhead 5.000% $57.89 Profit 5.000% $57.89 Sales Tax $27.03 Total Cost: $1,300.67 By: By: Ivan Casamayor John S. Chandler Date: Date: E. p difimo PATRICK POWERCORP. Electrical Contractors and Engineers COMMERCIAL - INSTITUTIONAL IN D U S T R I A L December 2"d, 2005 The Tower Group >a Mr. John Chandler 405 SW 148t' Avenue, Suite 1 Davie, Florida, 33325 Ref: Freeman Justice Center—RFI #89 Subject: Cost Proposal — AIC Receptacle Elevator Machine Room. PROPOSAL After carefully reviewing the changes in the elevator machine room, there was a cost impact found on our scope of work as a charge for the amount o S1,300.67 Our proposal is good for 30 days or until conditions change. An example of change on conditions wi�jl be pouring of the slabs. Layout, Coring, Cutting and Patchi I�a.5 not been included in our EE2p. sal Please contact me if I can be of any further assistance. Sincerely, lvalycasamaybr Project Manager cc: Michael J. Driscoll, PPC Jose Clausell, PPC 5691 N.E. 14th Avenue o, Fort Lauderdale, Florida 333:34, Telephone (954) 491-7745 � Facsimile: [954) '772-2126 PATRICK POWER CORP. ELECTRICAL_ CONTRACTORS & ENGINEERS PHONE (954) 4 91-7 74 5 5691 N.E 14th Ave FAX (954) 772-21 6 =ORT LAUDERDALE, FL 33334 PROPOSAL REQUEST SUMMARY TO THE TOWER GROUP DATE: 12/2/2005 405 SW 148th Avenue Suite 1 PROJECT: Freeman Justice Center Davie, Florida - 33325 OUR JOB #: 04-007 ATTENTION: JOHN CHANDLER REQUEST#: RFI #89 REQUEST DESCRIPTION: AC RECEPTACLE ELEV.MACH.RM ............ .............. 1 MATERIAL .............. ................. _ $ 353.29 2 FREIGHT CARRIER ................. 3 WASTE FACTOR .......... 2.00/° OF LINE 1 = $ 7.07 ° ................. ................... 4 STORAGE FEE ................. ................. ................... ................. ................... 5 QUOTES ............... ................. ................... ................. ................... _ $ - 6 EQUIPMENT RENTAL 7 TOTAL (LINES 1-6) _ $ 360.36 8 FLORIDA SALES TAX 7.50% OF LINE 7 ................. ................... _ $ 27.03 9 TOTAL (LINES 7 & 8) ................. ................. ................. ................... _ $ 387.39 10 SERVICE CHARGE C-= OF LINE 9 ................. ................... _ $ - 11 TOTAL MATERIAL (LINES 9 & 10)............... _ $ 387.39 12 LABOR HOURS'STRAIGHT TIME 14.47 HOURS @ $45.00 RATE _ $ 651.15 13 LABOR HOURS OVERTIME HOURS-@ $62.32 RATE _ $ 14 FOREMAN HRS STRAIGHT TIME 2.17 HOURS @ $55.00 RATE - $ 119.35 15 FOREMAN HOURS OVERTIME HOURS @ $76.41 RATE _ $ - 16 PROJECT MANAGERS HOURS 0.36 HOURS @ $75.00 RATE _ $ 27.00 17 WAREHOUSEMAN HOURS HOURS@ RATE _ $ - 18 EQUIPMENT OPERATOR HRS HOURS @ RATE _ $ - 19 TOTAL (LINES 12-18) _ $ 797.50 ........................ ...... 20 TESTING & CLEANUP 0.00°/o OF LINE 19 ...............- -................. _ $ - 21 LOST TIME FACTOR 0.00% OF LINE 19 = $ - 22 TOOL REPLACEMENT OF LINE 19 = $ - ° ................. ............... 23 TOTAL (LINES 19-22) ..................... ........................ ................. .........I......... _ $ 797.50 24 LABOR ESCALATION 0.00% OF LINE 23 ................. ................... _ $ - 25 TOTAL LABOR (LINES 23 & 24) _ $ 797.50 ........ ................... 26 PERMIT FEE ........ `, _ . ............. ................. 27 ENGINEERING LAYOUT = $ - ....................... ................... ....... . 28 AS BUILT DRAWINGS ........... = $ 29 SITE VEHICLE .0.00 ° 12 .... .............. ............ OF LINE ............ ................... _ $ - 30 TOTAL COST (LINES 7, & 25-29) ....................... ................... ................. ................... _ $ 1,157,86 31 F-5.00 ° OVERHEAD = $ 57.89 ....................... ................... ......... 32 - A LINES 30 & 31 = $ 1,215.75 33 1 5. ° PROFIT = $ 57.89 ................. ................... ......... 34 A LINES 32 & 33 I. = $ 1,273.64 35 1 0.00 ° BOND ................. ................. ................... ................. ................... = $ - 36 TOTAL (LINES 34 & 35) ........................ .........1....... ................... = $ 1,300.67 _ �SH�AT�.F v�`^m. r��$'2�'d.".•z'F."`:blic^,R.a.:'fi,;�va`Rr^. - . PROMOSED CHANGE ORDER Patrick Power Corp., 5691 N.E. Idth Avenue Phone: 954-491-7745 Ft. Lauderdale„Fl. 33334 Fax: 954-772-2126. � z ..._. TITLE:Roof Fan Breakers DATE: 12/2/2005 �j,.