1st Change Order 01/28/2020 .�ONROE COS / NGI EKING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: INITIATION DATE: December 13, 2019 Big Pine Key Community Park Lighting Repair CHANGE ORDER NO: 1 TO CONTRACTOR: CONTRACT DATE: July 17,2019 Electrical Contracting Service, Inc. 2375 West 77 Street Hialeah FL, 33016 The Contract is changed as follows: The original(Contract hum) (Guaranteed Maximum Price)............................................$333,770.00 Net change by previously authorized Change Orders....a............. ............................$0.00 The(Contract SuM)(Guaranteed Maximum Price)prior to this Change order was.............$333,770.00 The (Contract Sum)(Guaranteed Maximum Price)will be increased by this Change Order..$48,850.00 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is.......$382,620.00 The Contract Time will be(increased)by.................................................................. 60 Days The date of Substantial Completion as of the date of this Change Order is.....................February 29, 2020 Detailed description of change order and justification: Additional work to complete the,&hting re airs at SI Pine 1{e Ccr r rtrnr't Park. These Il hts were inadvertently left of of the on inal RFP and are included on the Hurricane Irma FEIVIA re art. Darin installation of the bat)rield ll hts it was d efernined there are to areas alon the walkin ath that remain unlit. Seca se Big Pine lie Communi Park Is o erg until 9;00 .m, and holds re ular s ortln events after sunset staff recommends.coon letion of the lj htln re air on the pathway for the safe and wellbeing of the public. Original substantial date December 31 2011-new substantial cam letion dates Februart 29 2020. Change order is 14.6° of on Inal contract price Not valid until signed by Owner Architect if applicable),and Contractor ARCHITECT: N/A Date /v CONTRACTOR: .2 .)0 ate DIRECTOR PROJECT MANAGEMENT � Da e AN 2020 COUNTY/ASSISTANT ADMINISTRATOR: 28_/ T Rovnan Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes® No❑ If Yes, explanation: Inadvertently left off of the original RFP, however required repairs were recognized in damage report dated February 28, 2019 and approved in the FEMA project#68387 • Change Order was included in the original specifications. Yes ❑ No 1U If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes ❑ NoO If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes❑ No� If no, explanation of why: An architect was not utilized in this Project. Required repairs were recognized in damage report dated February 28, 2019 and approved in the FEMA project#68387 • Change Order is correcting an error or omission in design document. Yes ❑No� Should a claim under the applicable professional liability policy be made? Yes❑ No ky Explain: Electrical Contracting Service, Inc. somata 2375 West 77th Street -----Hialeah,FL FL 33016 DATE ESTIMATE NO. Send Payments To: 12/13/2019 2922 12101 Tara Dr, Plantation FL 33325 NAME/ADDRESS Monroe County Attn: Suzi Rubio 102050 Overseas Hwy., Suite 219 Key Largo, FL 33037 PROJECT BigPineKeyPark... DESCRIPTION QTY COST TOTAL Big Pine Key Park Path Ir ighting All necessary labor,material&equipment to complete the following: Provide& install 10- 15'mounting height poles to match existing. Provide& install 12-LSD fixtures to match existing. Provide& install new wire&weatherproof splices to path lights&parking lot lights. Lot Cost ] 48,850.00 48,850.00 EXCLUDES- Permit fee.(if required) Repair of existing fixtures. Repairing existing conduit if needed. QUOTE IS OD FOR 60 DAYS FROM TODAYS DATE TOTAL $48,850.00