23rd Change Order 11/09/2006
MONROE COUNTY / ENGINEERING /FACHXIUS DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 23 Freeman Justice Center Jackson Square INITIATION DATE: 11/02/06 Key West, FL CONTRACT DATE: June 16, 2004 TO CONTRACTOR: COR#48R1, and 62 The Tower GroTg,Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $13,804,000.00 Net change by previously authorized Change Orders ................................................ $1,179,849.29 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $14,983,849.29 The (Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order.................. $ 168,644.18 The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $15,152,493.47 The Contract Time will be (increased) (decreased),(_unchanged) by .................. ( ) N/A The date of Substantial Completion as of the date of this Change Order is ..................January 25, 2007 Detailed description of change order and justification: Modifications requested by the 16 Judicial Circuit to include: Laminate countertop in room►t3071 $3,140.50 Tile and floorina chances $157,473.00 The Tower Group Inc. 5% $8,030.68 Total $168,644.18 Chanae Order reflects a$440,000.00 credit from the oriainal scope of work. Change Order does not reflect the credit for deletno marble file partitions, $28,788.65, or the cost for the hardware and doors for the granite oarttons(to be determined). This Change Order is funded by the 16 Judicial Circuit This Change Order is 1.22%f the oriainal contract amount: Not valid until:signed by Owner. Construction Manager and Contractor ARCHITECT: N/A ate 19L CONTRACTOR: 11 7 G� The Tower Group Date DIRECTOR, FACILITIES DEVELOPMENT: b Je am Date COUNTY ENGINEER: David . Koppel,V E. Date COUNTY ADMINISTRATOR Thomas Willi/Debbie ederick-Deputy Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes❑ No If Yes, explanation: • Change Order was included in the original specifications. Yes® No❑ If Yes, explanation of increase in price: Modifications are requested by and will be funded by the I e Judicial Circuit. • Change Order exceeds$25,000 or 5% of contract price(whichever is greater). Yes❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes❑ No If no, explanation of why: The Architect is not required to approve Change Orders for the Freeman Justice Center. • Change Omer is correcting an error or omission in design document. Yes❑No Should a claim under the applicable professional liability policy be made? Yes❑ No Explain: 11/03/2006 FRI 1:34 FAA 3052923435 16th Jud Court Admin guuliulz D �yg MONROE COUNTY COURTHOUSE ANNEX SISTERNM UDICXIZ CIRCt j,of FL40MMA 50Z WHITEHEAD STREET cJ KLV WEST,WLOR 10A 33OA0 November 2 2006 TELEPHONE(305)Z9Z-3aZ3 ? SU Ncoms APA-z4a A TELEFAX (308)292-3435 Mr. David Koppel Monroe Monroe County Engineer 1100 Simonton Street Key West, FL 33040 Iti RE: Freeman Justice Center Dear Mr. Koppel: Please see attached Change Order Requests 00048R1 and 00062 with regards to the flooring and countertops for the Freeman Justice Center. The original scope of the work was $440,000, however,the court has made changes and we arc prepared