Loading...
HomeMy WebLinkAbout30th Change Order 03/06/2007 MONROE COUNTY / ENGINEERING /FACILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 30 Freeman Justice Center Jackson Square INITIATION DATE: Various Key West, FL TO CONTRACTOR: CONTRACT DATE: June 16, 2004 The Tower Group, Inc. COR#34-R2; 37A; 42-R2; and 83 405 SW 148th Avenue Suite One Davie, FL 33325 The Contract is changed as follows: The original (Contract Sum)(Guaranteed Maximum Price) ........................................Net change b $13,804,000.00 g y previously authorized Change Orders ................................................ $ 1,965,299.30 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was ......... $15,769,299.30 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged) by this Change Order .... $ _ 64,879.50 The new(Contract Sum)(Guaranteed Maximum Price) including this Change Order is ... $JJ S73y /7go The Contract Time will be(increased) (decreased) unchan ed) by .................. The date of Substantial Completion as of the date of this Change Order is ........,.� ) N/A January 25, 2007 � Detailed description of change order and justification: Aluminuma ate and rilles at the arkin ara e Fire rated insulation for PVC sanita and drain i in Plenums aces throw h the HVAC return air 27 809.25 Resolve arade conflicts to the Parking lot 9 187.50 Powder-coated aluminum-guardrail and rab-rail 26 859.00 Total 1 023.75 This chang ie order is.411%of the on inal contract rice. Not valid until signed by Owner Construction Manager and Contractor ARCHITECT: N/A Date CONTRACTOR: The Tower Group 4 _ ate DIRECTOR, FACILITIES DEVELOPMENT: rry r Date COUNTY ENGINEER: Da S. ppel, P.E. Date COUNTY ADMINISTRATOR t / Thomas Willi/Debbie Frederick-Deputy (P ate I I I I i i i MEMORANDUM TO: Board of County Commissioners From: Thomas J. Willi County Administrator Date: March 2, 2007 RE: Change Orders Attached is a proposed change order for The Tower Group, for the Fr�` , �} Justice Center. (Change Order #30 in the amount of $7�0:�8 is or aluminum W 8�7q1 gate and grilles at the parking garage, fire rated insulation for PVC sanitary and drain piping through the HVAC return air plenum spaces, resolve grade conflicts to the parking lot, powder-coated aluminum guardrail and grab-rail.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator intends to approve this change order on Monday, March 5, 2007. Thomas J. Willi County Administrator TJW:adc rage i or i Campo-Abra From: Campo-Abra Sent: Friday,March 02,2007 3:28 PM To: County Commissioners and Aides Subject: Change Order Attachments: Change Order#30Tower Group.pdf For your review: Change Order#30 from the Tower Group for the Freeman Justice Center. Abra Campo Sr.Administrative Assistant Office of County Administrator 1100 Slmontnn St. Suite 205 Key We5t Ft 33040 (305)292-4445 3/2/2007 Thy Tower Group, Inc. CHANGE ORDER REQUEST 405 SW 148 Avenue No- 00037B su:le One Phone: (954)476-3200 Davie, FL 33325 Fax: (954)474-31 1 1 TITLE: Option 'B' - Garage Gate & Grilles DATE: U26/2007 PROJECT:Freeman Justice Center(FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT NO: 1 Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 2954306 Fax: (305) 295-4321 RE: EST To: TTG From: ATLMETAL Number: ATLM003 DESCRIPTION OF PROPOSAL Change Order Request(COR) 437B proposes to furnish and install powder-coated aluminum grilles and gate of standard color with vertical picket design as shown on the attached sketch in lieu of the design on CSA Drawing A3.00N(Re:COR#37A),complete with DoorKing 9050 gate opener and four(4)remote control operators. The cost for this Extra Work is S27,809.25. Lump Sum: $26,485.00 Lump Tax: $0.00 Lump Total: $26,485.00 Subtotal: $26,485.00 Description Markup Percent Markup Amount Profit 5.000% $1,324.25 Total Cost: $27,809.25 G'd L99Z-96Z-90C dnoan jamo i au i dal .cn jr) n7 11pr, Uwe- ATLANTIC AIIETALS _CZ.