= PROJECT:Freeman Justice Center (FJC) JOB: 0417 �� n TO: Attn: John S. Chandler CONTRACT NO:0417-0 4` The Tower Group, Inc. 302 Fleming St. ' (Jobsite Trailer) T�! Key West, FL 33040 C2 Phone: (305) 296-2521 Fax: (305) 296-2587 ' PUT RE: RFI To: GA From: TTG Number: 00106 DESCRIPTION OF PROPOSAL Proposed Change Order(PCO)#PPC010 addresses the cost to change the Roof Exhaust Fan Breakers as directed by the Architect's response to RFI#106. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Changes to the Roof Fan 1.000 LS $83.64 0.00% $0.00 $83.64 Breakers based on the Architect's response to RF1 ##106 Unit Cost: $83.64 Unit Tax: $0.00 Unit Total: $83.64 Subtotal: $83.64 Description Markup Percent Markup Amount Overhead 5.000% $4.18 Profit 5.000% $4.18 Sales Tax $6.27 Total Cost: $98.27 By: By: Ivan Casamayor John S. Chandler Date: Date: Expedition 0 Te y; PATR I K POWER CORP. Electrical Contractors and Engineers C O M M E R C I A L I N S T IT U T I ON A L IND U S T R I A L December 2 d, 2005 The Tower Group Mr. John Chandler 405 SW 148 h Avenue, Suite 1 Davie, Florida, 33325 Ref: Freeman Justice Center—RFI 9 106 Subject: Cost Proposal — Roof Fans Breakers PROPOSAL After carefully reviewing the changes in the roof fans breakers, there was a cost impact found on our scope of work as a charge for the amount o S98.2 7 Our proposal is good for 30 days or until conditions change. An example of change on conditions will be pouring of the slabs. Layout, Coring, Cuttin..- and patchinz has not been included in our proposal. Please contact me if I can be of any further assistance. Sincerely, Iv w?a-csda in a � r } Project Manager cc: Michael J. Driscoll, PPC Jose Clausell, PPC 5691 N.E. 14th Avenue FUBL € auderdale, Florida 33334 Telephone (954) 491-7745 @, Facsimile: (954) 772-212 6 .3ATRICK POWER CORP. -LEC7-RICAL CONTRACTORS & ENGINEERS PHONE (954 ) 491-7—�"-5 691 N.E 14th Ave F13X (954) 772-2_26 CRT LAUDERDALE, FL 33334 PROPOSAL REQUEST SUMMARY TO: THE TOWER GROUP DATE: i2/2/2005 405 SW 148th Avenue Suite 1 PROJECT: Freeman Justice Center Davie. Florida - 33325 OUR JOB#: 04-007 ATTENTION: JOHN CHANDLER REQUEST#: RFI #106 REQUEST DESCRIPTION: ROOF FANS BREAKERS 1 MATERIAL ................. ................. ................. ................... ................. ................... Fs 8200. 2 FREIGHT CARRIER = 3 WASTE FACTOR 2.00% OF LINE 1 ................. ................... = $ 1.64 4 STORAGEFEE = 5 QUOTES ................ ................. ................... ................. ................... _ $ - 6 EQUIPMENT RENTAL ................. _ 7 TOTAL (LINES 1-6) ................. ................. ................... ................. ................... _ $ 83.64 8 FLORIDA SALES TAX 7.500/ OF LINE 7 = $ 6.27 9 TOTAL (LINES 7 & 8) .......... ................. ................... = $ 89.91 10 SERVICE CHARGE I ] OF LINE 9 ............... ................... = $ - 11 TOTAL MATERIAL (LINES 9 & 10)....................... ................... ................. ................... = $ 89.91 12 LABOR HOURS STRAIGHT TIME 0.00 HOURS @ $45. 00 RATE _ $ - 13 LABOR HOURS OVERTIME HOURS @ $62.32 RATE _ $ 14 FOREMAN HRS STRAIGHT TIME 0.00 HOURS @ $55.00 RATE _ $ - 15 FOREMAN HOURS OVERTIME HOURS @ $76.41 RATE _ $ - 16 PROJECT MANAGERS HOURS 0.00 HOURS @ $75.00 RATE _ $ - 17 WAREHOUSEMAN HOURS HOURS @ RATE _ $ - 18 EQUIPMENT OPERATOR HRS HOURS @ RATE _ $ - 19 TOTAL (LINES 12-18) ..................... ........................ ................. ...I............... = $ - 20 TESTING & CLEANUP 0.00% OF LINE 19 = $................. ................... 21 LOST TIME FACTOR ............ 0.00% OF LINE 19 = $ - 22 TOOL REPLACEMENT 0.00% OF LINE 19 ................. ................... = $ - 23 TOTAL (LINES 19-22) .......... = $ - ........................ ............... 24 LABOR ESCALATION 0.00% OF LINE 23 ................. ................... = $ 25 TOTAL LABOR (LINES 23 & 24) ....................... ................... ................. ................... = $ - 26 PERMIT FEE _ ............. ................... ................. ...... 27 ENGINEERING LAYOUT ....... ................. ................... = $ 28 AS BUILT DRAWINGS = $ - 29 SITE VEHICLE - . 