to pay the difference_ Currently,the change order is for the flooring is $165.346.65. and it includes the scope of the granite toilet partitions,but does not include the credit,which is $29,798.65. It also does not include the hardware or doors for the toilet partitions. The Tower Group is currently seeking prices for these items and the Court wilt pay for tbern as well. The change order for the laminate countertop in lieu of granite is $3,447.41, and the Court will also pay for that change. I would have preferred to wait until the exact cost of everything was final before asking for your approval on the change orders, however, time is of the essence. It is my understanding that the elevator sills need to be set and the the needs to be ordered as soon as possible, so not to delay the project any further. The Court will use the existing Courthouse Facilities budget to field these change orders,and therefore there will be no additional cost to the Capital Fund. Based on the court's willing to rund these change orders, we would appreciate your verbal order to proceed with the new scope- Thank you for your attention to this matter. Please contact me if you need any additional information. Sincerely, 1 3�� Holly H. Elomina Administrative Services Manager cc: Richard G. Payne, Chicf Judge --� John Chandler, The Tower Group RQ TING 11/03/2006 FR1 1,34 FAX 3052923435 16th Jud Court Admin C OUL/u12 10/23/2006 16:00 FAX 954 370 5401 UNITED ENCINEGR[NG CORP. IM 001 FjThe Tower GMUP,I,w. 40i5 SW 148-Avenue,Suite One Do-Ac,Md"3= Ma" 9"-47"200 Faye 99�17431'f 1 �L : Fax Me o TOWER GROUP To: 16th Juftiary Circuit of Florida Front John Chander Artn- Hotly Elomhla TOUF 3e(954)476-3200/(9%)474-3111 Race (305)292-3435 Page : 6 Phone: (305)292-W3 Doat= October 23,2006 Re: Freeman Jusum Center(FJC) CM TTG/MO(COR-62).FF(COR-02) 0417-02374 Ubmect:P/L Gaur►t an ❑ wont ❑ For Review ❑ Please Canunent 13 Please Reply 17 Please Recycle • 6oenmenta: Dcar Holly. Please fmd attached proposal for the plastic laminate countertop in Room #3071, COR #620 tlmt I'm submitting to Facilities Developromt. I received the balcony tile information from A ette Smith today and forwarded. it W Stone To Go for pricing. As I noted previously, I have the credit proposal for deleting the marble toilet/urinal partitions, $28,788.65. Sbmm To Go's proposal,COR#48,includod the granite slabs and the installation of the new partitions, but excluded the hardware and doors. I cxpert to have the har`dwaTc proposal by tomorrow. Then I'll get pricing for wood louvered doors that At the hardware. That should complete the scope of these changes. Sincerely, John Chandler,Project Manager 11/03/2006 FRI 1:34 FAX 3052923435 16th Jud Court AdMin g uusiulz 10/23/2006 16:00 FAX 954 370 5401 UNITED ENGINEERING C01M. @ 002 The Tower Group, Inc. TRANSAWffAL 405 SW 148 Mama No. 01589 6uito Ono Phone: (954)476-3200 Davie,FL 33325 Fax: (9$4)4'74-3111 PROJECT: Freeman Justice Center(FJC) DATE: 10/23/2006 TO-. Nlomoe County Facilities Development REF: Change Order Request#62 1100 Simonton Strcot P/L Countertop in the Key West,FL 33040 Jury Assembly Room ATTN.