�l 003 56423rdq", Estimate �f4 Key West, R.33040 Office(305)293-1865 Number.E269 Fax(305)293-1862 SW To: _ Date: November 21,2006 f The Tower ro Gup, Ship To_--- fnc. 405 SW 148th Ave. Ste 1 Tim Clark Davie, FI. 33325 296-2521 Fax 296-2587 954 476 3200 Fax 954 474 3111, ea L—_— ---- ---- Freeman Justice Ctr Descrtption --`- - ----~--- ..`-� AS PER DRAWINGS TLAI+ITIC METALS- - __— — Amount MATERIALS: Frame 2'x 4"rec.tube Horizontals 1-x 2"channel Pickets 314"sq. tube Ail to be powder coated a standard color-s peciady colors additional charge lCustom fabricate and install double slkfe gate 23'-4" SupplY&insta'I two DooriGng 9050 gate° 12,650.00 electrc to gabs openers � with remotes-custoner to supptt, 5,600.00 Custom fabricate& install two aluminum wan panels PANEL ONE 13'-6 1/2"x 6'2" PANEL TWO 23-1 112"x 8'-2" 3,060.0fl Additional remotes$30.00%ach 5.175.00 Customer to supply perm(ts — _ ------------ $26,488A0 --- — 9-d L89Z-96Z-90£ dnoin iammm Aij, A,. .- _ •t-ice to • ■i-- I:•1�j■ • •. LJL- KIL LZ Lit- �i LAL tm -Cj wr s� F o $ �l g d L8SZ-96Z-90£ dnoin jamm a. _ .._ CHANGE ORDER OWNER Q REQUEST (COR) ARCHITECT CONTRACTOR ❑ FIELD ❑ THE OTHER ❑ TOWER GROUP PROJECT: FREEMAN JUSTICE CENTER COR NUMBER: 00042-R2 Jackson Square DATE: February 15, 2007 Key West, Florida CONTRACTOR PROJECT#: 0417 CONTRACTOR: The Tower Group, Inc. CONTRACT DATE: 6/16/2004 405 S.W 148th Avenue Suite# 1 : Davie, Florida 33325 DESCRIPTION OF CHANGE: Change Order Request(COR)#00042-R2 proposes to furnish and install fire-rated insulation on the PVC piping in the return air plenum spaces in order to meet Florida Building Code requirements. COR#00042-R2 supersedes COR#00042-RI in its entirety and proposes to perform this extra work for a Contract Price Increase of$9,187.50 based on the attached February 12, 2006 Proposal from Key's Acoustics Corp. We pro ose to change the Contract as follows: ITEM DESCRIPTION UNITS CITY. UNIT PRICE EXTENSION Furnish and install thermal ceramics, 1 Firemaster Plenumwrap, on all LS 1.00 $ 8,750.00 $ 8,750.00 exposed PVC piping in the return air plenum spaces. ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. .... ................................................. ....................................................................................................................................................................... .............................................. $ .. ................................................ $ - ........................................................................................................................................................................ ............................................ ................................................. $ .. ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... .............................................................................................. $ - $ - ......................................................................................................................................................................... .............................................................................................. $ - ........................................................................................................................................................................ ................................................................... .......................... Subtotal $ 8,750.00 Contractor Fee $ 437.50 Tax Total $ 9,187.50 2/15/2007 Page# 1 COR0042-R2-InsulatePVCinPlenum The Tower Group, Inc. 405 SW 148"'Avenue,Suite OneI ' 1 J Davie, Florida 33325Phone: 954-476-3200Fax:954-474-3111 ;TOWER GROUP To: Monroe County Facilities Development From: John Chandler Attn: Clark Briggs Tel/Fax:(954)476-3200/(954)474-3111 Fax: (305)295-432.1 Pages: 3 Phone: (305)295-4306 Date: February 15, 2007 Re: Freeman Justice Center(FJC) CC: TTG/MO(COR-42), FF(COR-42) 0417-02569 Subiect• Change Order Request 942-R2 ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle • Comments: Clark, Please find attached Change Order Request #42-R2 to furnish and install fire-rated insulation on the PVC piping in the return air plenum places. As you will recall, Monroe County offered a conditional approval of our previous COR for this work, #42-R1 (less lodging costs which were to be submitted separately after the work for reimbursement), and our subcontractor declined this condition. COR #42-R2 is based on a proposal from a local insulating contractor, which eliminates the lodging costs. Please approve this COR as soon as possible so we can insulate these pipes and close in the ceilings and proceed with millwork installation. Sincerely, Johp Chandler, Project Manager OUTING 0 0 kl,�I D lei- POO Key's Acoustics Corp. 17192 Marlin Drive Summerland Key, Fl 33042 phone: 305-745-9945 fax: 305-745-2888 February. 12, 2007 The Tower Group 405 SW 1481' Avenue Suite One Davie, F133325 Att: Mr. Timothy Clarke Proposal Re: Fleming Street Project Key West, Fl . Supply and install thermal ceramics, firemaster plenumwrap on all exposed PVC piping in all areas as directed. Cost of this project is: $8,750.00 Thank you for the opportunity. If you have any questions, please give me a call. Sincerel 14 Mike Scanlon Approved & Accepted - -- Post4r Fax(dote 7671 Date ftof �g�► To From Date CoJDept. Co. Phone li Phone =ax� Y 2'd L6S2962 t 01 8862SbLS02:T SJI1Snoob S Q)I WOt U WA7-T T L002-2T-833 HP OfficeJet 7210 Log for Personal Printer/Fax/Copier/Scanner The Tower Group 305-296-2587 Feb 15 2007 5:41 PM Last Transaction Date Time Type Identification Duration Pages Result Feb 15 5:40PM Fax Sent 3052954321 1:25 3 OK CHANGE ORDER OWNER El REQUEST (COR) ARCHITECT N,.�� �{ CONTRACTO �^f.�_l-i FIELDjz� [ ITHE OTHER 'TOWER GROUP PROJECT; FREEMAN JUSTICE CENTER CdA NUM'BEk I 4-Ri Jackson Square DATE: February 20, 2007 COUNTy Key West, Florida CONTRACTOR PROJECT#: 0417 MOLOPM FACILITIES E ES DEVELOPMENT CONTRACTOR: The Tower Group,Inc. CONTRACT DATE: 6/16/2004 405 S.W. 148th Avenue Suite# 1 FEB 2 0 2007 Davie, Florida 33325 TIME: RECEIVED BY: DESCRIPTION OF CHANGE: This Change Order Request(COR)addresses the changes to the parking lot to resolve grade conflicts that TTG first identified and made known to Monroe County Facilities Development(MCFD)and Gonzalez Architects (GA) via RFI #9, dated November 9, 2004. GA issued a revised Site Plan Drawing, #C-1 dated December 10, 2004, in response to RFI#9 but these revisions did not address the grade conflicts as outlined in TTG Letter#0417-00259, dated Dec. 28, 2004. GA had not yet provided a resolution at the time of their termination by the Monroe BOCC in October 2005. In December 2005,Currie Sowards Aguila Architects(CSA),the replacement Architect, issued drawings to resolve the grade conflicts: #SK-2 and#SK-2A