0.00% OF LINE 12 ................. ................... = $ - 30 TOTAL COST (LINES 7, & 25-29) ....................... ................... ................. ................... = $ 83.64 31 OVERHEAD�� = $ 4.1 ................... ................. ................... 32 - LINES 30 & 31 = $ 87.82 33 o PROFIT = $ 4.18 ................. ................... ........... 34 - A (LINES 32 & 33) ....................... ................... ................. ............... ... = $ 92.00 35 ° BOND =........ ................. ........... ....... ................. ................... 36 °AT TOTAL (LINES 34 & 35) .......... ................... = $ 98.27 ........... Patrick, Power Corp. PRO"OSEDCHANGE ORDER No. PPCO I I R1 5691 N.E. 14th Avenue Phone: 954-491-7745 Ft. Lauderdale,, Fl. 33334 Fax: 954-772-2126 TITLE:Duress Alarm in Courtroom 'A' DATE:4/6/2006 4 PROJECT:Freeman Justice Center (FJC) JOB: 0417 0-2T TO: Attn: John S. Chandler CONTRACT NO:0417-0 1" The Tower Group, Inc. 302 Fleming St. (Jobsite Trailer) Key West, FI, 33040 A, Phone: (305) 296-2521 Fax: (305) 296-2587 I I�-""I RE: RFI To: GA From: TTG Number: 00165 DESCRIPTION OF PROPOSAL Proposed Change Order(PCO)#PPC0 I I-R I addresses the cost to furnish a duress alarm in Courtroom'A'added by the Architect's response to Rrl 9165. PCO#PPCO I I-R I revises and supersedes PCO 4PPC0 11,which was rejected for missing a copy of the "Quotes" referenced in the Proposal Request Summary. A copy of the quote is included in PCO 9PPCO I I-R 1. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Andount Net Aniount 00001 Add Duress Alarm in 1.000 Ls $1,563.99 0.00% $0.00 $1,563.99 Courtroom'A'per RF1 9165 Unit Cost: $1,563.99 Unit Tax: $0.00 Unit Total: $1,563.99 Subtotal: $1,563.99 Description Markup Pereent Markup Amount Overhead 5.000% $78.20 Profit 5.000% $78.20 Sales "Tax $58A4 Total Cost: $1,778.53 By: By: Ivan Casamayor John S. Chandler Date: Date: F"p dition(!,) pc) WER CORPORATION, FACSIMILE TRANSMITTAL SHEET TO johil Chand1cr FROM I:vajj Casarmyor P.P.C. COMI'ANY. rsATF. The Towcr Group 4/6/2006 PAX NUMBLK NO (:jr?A(-irl.0 JNFlJlrjlN(,covroi: (305) 296 2587 PHONE NLIrArkr-k Tlrrj;jtl;.NCl;�NOMR10t —(305) 296 2521 TlF.Frinl;-N(J,'N11MIWit: XF; X El FOR Ri:vir-w El VLLASC- REPLY 0 NOTFS/C.OMMFNTS. PA l'it I C K pc)W L'R 1:0 R 110 R A I I N. 5 6')l NC 1 4 1 A 0 A I K, Fl 133 PRONPi (054) 491 7745 FAX: (I)S4) 491 04SS i- T A pCD qr_p Cp ':0 1 617t7sn- PATRICK Electrical Contractors and Engineers COMMEPCIA L INSTI T U TIONA L a INDUSTRIAL Deceniher 2ld 2005 The Tower Croup Mr, John Chwidler 405 SW 1481h Avenue, Suite i Davie, Florida, 33325 Ref ]N rccnuan Justicc Ccntcr--RF1 #1G5 Subject: Cost Proposal—Duress Alarm PROPOSAL After carefully reviewing the changes at the Court boom"A" on drawing E1.03 (Power Second Floor flan), there was a cost impact found on our scope of work as a char6;, for the amount o $1__1778._53 Our proposal is good for 30 days or until conditions change. An example of change on conditions will be pouring of the slabs. L aVout, Coring, Cutt, v and Patching has not been included in our Proposal._ Please contact me if 1 can be of any further assistorice. Sincerely, Iva ttsa ayor eject Masnager cc: Michael J. Driscoll, PPC Jose Clausell. PPC, 5 U 1 NX. 14th Avenue - Fort LaUderdele, Florida 3 34 Telaphnne (9 41 491-7745 g, Facsimile: (9541 77 m21 s I.. dam cz pATRICK POWER CORP. ELECTRICAL CONTRACTORS & ENGINECRS 5�691 N.E 94thAve PHONE (`�54) 49�.-7745 FORT LAUDERDALE, FL 33334 FAX PROP®GAL RE®.UEGT G1�1�9�ARY _� TO: THE TOWER GROUP DATE: 1 2/2/2005 405 SW 148th Avenue Suite 1 pKx )j xC c, Freeman Justice Center Davie Florida- 33325 OUR JOB#: 04-007 ATTENTION, JOHN CHANDLER REQUEST#: RFI #165 REQUEST DESCRIPTION: DURESS ALARM 1 MATERIAL ................. _ $ 186.51 2 FREIGHT CARRIER .. ....I......._..... = 3 WASTE FACTOR 2.00% OF LINE 1 .......... ................... _ $ 3.73 4 STORAGE FEE ............. ................. ................... ................. ................... _ 5 QUOTES ................ ............. ........I.......... _ $ 585.00 6 EQUIPMENT RENTAL . ................. ................... 7 TOTAL (LINES 1-6) .................... .... _ $ 775.24 8 FLORIDA SALES TAX 7.50% 1 OF LINE 7 ................. ................... = $ 58.14 9 TOTAL (LINES 7 & 6) - 833 .38 ................. . 