Loading...
06th Change Order 07/23/2020 MONROE COUNTYANGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: #06 Monroeu Library l Education INITIATION DATE: 07/ / Center, Marathon Branch CONTRACTT03/2112019 TO CONTRACTOR: Pedro-Falcon Contractors, Inc. 110 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original(Contract Sum) (Guaranteed Maximum Price) ........................................... 7,016,385.0 t change by previously authorized Change Orders.................................................. 27, 0 .2 The(Contract Sum)(Guaranteed Maximum Price) prior to this Change order was .............$7, 1 ,19.29 The(Contract Sum) (Guaranteed Maximum Price)will be(increased (decreased) (unchanged)by this Change Order............. 3,020. 6 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is ...... 7, 17,209.5 The Contract Time will be(increased) (decreased) (u ) y................................. 0Days The date of Substantial Completion as of the date of this Change Order is........................ 0 /1 /2020 Detailed description of change order and justification: During field investigation it was detennined that underground utilities were in conflict with the proposed Fire Department Connection. Subsequently, this connection was relocated to a landscaped peninsula within the parking lot During coordination of this relocation, the Fire Marshal determined that bollards would be required to protect the Fire Department Connection. The addition of 4 concrete-Filled steel bollards presents a contract increase of$3,02 . 6. Chance order is 0 04 of original contract price Not valid until signed by Owner Architect if a licable and Contractor ARCHITECT: fir_ Synalovskl'R" *a. ik-SaYe LLC Date CONTRACTOR: P rv-Falcon Contractors, Inc. Date Digitally signed by Cary Knight Cary Knight Date:2020.07.22 07:32:54 DIRECTOR PROJECT MANAGEMENT -04'00' Cary Knight,-Director Date Project Manaaement D'gi fly'g d by K G W'I P.E. DN cn-Kmn G.W'I PE M roe County,FL(the Florida (: [: - `-- Keys,o —1=wilson-ke n@monro nty-fl.g.,,c US O /ASSISTA T A I IST TOR: Date:2020.0].2316:13:42-04'00' Oman Gastesl Date Kevin Wilson Christine Hurley loft Change Order Aftachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes (Z No 0 If Yes, explanation: The additional cost stems from the relocation of the planned Fire Department Connection as a result of underground utility conflicts found during field investigation, after the contract had been awarded. • Change Order was included in the original specifications. Yes El No Z If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes 0 No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes Z No E] If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ONo Z Should a claim under the applicable professional liability policy be made? Yes [I No Z Explain: NIA 2of2 PEDRO FALCON CONTRACTORS, INC. 31160 Avenue C, Bigi , FL 33 1 (3 5) 72-22 -Fax(3 ) 72-221 6C 13003416/CGC 1507617 vwuw.pedrofaicon.com MarathonRequest for Change Order PCO Number.- 01 Bollards at Fire Department Connection Revision 1 ...................:..........._...........<.....,...._.........................................4,..................................;...,........ Pedro Falcon-Materials Four( ) Steel Bollards............................................................................................ . 00 Con Crete 1 . ...................................................................................$420.00 Subtotal MaterW Revisions ................................................................. . Bollards/Pour00 Pedro Falcon-Labor Install Concrete 1 1. ................................................. 1 .0 Subtotal Labor ......................................................................................$4114-00 .........................................................................................................................0.• Subtotal Labor&Materials ..............................................................$1,284.00 Overhead at 5% ................................................................................... ......................................................................4..................$64.20 subtotal.............................................................................................. DrillDiggin the Keys Holes........................................................................................................ ... 1, .00 Subtotal Drill' $1 ............................................................................. 500-00 Management @5% ............................................................................. industrial- rcl 1.Institutional-Residential-Utility Established 1984 Subtotal Subcontractor ...........................................................$1,575-00 DirectTotal Subcontract& ......................................................$2,987-40 .2 ............................................................... Total Requestfor Change *,6$3,020.26 y Respectftffiy Submitted, Ken Bygler Projectn DIGGING THE KEYS Proposal JOHN DAVEY PROPOSAL # Marathon Library 30809 ITTS LN. DATE 7/ / 020 BIG PINE KEY, FL 33043 305-731-0954 @L. Pedro Falcon Marathon Library Description - Amount 4-Auger Holes ' ' ...... _ .... Total $1,500.00 Make all checks payable to JOHN DAVEY Payment due upon receipt. Thank you for your business! r s � ae'1�w.;�'�u g N. „ �m fie w� rx s �a w w I K N a Sa t yy��r fix;,a'X�'Ada t f ;_ N' s„ 3. ,� � ^._ _ � rrs ..: � pax � - f .r;,�. „•.n. vs��r�rxwue Z r, e u � I( N r 14...4�.&1.�4..1.4w ,,.,+7ilm....... "Q u WiresI VA, a pia n o i rr rm»r + ,� bxr ..n C a A`'W+3n.F}'4}'—� w w'sw IU3 714 AVAYN k t 3?A ROAD No 5) _. a ( �,w e v w ,,�zk sf7E WArEft AND SEWER PLAN