- Clark Briggs D Shp Dra A vet © A 89 SUbmiaad Dtte Ler D Your use ❑ AnmW as Noted 0 mom ❑ As nested ❑ Returned AR¢r Loan Chow Or&r U Review end Comment ❑ Resubmit 13 pwa ❑ &tbmit s tee ❑ Roc aped ❑ soed&nfi= 9 Attached ❑ Rawmed for Cwmdons IST Other: P 094 1❑ sqnraft Cover MW omd-"ivary 1E3 Due Daft- ITEM NO. COPIES DATE ITEM NUMBER REV.NO.DESC EMON STATUS 1 1 10/23/2001 COR 00062 Change Order Request#62-P/L.Cotmtartop NEW for the Imy Assembly Room(#3071) Remairks$ This Change Order Request works in conjunction with Change Order Request#49 for the eb=seg to the cwpetiug and file scope of work. 1 CC:TTG1M0(COR-62).FF(COR-62) Signed: C5AtfLOoidmaA 16Judciiary/H,E1ont= John Chandler BxpC"m 0 11/03/2006 FRI 1:35 FAX 3052923435 16th Jud Court Admin 9MA12 10/23/2006 16:00 FAX 954 370 5401 UNYTED ENGINEERING CORP. Z 003 The Tower Group, Inc. CHANCE ORDER REQUEST N0. U0062 405 SW 148 Avetrue Suite One Phone: (954)476-3200 Davie,FL 33325 Far, (954)474.3111 TITLE: F/L Countertop in Room#3071 DATE;10/23/2006 PROJECT:Freeman Justice Center(FJC) JOB: 0417 TO: Attu: Clark Suggs CONTRACT NO: 1 Monroe County Facilities Development 1100 Simonton Street Key West,FL 33040 Phone: (305)295-d306 Fax: (305)295-4321 RE: To: From: Number: DESCRIVnDN OF PROPOSAL This Change Order Request(COR)proposes to furnish and install tho plastic lamivato countertop for tha Jury Assembly Room shown on ABS Intct o Drawing#ID-6,dated 7n 1/06,,in lieu of the granite countertop shown on Ooawaalez Aroluteeft Drawing#kA1.03. Tko value of the,deleted work for the originally specified granite aomntertop is inoluded in the scope of the changes Addressed by Change Order Request 048. Height and depth of the plastic laminate counteitap will be at accordance with the Oetober 23,2006 response by A1?S Interiors to Project RE#255(copy attached). The value of the work is base,on]Baron MamLftenvipg Proposal#BNHO13(copy attached). The Tower Group proposes to implement these ebanges for an increase to the C=U ct Price of 33,447.41 aad no change to the Contract Time. Item Description Stock* Quantity Uodts Unit Price Tax Rate Tax Amount Net Amount 00001 Burntab A hu an P/L 1.000 LS $3,291.25 0,00% S0.00 S3.293.25 Courimmp In room#3071 per ASS InmKaw DmWing#1D-4 d"7/21106 Ote:BMI Pwpwal#BMW13 dated l0/9/0;6) SA/Q-S-z Unit Cost: 49ag"4 Unit Tax: $0.00 Unit Total: Subtotal: Description Markup Percent Markup Amount Profit 5.000% $164.16 15-1),0 3 Total Cost: 11/03/2006 FRI 1:35 FAI 3052923435 16th Jud Court Alain g0U5 m 10/23/2066 16:00 FAX 954 370 5401 UNITED 10GINEERING CORP. ! 004 13AROM MANUFACTUIUNG CUSn)M WOODWC)RKING 3001 NW�6(954)590.38a0 �dX (g5�4�59C-38684i4a7 CHANGE ORDER NO. 15 TO: The Tower arcupt Inc,—John Chandler Phone/Fa= 305-296-2521 Fax 305-296.2587 From! Howard Singcr Dates- oewbor 9,2005 Re: Freeman JughcI Center We are viewed to furnish,finiSh and install• the ,top Counter in roam 2071.(3 07 t)lury assembly room as per your email dated 13ctWbcr 6.2006 for the above ref�r�Ce¢ oo prQ7�L 'Installation 16,HR cQ 55.00 S 880.00 .