10 SERVICE CHARGE OF LINE 9 = $ 11 TOTAL MATERIAL (LINES 9 & 10)............... .......... ................. ................... _ $ 833.38 12 LABOR HOURS STRAIGHT TIME 14.30 HOURS @ $46.00 RATE _ $ 643.50 13 LABOR HOURS OVERTIME HOURS @ $62.32 RATE _ $ 14 FOREMAN HRS'STRAIGHT TIME 2.15 HOURS @ $55.00 RATE _ $ 118.25 15 FOREMAN HOURS OVERTIME HOURS @ $76.41 RATE _ $ - 16 PROJECT MANAGERS HOURS 0.36 HOURS @ $75.00 RATE _ $ 27.00 17 WAREHOUSEMAN HOURS HOURS @ RATE _ $ 18 EQUIPMENT OPERATOR HRS HOURS @ RATE _ $ - 19 TOTAL(LINES 12-18) .......... .......... I............... .._.............. ................... _ $ 788.75 20 TESTING & CLEANUP 0.00% OF LINE 19 ......._........ ......._.... ..._ _ $ - 21 LOST TIME FACTOR 0.00% OF LINE 19 ...... . ....... ......_........... _ $ - 22 TOOL REPLACEMENT 0,00% OF LINE 19 .....-.-.. _ $ - 23 TOTAL (LINES 19-22) _. _ $ 788.75 24 LABOR ESCALATION ... .._._. 0.00% OF LINE 23 ..............._ ... _ $ - 25 TOTAL LABOR (LINES 23 & 24) ............... ....... ...I........ ...... ............... . ...... ...... ..... _ $ 788.75 26 PERMIT FEE - -- _ 27 ENGINEERING LAYOUT = $ ....................... ................... ... . 28 AS BUILT DRAWINGS __. _ $ 29 SITE VEHICLE 0.00%0 OF LINE 12 ................. ................... _ $ 30 TOTAL COST (LINES 7, & 25-29) .. ...... ..... ....._ ........ .......... . .... .. .... .. ...... ..... .. .. _ $ 1,563.99 31 ° OVERHEAD = $ 78.20 32 - (LINES 30 & 31) ..... ..... _ $ 1,642.19 ....................... .............. 33 o PROFIT = $ 78.20 34 - (LINES 32 & 33 ..... ... . _ $ 1,720.39 35 o BOND $ 36 TOTAL(LINES 34 &35) ................. _ $ 1,778.53 Ivan Casamayor \�1 ® l -7 From Louis Sorrentino(sorrentino@a navarrosecurity.corn] Sent: Tuesday, November 22, 2005 5:10 PM To: icasamayor@patrickpowercorp,com As request: Freeman Justice Building, Monroe County Florida Additional Wire Drop and Wre Run for(1)additional Duress button based on 130 feet as requested $585.00 Louis Sorrentino, Director Navarro Technical Services Inc. (954) 581-1516 Internal Virus Database is out-ol'-date. Chcckcd by AVG free Edition. Version: 7.1.362/Vinis Database'267.12.5/147 -Rele2se Data: 1 0/2 4120 0 5 l PIR 11 � V (�1 7rlr The Tourer Group, Inc. vita`d �-r3S2 962 SQE oJ_ SSt7OT6t t7S6 9dd:wo -d zT :80 9002-90-ddU Patrick PowerCorp. PROPOSED CHANGE ORDER'. No. PPCO12 5691 N.F. 14111 Avenue Phone: 954-491-7745 Ft. Lauderdale,,, 1'1 33334 Fax: 954--772-2126 TITLE: Cud's in Rn1's 2005 fir. 2028 DATE: 11/22/2005 PROJECT:Freeman Justice Center (FJC) JOB: 0417 ._ CONTRACT NO:0417 TO: Attn: John S. Chandler 04 The Tower Group, Inc. F ) ' 302 Fleming St. (Jobsite "l,railer) _- Key West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 RE: COR To: MCCM From: TTG Number: 00020-R1 DESCRIPTION OF PROPOSAL Proposed Change Order(PCO)11PPC012 addresses the costs to incorporate the changes to the scope of work for the telephone system in Room 92005, Senior Deputy, and Room 92028, Deputy Court Administrator, included in the post bid revision to Contract Drawing 14E 1.03. Item Description Stocic# Quantity units Unit Price Tax Rate Tax Amount Net Amount 00001 Telephone System Changes in 1.000 LS $2,170.64 0.00% $0.00 $2,170.64 the Senior Deputy Room (#2005)and the Deputy Court Administrator Room(#2028) Unit Cost: $2,170.64 Unit Tax: $0.00 Unit Total: $2,170.64 Subtotal: $2,1.70.64 Description Markup Percent Markup Amount Overhead 5.000% $10 8.5 3 Profit 5.000% $108.53 Sales Tax $31.73 Total Cost: $2,4t9.43 Ivan Casamayo7 John S. Chandler Date: Date: E,pediti o Pe PATRICK POWER CORP, Electrical Contractors and Engineers COty MEPC1A L - INSTITUTIONAL I NDUSTRIA L November 22nd 2005 The Tower Group Mr. John Chandler 405 SW 1481h Avenue, Suite 1 Davie, Florida, 33325 Ref: Freeman Justice Center Subject: Cost Proposal —Telephone Conduits. PROPOSAL After carefully reviewing the changes in the telephone system at the Senior Deputy Room and Deputy Court Administration on drawing E1.03 (Power Second Floor Plan), there was a cost impact found on our scope of work as a charge for the amount o$2,422.6.1 Our proposal is good for 30 days or until conditions change. An example of change on conditions will be pouring of the slabs. Layout, Coring, Cutting and Patching has not been included in our proposal. Please contact me if I can be of any further assistance. Sincerely, ("Z-- Ivan samayori Project