03rd Change Order 06/24/2020 MONROE CouiNny/ENGINEERING/ PROJECT AIAMNAGEIVIENT
CONTRACT CHANGE ORDER
PROJECT TITLE: CHANGE ORDER NO: 903
Monroe County Library and Adult Education INITIATION DATE: 06/17/2020
Center, Marathon Branch CONTRACT DATE; 03/21/2019
TO CONTRACTOR:
Pedro-Falcon Contractors, Inc,
31160 Avenue C
Big Pine Key, FL 33043
The Contract is changed as follows.-
The original (Contract Sum) (Guaranteed Maximum Price) ....... ........... .... 7,016,385.00
Net change by previously authorized Change Orders_ ........ $ 273,955,18
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ....... S 7,290,340.18
The (Contract Sum) (Guaranteed Maximum Price) will be (jncreasedl (decreased) (unchanged) by this
Change Order 13,027.12
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ......3 7,303,367.30
The Contract Time will be (increased) (decreased) (unchanged) by..._...._...... ._.._ 10 Days
The date of Substantial Completion as of the date of this Change Order is.. ...... .....__09/0912020
Detailed description of change order and justification:
Owner-requested Contract Plan Revision 11, Sheet A-804, requires Contractor to flood proof all exterior
perimeter walls up to 42"from elevation 10.04'utilizing DRYLOK Masonry Water Proofer or approved
equal. This additional work results in a contract increase of$13,027.12,
Increase Substantial Completion by 10 calendar days, from August 30, 2020 to September 09, 2020 due to
estimated time required to complete the additional work.
Change order is 0.19% of original contract price.
Not valid until signed by Owner, Architect if applicable), and Co
ARCHITECT:
Synalov i R aye LLCF Date
CONTRACTOR:
Pedro-Falcon Contractors, Inc, DAte
Digitally signed by Cary Knight
Cary Knight Date:2020.06.22 13:29:19
DIRECTOR PROJECT MANAGEMENT -04'00'
Cary Knight, Director Date
Project Management Dig itally s gned by KeemG.Wil—,P.E.
DN'o—Kevin G Wilson,P.E.,o—Mon roe County,FL(the Florida
COUNTY/ASSISTANT ADMINISTRATOR: Key,,no,ellil—wilson-kevin@monropco,nty-fl.gov,-US
Daty;2020.0624104108-0400'
Roman Gastesi Date
Kevin Wilson
Christine Hurley
—-—-------- .......... ................................. --------..........................
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: The additional cost stems from Architect's plan revisions after contract award.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain: N/A
£ to
PEDRO FALCON
"`'
CONTRACTORS, INC.
3
31160 Avenue C, Big Pine Key, FL 33043-4516
(305)872-2200 - Fax (305) 872-2215
r EC 13003416/CGC 1507617
www.pedrofalcon.com
Request for Change Order
r
Project: arathon Library
Number:PCO 005
Description: Waterproof Coating Per Revision 1i Drawing A-804
Pedroco
Flood roofing Materials
12o Gallons DrylocK @ $32.50 P/gal...................................................................$3,90O.00
Misc. Supplies Lump Sum.......................................................................................$400.00
Subtotal
Materials............................................................................
Labor to Install Dryloc
120 MHS @ 41.40............................................................................................... 4,96 .00
Labor to Prep Walls for Drylock
48 MHS @ $41.40..................................................................................................$1,987. 0
Materials Delivery/Pick-up
S@ 41.40....................................................................................................... 165.60
Subtotal Labor
......................................................„...........................$7,120.80
............................................................................................................................
Subtotal Labor
e ' ...........................................................•$11,420.80
Overhead @
%...............................•................................................•$571-04
%....•................................................•.•......•........................ 71.
Industrial-Commercial-Institutional-Residential-Utility
Established 1984
MaterialsSales Tax on
.........................................................................
.1% of Total Cost................................................................$141-74
...........................................................................................................................
Totalsta Order Amount:...................................... , 7.1
Additional Time Requested:....................................................................lo Calendar Days
Shop Drawing Other Than Those Included in This Proposal Are Specifically Excluded.