for a proposed retaining wall(Re: COR#15), #SK-3 for a proposed wall to close in the parking garage exit(COR#16), and#A3.10 for proposed parking lot modifications and an added Swale. The Civil Engineer approved these changes in March 2006, and CSA issued Drawing#A2.00S in April 2006, compiling the above-referenced changes. TTG submitted COR#34 in September 2006, which MCFD disapproved for lacking credit for a deleted concrete basin. TTG submitted COR#34-R1 in October 2006, incorporating MCFD's comments from COR#34, which MCFD disapproved for lacking detailed breakdowns of the original and revised scopes of work. COR#34-R2 revises and supersedes COR#34 and COR#34-111, and incorporates all previous MCFD review comments. We pro ose to change the Contract as follows: ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION 1 Add 2 Nyplast Basins&20LF of 12" LS 1.0 $ 11,000.00 $ 11,000.00 �✓ ADS Pipe ......................................................................................................................................................................... ............................................ ................................................. 2 Delete 1 Concrete Basin EA. 1.0 $ (4000.00) $ (4 000.00) ...................................................................................................................-............ . . 3........ Add Modified Type'D'Curb LF .....350:0..... ..$......................1.8.50.. ..$...................6,475.00... .. ........................................................ 4 Add 4" Sidewalk SF 1,345.0 $ 9.00 $ 12,105.00 .................... ......................... . . . .........-..........I.............................. ...................................... ..................................I.............. $ ......................................................................................................................................................................... ............................................ ................................................. $ .. ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. ......................................................................................................................................................................... ............................................ ................................................. $ - ......................................................................................................................................................................... ............................................ ................................................. $ - ...................................... Subtotal $ 25,580.00 Contractor Fee $ 1,279.00 Tax Total $ 26,859.00 2/20/2007 Page#1 COR0034-R2-ParkingLotChanges 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 00000000v� v; oo 0 .° o �noo �, 0000 � 0000 00 kn kn o �r -• o kn �n W b4 69 69 69 tos 69 69 64 69 64 69 69 69 69 a o 00000000OOo a� 0 0 C) °O v, O o a � a o oo'0000cv. = 0000, A 11 CA'i riiM v> kn p 64 tr9 i 6A i 64 69� 69 64 64 Go-,it � � � 3 �•- ; N,M W !� � � dd�wdv� �lvswwfv� �j o w �wwwwwav�iaa�on, coo o ;o;o; o;o;o;o; O E-. O o.o :O O,O,O: :o 0 p a o o;o; o;o:o:o: :kn.o. w 69 ,64;GA,:6R,61 ;,4A. A:4 9,S: 69;69:64 69 y O :O:O: :O:O:O:O: :O O ci O ;O:O: :O:O:O:O; :O 0_4w 0 GOO,: ;CA:E04:69:64: .................... c.> - •--••- t- f- .f... .................. 