Manager V cc: Michael J. Driscoll, PPC 2�Jv� Jose Clausell, PPC The Tower Group, Inc, 5691 N.E. 14th Avenue Fort Lauderdale, Florida 33334 .l..elephone (954) 491-774 a e Facsimile: (954) 72- 1 6 PATRICK POWER CORP. `f�� Ar ? o Qua ELECTRICAL CONTRACTORS & ENGINEERS 5691 N.E 14th Ave PHONE (954) 491-7745 FORT LAUDERDALE, FL 33334 FAX (954) 772-2126 PROPOSAL REQUEST SUMMARY -- TO: THE TOWER GROUP DATE: 11/21/2005 405 SW 148th Avenue Suite 1 PROJECT: Freeman Justice Center Davie Florida - 33325 OUR JOB #: 04-007 ATTENTION: JOHN CHANDLER REQUEST #: REQUEST DESCRIPTION: TELEPHONE CONDUITS 1 MATERIAL ............... ............... ................ ................................. ... ............. _ $ 14:79 2 FREIGHT CARRIER ............ ................ ................................. ................. 3 WASTE FACTOR ............ 2.00% OF LINE 1 ................ ................. _ $ 8.30 4 STORAGE FEE ............... ................ ................................. ................. _ 5 QUOTES ............... ................ ...............................I. ........... ...... _ $ - 6 EQUIPMENT RENTAL ............... ................ ................................. .......... _ 7 TOTAL (LINES 1-6) = 8 FLORIDA SALES TAX ............ 7.50% OF LINE 7 ................ ................. _ $ 31.73 9 TOTAL (LINES 7 & 8) ............ .............. ................................. ................. _ $ 454.82 10 SERVICE CHARGE —= OF LINE 9 ................ ................. _ $ - 11 TOTAL MATERIAL (LINES 9 &.1.0)................. ................................. ................. _ $ 454.82 12 LABOR HOURS STRAIGHT TIME 31.70 HOURS @ $45.00 RATE _ $ 1,426.50 13 LABOR HOURS OVERTIME HOURS @ $62.32 RATE _ $ - 14 FOREMAN HRS STRAIGHT TIME 4.76 HOURS @ $55.00 RATE _ $ 261.80 15 FOREMAN HOURS OVERTIME HOURS @ $76.41 RATE _ $ - 16 PROJECT MANAGERS HOURS 0.79 HOURS @ $75.00 RATE _ $ 59.25 17 WAREHOUSEMAN HOURS HOURS @ RATE _ $ -. 18 EQUIPMENT OPERATOR HRS HOURS @ RATE _ $ - 19 TOTAL (LINES 12-18) _ _ $ 1,747.55 20 TESTING & CLEANUP ............ _ 0.00% OF LINE 19 ................ ................. _ $ - 21 LOST TIME FACTOR ............ 0.00% OF LINE 19 ................ ................. _ $ - 22 TOOL REPLACEMENT 0.00% OF LINE 19 ................ I................ _ $ - 23 TOTAL (LINES 19-22) ..................... .... _ $ 1,747.55 ....................................... ............. 24 LABOR ESCALATION ............ 0.00% OF LINE 23 ................ ...........I..... _ $ - 25 TOTAL LABOR (LINES 23 &24).................... ................................. ................. _ $ 1,747.55 26 PERMIT FEE ......... ................ ................................. ................. _ 27 ENGINEERING LAYOUT ........ ............. ................................. ................. _ $ - 28 AS BUILT DRAWINGS ............... ................ ............................. _ $ 29 SITE VEHICLE ......... 0.00% OF LINE 12 ................ .............. .. _ 30 TOTAL COST (LINES 11, & 25-29)................. ................................2.1 170, 31 5.00% OVERHEAD ...................... ................................. ...fob,. y. _ $ -- 4-8--#z-- 32 SUB-TOTAL (LINES 30 & 31) ...................... ..... ...... _ $ -ate 33 5.00% PROFIT f e��.,. - $ '�`r` 34 SUB-TOTAL (LINES 32 & 33) ...................... ................................ .��. �. _ $ _222. 35 0.00% BOND ............... .. ............. ... _ $ 36 QUOTATION TOTAL (LIMES 34 & 35) � .... a ............ 1. `. _ $ IJQIG IVVY fJ Guv Freeman JUstice Center 04-007 Various Changes Tirne : 10:29AM Page : 1 �u.�i£Y.�'Z."tu....::�:.;n.^d....'r...R.:k§..._6.h ,.ry:Z.'^'...- _m�ti.::i.sii bM _..•..i:i.y-m:Tif_.. �:z"{&.'2.:.eS4'§':..dJfc:4.a,~r't.'�",�d'.�.ih�.}.stCY'G"SJ-�'_,.-.�'r"3S::cL'+IS'iiL..a:.::A.'^a.ask.i.�i-`. 3k_aIl n_n kCw�.l3skL1"zvTia_�..?.-�Y'!.:i....t2'3�A:.-m��.^.�iffi`.^e3.3"��b°Tn{SN�.,...a".E�'.23Ua�3_�-;"it <Telephone Conduits> - --- — -- ----- �- �Tofal Hours Desch lion Qt_ U ,Net Labor U Total Mat 8 -- L ----. ---- 6 20 C � 311 32 O -- 17.98; P Y 1 3/4" EMT CONDUIT 290'C 107.35 i 3/4" EMT DC SS CPLG 36 C - _86.40 -- ----31.101 216 3.21 0 48' __ _ 12.00 --- - _-- -- � 32.04 C ----- -- l 2 3/4' EMT DC SS CONN 4'C 80-30 4 3/4' EMT 1-H STEEL STRAP 36!C ( ?