08th Change Order 07/30/2020 CONTRACT CHANGE ORDER PROJECT MONROE CouNTY/ENGINEERING/ PROJECT MANAGEMENT Monroei tary and Adult Education INITIATION DATE:07/ / Center, Marathon Branch ! 1/ 1 T : Pedro-Falcon Contractors, Inc. 31160 Avenue Big Pine Key, FL 33043 The Contract is changed as follows: The original(Contrac Su ) (Guaranteed Maximum Price) ........................................... 7,016,385.00 t change by previously authorized Change Orders.................................................. 2 , 1. 3 The(Contra Sum)(Guaranteed axi u Price)prior to this Change order was ............. 7,315,846.83 The(Contract Sum)(Guaranteed Maximum Price)will be(increased (decreased) (unchanged) by this Change Order............. 9,966.24 The new(Contract Sum) (Guaranteed Maximum Price) including this Change Order is...... 7, , 1 .07 The Contract Time will be(increased)(decreased)(un nod) by................................. 0 Days The date of Substantial Completion as of the date of this Change Order i ........................ 0 /1 12 2 Detailed description of change order and justification: During construction observation by County staff, it was determined that the planned layout of the building's north ramp presented an undesirable condition that presented functionality, maintenance, and aesthetic concerns. To serve the library patrons and staff more appropriately, the inside ramp wall will be removed thus widening the ramp to eliminate the undesirable condition. This modification will improve ADA access at the rear of the library for special events.As such, this modification of the rear library ramp will result in contract increase of$9,966.24. C bane order is 0 14% of original cqn/r�e Not valid until signed by-Owner, Architect if applicable), and Contractor CHIT T: Synalc 'Ro-manik�pye LLC ate edro-Falcon contractors, Inc. Date Digitally signed by Cary Knight Cary Knight Date:2020.07.28 08:56:07 DIRECTOR J T MANAGEMENT -04'00, Cary ni t, Director Date Project Management Digitally signed by Kevin G.Wilson,P.E. DN rn Kev n G. son Wil P E onroe o M County,EL(the Florida Keys, C U /A ISTA TADMINISTRATOR: VS yi {= y ou email M—kev'n@monr—...ty fl.q -US Date:2020.07.30 10:37:57 14'00' Roman Gastesi Date Kevin Wilson Christine Hurley 1o2 Change Order Affachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes Z No El If Yes, explanation: This change is a result of the undesirable condition realized after contract execution and during construction of the planned ramp. • Change Order was included in the original specifications. Yes El No Z If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes 0 No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes Z No E] If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes E]No Z Should a claim under the applicable professional liability policy be made? Yes 0 No Z Explain: NIA 2 of 2 PEDRO FALCON CONTRACTORS, 1NC. 31160 Avenue C, Big Pine Key, FL 1 ( 0 ) 7 -2200-Fax O - 1 EC 13003416/CGC 1507617 www.pedrofalcon.com Request for Change Order Project: Marathon Library PCO Number: 17 RevisionDescription: North Ramp .®..a........—..............................-......--...............­...y ..............®.,.........................,..,............. Bella Construction Remove Fidsting WaU Ramp to 6"Below Ramp Elevation, BackfiR Void to Building Wall, Dowel Rebar and Pour Ramp from Building to Outside Wall DemoDemo/Install ... .................. ......... ........, ............ ........ ....... ..,.....,. ........ ................ ,1 PFC Management ..................................................................................................... 5 . 32 SubtotalSubcontractors&Fee......................................................... Pedro Falcon PFCDebris Hauling................................................................................................. 50.00 PFC Profit @ 5%..........................................................................................................$12.50 PFC Profit 5 ........................................................................................................... 1 .50 SubtotalPFC Direct.............................................................................. i.i .............................................................. Y Amount: 08-44 Total Requestfor Change Order .......................................$99966.24 Respectfully Submitted, Ken er Project Industrial-Commercial-Institutional-Residential-Utility Established 14 MARATHON LIBRARY CHANGE PROPOSAL C ca N�"T F�LJ C"1"9 tarot o " m�a'iaes Description: Rremove existing ramp wall at 6"below ramp elevation,backfill void to building wall,dowel rebar and pour ramp from building to outside wall. LABORDESIGNATION Rate OT Rate Reg.Hrs. OT Hrs. Rea.Cost OT Cost Total Cost Foreman $35 00 $52.50 16 $560,00 $0.00 $560.00 Carpenter $25.00 $37.50 40 $1,000.00 $0.00 $1,000.00 laborer $18.00 $27.00 64 $1,152.00 $0.00 $1,152.00 -$0.00 $0.00 $0.00 $0.00 RAW SUBTOTAL $2,712.00 BURDEN 40% $1,084.80 LABORSUBTOTAL $3,796.80 MATERIALS_ Quantity Unit Unit Price CONCRETE 4 CY $250.00 $1,000.00 REBAR 200# $1.00 $200.00 $0.00 MISC FORM, POLY ETC, 1 LS $100.00 _ $100.00 $0.00 MATERIAL SUBTOTAL $1,300,00 50% EQUIPMENT Oper.Rate Idle Rate Oper.Hrs. Idle Hrs Oper.Cost Idle Cost Total BACK HOE W OPERATOR $100.00 24 $2,400,00 $0.00 $2,400.00 PUMP $125.00 6 $750.00 $0.00 $750.00 $0.00 $0.00 $0.00 EQPT.SUBTOTAL $3,150.00 SUCOT CTOR Quantity I jUnItPrIce _ $0.00 SUBCONTRACTOR SUBTOTAL $0.00 MISCELLANEOUS ITEM Quanta Unit Price $0.00 SMALL TOOLS 1 LS $50.001 $50.00 $0.00 $0.00 MISC.ITEM SUBTOTAL $50.00 NOTES: SUBCONTRACTOR $0.00 LABOR $3,796.80' EQUIPMENT $3,150.00 MATERIAL $1,300.00' MISC $50.00 SUBTOTAL $8,296.80' OH&P Markup,5%&5% $6 $829.68 SUBTOTAL / arkup $84 ,$9,126A8 LIABILITY&BOND [GIRANIA TOTAsL,DOLLARS; $;