00A:>• :coo:w;w:C/) O Q cd: Q Q.eq. Ai; a)'v'. ' CIS of w;w i 1. CHARLEY TOPPINO &SONS,INC. P.O-Box 767 KEY WEST,FLORIDA 33041 (305)29E-5606 FAX(MS)296-5189 Fax:296-2587 The Tower Group, Inc. FREEMAN JUSTICE CENTER 405 SW 148"'Ave.Suite One Protect#0405 Davie, Florida 33325 ATTN: TIM CLARK September 26,2005 SUBJECT. PROPOSAL FOR STORM SEWER WORK IN PARKING LOT Dear Tim; The purpose of this letter is to submit a proposal to install 2 NYLOPLAST basins in the parking lot area of the Freeman Justice Center SCOPE OF WORK: INSTALL 2 NYLOPLAST ADS DRAIN BASINS INSTALL 20 LF OF 12"ADS DRAINAGE PIPE FORM&GRADE SWALE TOTAL FOR EXTRA WORK: $11,000.00 CREDIT FOR CATCH BASIN NOT INSTALLED: $ 4,000.00 PROPOSAL AMOUNT: $ 7,000.00 NOTE: Due to increase in the cost of asphalt,there Is no deduction for the reduction in paving. If you have any questions please advise. Sincerely, CHARLEY TOPPINO&SONS, INC. TA ,Q Ronald J.Armstrong Project Manager CHARLEY TOPPINO & SONS, INC. R.0 RnY 787 • KEY WEST FLORInq-3041 •(305) 296-56(16 . F X (305) 296-5189 The Tower Group, Inc. 405 Southwest 148th_St. Davie, Fl. 33325 Att: Tim Clark Re: Proposal for additional work at Freeman Justice-Center. Items: 1. Modified type "D" curb. 350 If $ 6,475.00 2. 4 in. sidewalk 1,345 sf 12,105,00 18,580.00 • This proposal is based on sheet 9 A2.00S as highlighted. DATE 10 / 9 / 06 Edward Toppino, Jr_ An Equal Opportunity Employer " L`''�' Inc. TopPnvo's, INC. pool oox 707•Kgy west. FLORIDA 33041 tsos>�fle-6d00 FAX(�Qa? 9 PROPOSAL FREEMAN JUSUCE BLnLDTNG KEY WEST, FL.. SCOPE OF WORK: 1. Demolition of existing asphalt and retaining wall & sidewalks 2. Grade building site to bottom of floor slab 3. Site drainage a) 2 catch basins Z �- b) Approx, 115 If. of 15" drainage pipe/ c) 1 double chambered ell box d) 1 injection well 4. Approx. 904sy of new base and paving 5. Final dressing of site at completion of project This proposal does not include the following: 1. Permits 2. E m tal protection . Free rem — 2- 1 jxgt �VAny oval caused fling or Found tion work o `i`Ft s street6,�` gs or sl 3, f dlc., DATE 2 / 03 EDWARD TOPPINO, JR. V.P. r=—� 'rho Tower Group, Inc. 405 SW 1481"Avenue,Suite One Davie, Florida 33325 Phone: 954-478-3200 " Fax i Fax:954-474-3111 ,,,., 0 THE TOWER GROUP ! To: Charley Toppino &Sons, Inc. From: John S. Chandler Attn: Ed Tcppino, Jr. Tel/Fax:(305;296-2521 /(305) 296-2587 Fax: 305-296-5189 Pages: 11 Phone: 305-296-5606 Date: May 12, 2006 Re: Freeman Justice Center(FJC) CC: TTG/MO, FF(CT&S, COR-34) 0417-01914 Subiect: REL Public Puking Lot Modifications ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle e Comments: Dear Mr. Toppino: The 'replacement Architect has revised the Public Parking Lot and grading at the front entrance of the Freeman Justice Center as shown on the attached "Site Plan"to resolve grade conflicts from the original Contract Site Plan, Drawing#C-1. With reference to the original scope of work shown on Contract Drawing#A0.02, the changes slightly reduce the size of the paved parking area, delete the asphalt pavement connecting the new parking area to the existing roadway around the Old Courthouse Addition: adding a sidewalk, swale and retaining wall in its place: and add parking lot storm drainage (Re: Section A-A). Please submit a cost proposal for the changes to your scope of the Work: grading, asphalt paving and drainage. We have included data sheets(8 pages)for the Nyoplast Drain products that the Architect recommends. If you intend to use different drainage products, please state so in your proposal. You may fax your proposal to my attention at(305)296-2587. We appreciate your prompt attention to this request for proposal. If you have any questions, please call me