— 5.00 C 11.53 1.80 - ( ) M 99.30'' 0 00 M i 31 68 0.00 5 1/4" POLYROPE M -- 319�, — __- --_ :... 6 4x2 1/6" SO BOX COMB KO 2,C 636.01 , 35-00 C ! 12.72 0.70 -- -------7 4" SO BLANK COVER 2 C 148.49 49: 9.00 -- - 0.18 8 4 11/16" SO 1G PLSTR RING 5/8" F 2 C ! 333.04 2000 CT - 6.66 , , - - _ 0.40 g #10x1 F/H SELF TAP SCREW 40 C 8.99 20.00 C ! 3.60 8 00 Totals ? 414 79; 31.70 Monroe County <cic l€ales D€.fel0,PMent AUG16 2066 PECFFVED IVA.N CASAMAYOR The ' o er Group, In,. ( ANGE ORDER REQUEST 302 Flemin< St. N®. 00033 (Jobsite Trailer) Phone: (305)296-2521 on,oc-county Key West FI, 33040 Fax: (305)296-2587 rcaolglti€s ,,,p __x TITLE: Cabinetry Changes &Door Capitols DATE: 5/11/2006 AUG16 200 PROJECT:Freeman Justice Center (FJC) JOB: 0417 T1ME: _____ _ RECENED BY: — TO: Attn: Clark Briggs CONTRACT NO: --T - Monroe County Facilities Development 1100 Simonton Street -[1 ,�9 �Ot✓ Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 X RE: PCO To: TTG From: BMI Number: BMI007 DESCRIPTION OF PROPOSAL Change Order Request(COR)833 addresses the additional costs to widen the cabinets at the sinks in the Hearing Rooms, Jury Rooms and Grand Jury Room to meet the "Forward Reach" criteria of the ADA Standards,rather than the "Side Reach" criteria, which would limit accessibility to the sinks(Reference Figure 5 and Figure 6 of 28 CPR Part 36, respectively, attached). In addition, COR 933 addresses the additional costs to furnish and install a "Capitol" style frame at the door head instead of the standard door frame. The costs for COR 03 are based on four proposals by Baron Manufacturing(copy attached). COR 1133 requests a Contract Price hicrease of$14,070.00 and a Contract Time Extension of 0 days to furnish the additional work outlined above. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Modify cabinets for Hearing 1.000 LS $1,980.00 0.00% $0.00 $1,980.00 Rooms:/11021,91048,82018 &It2033:to accommodate ADA requirements for forward reach rather than side reach. 00002 Modify cabinets for Jury 1.000 Ls $4,456.00 0.00% $0.00 $4,456.00 Rooms:#1022,#1030,#1039, 111047,t12019&112034:to accommodate ADA requirements for forward reach rater flan sae 00003 Modify cabinets for Grand Jury 1.000 Ls $1,486.00 0.00% $0.00 $1,486.00 Room,112.020,to accommodate ADA requirements for forward reach rather than side reach. 00004 Add Capitol at each of six(6) 1.000 I S $5,478.00 0.00% $0.00 $5,478,00 Courtroom Entry Doors Unit Cost: $13,400.00 Unit Tax: $0.00 Unit Total: $13,400.00 Subtotal: $13,400.00 Description Markup Percent Markup Amount Profit 5.000% $670.00 Total Cost: $14,070.00 Department ®f Justice Pt. 36,App. 4.3 Accessible Route Mom oe County Pment G tlr R . QED : �. 48 1220 (a) Nigh Forward Reach Urnit 08 z 48 1220 48 1220 NOTE:x shall be<25 in(635 mm);z shall be>x When x C 20 In(510 mm),then y shall be 48 in(1220 mrn)maximum. When x Is 20 to 23 in(510 to 635 mm),then y shall be 44 In(1120 mm)maximum. (b) ttlmum Forward Reach over an Obstruction Mg. 5 F'omwd Reach 18 509 Pt. 36,App.A 28 CFR Ch. 1 (7-1- 4 Edition) 4.3.7 Slope 10 max 30 255 Sjt f; .............. 10 max 3 255 reo • Clear Floor Space(a)Parallel Approach High and Low (b) Ski, C�aur?fy erg i �s Develop r en AUG 6N ✓� RECENED BY:-----, (c) MaArnum Side Reach over Obstruction Fig.6 Side Reach 4.3.7 Slope.An accessible route wills a ramp, ramp, elevator, or platform lift (as per-alit- running slope greater than 1:20 is a ramp and ted in 4.1.3 and 4.1.6)shall be provided that shall comply with 4.8. Nowhere shall the cross complies with 4.7, 4.8, 4.10,or 4.11, respec- slope of an accessible route exceed 1:50. lively.An accessible route does not include stairs, steps, or escalators.See definition of 4.3.8 Chmiges in Levels. Changes in levels "egress,means of in 3.5. along an accessible route shall comply with 4.5.2.If an accessible route has changes in 4.3.9 Doors. Doors along an accessible route level greater than 1/2 in (13 nun),then a curb shall comply with 4.13. ---- 19 510 Baron Manufacturing -nc. Ei POSER CHANGE ORDER No. BMI007 3001 NW 16th Terrace Phone: 954-590-3800 Pompano Beach,Fl, 33064-1407 Fax: 954-590-3863 TITLE:Add on/Hearing Rms#1021,1048,2018 & DATE:4/13/2006 PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Gregory F. Galmin CONTRACT '' „ ` L0 � The Tower Group, Inc. 405 Southwest 148th Avenue Davie