��' Po 'Qvakead and Profit S 428.25 �r-5 Total Price for this Change Order s 4283.75 Price is goad for 30 days from above data. Baron Manufacturing Howard L Simer Project Manages 11/03/2006 FRI 1:35 FAX 3052923435 16th Jud Court Admin g oublm 10/23/2006 16:00 FAX 954 370 5401 UNITED ENGINEERING CORP. (a005 AES Interiors & Associates Inc. 62 SE 61'Avenue Delray Beach, Florida 33483 561•Z7B-9695-P 561.276-9678-F 10.23.08 Res once-addendum#1 to RFI#00255 Profct: Freeman Justice Center To; John Chandler Date: 10/23/06 The Tower Group, Inc. .lob: 0417/5000.86 405 SW 148 Avenu© -Suite One Davie, Florida 33325 Phone: 954-476-3200 Fax: 954-474-3111 Response: Depth of the counter located in the Jury Assembly Room#3071 Is 18"the height above flnlsh floor to be 29". By; AES Interiors &Associates Inc. 11/03,/2006 FRI 1.35 FAX 3052923435 16th Jud Court Admin 9007/012 CHANGE ORDER REQUEST The Tower Group, Inc. No. 0004SR1 405 SW 148 Avenue Suite One Phoney (954)476-3200 . Davie,FL 33325 Fax. (954)474-3111 TITLE: Stone Tide and Flooring Changes DATE; 10/19/2006 PROJECT:Freeman Justice Center(FJC) JOB: 0417 TO; Attn: Clark Briggs CONTRACT NO: 1 1vlonroe Country Facilities Development 1100 Simonton Street Key West, FI, 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 RE:PCO To: TTG From: STG Number: STGO02B DIPSCRIPTION OF PROPOSAL Chance Ordcr'Roqucst(COR)#48-R1 addresses the cost to furnish and install the revised scope of quarry stone,ceramic tile,VCT and carpeting work based on AES Drawings:ID-1 dated 7/21/06,III-2 dated 7/21/06,ID-3 dated 8/10/06, ID-4 dated 7/21/06, ID-5 dated 7/21106,TD-6 dated 7/21/06, iD27 dated 5/31106,ID-8 dated 7/21/06&ID-9 dated 7/19/06:in lieu of the original scope of VCT and car k6r18 work on the Gonzalez Architects Drawings. In accordance with a meeting with the quarry stone,ceramic tile, 16th Judiciary Circuit,COR IMS-R1 excludes the cost to furnish and install balcony floor file pending direction from the Interior Architect. COR#48-R1 'does not include the costs for any.'ofthe'other Interior finish changes shown on the above-referenced ID-series. COR 948-R1 also does not include the costs`for'the engineering,doors and hardware for the toilet partitions. COP,#48-RI is.proposed separately from tliese items because the slew quarry slon�tilt proposed on the above-referenced ID-series drawings,New Venetian Gold gironitc,has a 16 week lead tirnc. According to'the September 2006 Project Schedule Update,'quarry stone tile work is scheduled to begin in mid-lanuaty'7_007. Therefore,the New Venetian Gold granite must be ordered immediately to meet the schedule. Please process a Change Order in the amount of S 165,346.65 for this changed scope of work. Detailed breakdowns of our stone/carpeting subcontractors costs for the base scope of work and the revised scope of work are enclosed. Item Description Stool+;A Quantity ..Units Uuit Price ..,Tax Rate Tax Amount Net Amount 00001 Chan.s to Tile antl flooring 1.000 LS S157,d73.00 0.00% 30.0o 3157,473.00 Work per Swnc To Go PCO eSTG002T3 Unit Cost: $157,473.00 Unit Tax: $0.00 Unit Total: $157,473.00 Subtotal: $157,473.00 Description Markup Percent,Markup Amount