at(786)367-0549. Sincerely, John Chandler, Project Manager A C3 .15 w 0 o Z(z La L.:�j GROUND FLOOR PLAN PARKING Vr-l'-w 2 o� CZ 3 U� 3 4.: � J 0 J u t w I Nyloplast-ADS Drain Basins are used as a collection point where two or more drain lines converge,Nyloplast-ADS basins can provide a transition between different sizes and types of pipe,and —� 'also change the elevation or directlon of the pipe. I - d D I B See pages 12& 13 E for available grate options. i A —� INVERTHEIGHTHEIGHT D=VARIABLE OV ERALL L j 8" _ 4"_8" (10'RECOMMENDED MAX.) 1011 4"- 10" E=6"MINIMUM 12" 4"- 12" F°=ADAPTERS CAN BE MOUNTED 15" 4" 15" ON ANY ANGLE 04 TO 359 0. TO DETERMINE MINIMUM ANGLE 1$" 4"- 1T BETWEEN ADAPTERS SEE 24" 4 24" M;MiMUM ANGLE CHARTS 30" 4"- 30" 'NOMINAL S.ZE See CD-Porn for detailed drawings 'r and additionai technical infcrmation. 8 & 101, 18 & 24 A --=T E— a MEOW r Nyloplast-ADS Inline Drains are designed to enter an existing line with a riser and tee,or for use at,the beginning of a'drain Iine and represent the latest in storm wafer plying technology.Their innovative corpb►natlon of performance proven ductile iion grates with a rugged,heavy- duty,PVC stricture makes them unique In the 44faoe drainage field, 121.1 A �-- � I A �I mom See pages 12& 13 for ava/lable grate options. B �— B —� 8" 4"-8" 10" 4"- 10" 12" 4 12" 15" 4'- 15" 18" 4"- 18" 24" 4"- 24" 30" 4"-30" 'NOM'NAL SIZE See CD-Porn for detailed drawings and additional technical information. rt, 5 x *� " FJ r• TS l Dome Light-Duty 0, 10, 12 & 15" a"&10". • Standard Light-Duty (also available in bronze) ar { I all&10" , + Solid • Light-Duty Ductile Iron Grates for Every Traffic Situation, Weight Load and Site Requirement 12"&i5" Standard •H-25 Heavy-duty grates H-25► •Medlum-duty grates Hinged ' +Solid covers H-25 rated Design i •Bronze grates •Domed grates •Drop-in grates Locking option is available for all grates. 12"&15" '• l AI grate options are available for drain Pedestrian I basins and inline drains, H-10 (see pages 10&11) r Hinged � Ductile Iron Grates meet the Design following ASTM standards. ASTM A536 grate 70-50-05 for ductile Iron, ASTM A•48-83 class 30B for 12"&15"cast iron frames. 12"&15" Pedestrian Light-Duty I Bronze 12"&IS" S011d H-25 I Hinged . j See CD-Rom for detai,,ed drawings Design and additional technical information. i _ <1•, y 18° �'�� • .M11 Standard H-25 ', 15, 24 & 30" �. i�•�0 1811 &24" . . •. ,�; Solid far •, ' ••':'�•:+ H-25 •••+ . r Pedestrian H-10 Looking option is available ICI for all grates, ■ All grate options 6 available for drain 24" + basins and inline drains, . Standard (see pages 10&11) H725 Ductile Iron Grates meet the , following ASTM standards. . 14 ASTM A536 grate 70-50'05 for ductile Iron. ASTM A-48-83 class.30B for 12"&15"cast iron frames, 24„ Pedestrian H-10 30" Standard H-25 ,A 30" Solid H-25 r See CD-Rom for detailed drawings and additional technical information. 13 ' I .4 rr MS ,t f i, � 7; j F 1 24" I I I Y I C D - � I B f E Nytoplast-ADS PVC Road&Highway Structures offer all of the Nyloplast ADS product benefits such as heavy-duty " construction,easy,economk;al Installa- 12"** 4"- 12" 24" NA tion and a watertight system.Plus our H-25 rated ductile Iron grates provide 1511 4"- 15" 24" NA maximum surface drainage Inlet capacity. isle 4"- 18" 24" 36" 24" 4"-24" 24" 36" _ ' 30" 4"-30" _ 24" 36" *NOMINAL SZE Available with 2'x 2' and 21x 3' Ductile Iron Grates. C=VARIABLE INVERT HE GHT D=VARIABLE OVERALL HEIGHT(10'RECOMMENDED MAX.) E=6"MINIMUM P=ADAPTERS CAN BE MOUNTED ON ANY ANGLE 00 TO 3590, TO DETERMINE MXMU'M ANGLE BETWEEN