Florida 33325 ,jat, Phone: 954-476-3200 Fax: 954-474-3111 RE: PCO To: TTG From: BMI Number: BMI007 DESCRIPTION OF PROPOSAL € onroe CountyFacifliles Development Add on to modify cabinets at hearing Rooms 91021, 1048,2018 &2033 drawing#t2.0 per meeting on 4/7/06 New-4@ 34"Hx 34"W base cabinets RECEIVED BY: Product: $1800.00 5%O/H: 90.00 5% Porf: 90.00 Total: $1980.00 Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 4@ 34"H x 34"W base cabinets 1.000 LS $1,800.00 0.00% $0.00 $1,800.00 00002 Overhead 1.000 5% $90.00 0.00% $0.00 $90.00 00003 Profit 1.000 5% $90.00 0.00% $(00 $90.00 Unit Cost: $1,980.00 Unit Tax: $0.00 Unit Total: S1,980.00 By: By: Tarek Rihan Gregory F. Galmin Date: Date: rl"J dit""'c> 06/13/2006 12:23 954-590--3863 BARON MANUFAC'FURING PAGE 05 BARON _V-A-11- 7 MANUFACTURING Phone: 954-590-3800 / Fax. 954-590-3863 3001 MV 10b TERRACE, POMPANO BEACH, FL, 33064-1407 CT-ViNGE ORDER NO. 10 Memo Monroe County Facilities Devolopment To- The Tower G-oup Inc,,John Chandler AU Phom I Fax- (305)296-2521 /(305)296-2587 From: Tarek Rihan WE DOWN 0411312006 QECEIVED ------- R'Q! Freemen Juske Center, Headrig Rooms#1021, 1048, 2018&2033 Attached is our add price to mcidify cabinets at Hearing Rooms#1021, 1W,2018 2033 drawing#2.0 per meeting on 04/07106 for the above referenced project. I- New 4 EA. 34" N.X 3.,1"W. Base Cabinets, Manufactured Product $ 1,800-00 Overhead @ 5% $ 90.00 Profit @ 5% 90.00 Tolml Change Order S 1,980.00 If you have any further questions please call me at your earliest convenience. Baron Manufacturers Tarek M Rihan V. P. Estimating&Engineering a Page I Baronc ri ac. PI' 'POSED CHANGE ANGE ORDER . BMI008 onroe county 3001 NW 16th Terrace Phone: 954-590-3800 Far€"Ves D,,,vC'I0P ent Pompano Beach, 11, 33064-1407 Fax: 954-590-3863 TITLE:Add on/Jury Rms/1022,1047,1030,1039 DATE:4/13/2006 A I J G 6 2'3'S TIME: e� PROJECT:Freeman Justice Center (FJC) JOB: 0417 RECE F � , TO: Attn: Gregory F. Gallnin CONTRACT NO:0417-013 The Tower Group, Inc. tn1 `y�1i�' 405 Southwest 148th Avenue Davie, Florida 33325 Phone: 954-476-3200 Fax: 954-474-3111 �� RE: PCO To: TTG From: BMI Number: BMI008 DESCRIPTION OF PROPOSAL Add on price to modify cabinets at Jry Rooms 91022,1047,1030,1039,2019,2034 per drawing 93.0 per mecting on 4/7/06 for FJC. New-6@ 34"Hx 34"W base cabinets New-6@ 34"Hx 17" W base cabinets Product: $4050.00 5% O/H: 203.00 5% Prof: 203.00 Total $4456.00 Item ' Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 New-6 @ 34"Hx 36"W base 1.000 LS $4,050.00 0.00% $0.00 $4,050.00 cabinets,New-6 a 34"14 x 17W base cabinets 00002 Overhead L000 5% $203.00 0.00% $0.00 $203.00` " 00003 PF011t 1.000 5% $203.00 0.001yo $0.00 $203M Unit Cost: $4,456.00 Unit Tax: $0.00 Unit Total: $45456.00 �4 By: By: Tarek Rihan Gregory F. Galmin Date: Date: Expedition O 04/13/2000 12:23 954-590-3GS3 BARD-] MN-IUFACTURING PAGE 06 BARON MANUFACTURING PhDne: 954-590-3800 / Fax: 954-590-3863 3001 ,NW lVhTERRACE, POMPANO BEACH, FL, 33064-1407 CHANGEORDF,RNC. 1), Monroe County, r"I('Ifftfos L)'v"OrMent AUGI Memo TO. The Tower G-coup Inc.,John Chandler Phone/Fax (305)296-25.111(305)296-2587 From: Tarek Rihan Date: 04/13/2006 Re: Freemen Justice Center,Jury Rooms*1022, 1047, 1030, 1039, 2019&2034 Attached is our add price to mcclify cabinets at Jury Rooms 1022, 1047, 1030, 1039,2019&2034 drawing#3.0 per meeting on 04107/06 for the above referenced project 1- New 6 EA. 34" H. X 34'"W. Base Cabinets. 2- New 6 EA, 34"H.X 1;:"W. Base Cabinets, Manufactured Product $ 4,050.00 Overhead @ 5% $ 203.00 Profit @ 5% L-2-03-00 Total Change Order $ 4,456.00 If you have any further questions please call me at your earliest convenience_ BaronManufacturers Tarek M Rihan V. P. Estimating&Engineering a pnel Baront i g -ne. PT POSED CHANGE ORDER No. B I010 3001 NW 16th Terrace Phone: 954-590-3800 Pompano Beach, FL 33064-1407 Fax: 954-590-3863 TITLE:Add on/Grand Jury Room 42020 DATE:4/13/2006 PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Gregory F. Galmin CONTRACT NO r a7F 013 . g Y ��-� The Tower Group, Inc. 405 Southwest 148th Avenue Davie, Florida 33325 I l 1 Phone: 954-476-3200 Fax: 954-474-3111 RE: PCO To: TTG From: BMI Number: 13MI010 DESCRIPTION OF PROPOSAL Monroe County Add on price to modify cabinets at Grand Jury Room 42020 -drawing 910.0 per