08th Change Order 07/30/2020 CONTRACT CHANGE ORDER
PROJECT MONROE CouNTY/ENGINEERING/ PROJECT MANAGEMENT
Monroei tary and Adult Education INITIATION DATE:07/ /
Center, Marathon Branch ! 1/ 1
T :
Pedro-Falcon Contractors, Inc.
31160 Avenue
Big Pine Key, FL 33043
The Contract is changed as follows:
The original(Contrac Su ) (Guaranteed Maximum Price) ........................................... 7,016,385.00
t change by previously authorized Change Orders.................................................. 2 , 1. 3
The(Contra Sum)(Guaranteed axi u Price)prior to this Change order was ............. 7,315,846.83
The(Contract Sum)(Guaranteed Maximum Price)will be(increased (decreased) (unchanged) by this
Change Order............. 9,966.24
The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is...... 7, , 1 .07
The Contract Time will be(increased)(decreased)(un nod) by................................. 0 Days
The date of Substantial Completion as of the date of this Change Order i ........................ 0 /1 12 2
Detailed description of change order and justification:
During construction observation by County staff, it was determined that the planned layout of the building's
north ramp presented an undesirable condition that presented functionality, maintenance, and aesthetic
concerns. To serve the library patrons and staff more appropriately, the inside ramp wall will be removed
thus widening the ramp to eliminate the undesirable condition. This modification will improve ADA access at
the rear of the library for special events.As such, this modification of the rear library ramp will result in
contract increase of$9,966.24.
C bane order is 0 14% of original cqn/r�e
Not valid until signed by-Owner, Architect if applicable), and Contractor
CHIT T:
Synalc 'Ro-manik�pye LLC ate
edro-Falcon contractors, Inc. Date
Digitally signed by Cary Knight
Cary Knight Date:2020.07.28 08:56:07
DIRECTOR J T MANAGEMENT -04'00,
Cary ni t, Director Date
Project Management
Digitally signed by Kevin G.Wilson,P.E.
DN rn Kev n G. son Wil P E onroe o M County,EL(the Florida Keys,
C U /A ISTA TADMINISTRATOR: VS yi {= y ou email M—kev'n@monr—...ty fl.q -US
Date:2020.07.30 10:37:57 14'00'
Roman Gastesi Date
Kevin Wilson
Christine Hurley
1o2
Change Order Affachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes Z No El
If Yes, explanation: This change is a result of the undesirable condition realized after contract
execution and during construction of the planned ramp.
• Change Order was included in the original specifications. Yes El No Z
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes 0 No Z
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes Z No E]
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes E]No Z
Should a claim under the applicable professional liability policy be made? Yes 0 No Z
Explain: NIA
2 of 2
PEDRO FALCON
CONTRACTORS, 1NC.
31160 Avenue C, Big Pine Key, FL 1
( 0 ) 7 -2200-Fax O - 1
EC 13003416/CGC 1507617
www.pedrofalcon.com
Request for Change Order
Project: Marathon Library
PCO Number: 17
RevisionDescription: North Ramp
.®..a........—..............................-......--..................y ..............®.,.........................,..,.............
Bella Construction
Remove Fidsting WaU Ramp to 6"Below Ramp Elevation, BackfiR Void to
Building Wall, Dowel Rebar and Pour Ramp from Building to Outside Wall
DemoDemo/Install ... .................. ......... ........, ............ ........ ....... ..,.....,. ........ ................ ,1
PFC Management ..................................................................................................... 5 .
32
SubtotalSubcontractors&Fee.........................................................
Pedro Falcon
PFCDebris Hauling................................................................................................. 50.00
PFC
Profit @ 5%..........................................................................................................$12.50
PFC
Profit 5 ........................................................................................................... 1 .50
SubtotalPFC Direct..............................................................................
i.i .............................................................. Y
Amount: 08-44
Total Requestfor Change Order .......................................$99966.24
Respectfully Submitted,
Ken er
Project
Industrial-Commercial-Institutional-Residential-Utility
Established 14
MARATHON LIBRARY
CHANGE PROPOSAL
C ca N�"T F�LJ C"1"9 tarot
o " m�a'iaes Description: Rremove existing ramp wall at 6"below ramp elevation,backfill void to
building wall,dowel rebar and pour ramp from building to outside wall.
LABORDESIGNATION Rate OT Rate Reg.Hrs. OT Hrs. Rea.Cost OT Cost Total Cost
Foreman $35 00 $52.50 16 $560,00 $0.00 $560.00
Carpenter $25.00 $37.50 40 $1,000.00 $0.00 $1,000.00
laborer $18.00 $27.00 64 $1,152.00 $0.00 $1,152.00
-$0.00 $0.00 $0.00 $0.00
RAW SUBTOTAL $2,712.00
BURDEN 40% $1,084.80
LABORSUBTOTAL $3,796.80
MATERIALS_ Quantity Unit Unit Price
CONCRETE 4 CY $250.00 $1,000.00
REBAR 200# $1.00 $200.00
$0.00
MISC FORM, POLY ETC, 1 LS $100.00 _ $100.00
$0.00
MATERIAL SUBTOTAL $1,300,00
50%
EQUIPMENT Oper.Rate Idle Rate Oper.Hrs. Idle Hrs Oper.Cost Idle Cost Total
BACK HOE W OPERATOR $100.00 24 $2,400,00 $0.00 $2,400.00
PUMP $125.00 6 $750.00 $0.00 $750.00
$0.00 $0.00 $0.00
EQPT.SUBTOTAL $3,150.00
SUCOT CTOR Quantity I jUnItPrIce _
$0.00
SUBCONTRACTOR SUBTOTAL $0.00
MISCELLANEOUS ITEM Quanta Unit Price
$0.00
SMALL TOOLS 1 LS $50.001 $50.00
$0.00
$0.00
MISC.ITEM SUBTOTAL $50.00
NOTES:
SUBCONTRACTOR $0.00
LABOR $3,796.80'
EQUIPMENT $3,150.00
MATERIAL $1,300.00'
MISC $50.00
SUBTOTAL $8,296.80'
OH&P Markup,5%&5% $6 $829.68
SUBTOTAL / arkup $84 ,$9,126A8
LIABILITY&BOND
[GIRANIA TOTAsL,DOLLARS; $;