Flood barriers are Specifically Excluded (pre-pricing Declined by owner)
Respectfully Submitted,
Ken Bygler
Project Manager
PRODUCTSDRYLOK' MASONRY
+E '$`iCi�1`�t�l "lgc ►Stt11 y1k@
MANUFACTURER
UNITED OILS KITE LABORATORIES I °
MAILING:P.O.Box 70,Scranton,Pennsylvania, �85Q1
SHIPPING: I396jefferson Avenue,Dunmore,P nsylvania;18509 '`" 0
TOLL FREE; 1-800-UGL-LABS(845-5227)
PHONE: 1-570-344-1202 = FAX:1-570-969-763 x '
www.UGL.com
110
t ee6r .
PRODUCT DESCRIPTION -qitt "fC I A
<.�asr ,l,i�� ., � t.,�
DRYLOK'is ideal for interior/exterior, CO ., Sf 10 14
10 14
above/below grade masonry including to bctua)coverage will vary w
�.
cinder and concrete block,stucco,brick, SH ntg upon application X 0
and bare concrete swimming pools. N/A method,surface texture,and
Features Flexible Encapsulated Polymers Z
for a beautiful,smooth waterproof finish. %WEIGHT SOLIDS: porosity, 0
62 64% RECOMMENDED FILM THICKNESS/COAT: �
Specifically formulated to resist mildew -0
growth on the dry paint film,with the DENSITY(LBSJUS GAL.): 21 13 wet mils/2 coats
(533-330 microns)
incorporation of a biocide.Tested to 10.13-20.2(1.21 ±0.02 g/L)
ASTM D-7088 Resistance to Hydrostatic VISCOSITY: SHELF LIFE: e'
—
Pressure and ASTM D-6904 Resistance to 5 Years unopened container
Wind-Driven Rain.Stops 15 psi,greater 110 120 Ku @ 77°F(25°C)
FREEZE/THAW:
than a wall of water 33 feet(10 meters) PH:
high!Fully transferable 15 year warranty. 9.0-10 Three cycles
Bright white,smooth finish COLOR: CONTAINER SIZES:
Resists mildew growth on the dry paint White—ready mixed formula One quart(946 mQ,One gallon 0 C)
film 1 ready mixed color (3.785), and five gallon(18.9 L)
11 Resists 15 PSI,equivalent to a wall of water DRYTIME: containers Z
33 ft.high 2 3 hours VOC
12 'Category 4-11 Does not exceed 100 /L 140 MPH wind-driven .To recant:2 hours g
rain Note:Maximum cure and dry time TINTING
Fully transferable 15 year warranty will be prolonged when slightly Use alkali-proof universal tinting colorants.
Guaranteed to stop water,even under humid and damp,cool conditions Use only 50%of color normally
pressure prevail. recommended.Do not use more than 2 fl.
Features flexible encapsulated polymers Note:When painting the inside of oz.of colorant per gallon.(15 g/L).
Tintable concrete non-potable watertanks, SURFACE PREPARATION
BASIC USES allow to dry at least 1 week before Masonry surfaces must be clean and free
Ideal for interior,exterior,above or below putting into service. from dirt,dust,grease,oil,form release
grade masonry walls,basement walls, CLEAN UP: compound,frost,or paint.Patch all hales or
retaining walls,foundations,landscape Warm soapy water cricks with DRYLOK'Fast Plug",a fast
walls,cinder blocks,concrete blocks,bare Dispose of contaminated absorbent, setting hydraulic cement,and smooth the
concrete swimming pools,stucco,and container,and unused contents in patch evenly with the surface around it,
brick• accordance with local,state,and Check the joint where the floor and wall
LIMITATIONS federal regulations. meet and fill any breaks with DRYLOK'Fast
DRYLOK'Extreme Basement&Masonry COVERAGE(SQ.FT./GAL.): Plug'
Waterproofer may be applied over First coat:Wet:21 Dry: 10 mils @ 76 EFFLORESCENCE,a white,powdery,
previous coatings in sound condition,but sq.ft.lgal. crystal-like deposit visible on the masonry
the warranty is void.Not formulated for surface must be removed.
horizontal surfaces subject to foot traffic. Second soot:Wet: 13 Dry:7 mils @ DRYLOK'Etch(liquid or powder)or
125 sq.ft./gal, muriatic acid,used according to
DRYTIME: CLEAN-UP: COVERAGE: •— SPREADRATE:
2-3 Flours X.C. Soap and Water 2 Coats Minimum 100 Sq.FtJGallon
Recoat 2 Hours
• -
0 o w m O
H LL
Q V m L LI
Z) CO
U 00
Z
6 OU 0
LL
Y N
CO