Profit 5.000% $7,973.65 Total Cost: ___- 516a'246.65 11/03/2006 FRI 1,36 FAX 3052923435 16th Jud Court Admin g un/m Stone To Go PROPOSED CHANGE ORDER No. STGO02B 2322 East Oakland Park Blvd. Phone: 954-359-0800 Ft.L.auderdale.Fl. 33306 Fax: 954-31MS40 TITLE:Stone Tile & Carpet Changes DATE: 10/16/2006 PROJECT:Freeman Justice Center(FJC) JOB: 0417 TO: Attt1: John Chandler CONTRACT NO:0417-032 The Tower Group,Inc. 405 SW 148 Avcnuc Suite One Davie,FL 33375 Phone: (954) 476-3200 Fax: (954) 474-3111 RE:COR To: MCCM From: TTG Number: 00048R1 DESCRIPTION OF PROPOSAL Changcs to the scope of carpet,tile,and VCT•work bascd on Drawings: #ID-1 dated-7/21/06 #ID-2 dated 7/21/06 PID-3 dated 9/10/06 #ID4 dated 7121/06 #ID-5 dated 7/21/06 #ID-6 dated 5/31/06 AID-7 dated 7/21/06 , 9ID-8 dated W21/06 #113-9 dated 7/19/06 Notes: 1.24x24 New Venetian Gold Granitc tile is 3/4"thick,and 18xl8 New Venetian Gold Granite the is 1/2"thick 2.This proposal excludes balcony floor tile per 10/13/06 meeting with Holly P10.Mina of the 16th Iudiciary Circuit. Item Description 'Stocld' " Quantity Units Unit Pricc. Tas Rate Tax'AmouritT9et Eltaount 00001 Supply and install carpct 1.000 LS 5171,9fl0.00 0.00% S0,00 S171,900.00 00002 SUDDly and install VCf 1.000 Ls $&360.00 0.00% $0.00 S8,360.00 00003 supply and install porcelain the IMCI LS S11,004,00 0.00% 30.00 511,004.00 0000� Supply and install porcelain 1.000 LiS6,644,00 0.00% $0.00 $6,644,00 bay 00003 Supply and ln5tall 24:t24 11000 IS $2Z5,OOD.00 0.00% 50.00 5225,000.00 granitc floor the 00006 Supply and install 1808 1.000 l.S $75,000,00 0,00%'— SO.00 575.000.00 gnmitc will tile 00007 Supply and inst;+ll 4-24 granite 1.000 IS 533,625.00 0.00% $0.00 $38,625.OD oase tile ° $0,00 $24.800.00 00008 Supply and install granitc tcilct 1.000 LS $_4,800.00 O.DO/o partitions 1.004 LS S34,Cr40.00 0.00% 50.00 534,640A 00009 Supply and intwll custom 2r2nite counttrtops 50.04 SI,iO . 00010 Supply alto install flooring for 1.000 L4 $I,SOO.VO 0,00"/o Eicvator R3&15 00011 Dcduct for original scope of 1.000 LS (5440,000.00) 0.00°1 (b44o,o00.00) 1`:;,�+�,..50.00 wprk Unit Cost: $157,473.00 Unit Tax: $0.00 Unit Total: $157,473.00 11/03/2006 FRI 1:36 FAX 3052923435 IM Jud Court Admin tJuum ulz OCT-17- 0Q5. 15:43 FROM: 95R9740888 T0=32S6949774 P.2-'3 STONE TO GO . PROPOSAL STONE DESIGN FLOORING 2322 East Qakland Park Blvd. Fort Laudeidale, Florida Tel.954 35,$0800 Fax.954 3j8 0540 REVISED ON October 16 2006 Attention . John Chandler Cu5 outer: _ _ Pro ect Location. _4Ck5-51Y j 4$tt.►.rJ,x�lc:+ _. �'�L r:;r t1 =a hMSIx; Room Detall Carpet Supply and install: Carpet 2017=2033-2034 Per.pipns and Specifications 2036-2053.205.4 Glue down 2056-2058-2062-2063-2064 ' CPT-1 liManui'actor: Crooley Tandus Group 2066-2067-2068-2069-2076 Style:02591 Endhara/Color-Bonsai-Carpet file 2077-2079-2081-2082-2083 Privat$offices and courtrooms: Run M"onolithic 2084-2086-2089-2089-2090-2091 CPT=1A" Manu1aotor: Crossley Tandus Group 2008-20.16-20317 Style:62591 Endha«/Color Bonsai 00456 2061-2091-2051 Carpet Tile/Quarter Tirnin Corridors/Vest Only CPT-2 Manu4actor: Gros9ley Tandus Group 