meeting on 4/7/06 for Ig ales Development I- 34H04W base cabinet AUG g #( 2uj 2- 34Hx28W base cabinets TIME: RECENED Product: $1350.00 5%O/H: 68.00 5%Prof: 68.00 Total: $1486.00 Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 1-34"Hx 34"W base cabinet, 1.000 Ls $1,350.00 0.00% $0.00 $1,350.00 2-34"PI x 28"W base cabinets 00002 Profit 1.000 5% $68.00 0.00% $0.00 $68.00&7 YU. 00003 overhead 1.000 5% $68.00 0.00% $0.00 $68,00 Unit Cost: $1,486.00 Unit Tax: $0.00 Unit Total: $1,486.00 I3y: By: Tarek Rihan Gregory F. Galmin Date: Date: Expedition OO 04/13/2006 12:23 954-590-3863 BARON MAHUFACTUR11,IG PAGE 08 BARON 10 MANUFACTURING Phone: 954-590-3800 / Fax: 954-590-3863 3001 NW 161h TERRACE, POMPANO BEACH, FL, 33064-1407 CHANGE ORDER NO. 13 Mlnme County Facilities De,9100ment A U G 2 0 do' Memo TIME: The Tower Group Inc.,John Chandler Phone I raw. (305)296-2521 /(305)296-2587 From Tarek Rihan Daw. 04/13/2006 Fla. Freeman Justice Center, Grand Jury Room#2020 Attached is our add price to mcdify cabinets at Grand Jury Room#2020 drawing#10.0 per meeting on 04/07/06 for the above referenced project. 1- New 1 EA- 34"H. X WW Base Cabinets. 2- New EA. 34"H. X 28"W. Base Cabinets. Manufactured Product $ 1,350.00 Overhead @ 5% $ 68.00 Profit @ 5% $ 68,0 Total Change Order $ 1,486.00 If you have any further questions please call me at your earliest convenience, Baron Manufacturers Tarek M Rihan V,P. Estimating&Engineering *p9ge 1 Baronc ri ,, 4 c. F )POSED CHANGE ORDER No. BM1011R1 3001 NW 16th"Terrace Phone: 954-590-3800 Monroe County Pompano Beach, FL 33064-1407 Fax: 954-590-3863 fac46ltles Development TITLE:Add on - Courtroom Entries DATE: 5/11/20 _(3 l PROJECT:Freeman Justice Center (FJC) JOB:TORECOVED : Attn: John S. Chandler CONTRACT NO: 0417-013 The Tower Group, Inc. 302 Fleming St. °- (Jobsite Trailer) Key West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 �� RE: PCO To: TTG From: BM1 Number: 13M1011 DESCRIPTION OF PROPOSAL Based on Baron Manufacturing Proposal dated May 11,2006 with corrections to mark-up. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Add Capitol at each of six(6) 1.000 LS $4,980.00 0 00% $0.00 $4,980.00 Courtroom Entry Doors Unit Cost: $4,980.00 Unit Tax: $0.00 Unit Total: $4,980.00 Subtotal: $4,980.00 Description Markup Percent Markup Amount Overhead 5.000% $249.00 Profit 5.000% $249.00 Total Cost: $5,478.00 By: By: Tarelc Rihan John S. Chandler Date: Date: BARON MANUFACTURING Ph,ne: 954-590-3800 / Fax: 954-590-3863 3001 NW JE,,h TERRACE, POMPANO BEACH, FL, 33064-1407 CHANGE ORDER NO. 14 A Monroe County '001fies r'o rr r ALI G 16 RECEIVED Tas The Tower Group Inc_, John Chandler phone/Fax (305)296-2521 /(305)296-2587 Frmnr. Tarek Rihan Dates 05/11/2006 ReK Freeman Justice Center,6 EA.Courtrooms Entry Attached is our add price to ad d a Capitol at 6 EA. Courtrooms Entry per your memo dated 05/09/06 for the above referenced project. 1- New 6 EA. Capitol ab(we courtrooms entry doors. Manufactured Product $ 4,980.00 Overhead Q 5% $ _-24"T 24q.C D Profit cQ 5% ---- 24� Total Change Order $ � � •aa��- If you have any further questions please call me at your earliest convenience. C'� 1� G� Baron Manufacturers Tarek M Rihan V. P. Estimating&Engineering a Page 1 MEM ORA JVD UM TO: Board of County Commissioners From: Debbie Frederick County Administrator Date: August 18, 2006 RE: Change Orders Attached is a proposed change order for The Tower Group, for the Freeman Justice Center. (Change Order #16 in the amount of $49,670.51 is to include reinforced concrete retaining wall and footer to resolve grade conflicts, furnish and install louvers to resolve grade conflicts, change scope of electrical work for fire and alarm system in Stair #1 and modify cabinets.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator intends to approve this change order on Monday, August 21, 2006. Debbie Frederick beputy County Administrator DLF:adc Page I of I Campo-Abra From: Campo-Abra Sent: Friday, August 18, 2006 12:49 PM To: County Commissioners and Aides Subject: Change Order Attachments: 00002271131.tif Please review the attached Tower Group Change Order 16 for The Freeman Justice Center. Akira Campo Sr,Administrative Assistant Office of County Administrator 1100 Simonton St, Suite 205 Key West, FL 33040 (305)292-4445 8/18/2006