ADAPTERS SEE MiMIMUM ANGLE CHARTS See CD-Rom for detailed drawings "only aveable,with 24'wldh grates. and additional technical information, Nyop:ast-ADS Droo•'n Grates provide easy insta"ation by ekninating the need for a frame.This reduces the amount of � Ir abor invo:ved by dropping the grate directy into the pipe opening, Nyoplast- ADS Drop In Grates adapt to a variety * of common'y used pipes including ` $� ADS N-12,Sewer SOR-35 and DWV ` ;t' Schedu'e 40.They are Ideal for light- x, duty app'ications. r r Fits Inside Sewer SDR 35 Pipe and IPS SCH 40 Pipe - I Grate Sizes i IOIII�IIr�ulnr�r �Ili�ll�� wuru■�l�l Iw�uMe�w . p�11�INllll�llllf� '�II� � INIIVII�1111 II�I�IIwll11 1��Iln�l �Iruui I 6" Light-Duty j 8" Light-Duty 10" Light-Duty j Fits Inside 12" Light-Duty ADS N-12 Pipe 15" Light-Duty 18" Light-Duty 24" Light-Duty See CD-Rom for detailed d-awingS and additional technical information, n ig z n m i U N I \�. CN F C I aa ww0 wLL w I • N U N Z w ZUj Zto LL_ 1. vM =C W J t) • � L N Q . ICI � I N 10 N z N 2 � O z=c�W2OLL W W C[�N W ; �22zt�03 uj 514m4 g� V ry�r� -J J W O G (J .Li a O oz �$p Z� �W sow OCwg O Q Nwz- to 2 0 L LL r r N� =m O W �p-, g 50UUUr Q cc e W n. Q z t1 ? CD Qf N'- N N cv �— N r- LU W LiJ C' cD o7 O N ll� a � !a■ - ) )o - \ Ic } ' \ k\§ 2k w � 5 / \` 5 §j33 / u=® o O � ±) U\ = R ) ° � \ \\ /\ \\ 39 - �:�. ƒ & \ .�: \\ B j c $ $ < . . - § . k § k k | k � § ) / � G- - G §$§ ' o Cn — ! s » \ / \t . z � \ d_ k)/ � k� ,Q& � /LU U �k■ %§§Ln .i. . co / k d d d d d k \ \/ m g 3 2 g R R Q ¢ , < d uj � » E 5 R 5 » \ 2 ƒ I z � < � The Tower Group, Inc. CHANGE ORDER REQUEST 405 SW 148 Avenue Suite One Phone: (954)4'6-3200 No. 0OO83 bavie, FL 33325 Fax: (954)4 44-31 1 1 TITLE: Handrail for New Steps @ Stair#3 DATE: l J26/2007 PROJECT:Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT NO: Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-432I RE: EST To: TTG From: ATLMETAL Number: ATLM002 DESCRIPTION OF PROPOSAL Change Order Request(COR)#83 proposes to furnish and install a powder-coated aluminum guardrail and grab-rail,standard color, for the new stair added at the new exit door at Stair 43 as shown on CSA Drawing A3.00N(partial copy attached). The cost for this Extra Work is$1,023,75. '�tt Lump Sum: 3975.00 Lump Tax: $0.00 Lump Total: S975.00 Subtotal: S975.00 Description Markup Percent Markup Amount Profit 5.000% $48.75 Total Cost: $1,023.75 �r Zd L89Z-96Z-90f; dnoaO jemo1 eui Hn7'c ,n ,,.,, ATLANTIC METALS 5642 3rd Ave. Estimate KeY West.FI. 33040 Office(305)293.1865 Number.E270 Sill To: fax (305)293-1862 Date: Novem ben 21,2006 Ship To: [The Tower Group,Inc. � •- - 405 SW 148th Ave. Ste 9 Tim Clark Tin,Cl Cla r Davie, Fl. 33325 2521 Fax 296 2587 r 54 476 3200 ax 954 474 3111 Project ---- - Freeman Justice Ctr y- - --- — -- i :D �rio� 'Custorn fabricate and install ap x 15'of afurnirrum guardrail with by Salty Pat dour -- gmbrail at entrance e MATERIALS: Pickets 314"sq. tube Posts 2"sq.tube 3"Cap rail on top 1'x 2"channel on bottom 1 Ur round tube for grabrall Powder 00et standard Color-specialty color additional charge Customer to su 975.00 PptY permits. I £d Z99Z-96Z-90£ dnojc� jt;mn i Ama ARCHITECTS Architects, Planners &hterior Cesig�ers AA0002271 134 N.0 1wj DWroy e.QA.Florkk 33u4 TEl, 30l z7e-401 FA)L• Sol 243-6184 E- wl; RGCP*CURPoEAAC.com ISELF-C FOR a DS r CO.NSTRU:110N 3-15-06 ------------- SEAL FREEMAN - JUSTICE CENTER -------------- KEYWEST, FL 33040 REM SIous FILE NUMBER A905—3.00.D WG ORAWINC rMS NORTH ELEVATION CATE DRAWN eV 3-15-06 1KWH ice Nue6ER 05C905 '_RAWN,NUMBER A3 . 00N 17 d