2003-2006-2010- Sty s 62667 Llano Firma Color 00827 Bonsai 2013= Judges Chambers CPT-3 Manufactor: Crossley Tandus Group 2004-2005-2011 style 11065 soie color 00827 Bonsal 2012-2021-2022-2043 Hearing Jury and Judges assisitant 2026-2029-2030 S17t,900.00 2039-2040-2047-204B Supply and Install: VCT" VCT1 VGT:Armstrong 51 VS/Brushed Sand 12 x 12 VG73 VGT:Armstrong 51869/Hurnus 12 x 12 Per p►pns and Specifications 1672 Squaro Feet $8,060.00 All Frit?ght includea 11/03/2006 FRI 1.36 FAX 3052923435 16th Jud Court Admin gulu/ulz :ICi-a7-2p06 13:43 30 FROM: 9549T4�96 TO' 55949774 P.3/3 STONE TO GO PROPOSAL STONE DESIGN FLOORING 2322 East Oakland Park Blvd. Fort Lauderdale, Florida Tel,954 358 0800 Fax, 954 Sig OS40 Continued C.-stomer- Pro eot L ion _. j. e`s3-M, .• , Tel"a'4�F��1d�1::�ix 354r ��'1� = �i•.'w '_• :. ��,�:.:�"__. =•'"x' c��'i ,eta � - T1 Supply and Install: Porcelain Tile Per Pll ins and SpRcifications Stone Peak Porcelain/Series/limestone 12'x.24• Colon Cream Gold 917 square Feet El 1,004.00 Base: Matching 3"x 12" 604 Linear Feet $6,644.00 Supply and Install: Granite: Now Venitlan Gold Per plens and specifications Flooro, 9000. Square.Feet 241,x 2411 S225,000.00 Walls 3000 Square Feet. 18`x 18" $75,000.00 Base 2576 Linear Feet 4"x 24': $M,625.00 Custom fabricated partitons/UrinaI&Toilet 310 Square feet $24,800.00 Custom Fabricated counter tops 433 Square Feet $34.640.00 All Didmond Out and Inserts Included Supply and Install; Elevators Manufactor:Roppe,Style 994 Raised Square t7c3igb/Color Fawn P140 Elevator#3 and#5 only 96 square feet $1,500.00 Transjstions Strips: Schluter Reno-TK1,4 Tile to Carpet 600 IinQar Feet Included/No Charger Supply and Install; Exterior Balconies/To Be Determined *To Be Determined* Per hltteeting @ Stone Deslgn Office on 10/13 Per Plans and Specifications 1380 Square Feet Total $597,473.00 Subrrutted By: Craig Carli , President Stone Design Flooring Stone To Go 11/03/2006 FRI 1:37 FAX 3052923435 16th Jud Court Admin gullrulz n o � O J � cc4 % aoojc� � o3 r G � GQOO, V v P o .J. ✓� R^�i C � S � o � +au � a o 0 0 � � C O G7 vz i •:i h .{sy N +H W � u., yq cp ses t+� aa..,CR# H � N N „ew csa9u1 t � 4.4464 c� dr � cz C Noc � � zO � E-- c < v C� ZQF fvv � C-4 u � � ... .. ^ �i tz! pO ILI 11iO3�/2006 FRI N7 FAX 3052923435 16th Jud Court Admin gulz/ulz z . a O U G` E c � rLQ75 rj - n _ cc - r Y,v Q� aCA Opp�Vn QP ci o P C♦ f �: n f- Q C.1 O- N ems: C„ as 1 O V .9 (y • _ r7 'E V � O CJ' vZ = to a ` � U � L r G z �• r 4 O C _ J � V w M C MEMORANDUM TO: Board of County Commissioners From: Thomas J.Willi County Administrator Date: November 8, 2oo6 RE: Change Order Attached is a proposed change order for The Tower Group, for the Freeman Justice Center. (Change Order *23 is for $168,644..18 for modifications requested by the i6th Judicial Circuit to include: laminated countertops, tile and floor changes.) This will be funded by the Sixteenth judicial Circuit Court According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator intends to approve this change order on Thursday, November 9, 2oo6. Thomas Ywilli County AdjMnistrator TJW:cac