Loading...
3rd Change Order 05/27/2020 s BOARD OF COUNTY COMMISSIONERS k1ounty of Monroe �' � ��i�ltz "y Mayor Heather Carruthers,District 3 The Florida Keys Mayor Pro Tem Michelle Coldiron,District 2 Craig Cates,District 1 David Rice,District 4 Sylvia J.Murphy,District 5 Memorandum DATE: 05/27/2020 TO: BOCC Digitally signed by Kevin G.Wilson,P.E. DN:cn=Kevin G.Wilson,P.E.,o=Monroe County,Fl-(the Florida Keys,ou, FROM: Kevin G. Wilson, P.E. " - email=wilson-kevin@monroecounty-fl.gov, c=us Date:2020.05.27 14:56:47-04'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change order 43 for the Big Pine Key Community Park Lighting Repair project. This change order increases/decreases the final contract sum by $7,209.00. The substantial completion date remains unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority. MONROE COUNTYANGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: INITIATION DATE: May 20, 2020 Big Pine Key Community Park Lighting Repair CHANGE ORDER NO: 3 TO CONTRACTOR: CONTRACT DATE: July 17, 2019 Electrical Contracting Service, Inc. 2375 West 77 Street Hialeah, F-L 33016 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)........ .................. ......$333,770.00 Net change by previously authorized Change Orders... ..........—................ .......-....$56,250.00 The (Contract,Sum) (Guaranteed Maximum Price) prior to this Change order was......... $3 90,020,00 The (Contract Sum) (Guaranteed Maximum Price)will be increased by this Change Order...$7,209.00 The new (Contract Sum.)_(Guaranteed Maximum Price) including this Change Order is.......$397,229.00 The Contract Time will be (unchanged) ..........__............................................... ....... 0 Days The date of Substantial Completion as of the date of this Change Order is.....................June 30, 2020 Detailed description of change order and justification: All wiring between the pathway.6ighting poles has been re Laced. Upon energizing and then troubleshootin q the lights, it was determined that several of the existing light fixtures, left over pre-Irma, were not working. This change order is to install new wire from the fixtures to the base of the poles and resplice. New fixtures will be purchased in house. This change order is 0,021% of the original contract price. Not valid until signed by Owner,-Architect(if applicable), and Contractor ARCHITECT: N/A Date CONTRACTOR: L'2�)' b Digitally signed by Cary9neight Cary Knight Date:2020.05.26 16:40:41 DIRECTOR PROJECT MANAGEMENT -04'00' Date COUNTY/ASSISTANT ADMINISTRATOR: Roman Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: It was assumed that the existing, non-visually damaged lights on the pathway were in good working order. Upon energizing, this was determined to not be the case. All lighting between poles has been replaced. This change order replaces the wiring from the fixture to the pole base • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no, explanation of why: Architect was not required for this project. • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Electrical Contracting Service, Inc. Estimate 2375 West 77th Street Hialeah, FL 33016 DATE ESTIMATE NO. Send Payments To: 5/15/2020 2971 12101 Tara Dr, Plantation FL 33325 NAME/ADDRESS Monroe County BOCC 500 Whitehead Street Key Wst, FL 33040 PROJECT BigPine Walkwa... DESCRIPTION QTy COST TOTAL Big Pine Community Park Walkway Fixtures(Change Order) All necessary labor, material &equipment to complete the following- Insiall 19 fixtures on existing poles. Install new wire from fixture to base of pole& re-splice. Lot Cost 1 16,659.00 16,659.00 NOTE: Deduct$9,450.00 if you purchase the fixtures directly. QUOTE 1 GOOD FOR 60 DAYS FROM TODAYS DATE TOTAL