06th Change Order 07/23/2020 MONROE COUNTYANGINEERING/ PROJECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE: CHANGE ORDER NO: #06
Monroeu Library l Education INITIATION DATE: 07/ /
Center, Marathon Branch CONTRACTT03/2112019
TO CONTRACTOR:
Pedro-Falcon Contractors, Inc.
110 Avenue C
Big Pine Key, FL 33043
The Contract is changed as follows:
The original(Contract Sum) (Guaranteed Maximum Price) ........................................... 7,016,385.0
t change by previously authorized Change Orders.................................................. 27, 0 .2
The(Contract Sum)(Guaranteed Maximum Price) prior to this Change order was .............$7, 1 ,19.29
The(Contract Sum) (Guaranteed Maximum Price)will be(increased (decreased) (unchanged)by this
Change Order............. 3,020. 6
The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is ...... 7, 17,209.5
The Contract Time will be(increased) (decreased) (u ) y................................. 0Days
The date of Substantial Completion as of the date of this Change Order is........................ 0 /1 /2020
Detailed description of change order and justification:
During field investigation it was detennined that underground utilities were in conflict with the proposed Fire
Department Connection. Subsequently, this connection was relocated to a landscaped peninsula within the
parking lot During coordination of this relocation, the Fire Marshal determined that bollards would be
required to protect the Fire Department Connection. The addition of 4 concrete-Filled steel bollards presents
a contract increase of$3,02 . 6.
Chance order is 0 04 of original contract price
Not valid until signed by Owner Architect if a licable and Contractor
ARCHITECT: fir_
Synalovskl'R" *a. ik-SaYe LLC Date
CONTRACTOR:
P rv-Falcon Contractors, Inc. Date
Digitally signed by Cary Knight
Cary Knight Date:2020.07.22 07:32:54
DIRECTOR PROJECT MANAGEMENT -04'00'
Cary Knight,-Director Date
Project Manaaement
D'gi fly'g d by K G W'I P.E.
DN cn-Kmn G.W'I PE M roe County,FL(the Florida
(: [: - `-- Keys,o —1=wilson-ke n@monro nty-fl.g.,,c US
O /ASSISTA T A I IST TOR: Date:2020.0].2316:13:42-04'00'
Oman Gastesl Date
Kevin Wilson
Christine Hurley
loft
Change Order Aftachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes (Z No 0
If Yes, explanation: The additional cost stems from the relocation of the planned Fire Department
Connection as a result of underground utility conflicts found during field investigation, after the
contract had been awarded.
• Change Order was included in the original specifications. Yes El No Z
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes 0 No Z
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes Z No E]
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ONo Z
Should a claim under the applicable professional liability policy be made? Yes [I No Z
Explain: NIA
2of2
PEDRO FALCON
CONTRACTORS, INC.
31160 Avenue C, Bigi , FL 33 1
(3 5) 72-22 -Fax(3 ) 72-221
6C 13003416/CGC 1507617
vwuw.pedrofaicon.com
MarathonRequest for Change Order
PCO Number.- 01
Bollards at Fire Department Connection
Revision 1
...................:..........._...........<.....,...._.........................................4,..................................;...,........
Pedro Falcon-Materials
Four( ) Steel Bollards............................................................................................ .
00
Con
Crete 1 . ...................................................................................$420.00
Subtotal MaterW Revisions
................................................................. .
Bollards/Pour00
Pedro Falcon-Labor
Install
Concrete 1 1. ................................................. 1 .0
Subtotal Labor
......................................................................................$4114-00
.........................................................................................................................0.•
Subtotal Labor&Materials
..............................................................$1,284.00
Overhead at 5%
...................................................................................
......................................................................4..................$64.20
subtotal..............................................................................................
DrillDiggin the Keys
Holes........................................................................................................ ... 1, .00
Subtotal Drill' $1
............................................................................. 500-00
Management @5%
.............................................................................
industrial- rcl 1.Institutional-Residential-Utility
Established 1984
Subtotal Subcontractor
...........................................................$1,575-00
DirectTotal Subcontract& ......................................................$2,987-40
.2 ...............................................................
Total Requestfor Change *,6$3,020.26
y
Respectftffiy Submitted,
Ken Bygler
Projectn
DIGGING THE KEYS Proposal
JOHN DAVEY PROPOSAL # Marathon Library
30809 ITTS LN. DATE 7/ / 020
BIG PINE KEY, FL 33043
305-731-0954 @L.
Pedro Falcon
Marathon Library
Description - Amount
4-Auger Holes ' '
...... _ ....
Total $1,500.00
Make all checks payable to JOHN DAVEY
Payment due upon receipt.
Thank you for your business!
r s
�
ae'1�w.;�'�u g
N.
„
�m fie
w� rx s �a w
w
I K N a Sa
t
yy��r
fix;,a'X�'Ada
t f
;_
N' s„
3.
,� � ^._ _ � rrs ..: � pax � - f .r;,�. „•.n. vs��r�rxwue Z
r, e u
�
I( N r
14...4�.&1.�4..1.4w ,,.,+7ilm....... "Q u
WiresI VA,
a pia n o i rr rm»r + ,� bxr ..n C a
A`'W+3n.F}'4}'—�
w w'sw IU3 714 AVAYN k t 3?A ROAD No 5) _. a
( �,w e v w
,,�zk
sf7E WArEft AND
SEWER PLAN